- Enforced by
- OPSS
- Status
- Amended (in force with amendments)
- Penalty ceiling
- Imprisonment 3 of 73 obligations carry a criminal penalty. 4 carry different penalties and 66 have no criminal penalty — flagged in the list below.
Does it bind you?
Business-side roles with duties under this instrument.
Manufacturer43
Any Person14
Responsible Person2
Director or Officer2
Conformity Assessment Body1
Operator1
Plus 10 duties on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Manufacturer — also bound by 502 other Acts
Measuring Instruments Regulations 2016
85 duties
Human Medicines Regulations 2012
75 duties
Any Person — also bound by 2340 other Acts
Human Medicines Regulations 2012
184 duties
Merchant Shipping Act 1995
144 duties
Insolvency (England and Wales) Rules 2016
104 duties
Communications Act 2003
92 duties
Road Traffic Act 1988
92 duties
Responsible Person — also bound by 108 other Acts
MH(CT)(S)A 2003
30 duties
Director or Officer — also bound by 429 other Acts
Insolvency (England and Wales) Rules 2016
162 duties
Companies Act 2006
126 duties
Insolvency Act 1986
77 duties
Building Societies Act 1986
32 duties
Conformity Assessment Body — also bound by 47 other Acts
Lifts Regulations 2016
28 duties
Radio Equipment Regulations 2017
27 duties
Explosives Regulations 2014
22 duties
Operator — also bound by 746 other Acts
Regulation (EU) No 965/2012 (Air Operations)
203 duties
Space Industry Regulations 2021
76 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
s.003
The manufacturer must lodge an application for assessment of his...
Regulated
- Apply for assessment of your quality assurance system for outdoor equipment noise emissionsManufacturer
s.003
The quality assurance system must ensure compliance of the product...
Regulated
- Manufacturers must implement a documented quality assurance system for product complianceManufacturer
s.003
It must contain in particular an adequate description of: —...
Regulated
- Set up a quality assurance system covering design and manufacturing qualityManufacturer
s.003
The manufacturer must undertake to fulfil the obligations arising out...
Regulated
- Maintain your quality assurance system and notify the approved body of any updatesManufacturer
s.004
The manufacturer must allow the approved body entrance for inspection...
Regulated
- Allow approved bodies to inspect your manufacturing and testing sitesManufacturer
s.004
The approved body shall periodically carry out audits to make...
Regulated
Other duties (1) — Crown / regulator
- Approved bodies must periodically audit manufacturers' quality systemsStatutory regulator
s.004
Additionally the approved body may pay unexpected visits to the...
Regulated
Other duties (1) — Crown / regulator
- Approved body may carry out unannounced visits and testsStatutory regulator
s.007
General duty relating to placing on the market or putting into service
Imprisonment
- Ensure equipment meets noise emission and marking standardsResponsible Person
- Ensure your equipment complies with noise regulations before marketManufacturer
s.008
Permissible sound power level of equipment
Regulated
- Ensure equipment meets noise emission limits and is correctly markedManufacturer
- Ensure outdoor equipment meets noise limits and is properly markedManufacturer
s.011
CE marking and indication of the guaranteed sound power level
Regulated
- Affix UK marking and noise level indication to equipmentManufacturer
- Attach UK marking and guaranteed sound power level to each outdoor equipment unitManufacturer
s.012
Provision of data
Regulated
- Send declaration of conformity to Secretary of State within 28 daysManufacturer
- Send declaration of conformity to the Secretary of State and EU CommissionResponsible Person
s.014
(1) The Secretary of State may from time to time...
Regulated
- Approved bodies must carry out conformity assessment and surveillance dutiesConformity Assessment Body
s.017
Enforcement
Regulated
Other duties (1) — Crown / regulator
- OPSS must issue a compliance notice before taking further enforcement actionStatutory regulator
s.019
Penalties
Imprisonment
- Breach of noise emission or marking requirements for outdoor equipmentAny Person
- Breach of Noise Emission Regulations (regulation 18)Any Person
s.021
Liability of persons other than the principal offender
Imprisonment
- Be liable for another's noise offenceAny Person
- Secondary liability for business owners and company officersDirector or Officer
s.register of approved bodies
Register of approved bodies
Regulated
Other duties (1) — Crown / regulator
- Secretary of State must maintain a public register of approved bodiesCrown / Minister / Government department
36 other provisions — procedural and definitional
s.001
Citation, commencement and revocation
s.002
Interpretation
s.002
Fan speed
s.002
Test of powered equipment free of load
s.002
Test of powered equipment under load
s.002
Test of hand-operated equipment
s.003
Application
s.004
Excluded equipment
s.004
The purpose of surveillance is to make sure that the...
s.005
These Regulations shall not apply to equipment placed on the...
s.006
(1) Subject to paragraph (2), these Regulations shall not apply...
s.009
Exceptions to placing on the market and putting into service of certain equipment
s.010
Conformity assessment procedures
s.013
Approved Bodies
s.015
Fees
s.016
Conditions for equipment being taken to conform
s.018
Offences
s.020
Defence of due diligence
s.022
Consequential amendments
s.023
Transitional provision in relation to EU Exit
s.024
Review
s.further use of uk marking
Further use of UK marking
s.obligations which are met by complying with obliga
Obligations which are met by complying with obligations in the Directive
s.para.879
Introduction
s.para.880
Part A of this Annex lays down the basic noise...
s.para.881
Part B of this Annex lays down the equipment specific...
s.para.882
When testing specific types of equipment, manufacturers or their authorised...
s.para.883
Where the noise test codes laid down in Part B,...
s.para.884
For equipment listed in Article 12, where the use of...
s.qualifying northern ireland goods
Qualifying Northern Ireland Goods
Schedules
Schedules
46 of 901 shown
s.sch005
(ANNEX II to the Directive) (opens in a new tab)
Regulated
- Create and maintain an EC declaration of conformity for noisy equipmentManufacturer
s.sch006
Fan speed
Regulated
- Set fan speed correctly during noise emission testsManufacturer
s.sch006
Test of powered equipment free of load
Regulated
- Manufacturers must follow prescribed noise test procedures for powered equipmentManufacturer
s.sch006
Test of powered equipment under load
Regulated
- Follow specified procedures when testing equipment under load for noiseManufacturer
s.sch006
Test of hand-operated equipment
Regulated
- Define conventional operating conditions for hand-operated equipmentManufacturer
s.sch007
(ANNEX IV to the Directive) (opens in a new tab)
Regulated
- Use correct format and size for CE/UK markings and noise level labelsManufacturer
s.sch008
(ANNEX V to the Directive) (opens in a new tab)
Regulated
- Maintain technical documentation and ensure noise compliance for equipmentManufacturer
- Maintain technical records and affix conformity marking on all outdoor equipmentManufacturer
s.sch008
This Schedule describes the procedure whereby the manufacturer, or his...
Regulated
- Affix UK marking and sound power label and draw up declaration of conformityManufacturer
s.sch008
The manufacturer, or his authorised representative established in the European...
Regulated
- Keep technical documentation for 10 years after last product madeManufacturer
s.sch008
The technical documentation must enable the conformity of the equipment...
Regulated
- Prepare technical documentation proving your equipment meets noise regulationsManufacturer
s.sch008
The manufacturer must take all measures necessary in order that...
Regulated
- Set up your manufacturing process to keep equipment consistently compliantManufacturer
s.sch009
(ANNEX VI to the Directive) (opens in a new tab)
Regulated
- Maintain technical files and undergo noise assessment for equipmentManufacturer
- Prepare technical documents and get approved body checks for noise complianceManufacturer
s.sch009
This Schedule describes the procedure whereby the manufacturer, or his...
Regulated
- Affix UKCA mark and sound power label, and draw up declaration of conformityManufacturer
s.sch009
The manufacturer, or his authorised representative established in the European...
Regulated
- Keep technical documentation for 10 years after last product madeManufacturer
s.sch009
The technical documentation must enable the conformity of the equipment...
Regulated
- Prepare technical documentation to prove noise emission complianceManufacturer
s.sch009
The manufacturer must take all measures necessary in order that...
Regulated
- Ensure manufacturing process produces compliant equipmentManufacturer
s.sch009
Evaluation by the approved body prior to placing on the...
Regulated
- Submit technical documentation to an approved body before marketing outdoor equipmentManufacturer
s.sch009
Evaluation by the approved body during production The manufacturer, or...
Regulated
- Involve an approved body to verify production compliance with noise regulationsManufacturer
s.sch010
(ANNEX VII to the Directive) (opens in a new tab)
Regulated
- Apply for unit verification for noise emission complianceManufacturer
- Declare and certify noise‑emission compliance for outdoor equipmentManufacturer
s.sch010
This Schedule describes the procedure whereby the manufacturer, or his...
Regulated
- Affix UK marking and draw up declaration of conformity for outdoor equipmentManufacturer
s.sch010
The application for a unit verification must be lodged by...
Regulated
- Submit unit verification application for outdoor equipment noise complianceManufacturer
s.sch010
The approved body must: — examine whether the equipment has...
Regulated
Other duties (1) — Crown / regulator
- Approved body must verify your outdoor equipment meets noise standardsStatutory regulator
s.sch010
Where the equipment meets the provisions of these Regulations, the...
Regulated
Other duties (1) — Crown / regulator
- Approved body must issue or refuse a certificate of conformityStatutory regulator
s.sch010
The manufacturer, or his authorised representative established in the European...
Regulated
- Keep certificate of conformity for 10 years from market placementManufacturer
s.sch011
(ANNEX VIII to the Directive) (opens in a new tab)
Regulated
- Implement a Full Quality Assurance system for equipment noise emissionsManufacturer
- Set up and maintain a quality assurance system for noise complianceManufacturer
s.sch011
This Schedule describes the procedure whereby the manufacturer who satisfies...
Regulated
- Affix UK marking and draw up declaration of conformity for outdoor equipmentManufacturer
s.sch011
The manufacturer must operate an approved quality assurance system for...
Regulated
- Operate an approved quality assurance system for outdoor equipmentManufacturer
s.sch011
The manufacturer must, for a period ending at least 10...
Regulated
- Retain noise emission documentation for 10 years after last equipment producedManufacturer
s.sch011
Each approved body must give the other approved bodies the...
Regulated
Other duties (1) — Crown / regulator
- Approved bodies must share quality assurance system approval informationStatutory regulator
s.sch012a
Approved body requirements
Regulated
- Ensure impartial inspections and hold liability insuranceAny Person
- Ensure independence and competence of equipment verification bodiesDirector or Officer
s.sch012a
The body and its staff must carry out the assessments...
Regulated
- Assess and verify with integrity and independenceAny Person
s.sch012a
The body must have at its disposal the necessary staff...
Regulated
- Maintain adequate staff, facilities and equipment for inspection and surveillanceAny Person
s.sch012a
The body must be able to demonstrate the impartiality of...
Regulated
- Demonstrate impartiality of inspection staffAny Person
s.sch012a
The remuneration of the inspection staff must not depend on...
Regulated
- Inspection body must not link staff pay to test numbers or resultsAny Person
s.sch012a
The body must have, and must satisfy the Secretary of...
Regulated
- Hold adequate civil liability insurance for your activitiesAny Person
s.sch012a
The body must ensure that its staff observe professional secrecy...
Regulated
- Ensure staff keep test information confidentialAny Person
s.sch013
False information
Regulated
- Give false information under noise regulationsAny Person
s.sch013
Obstruction etc. of officers of enforcement authorities etc.
Regulated
- Obstruct or fail to assist enforcement officersAny Person
s.sch013
Forfeiture: England and Wales and Northern Ireland
Regulated
Other duties (1) — Crown / regulator
- Magistrates' court must order forfeiture only if regulation 7 contravention provenTribunal / Court
s.sch013
Forfeiture: Scotland
Regulated
Other duties (1) — Crown / regulator
- Court can order forfeiture of equipment breaching noise rules in ScotlandCrown / Minister / Government department
s.sch013
Appeals against suspension notices
Regulated
Other duties (1) — Crown / regulator
- Magistrates’ court or sheriff must decide suspension notice appeals on specified groundsTribunal / Court
s.sch013
Contravention of a suspension notice
Regulated
- Contravene a suspension noticeAny Person
s.schedule/5/part/paragraph/wrapper135n2
The EC declaration of conformity must contain the following particulars:...
Regulated
- Include required particulars in EC declaration of conformityManufacturer
s.schedule/6/part/b/paragraph/wrapper553n2
For this test, an artificial test track, simulating an irregular...
Regulated
- Use a standardised artificial test track for noise testing of containersAny Person
s.schedule/6/part/b/paragraph/wrapper558n2
During the test, for a 2-wheel container, the angle between...
Regulated
- Ensure correct test setup for 2-wheel and 4-wheel containersOperator
s.schedule/7/part/paragraph/wrapper726n2
If the indication is reduced or enlarged according to the...
Regulated
- Scale sound power level label proportionally; keep height at least 40mm if possibleManufacturer
855 other schedules
s.sch003
Type of equipment Net installed power P (in kW )...
s.sch004
Aerial access platforms with combustion engines
s.sch004
Concrete-breakers and picks, hand held
s.sch004
Concrete or mortar mixer
s.sch004
Construction winch
s.sch004
Conveying and spraying machine for concrete and mortar
s.sch004
Conveyor belt
s.sch004
Cooling equipment on vehicles
s.sch004
Dozer
s.sch004
Drill rig
s.sch004
Dumper
s.sch004
Equipment for loading and unloading of silos or tanks on trucks
s.sch004
Brush cutter
s.sch004
Excavator, hydraulic or rope-operated
s.sch004
Excavator-loader
s.sch004
Glass recycling container
s.sch004
Grader
s.sch004
Grass trimmer/grass edge trimmer
s.sch004
Hedge trimmer
s.sch004
High pressure flusher
s.sch004
High pressure water jet machine
s.sch004
Hydraulic hammer
s.sch004
Hydraulic power pack
s.sch004
Builders’ hoist for the transport of goods
s.sch004
Joint cutter
s.sch004
Landfill compactor, loader-type with bucket
s.sch004
Lawnmower
s.sch004
Lawn trimmer/lawn edge trimmer
s.sch004
Leaf blower
s.sch004
Leaf collector
s.sch004
Lift truck, combustion-engine driven, counterbalanced
s.sch004
Loader
s.sch004
Mobile crane
s.sch004
Mobile waste container
s.sch004
Building site band saw machine
s.sch004
Motor hoe
s.sch004
Paver-finisher
s.sch004
Piling equipment
s.sch004
Pipelayer
s.sch004
Piste caterpillar
s.sch004
Power generator
s.sch004
Power sweeper
s.sch004
Refuse collection vehicle
s.sch004
Road-milling machine
s.sch004
Scarifier
s.sch004
Building site circular saw bench
s.sch004
Shredder/chipper
s.sch004
Snow-removing machine with rotating tools
s.sch004
Suction vehicle
s.sch004
Tower crane
s.sch004
Trencher
s.sch004
Truck mixer
s.sch004
Water pump unit
s.sch004
Welding generator
s.sch004
Chain saw, portable
s.sch004
Combined high pressure flusher and suction vehicle
s.sch004
Compaction machine
s.sch004
Compressor
s.sch006
Equipment that is tested free of load
s.sch006
Concrete-breakers and picks, hand-held
s.sch006
Concrete or mortar mixers
s.sch006
Construction winches
s.sch006
Conveying and spraying machines for concrete and mortar
s.sch006
Conveyor Belts
s.sch006
Cooling equipment on vehicles
s.sch006
Dozers
s.sch006
Drill rigs
s.sch006
Dumpers
s.sch006
Equipment for loading and unloading tanks or silos on trucks
s.sch006
Excavators
s.sch006
Excavator-loaders
s.sch006
Glass recycling containers
s.sch006
Graders
s.sch006
Grass trimmers/grass edge trimmers
s.sch006
Hedge trimmers
s.sch006
High pressure flushers
s.sch006
High pressure water jet machines
s.sch006
Hydraulic hammers
s.sch006
Hydraulic power packs
s.sch006
Joint cutters
s.sch006
Landfill compactors
s.sch006
Lawnmowers
s.sch006
Lawn trimmers/lawn edge trimmers
s.sch006
Leaf blowers
s.sch006
Leaf collectors
s.sch006
Lift trucks
s.sch006
Loaders
s.sch006
Mobile Cranes
s.sch006
Mobile waste containers
s.sch006
Motor hoes
s.sch006
Paver-finishers
s.sch006
Piling equipment
s.sch006
Pipelayers
s.sch006
Piste caterpillars
s.sch006
Power generators
s.sch006
Power sweepers
s.sch006
Refuse collection vehicles
s.sch006
Road milling machines
s.sch006
Scarifiers
s.sch006
Shredders/Chippers
s.sch006
Snow removing machines with rotating tools
s.sch006
Suction vehicles
s.sch006
Tower cranes
s.sch006
Trenchers
s.sch006
Truck Mixers
s.sch006
Water pump units
s.sch006
Welding generators
s.sch006
Combined High Pressure Flushers and Suction Vehicles
s.sch006
Compaction Machines
s.sch006
Compressors
s.sch006n
Annex III - METHODS TO MEASURE AIRBORNE NOISE EMITTED BY EQUIPMENT FOR USE OUTDOORS
s.sch012a
(1) The body, its director and its staff responsible for...
s.sch012a
The staff responsible for inspection must have—
s.sch012a
Paragraph 8 does not prevent the staff from providing the...
s.sch013
ENFORCEMENT (opens in a new tab)
s.sch013
Enforcement authorities
s.sch013
Extension of time for bringing summary proceedings
s.sch013
Recovery of expenses of enforcement
s.sch013
Service of documents etc.
s.sch013
Savings for certain privileges
s.sch013
Savings for action taken under other enactments
s.sch013
Test purchases
s.sch013
Powers of search etc.
s.sch013
Provisions supplemental to paragraph 3
s.sch013
Appeals against detention of equipment
s.sch013
Suspension notices
s.sch013
Power to require production of documents and information etc.
s.schedule/11/part/paragraph/wrapper743n2
schedule/11/part/paragraph/wrapper743n2
s.schedule/11/part/paragraph/wrapper744n2
schedule/11/part/paragraph/wrapper744n2
s.schedule/11/part/paragraph/wrapper745n2
schedule/11/part/paragraph/wrapper745n2
s.schedule/12/part/paragraph/wrapper746n2
schedule/12/part/paragraph/wrapper746n2
s.schedule/1/part/paragraph/wrapper10n2
Definition: Annex I Schedule 4, Item 12. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper11n2
dozers (<500 kW)
s.schedule/1/part/paragraph/wrapper12n2
Definition: Annex I Schedule 4, Item 16. Measurement : Annex...
s.schedule/1/part/paragraph/wrapper13n2
dumpers (<500 kW)
s.schedule/1/part/paragraph/wrapper14n2
Definition: Annex I Schedule 4, Item 18. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper15n2
excavators, hydraulic or rope-operated (<500 kW)
s.schedule/1/part/paragraph/wrapper16n2
Definition: Annex I Schedule 4, Item 20. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper17n2
excavator-loaders (<500 kW)
s.schedule/1/part/paragraph/wrapper18n2
Definition: Annex I Schedule 4, Item 21. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper19n2
graders (<500 kW)
s.schedule/1/part/paragraph/wrapper1n2
builders’ hoists for the transport of goods (combustion-engine driven)
s.schedule/1/part/paragraph/wrapper20n2
Definition: Annex I Schedule 4, Item 23. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper21n2
hydraulic power packs
s.schedule/1/part/paragraph/wrapper22n2
Definition: Annex I Schedule 4, Item 29. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper23n2
landfill compactors, loader-type with bucket (<500 kW)
s.schedule/1/part/paragraph/wrapper24n2
Definition: Annex I Schedule 4, Item 31. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper25n2
lawnmowers (excluding agricultural and forestry equipment, and multi-purpose devices, the...
s.schedule/1/part/paragraph/wrapper26n2
Definition: Annex I Schedule 4, Item 32. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper27n2
lawn trimmers/lawn edge trimmers
s.schedule/1/part/paragraph/wrapper28n2
Definition: Annex I Schedule 4, Item 33. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper29n2
lift trucks, combustion-engine driven, counterbalanced (excluding “other counterbalanced lift trucks"...
s.schedule/1/part/paragraph/wrapper2n2
Definition: Annex I Schedule 4, Item 3. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper30n2
Definition: Annex I Schedule 4, Item 36. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper31n2
loaders (<500 kW)
s.schedule/1/part/paragraph/wrapper32n2
Definition: Annex I Schedule 4, Item 37. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper33n2
mobile cranes
s.schedule/1/part/paragraph/wrapper34n2
Definition: Annex I Schedule 4, Item 38. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper35n2
motor hoes (<3 kW)
s.schedule/1/part/paragraph/wrapper36n2
Definition: Annex I Schedule 4, Item 40. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper37n2
paver-finishers (excluding paver-finishers equipped with a high-compaction screed)
s.schedule/1/part/paragraph/wrapper38n2
Definition: Annex I Schedule 4, Item 41. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper39n2
power generators (<400 kW)
s.schedule/1/part/paragraph/wrapper3n2
compaction machines (only vibrating and non-vibrating rollers, vibratory plates and...
s.schedule/1/part/paragraph/wrapper40n2
Definition: Annex I Schedule 4, Item 45. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper41n2
tower cranes
s.schedule/1/part/paragraph/wrapper42n2
Definition: Annex I Schedule 4, Item 53. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper43n2
welding generators
s.schedule/1/part/paragraph/wrapper44n2
Definition: Annex I Schedule 4, Item 57. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper4n2
Definition: Annex I Schedule 4, Item 8. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper5n2
compressors (<350 kW)
s.schedule/1/part/paragraph/wrapper6n2
Definition: Annex I Schedule 4, Item 9. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper7n2
concrete-breakers and picks, hand-held
s.schedule/1/part/paragraph/wrapper8n2
Definition: Annex I Schedule 4, Item 10. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper9n2
construction winches (combustion-engine driven)
s.schedule/2/part/paragraph/wrapper100n2
Definition: Annex I Schedule 4, Item 42. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper101n2
pipelayers
s.schedule/2/part/paragraph/wrapper102n2
Definition: Annex I Schedule 4, Item 43. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper103n2
piste caterpillars
s.schedule/2/part/paragraph/wrapper104n2
Definition: Annex I Schedule 4, Item 44. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper105n2
power generators ( ≥400 kW)
s.schedule/2/part/paragraph/wrapper106n2
Definition: Annex I Schedule 4, Item 45. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper107n2
power sweepers
s.schedule/2/part/paragraph/wrapper108n2
Definition: Annex I Schedule 4, Item 46. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper109n2
refuse collection vehicles
s.schedule/2/part/paragraph/wrapper110n2
Definition: Annex I Schedule 4, Item 47. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper111n2
road milling machines
s.schedule/2/part/paragraph/wrapper112n2
Definition: Annex I Schedule 4, Item 48. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper113n2
scarifiers
s.schedule/2/part/paragraph/wrapper114n2
Definition: Annex I Schedule 4, Item 49. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper115n2
shredders/chippers
s.schedule/2/part/paragraph/wrapper116n2
Definition: Annex I Schedule 4, Item 50. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper117n2
snow-removing machines with rotating tools (self-propelled, excluding attachments)
s.schedule/2/part/paragraph/wrapper118n2
Definition: Annex I Schedule 4, Item 51. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper119n2
suction vehicles
s.schedule/2/part/paragraph/wrapper120n2
Definition: Annex I Schedule 4, Item 52. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper121n2
trenchers
s.schedule/2/part/paragraph/wrapper122n2
Definition: Annex I Schedule 4, Item 54. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper123n2
truck mixers
s.schedule/2/part/paragraph/wrapper124n2
Definition: Annex I Schedule 4, Item 55. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper125n2
water pump units (not for use under water)
s.schedule/2/part/paragraph/wrapper126n2
Definition: Annex I Schedule 4, Item 56. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper45n2
aerial access platforms with combustion engine
s.schedule/2/part/paragraph/wrapper46n2
Definition: Annex I Schedule 4, Item 1. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper47n2
brush cutters
s.schedule/2/part/paragraph/wrapper48n2
Definition: Annex I Schedule 4, Item 2. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper49n2
builders’ hoists for the transport of goods (with electric motor)...
s.schedule/2/part/paragraph/wrapper50n2
Definition: Annex I Schedule 4, Item 3. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper51n2
building site band saw machines
s.schedule/2/part/paragraph/wrapper52n2
Definition: Annex I Schedule 4, Item 4. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper53n2
building site circular saw benches
s.schedule/2/part/paragraph/wrapper54n2
Definition: Annex I Schedule 4, Item 5. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper55n2
chain saws, portable
s.schedule/2/part/paragraph/wrapper56n2
Definition: Annex I Schedule 4, Item 6. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper57n2
combined high pressure flushers and suction vehicles
s.schedule/2/part/paragraph/wrapper58n2
Definition: Annex I Schedule 4, Item 7. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper59n2
compaction machines (explosion rammers only)
s.schedule/2/part/paragraph/wrapper60n2
Definition: Annex I Schedule 4, Item 8. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper61n2
concrete or mortar mixers
s.schedule/2/part/paragraph/wrapper62n2
Definition: Annex I Schedule 4, Item 11. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper63n2
construction winches (with electric motor)
s.schedule/2/part/paragraph/wrapper64n2
Definition: Annex I Schedule 4, Item 12. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper65n2
conveying and spraying machines for concrete and mortar
s.schedule/2/part/paragraph/wrapper66n2
Definition: Annex I Schedule 4, Item 13. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper67n2
conveyor belts
s.schedule/2/part/paragraph/wrapper68n2
Definition: Annex I Schedule 4, Item 14. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper69n2
cooling equipment on vehicles
s.schedule/2/part/paragraph/wrapper70n2
Definition: Annex I Schedule 4, Item 15. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper71n2
drill rigs
s.schedule/2/part/paragraph/wrapper72n2
Definition: Annex I Schedule 4, Item 17. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper73n2
equipment for loading and unloading silos or tanks on trucks...
s.schedule/2/part/paragraph/wrapper74n2
Definition: Annex I Schedule 4, Item 19. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper75n2
glass recycling containers
s.schedule/2/part/paragraph/wrapper76n2
Definition: Annex I Schedule 4, Item 22. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper77n2
grass trimmers/grass edge trimmers
s.schedule/2/part/paragraph/wrapper78n2
Definition: Annex I Schedule 4, Item 24. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper79n2
hedge trimmers
s.schedule/2/part/paragraph/wrapper80n2
Definition: Annex I Schedule 4, Item 25. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper81n2
high pressure flushers
s.schedule/2/part/paragraph/wrapper82n2
Definition: Annex I Schedule 4, Item 26. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper83n2
high pressure water jet machines
s.schedule/2/part/paragraph/wrapper84n2
Definition: Annex I Schedule 4, Item 27. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper85n2
hydraulic hammers
s.schedule/2/part/paragraph/wrapper86n2
Definition: Annex I Schedule 4, Item 28. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper87n2
joint cutters
s.schedule/2/part/paragraph/wrapper88n2
Definition: Annex I Schedule 4, Item 30. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper89n2
leaf blowers
s.schedule/2/part/paragraph/wrapper90n2
Definition: Annex I Schedule 4, Item 34. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper91n2
leaf collectors
s.schedule/2/part/paragraph/wrapper92n2
Definition: Annex I Schedule 4, Item 35. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper93n2
lift trucks, combustion-engine driven, counterbalanced (only “other counterbalanced lift trucks"...
s.schedule/2/part/paragraph/wrapper94n2
Definition: Annex I Schedule 4, Item 36. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper95n2
mobile waste containers
s.schedule/2/part/paragraph/wrapper96n2
Definition: Annex I Schedule 4, Item 39. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper97n2
paver-finishers (equipped with a high-compaction screed)
s.schedule/2/part/paragraph/wrapper98n2
Definition: Annex I Schedule 4, Item 41. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper99n2
piling equipment
s.schedule/4/part/paragraph/wrapper129n2
Excluded are the following categories of device: — fans, i.e....
s.schedule/4/part/paragraph/wrapper130n2
These machines may be mounted on trucks, trailers or special...
s.schedule/4/part/paragraph/wrapper131n2
The refrigeration unit may be powered by means of an...
s.schedule/4/part/paragraph/wrapper132n2
Drill rigs are stationary during drilling. They may move from...
s.schedule/4/part/paragraph/wrapper133n2
The cutting devices are either: — rigid cutting elements, or...
s.schedule/4/part/paragraph/wrapper134n2
Also a walk-behind or ride-on grass cutting machine or a...
s.schedule/6/part/1/paragraph/wrapper136n2
Scope
s.schedule/6/part/1/paragraph/wrapper137n2
Part A of this Schedule for each type of equipment...
s.schedule/6/part/1/paragraph/wrapper138n2
Part B of this Schedule for each type of equipment...
s.schedule/6/part/1/paragraph/wrapper139n2
When testing specific types of equipment, the manufacturer or his...
s.schedule/6/part/a/paragraph/wrapper140n2
For the determination of the sound power level of equipment...
s.schedule/6/part/a/paragraph/wrapper141n2
The test is carried out with the equipment in a...
s.schedule/6/part/a/paragraph/wrapper142n2
If the machine is powered by a generator or from...
s.schedule/6/part/a/paragraph/wrapper143n2
If the machine is powered by battery, the battery shall...
s.schedule/6/part/a/paragraph/wrapper144n2
The speed used and the corresponding net power are stated...
s.schedule/6/part/a/paragraph/wrapper145n2
If the equipment is fitted with several engines, they must...
s.schedule/6/part/a/paragraph/wrapper146n2
The speed or velocity of the equipment during the test...
s.schedule/6/part/a/paragraph/wrapper147n2
If the equipment is fitted with several engines and/or aggregates...
s.schedule/6/part/a/paragraph/wrapper148n2
For each type of equipment that is to be tested...
s.schedule/6/part/a/paragraph/wrapper149n2
The report shall contain the technical data necessary to identify...
s.schedule/6/part/a/paragraph/wrapper152n2
schedule/6/part/A/paragraph/wrapper152n2
s.schedule/6/part/b/paragraph/wrapper153n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper154n2
Test area
s.schedule/6/part/b/paragraph/wrapper155n2
Reflecting surface of concrete or non-porous asphalt
s.schedule/6/part/b/paragraph/wrapper156n2
Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper157n2
K2A = 0
s.schedule/6/part/b/paragraph/wrapper158n2
Measurement surface/number of microphone positions/measuring distance (i) If the largest...
s.schedule/6/part/b/paragraph/wrapper159n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper160n2
The noise tests shall be carried out according to Part...
s.schedule/6/part/b/paragraph/wrapper161n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper162n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper163n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper164n2
Test area
s.schedule/6/part/b/paragraph/wrapper165n2
ISO 10884:1995
s.schedule/6/part/b/paragraph/wrapper166n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper167n2
ISO 10884:1995
s.schedule/6/part/b/paragraph/wrapper168n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper169n2
ISO 10884:1995, point 5.3
s.schedule/6/part/b/paragraph/wrapper170n2
Period(s) of observation
s.schedule/6/part/b/paragraph/wrapper171n2
ISO 10884:1995
s.schedule/6/part/b/paragraph/wrapper172n2
The geometrical centre of the engine shall be positioned above...
s.schedule/6/part/b/paragraph/wrapper173n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper174n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper175n2
ISO 7960:1995, Annex J withd = 1m
s.schedule/6/part/b/paragraph/wrapper176n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper177n2
Corresponding to ISO 7960:1995, Annex J (point J2(b) only)
s.schedule/6/part/b/paragraph/wrapper178n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper179n2
Corresponding to ISO 7960:1995, Annex J
s.schedule/6/part/b/paragraph/wrapper180n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper181n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper182n2
ISO 7960:1995, Annex A, measurement distanced = 1m
s.schedule/6/part/b/paragraph/wrapper183n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper184n2
ISO 7960:1995, Annex A (point A2(b) only)
s.schedule/6/part/b/paragraph/wrapper185n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper186n2
ISO 7960:1995 Annex A
s.schedule/6/part/b/paragraph/wrapper187n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper188n2
Test area
s.schedule/6/part/b/paragraph/wrapper189n2
ISO 9207:1995
s.schedule/6/part/b/paragraph/wrapper190n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper191n2
ISO 9207:1995
s.schedule/6/part/b/paragraph/wrapper192n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper193n2
Full load sawing wood/engine at maximum revolution without load
s.schedule/6/part/b/paragraph/wrapper194n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper195n2
ISO 9207:1995 points 6.3 and 6.4
s.schedule/6/part/b/paragraph/wrapper196n2
The resulting sound power level Lwa is calculated by: L...
s.schedule/6/part/b/paragraph/wrapper197n2
See No. 0 (ii) Vibrating rollers for ride-on operators
s.schedule/6/part/b/paragraph/wrapper198n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper199n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper200n2
The vibrating roller shall be installed on one or more...
s.schedule/6/part/b/paragraph/wrapper201n2
Test under load
s.schedule/6/part/b/paragraph/wrapper202n2
The machine shall be tested in a stationary position with...
s.schedule/6/part/b/paragraph/wrapper203n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper204n2
The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper205n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper206n2
Test area
s.schedule/6/part/b/paragraph/wrapper207n2
EN 500-4 rev. 1:1998, Annex C
s.schedule/6/part/b/paragraph/wrapper208n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper209n2
EN 500-4 rev. 1:1998, Annex C
s.schedule/6/part/b/paragraph/wrapper210n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper211n2
EN 500-4 rev. 1:1998, Annex C
s.schedule/6/part/b/paragraph/wrapper212n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper213n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper214n2
hemisphere/six microphone positions according to Part A item 5/according to...
s.schedule/6/part/b/paragraph/wrapper215n2
or
s.schedule/6/part/b/paragraph/wrapper216n2
parallelepiped according to ISO 3744:1995 with measurement distanced = 1m...
s.schedule/6/part/b/paragraph/wrapper217n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper218n2
The compressors shall be installed on the reflecting plane; skid-mounted...
s.schedule/6/part/b/paragraph/wrapper219n2
Test under load
s.schedule/6/part/b/paragraph/wrapper220n2
The compressor under test shall have been warmed up and...
s.schedule/6/part/b/paragraph/wrapper221n2
The determination of the sound power level shall be made...
s.schedule/6/part/b/paragraph/wrapper222n2
Should the layout of the complete plant be such that...
s.schedule/6/part/b/paragraph/wrapper223n2
During test the gas exhausted from the compressor shall be...
s.schedule/6/part/b/paragraph/wrapper224n2
Care shall be taken that air discharge does not introduce...
s.schedule/6/part/b/paragraph/wrapper225n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper226n2
The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper227n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper228n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper229n2
Hemisphere/six microphone positions according to Part A item 5 and...
s.schedule/6/part/b/paragraph/wrapper230n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper231n2
All appliances shall be tested in the vertical position.
s.schedule/6/part/b/paragraph/wrapper232n2
If the test appliance has got an air exhaust, its...
s.schedule/6/part/b/paragraph/wrapper233n2
Support of the appliance
s.schedule/6/part/b/paragraph/wrapper234n2
The appliance shall be coupled during the test run to...
s.schedule/6/part/b/paragraph/wrapper235n2
Block characteristics
s.schedule/6/part/b/paragraph/wrapper236n2
The block shall be in the shape of a cube...
s.schedule/6/part/b/paragraph/wrapper237n2
Quality of the concrete
s.schedule/6/part/b/paragraph/wrapper238n2
The quality of the concrete shall correspond to C 50/60...
s.schedule/6/part/b/paragraph/wrapper239n2
The cube shall be reinforced by 8 mm-diameter steel rods...
s.schedule/6/part/b/paragraph/wrapper240n2
Supporting tool
s.schedule/6/part/b/paragraph/wrapper241n2
The tool shall be sealed into the block and shall...
s.schedule/6/part/b/paragraph/wrapper242n2
Suitable treatment shall be carried out to integrate the two...
s.schedule/6/part/b/paragraph/wrapper243n2
The block shall remain mechanically sound, particularly at the point...
s.schedule/6/part/b/paragraph/wrapper244n2
Positioning of the cube
s.schedule/6/part/b/paragraph/wrapper245n2
The cube shall be set in a pit cemented throughout,...
s.schedule/6/part/b/paragraph/wrapper246n2
The opening in the screening slab through which the tool...
s.schedule/6/part/b/paragraph/wrapper247n2
Test under load
s.schedule/6/part/b/paragraph/wrapper248n2
The appliance tested shall be connected to the supporting tool....
s.schedule/6/part/b/paragraph/wrapper249n2
The test appliance shall be operated in stable conditions having...
s.schedule/6/part/b/paragraph/wrapper250n2
The test appliance shall be operated at the maximum power...
s.schedule/6/part/b/paragraph/wrapper251n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper252n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper253n2
schedule/6/part/B/paragraph/wrapper253n2
s.schedule/6/part/b/paragraph/wrapper254n2
schedule/6/part/B/paragraph/wrapper254n2
s.schedule/6/part/b/paragraph/wrapper255n2
The value of A should be such that the screening...
s.schedule/6/part/b/paragraph/wrapper256n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper257n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper258n2
The mixing device (drum) shall be filled to its rated...
s.schedule/6/part/b/paragraph/wrapper259n2
The mixing device shall be operated at least at the...
s.schedule/6/part/b/paragraph/wrapper260n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper261n2
The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper262n2
The geometrical centre of the engine shall be positioned above...
s.schedule/6/part/b/paragraph/wrapper263n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper264n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper265n2
Test under load (i) For machines conveying and spraying concrete:...
s.schedule/6/part/b/paragraph/wrapper266n2
The conveying system and the pipe shall be filled with...
s.schedule/6/part/b/paragraph/wrapper267n2
The conveying system and the pipe shall be filled with...
s.schedule/6/part/b/paragraph/wrapper268n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper269n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper270n2
The geometrical centre of the engine shall be positioned above...
s.schedule/6/part/b/paragraph/wrapper271n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper272n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper273n2
The cooling equipment shall be installed in a real or...
s.schedule/6/part/b/paragraph/wrapper274n2
Cooling equipment installed in cargo-space refrigeration units which have a...
s.schedule/6/part/b/paragraph/wrapper275n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper276n2
The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper277n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper278n2
Test area
s.schedule/6/part/b/paragraph/wrapper279n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper280n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper281n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper282n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper283n2
Crawler dozers shall be tested on the test site corresponding...
s.schedule/6/part/b/paragraph/wrapper284n2
Test under load
s.schedule/6/part/b/paragraph/wrapper285n2
ISO 6395:1988, Annex B
s.schedule/6/part/b/paragraph/wrapper286n2
Period(s) of observation and consideration of different operating conditions, if...
s.schedule/6/part/b/paragraph/wrapper287n2
ISO 6395:1988, Annex B
s.schedule/6/part/b/paragraph/wrapper288n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper289n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper290n2
EN 791:1995, Annex A
s.schedule/6/part/b/paragraph/wrapper291n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper292n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper293n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper294n2
Test area
s.schedule/6/part/b/paragraph/wrapper295n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper296n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper297n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper298n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper299n2
Equivalent ISO 6395:1988, Annex C, with the following amendment:
s.schedule/6/part/b/paragraph/wrapper300n2
C4.3, second paragraph is replaced by: The engine shall be...
s.schedule/6/part/b/paragraph/wrapper301n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper302n2
ISO 6395:1988, Annex C
s.schedule/6/part/b/paragraph/wrapper303n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper304n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper305n2
The equipment shall be tested with the truck in a...
s.schedule/6/part/b/paragraph/wrapper306n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper307n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper308n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper309n2
Test area
s.schedule/6/part/b/paragraph/wrapper310n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper311n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper312n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper313n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper314n2
ISO 6395:1988, Annex A
s.schedule/6/part/b/paragraph/wrapper315n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper316n2
ISO 6395:1988, Annex A
s.schedule/6/part/b/paragraph/wrapper317n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper318n2
Test area
s.schedule/6/part/b/paragraph/wrapper319n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper320n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper321n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper322n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper323n2
ISO 6395:1988, Annex D
s.schedule/6/part/b/paragraph/wrapper324n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper325n2
ISO 6395:1988, Annex D
s.schedule/6/part/b/paragraph/wrapper326n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper327n2
For the purpose of this noise test code the single-event...
s.schedule/6/part/b/paragraph/wrapper328n2
Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper329n2
Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper330n2
K2A = 0
s.schedule/6/part/b/paragraph/wrapper331n2
Measurements indoors
s.schedule/6/part/b/paragraph/wrapper332n2
The value of the constant K2A, determined in accordance with...
s.schedule/6/part/b/paragraph/wrapper333n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper334n2
The glass bottles are defined as follows: — capacity: 75cl...
s.schedule/6/part/b/paragraph/wrapper335n2
The testing operator holds each bottle by its neck and...
s.schedule/6/part/b/paragraph/wrapper336n2
Period(s) of observation/determination of resulting sound power if more than...
s.schedule/6/part/b/paragraph/wrapper337n2
The A-weighted single-event sound pressure level is preferably simultaneously measured...
s.schedule/6/part/b/paragraph/wrapper338n2
The A-weighted single-event sound power level averaged over the measurement...
s.schedule/6/part/b/paragraph/wrapper339n2
The A-weighted single-event sound pressure level averaged over all 120...
s.schedule/6/part/b/paragraph/wrapper340n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper341n2
Test area
s.schedule/6/part/b/paragraph/wrapper342n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper343n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper344n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper345n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper346n2
Corresponding to ISO 6395:1988, Annex B
s.schedule/6/part/b/paragraph/wrapper347n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper348n2
ISO 6395:1988, Annex B
s.schedule/6/part/b/paragraph/wrapper349n2
The trimmer shall be positioned by a suitable device in...
s.schedule/6/part/b/paragraph/wrapper350n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper351n2
Test area
s.schedule/6/part/b/paragraph/wrapper352n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper353n2
in case of dispute, measurements shall be carried out in...
s.schedule/6/part/b/paragraph/wrapper354n2
Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper355n2
Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper356n2
K2A = 0
s.schedule/6/part/b/paragraph/wrapper357n2
Measurements indoors
s.schedule/6/part/b/paragraph/wrapper358n2
The value of the constant K2A, determined without the artificial...
s.schedule/6/part/b/paragraph/wrapper359n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper360n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper361n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper362n2
The hedge trimmer shall be held in the natural manner...
s.schedule/6/part/b/paragraph/wrapper363n2
Test under load
s.schedule/6/part/b/paragraph/wrapper364n2
The hedge clipper shall be operated at its nominal speed...
s.schedule/6/part/b/paragraph/wrapper365n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper366n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper367n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper368n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper369n2
The high pressure flusher shall be tested in a stationary...
s.schedule/6/part/b/paragraph/wrapper370n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper371n2
The period of observation shall at least be 30 seconds....
s.schedule/6/part/b/paragraph/wrapper372n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper373n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper374n2
Parallelepiped/according to EN ISO 3744:1995 with measurement distanced = 1m...
s.schedule/6/part/b/paragraph/wrapper375n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper376n2
The high pressure water jet machine shall be installed on...
s.schedule/6/part/b/paragraph/wrapper377n2
Test under load
s.schedule/6/part/b/paragraph/wrapper378n2
The high-pressure cleaning machine shall be brought to its steady-state...
s.schedule/6/part/b/paragraph/wrapper379n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper380n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper381n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper382n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper383n2
Hemisphere/six microphone positions according to Part A, item 5/r=10 m...
s.schedule/6/part/b/paragraph/wrapper384n2
Operating conditions during tests
s.schedule/6/part/b/paragraph/wrapper385n2
For the test the hammer is attached to a carrier...
s.schedule/6/part/b/paragraph/wrapper386n2
Carrier
s.schedule/6/part/b/paragraph/wrapper387n2
The carrier for the test hammer shall meet the requirements...
s.schedule/6/part/b/paragraph/wrapper388n2
Mounting
s.schedule/6/part/b/paragraph/wrapper389n2
Mechanical mounting as well as connections (hoses, pipes ...) must...
s.schedule/6/part/b/paragraph/wrapper390n2
Hammer stability and static hold force
s.schedule/6/part/b/paragraph/wrapper391n2
The hammer shall be firmly held down by the carrier...
s.schedule/6/part/b/paragraph/wrapper392n2
Tool
s.schedule/6/part/b/paragraph/wrapper393n2
A blunt tool shall be used in the measurements. The...
s.schedule/6/part/b/paragraph/wrapper394n2
Test under load
s.schedule/6/part/b/paragraph/wrapper395n2
Hydraulic input and power and oil flow
s.schedule/6/part/b/paragraph/wrapper396n2
Operating conditions of the hydraulic hammer shall be appropriately adjusted,...
s.schedule/6/part/b/paragraph/wrapper397n2
Care shall be taken that the total uncertainty of the...
s.schedule/6/part/b/paragraph/wrapper398n2
Adjustable components having effect on the hammer power
s.schedule/6/part/b/paragraph/wrapper399n2
Pre-settings of all accumulators, pressure central valves and other possible...
s.schedule/6/part/b/paragraph/wrapper400n2
Quantities to be measured
s.schedule/6/part/b/paragraph/wrapper401n2
p s The mean value of the hydraulic supply fine...
s.schedule/6/part/b/paragraph/wrapper402n2
Q The mean value of the breaker inlet oil flow...
s.schedule/6/part/b/paragraph/wrapper403n2
T The oil temperature must lie between + 40/+ 60°...
s.schedule/6/part/b/paragraph/wrapper404n2
Pa The prefill gas pressure of all accumulators must be...
s.schedule/6/part/b/paragraph/wrapper405n2
Parameters to be evaluated from the measured operating parameters:
s.schedule/6/part/b/paragraph/wrapper406n2
P IN Hydraulic input power of the breaker P IN...
s.schedule/6/part/b/paragraph/wrapper407n2
Hydraulic supply line pressure measurement, ps —ps must be measured...
s.schedule/6/part/b/paragraph/wrapper408n2
Breaker inlet oil flow, Q —Q must be measured from...
s.schedule/6/part/b/paragraph/wrapper409n2
Measuring point of the oil temperature, T —T must be...
s.schedule/6/part/b/paragraph/wrapper410n2
Period of observation/determination of resulting sound power level
s.schedule/6/part/b/paragraph/wrapper411n2
The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper412n2
The measurements are repeated three times, or more if necessary....
s.schedule/6/part/b/paragraph/wrapper413n2
schedule/6/part/B/paragraph/wrapper413n2
s.schedule/6/part/b/paragraph/wrapper414n2
schedule/6/part/B/paragraph/wrapper414n2
s.schedule/6/part/b/paragraph/wrapper415n2
Definitions
s.schedule/6/part/b/paragraph/wrapper416n2
d Tool diameter (mm)
s.schedule/6/part/b/paragraph/wrapper417n2
d 1 Anvil diameter, 1200±100 mm
s.schedule/6/part/b/paragraph/wrapper418n2
d 2 Inner diameter of the anvil support structure, ≤...
s.schedule/6/part/b/paragraph/wrapper419n2
d 3 Diameter of the test block deck, ≤ 2200...
s.schedule/6/part/b/paragraph/wrapper420n2
d 4 Diameter of the tool opening in the deck,...
s.schedule/6/part/b/paragraph/wrapper421n2
d 5 Diameter of the tool seal, ≤1000 mm
s.schedule/6/part/b/paragraph/wrapper422n2
h¹ Visible tool length between the lowest part of the...
s.schedule/6/part/b/paragraph/wrapper423n2
h 2 Tool seal thickness above the deck, ≤20 mm...
s.schedule/6/part/b/paragraph/wrapper424n2
h 3 Distance between deck upper surface and anvil upper...
s.schedule/6/part/b/paragraph/wrapper425n2
h 4 Isolating foam rubber deck seal thickness, ≤30 mm...
s.schedule/6/part/b/paragraph/wrapper426n2
h 5 Anvil thickness, 350 ±50 mm
s.schedule/6/part/b/paragraph/wrapper427n2
h 6 Tool penetration, ≤50 mm
s.schedule/6/part/b/paragraph/wrapper428n2
If the quadratic shape of the test block structure is...
s.schedule/6/part/b/paragraph/wrapper429n2
The empty space between the deck and the anvil can...
s.schedule/6/part/b/paragraph/wrapper430n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper431n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper432n2
The hydraulic power pack shall be installed on the reflecting...
s.schedule/6/part/b/paragraph/wrapper433n2
Test under load
s.schedule/6/part/b/paragraph/wrapper434n2
During testing, no tools shall be coupled to the hydraulic...
s.schedule/6/part/b/paragraph/wrapper435n2
The hydraulic power pack shall be brought to its steady-state...
s.schedule/6/part/b/paragraph/wrapper436n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper437n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper438n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper439n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper440n2
The joint cutter shall be equipped with the largest possible...
s.schedule/6/part/b/paragraph/wrapper441n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper442n2
The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper443n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper444n2
Test area
s.schedule/6/part/b/paragraph/wrapper445n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper446n2
In case of dispute, measurements shall be carried out in...
s.schedule/6/part/b/paragraph/wrapper447n2
Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper448n2
Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper449n2
K2A = 0
s.schedule/6/part/b/paragraph/wrapper450n2
Measurements indoors
s.schedule/6/part/b/paragraph/wrapper451n2
The value of the constant K2A, determined without the artificial...
s.schedule/6/part/b/paragraph/wrapper452n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper453n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper454n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper455n2
If the wheels of the lawnmower could cause a compression...
s.schedule/6/part/b/paragraph/wrapper456n2
Test free of load
s.schedule/6/part/b/paragraph/wrapper457n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper458n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper459n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper460n2
The trimmer shall be positioned by a suitable device in...
s.schedule/6/part/b/paragraph/wrapper461n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper462n2
Test area
s.schedule/6/part/b/paragraph/wrapper463n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper464n2
In case of dispute, measurements shall be carried out in...
s.schedule/6/part/b/paragraph/wrapper465n2
Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper466n2
Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper467n2
K2A = 0
s.schedule/6/part/b/paragraph/wrapper468n2
Measurements indoors
s.schedule/6/part/b/paragraph/wrapper469n2
The value of the constant K2A, determined without artificial surface...
s.schedule/6/part/b/paragraph/wrapper470n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper471n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper472n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper473n2
The leaf blower shall be positioned in the natural manner...
s.schedule/6/part/b/paragraph/wrapper474n2
Test under load
s.schedule/6/part/b/paragraph/wrapper475n2
The leaf blower shall be operated at its nominal speed...
s.schedule/6/part/b/paragraph/wrapper476n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper477n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper478n2
Note: If a leaf blower can be also used as...
s.schedule/6/part/b/paragraph/wrapper479n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper480n2
Test area
s.schedule/6/part/b/paragraph/wrapper481n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper482n2
In case of dispute, measurements shall be carried out in...
s.schedule/6/part/b/paragraph/wrapper483n2
Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper484n2
Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper485n2
K2A = 0
s.schedule/6/part/b/paragraph/wrapper486n2
Measurements indoors
s.schedule/6/part/b/paragraph/wrapper487n2
The value of the constant K2A, determined without artificial surface...
s.schedule/6/part/b/paragraph/wrapper488n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper489n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper490n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper491n2
The leaf collector shall be positioned in the natural manner...
s.schedule/6/part/b/paragraph/wrapper492n2
Test under load
s.schedule/6/part/b/paragraph/wrapper493n2
The leaf collector shall be operated at its nominal speed...
s.schedule/6/part/b/paragraph/wrapper494n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper495n2
The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper496n2
Note: If a leaf collector can be also used as...
s.schedule/6/part/b/paragraph/wrapper497n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper498n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper499n2
Lifting condition
s.schedule/6/part/b/paragraph/wrapper500n2
With the truck stationary the load (non-sound absorbent material, eg...
s.schedule/6/part/b/paragraph/wrapper501n2
Drive condition
s.schedule/6/part/b/paragraph/wrapper502n2
Drive the truck, without load, at full acceleration from standstill...
s.schedule/6/part/b/paragraph/wrapper503n2
If the truck has a multi-gear transmission, select the gear...
s.schedule/6/part/b/paragraph/wrapper504n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper505n2
The periods of observation are: — for lifting condition: the...
s.schedule/6/part/b/paragraph/wrapper506n2
The resulting sound power level for all types of lift...
s.schedule/6/part/b/paragraph/wrapper507n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper508n2
Test area
s.schedule/6/part/b/paragraph/wrapper509n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper510n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper511n2
ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper512n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper513n2
Crawler loaders shall be tested on the test site corresponding...
s.schedule/6/part/b/paragraph/wrapper514n2
Test under load
s.schedule/6/part/b/paragraph/wrapper515n2
ISO 6395:1988, Annex C
s.schedule/6/part/b/paragraph/wrapper516n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper517n2
ISO 6395:1988, Annex C
s.schedule/6/part/b/paragraph/wrapper518n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper519n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper520n2
If the crane is equipped with outriggers, they shall be...
s.schedule/6/part/b/paragraph/wrapper521n2
Test under load
s.schedule/6/part/b/paragraph/wrapper522n2
The mobile crane to be tested shall be presented in...
s.schedule/6/part/b/paragraph/wrapper523n2
Before carrying out any measurement, the engine and the hydraulic...
s.schedule/6/part/b/paragraph/wrapper524n2
If the mobile crane is equipped with several engines, the...
s.schedule/6/part/b/paragraph/wrapper525n2
If the engine of the mobile crane is fitted with...
s.schedule/6/part/b/paragraph/wrapper526n2
The mobile crane shall be measured under the following three...
s.schedule/6/part/b/paragraph/wrapper527n2
For all working conditions the following shall apply: — Engine...
s.schedule/6/part/b/paragraph/wrapper528n2
The mobile crane shall be loaded with a load which...
s.schedule/6/part/b/paragraph/wrapper529n2
With the boom adjusted to an angle of 40° to...
s.schedule/6/part/b/paragraph/wrapper530n2
The test starts with raising the short jib from the...
s.schedule/6/part/b/paragraph/wrapper531n2
With the jib adjusted to an angle of 40° to...
s.schedule/6/part/b/paragraph/wrapper532n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper533n2
The resulting sound power level is calculated by:
s.schedule/6/part/b/paragraph/wrapper534n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper535n2
Test area — Reflecting surface of concrete or non-porous asphalt...
s.schedule/6/part/b/paragraph/wrapper536n2
Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper537n2
Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper538n2
K2A = 0
s.schedule/6/part/b/paragraph/wrapper539n2
Measurement indoors
s.schedule/6/part/b/paragraph/wrapper540n2
The value of the constant K2A, determined in accordance with...
s.schedule/6/part/b/paragraph/wrapper541n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper542n2
Hemisphere/six microphone positions according to Part A item five/r =...
s.schedule/6/part/b/paragraph/wrapper543n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper544n2
Test No. 1: Free shutting down of the lid along...
s.schedule/6/part/b/paragraph/wrapper545n2
To minimise his influence on the measurements, the operator shall...
s.schedule/6/part/b/paragraph/wrapper546n2
The measurement is carried out during the following cycle, repeated...
s.schedule/6/part/b/paragraph/wrapper547n2
Note: If necessary the operator can move temporarily to raise...
s.schedule/6/part/b/paragraph/wrapper548n2
Test No. 2 Complete opening of the lid
s.schedule/6/part/b/paragraph/wrapper549n2
To minimise his influence on the measurements, the operator shall...
s.schedule/6/part/b/paragraph/wrapper550n2
To prevent any moving of the container, wheels shall be...
s.schedule/6/part/b/paragraph/wrapper551n2
The measurement is carried out during the following cycle: —...
s.schedule/6/part/b/paragraph/wrapper552n2
Test No. 3: Rolling of the container over an artificial...
s.schedule/6/part/b/paragraph/wrapper554n2
Note: Every strip can be composed of several 400 mm...
s.schedule/6/part/b/paragraph/wrapper555n2
An example of adequate track is given in Figures 39.1...
s.schedule/6/part/b/paragraph/wrapper556n2
The operator is situated at the lid hinge side.
s.schedule/6/part/b/paragraph/wrapper557n2
The measurement is carried out while the operator draws the...
s.schedule/6/part/b/paragraph/wrapper559n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper560n2
Test Nos 1 and 2: Free shutting down of the...
s.schedule/6/part/b/paragraph/wrapper561n2
If possible, the measurements are carried out simultaneously at the...
s.schedule/6/part/b/paragraph/wrapper562n2
The A-weighted single-event sound pressure level is measured for each...
s.schedule/6/part/b/paragraph/wrapper563n2
Test No. 3: Rolling the container over an artificial irregular...
s.schedule/6/part/b/paragraph/wrapper564n2
The period of observation T shall be equal to the...
s.schedule/6/part/b/paragraph/wrapper565n2
The sound power level LWArolling is equal to the mean...
s.schedule/6/part/b/paragraph/wrapper566n2
The resulting sound power level is calculated by:
s.schedule/6/part/b/paragraph/wrapper567n2
schedule/6/part/B/paragraph/wrapper567n2
s.schedule/6/part/b/paragraph/wrapper568n2
schedule/6/part/B/paragraph/wrapper568n2
s.schedule/6/part/b/paragraph/wrapper569n2
schedule/6/part/B/paragraph/wrapper569n2
s.schedule/6/part/b/paragraph/wrapper570n2
The tool shall be disconnected during measurement.
s.schedule/6/part/b/paragraph/wrapper571n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper572n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper573n2
The engine of the machine shall operate at the nominal...
s.schedule/6/part/b/paragraph/wrapper574n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper575n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper576n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper577n2
Test area
s.schedule/6/part/b/paragraph/wrapper578n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper579n2
The piling equipment is installed at the top of a...
s.schedule/6/part/b/paragraph/wrapper580n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper581n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper582n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper583n2
Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper584n2
Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper585n2
K2A = 0
s.schedule/6/part/b/paragraph/wrapper586n2
Measurement indoors
s.schedule/6/part/b/paragraph/wrapper587n2
The value of the constant K2A, determined without artificial surface...
s.schedule/6/part/b/paragraph/wrapper588n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper589n2
Hemisphere/six microphone positions according to Part A item 5/according to...
s.schedule/6/part/b/paragraph/wrapper590n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper591n2
The power generators shall be installed on the reflecting plane;...
s.schedule/6/part/b/paragraph/wrapper592n2
Test under load
s.schedule/6/part/b/paragraph/wrapper593n2
ISO 8528-10:1998, point 9
s.schedule/6/part/b/paragraph/wrapper594n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper595n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper596n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper597n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper598n2
The power sweeper shall be tested in a stationary position....
s.schedule/6/part/b/paragraph/wrapper599n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper600n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper601n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper602n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper603n2
The refuse collection vehicle shall be tested in a stationary...
s.schedule/6/part/b/paragraph/wrapper604n2
The refuse collection vehicle and the hopper receiving the waste...
s.schedule/6/part/b/paragraph/wrapper605n2
If the engine speed is automatically accelerated when the compaction...
s.schedule/6/part/b/paragraph/wrapper606n2
If the engine speed for the compaction system is not...
s.schedule/6/part/b/paragraph/wrapper607n2
Materials are emptied in bulk with the lifting device into...
s.schedule/6/part/b/paragraph/wrapper608n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper609n2
The period of observation shall be:
s.schedule/6/part/b/paragraph/wrapper610n2
The resulting sound power level is calculated by:
s.schedule/6/part/b/paragraph/wrapper611n2
Note: In the case of a refuse collection vehicle only...
s.schedule/6/part/b/paragraph/wrapper612n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper613n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper614n2
The longitudinal axis of the road milling machine shall be...
s.schedule/6/part/b/paragraph/wrapper615n2
Test under load
s.schedule/6/part/b/paragraph/wrapper616n2
The road milling machine shall be brought to its steady...
s.schedule/6/part/b/paragraph/wrapper617n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper618n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper619n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper620n2
Test area
s.schedule/6/part/b/paragraph/wrapper621n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper622n2
In case of dispute, measurements shall be carried out in...
s.schedule/6/part/b/paragraph/wrapper623n2
Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper624n2
Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper625n2
K2A = 0
s.schedule/6/part/b/paragraph/wrapper626n2
Measurement indoors
s.schedule/6/part/b/paragraph/wrapper627n2
The value of the constant K2A, determined without artificial surface...
s.schedule/6/part/b/paragraph/wrapper628n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper629n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper630n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper631n2
The scarifier shall be operated with the engine at its...
s.schedule/6/part/b/paragraph/wrapper632n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper633n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper634n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper635n2
Test area
s.schedule/6/part/b/paragraph/wrapper636n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper637n2
Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper638n2
Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper639n2
K2A = 0
s.schedule/6/part/b/paragraph/wrapper640n2
Measurements indoors
s.schedule/6/part/b/paragraph/wrapper641n2
The value of the constant K2A, determined without artificial surface...
s.schedule/6/part/b/paragraph/wrapper642n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper643n2
ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper644n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper645n2
Test under load
s.schedule/6/part/b/paragraph/wrapper646n2
The shredder/chipper shall be tested chipping one or more pieces...
s.schedule/6/part/b/paragraph/wrapper647n2
The work-cycle consists of chipping a round piece of wood...
s.schedule/6/part/b/paragraph/wrapper648n2
Period of observation/determination of resulting sound power level
s.schedule/6/part/b/paragraph/wrapper649n2
The period of observation shall end when there is no...
s.schedule/6/part/b/paragraph/wrapper650n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper651n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper652n2
The snow blower shall be tested in a stationary position....
s.schedule/6/part/b/paragraph/wrapper653n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper654n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper655n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper656n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper657n2
The suction vehicle shall be tested in a stationary position....
s.schedule/6/part/b/paragraph/wrapper658n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper659n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper660n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper661n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper662n2
Measurement at ground-level
s.schedule/6/part/b/paragraph/wrapper663n2
Hemisphere/six microphone positions according to Part A paragraph 5/according to...
s.schedule/6/part/b/paragraph/wrapper664n2
Measurements carried out at jib-height.
s.schedule/6/part/b/paragraph/wrapper665n2
Where the lifting mechanism is located at the jib-height, the...
s.schedule/6/part/b/paragraph/wrapper666n2
Where the measurement is carried out with the lifting mechanism...
s.schedule/6/part/b/paragraph/wrapper667n2
The microphone positions shall be as follows (see Figure 53.1):...
s.schedule/6/part/b/paragraph/wrapper668n2
Four microphone positions on a horizontal plane passing through the...
s.schedule/6/part/b/paragraph/wrapper669n2
The other two microphone positions shall be located at the...
s.schedule/6/part/b/paragraph/wrapper670n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper671n2
Measurement of lifting mechanism
s.schedule/6/part/b/paragraph/wrapper672n2
The lifting mechanism during the test shall be mounted in...
s.schedule/6/part/b/paragraph/wrapper673n2
The mounted crane shall be placed on a flat reflecting...
s.schedule/6/part/b/paragraph/wrapper674n2
The lifting mechanism shall be at least 12 m above...
s.schedule/6/part/b/paragraph/wrapper675n2
The lifting mechanism shall be fixed to a flat reflecting...
s.schedule/6/part/b/paragraph/wrapper676n2
Measurement of the energy generator.
s.schedule/6/part/b/paragraph/wrapper677n2
Where the energy generator is attached to the crane, whether...
s.schedule/6/part/b/paragraph/wrapper678n2
Where the lifting mechanism is situated on the jib stay,...
s.schedule/6/part/b/paragraph/wrapper679n2
Where the energy source powering the crane is independent from...
s.schedule/6/part/b/paragraph/wrapper680n2
Where the energy generator is attached to the crane, the...
s.schedule/6/part/b/paragraph/wrapper681n2
During the test the lifting mechanism and the energy generator...
s.schedule/6/part/b/paragraph/wrapper682n2
Test free of load
s.schedule/6/part/b/paragraph/wrapper683n2
The energy generator incorporated in the crane shall operate at...
s.schedule/6/part/b/paragraph/wrapper684n2
The lifting mechanism shall operate free of load, with its...
s.schedule/6/part/b/paragraph/wrapper685n2
Test under load
s.schedule/6/part/b/paragraph/wrapper686n2
The energy generator incorporated in the crane shall operate at...
s.schedule/6/part/b/paragraph/wrapper687n2
Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper688n2
For the measurement of the sound pressure level of the...
s.schedule/6/part/b/paragraph/wrapper689n2
(tr +tf) seconds: t r being the period in seconds...
s.schedule/6/part/b/paragraph/wrapper690n2
The root mean square value at microphone position i shall...
s.schedule/6/part/b/paragraph/wrapper691n2
Figure 53.1 Arrangement of microphone positions where the lifting mechanism...
s.schedule/6/part/b/paragraph/wrapper692n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper693n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper694n2
The truck mixer shall be tested in a stationary position....
s.schedule/6/part/b/paragraph/wrapper695n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper696n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper697n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper698n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper699n2
Parallelepiped/according to EN ISO 3744:1995 with measurement distanced = 1...
s.schedule/6/part/b/paragraph/wrapper700n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper701n2
The water pump unit shall be installed on the reflecting...
s.schedule/6/part/b/paragraph/wrapper702n2
Test under load
s.schedule/6/part/b/paragraph/wrapper703n2
The engine must operate at the point of best efficiency...
s.schedule/6/part/b/paragraph/wrapper704n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper705n2
The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper706n2
Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper707n2
Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper708n2
Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper709n2
K2A = 0
s.schedule/6/part/b/paragraph/wrapper710n2
Measurement indoors
s.schedule/6/part/b/paragraph/wrapper711n2
The value of the constant K2A, determined in accordance with...
s.schedule/6/part/b/paragraph/wrapper712n2
Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper713n2
Hemisphere/6 microphone positions according to Part A item 5/according to...
s.schedule/6/part/b/paragraph/wrapper714n2
Ifl2 m: a parallelepiped according to EN ISO 3744:1995 may...
s.schedule/6/part/b/paragraph/wrapper715n2
Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper716n2
The welding generators shall be installed on the reflecting plane;...
s.schedule/6/part/b/paragraph/wrapper717n2
Test under load
s.schedule/6/part/b/paragraph/wrapper718n2
ISO 8528-10:1998, point 9.
s.schedule/6/part/b/paragraph/wrapper719n2
Period of observation
s.schedule/6/part/b/paragraph/wrapper720n2
The period of observation shall at least be 15 seconds....
s.schedule/7/part/paragraph/wrapper721n2
The CE UK conformity marking must consist of the initials...
s.schedule/7/part/paragraph/wrapper722n2
schedule/7/part/paragraph/wrapper722n2
s.schedule/7/part/paragraph/wrapper723n2
If the CE UK marking is reduced or enlarged according...
s.schedule/7/part/paragraph/wrapper724n2
The indication of the guaranteed sound power level must consist...
s.schedule/7/part/paragraph/wrapper725n2
schedule/7/part/paragraph/wrapper725n2
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.