UK Statutory Instrument SI 2001/1701 United Kingdom

The Noise Emission in the Environment by Equipment for use Outdoors Regulations 2001

Enforced by
OPSS
Status
Amended (in force with amendments)
Penalty ceiling
Imprisonment 3 of 73 obligations carry a criminal penalty. 4 carry different penalties and 66 have no criminal penalty — flagged in the list below.

Does it bind you?

Business-side roles with duties under this instrument.

Manufacturer43 Any Person14 Responsible Person2 Director or Officer2 Conformity Assessment Body1 Operator1

Plus 10 duties on the regulator, Crown ministers and public bodies — folded into the section list below.

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Manufacturer — also bound by 502 other Acts
Any Person — also bound by 2340 other Acts
Responsible Person — also bound by 108 other Acts
Director or Officer — also bound by 429 other Acts
Conformity Assessment Body — also bound by 47 other Acts
Operator — also bound by 746 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.003 The manufacturer must lodge an application for assessment of his... Regulated
  • Apply for assessment of your quality assurance system for outdoor equipment noise emissionsManufacturer
s.003 The quality assurance system must ensure compliance of the product... Regulated
  • Manufacturers must implement a documented quality assurance system for product complianceManufacturer
s.003 It must contain in particular an adequate description of: —... Regulated
  • Set up a quality assurance system covering design and manufacturing qualityManufacturer
s.003 The manufacturer must undertake to fulfil the obligations arising out... Regulated
  • Maintain your quality assurance system and notify the approved body of any updatesManufacturer
s.004 The manufacturer must allow the approved body entrance for inspection... Regulated
  • Allow approved bodies to inspect your manufacturing and testing sitesManufacturer
s.004 The approved body shall periodically carry out audits to make... Regulated
Other duties (1) — Crown / regulator
  • Approved bodies must periodically audit manufacturers' quality systemsStatutory regulator
s.004 Additionally the approved body may pay unexpected visits to the... Regulated
Other duties (1) — Crown / regulator
  • Approved body may carry out unannounced visits and testsStatutory regulator
s.007 General duty relating to placing on the market or putting into service Imprisonment
  • Ensure equipment meets noise emission and marking standardsResponsible Person
  • Ensure your equipment complies with noise regulations before marketManufacturer
s.008 Permissible sound power level of equipment Regulated
  • Ensure equipment meets noise emission limits and is correctly markedManufacturer
  • Ensure outdoor equipment meets noise limits and is properly markedManufacturer
s.011 CE marking and indication of the guaranteed sound power level Regulated
  • Affix UK marking and noise level indication to equipmentManufacturer
  • Attach UK marking and guaranteed sound power level to each outdoor equipment unitManufacturer
s.012 Provision of data Regulated
  • Send declaration of conformity to Secretary of State within 28 daysManufacturer
  • Send declaration of conformity to the Secretary of State and EU CommissionResponsible Person
s.014 (1) The Secretary of State may from time to time... Regulated
  • Approved bodies must carry out conformity assessment and surveillance dutiesConformity Assessment Body
s.017 Enforcement Regulated
Other duties (1) — Crown / regulator
  • OPSS must issue a compliance notice before taking further enforcement actionStatutory regulator
s.019 Penalties Imprisonment
  • Breach of noise emission or marking requirements for outdoor equipmentAny Person
  • Breach of Noise Emission Regulations (regulation 18)Any Person
s.021 Liability of persons other than the principal offender Imprisonment
  • Be liable for another's noise offenceAny Person
  • Secondary liability for business owners and company officersDirector or Officer
s.register of approved bodies Register of approved bodies Regulated
Other duties (1) — Crown / regulator
  • Secretary of State must maintain a public register of approved bodiesCrown / Minister / Government department
36 other provisions — procedural and definitional
s.001 Citation, commencement and revocation
s.002 Interpretation
s.002 Fan speed
s.002 Test of powered equipment free of load
s.002 Test of powered equipment under load
s.002 Test of hand-operated equipment
s.003 Application
s.004 Excluded equipment
s.004 The purpose of surveillance is to make sure that the...
s.005 These Regulations shall not apply to equipment placed on the...
s.006 (1) Subject to paragraph (2), these Regulations shall not apply...
s.009 Exceptions to placing on the market and putting into service of certain equipment
s.010 Conformity assessment procedures
s.013 Approved Bodies
s.015 Fees
s.016 Conditions for equipment being taken to conform
s.018 Offences
s.020 Defence of due diligence
s.022 Consequential amendments
s.023 Transitional provision in relation to EU Exit
s.024 Review
s.further use of uk marking Further use of UK marking
s.obligations which are met by complying with obliga Obligations which are met by complying with obligations in the Directive
s.para.879 Introduction
s.para.880 Part A of this Annex lays down the basic noise...
s.para.881 Part B of this Annex lays down the equipment specific...
s.para.882 When testing specific types of equipment, manufacturers or their authorised...
s.para.883 Where the noise test codes laid down in Part B,...
s.para.884 For equipment listed in Article 12, where the use of...
s.qualifying northern ireland goods Qualifying Northern Ireland Goods
Schedules

Schedules

46 of 901 shown
s.sch005 (ANNEX II to the Directive) (opens in a new tab) Regulated
  • Create and maintain an EC declaration of conformity for noisy equipmentManufacturer
s.sch006 Fan speed Regulated
  • Set fan speed correctly during noise emission testsManufacturer
s.sch006 Test of powered equipment free of load Regulated
  • Manufacturers must follow prescribed noise test procedures for powered equipmentManufacturer
s.sch006 Test of powered equipment under load Regulated
  • Follow specified procedures when testing equipment under load for noiseManufacturer
s.sch006 Test of hand-operated equipment Regulated
  • Define conventional operating conditions for hand-operated equipmentManufacturer
s.sch007 (ANNEX IV to the Directive) (opens in a new tab) Regulated
  • Use correct format and size for CE/UK markings and noise level labelsManufacturer
s.sch008 (ANNEX V to the Directive) (opens in a new tab) Regulated
  • Maintain technical documentation and ensure noise compliance for equipmentManufacturer
  • Maintain technical records and affix conformity marking on all outdoor equipmentManufacturer
s.sch008 This Schedule describes the procedure whereby the manufacturer, or his... Regulated
  • Affix UK marking and sound power label and draw up declaration of conformityManufacturer
s.sch008 The manufacturer, or his authorised representative established in the European... Regulated
  • Keep technical documentation for 10 years after last product madeManufacturer
s.sch008 The technical documentation must enable the conformity of the equipment... Regulated
  • Prepare technical documentation proving your equipment meets noise regulationsManufacturer
s.sch008 The manufacturer must take all measures necessary in order that... Regulated
  • Set up your manufacturing process to keep equipment consistently compliantManufacturer
s.sch009 (ANNEX VI to the Directive) (opens in a new tab) Regulated
  • Maintain technical files and undergo noise assessment for equipmentManufacturer
  • Prepare technical documents and get approved body checks for noise complianceManufacturer
s.sch009 This Schedule describes the procedure whereby the manufacturer, or his... Regulated
  • Affix UKCA mark and sound power label, and draw up declaration of conformityManufacturer
s.sch009 The manufacturer, or his authorised representative established in the European... Regulated
  • Keep technical documentation for 10 years after last product madeManufacturer
s.sch009 The technical documentation must enable the conformity of the equipment... Regulated
  • Prepare technical documentation to prove noise emission complianceManufacturer
s.sch009 The manufacturer must take all measures necessary in order that... Regulated
  • Ensure manufacturing process produces compliant equipmentManufacturer
s.sch009 Evaluation by the approved body prior to placing on the... Regulated
  • Submit technical documentation to an approved body before marketing outdoor equipmentManufacturer
s.sch009 Evaluation by the approved body during production The manufacturer, or... Regulated
  • Involve an approved body to verify production compliance with noise regulationsManufacturer
s.sch010 (ANNEX VII to the Directive) (opens in a new tab) Regulated
  • Apply for unit verification for noise emission complianceManufacturer
  • Declare and certify noise‑emission compliance for outdoor equipmentManufacturer
s.sch010 This Schedule describes the procedure whereby the manufacturer, or his... Regulated
  • Affix UK marking and draw up declaration of conformity for outdoor equipmentManufacturer
s.sch010 The application for a unit verification must be lodged by... Regulated
  • Submit unit verification application for outdoor equipment noise complianceManufacturer
s.sch010 The approved body must: — examine whether the equipment has... Regulated
Other duties (1) — Crown / regulator
  • Approved body must verify your outdoor equipment meets noise standardsStatutory regulator
s.sch010 Where the equipment meets the provisions of these Regulations, the... Regulated
Other duties (1) — Crown / regulator
  • Approved body must issue or refuse a certificate of conformityStatutory regulator
s.sch010 The manufacturer, or his authorised representative established in the European... Regulated
  • Keep certificate of conformity for 10 years from market placementManufacturer
s.sch011 (ANNEX VIII to the Directive) (opens in a new tab) Regulated
  • Implement a Full Quality Assurance system for equipment noise emissionsManufacturer
  • Set up and maintain a quality assurance system for noise complianceManufacturer
s.sch011 This Schedule describes the procedure whereby the manufacturer who satisfies... Regulated
  • Affix UK marking and draw up declaration of conformity for outdoor equipmentManufacturer
s.sch011 The manufacturer must operate an approved quality assurance system for... Regulated
  • Operate an approved quality assurance system for outdoor equipmentManufacturer
s.sch011 The manufacturer must, for a period ending at least 10... Regulated
  • Retain noise emission documentation for 10 years after last equipment producedManufacturer
s.sch011 Each approved body must give the other approved bodies the... Regulated
Other duties (1) — Crown / regulator
  • Approved bodies must share quality assurance system approval informationStatutory regulator
s.sch012a Approved body requirements Regulated
  • Ensure impartial inspections and hold liability insuranceAny Person
  • Ensure independence and competence of equipment verification bodiesDirector or Officer
s.sch012a The body and its staff must carry out the assessments... Regulated
  • Assess and verify with integrity and independenceAny Person
s.sch012a The body must have at its disposal the necessary staff... Regulated
  • Maintain adequate staff, facilities and equipment for inspection and surveillanceAny Person
s.sch012a The body must be able to demonstrate the impartiality of... Regulated
  • Demonstrate impartiality of inspection staffAny Person
s.sch012a The remuneration of the inspection staff must not depend on... Regulated
  • Inspection body must not link staff pay to test numbers or resultsAny Person
s.sch012a The body must have, and must satisfy the Secretary of... Regulated
  • Hold adequate civil liability insurance for your activitiesAny Person
s.sch012a The body must ensure that its staff observe professional secrecy... Regulated
  • Ensure staff keep test information confidentialAny Person
s.sch013 False information Regulated
  • Give false information under noise regulationsAny Person
s.sch013 Obstruction etc. of officers of enforcement authorities etc. Regulated
  • Obstruct or fail to assist enforcement officersAny Person
s.sch013 Forfeiture: England and Wales and Northern Ireland Regulated
Other duties (1) — Crown / regulator
  • Magistrates' court must order forfeiture only if regulation 7 contravention provenTribunal / Court
s.sch013 Forfeiture: Scotland Regulated
Other duties (1) — Crown / regulator
  • Court can order forfeiture of equipment breaching noise rules in ScotlandCrown / Minister / Government department
s.sch013 Appeals against suspension notices Regulated
Other duties (1) — Crown / regulator
  • Magistrates’ court or sheriff must decide suspension notice appeals on specified groundsTribunal / Court
s.sch013 Contravention of a suspension notice Regulated
  • Contravene a suspension noticeAny Person
s.schedule/5/part/paragraph/wrapper135n2 The EC declaration of conformity must contain the following particulars:... Regulated
  • Include required particulars in EC declaration of conformityManufacturer
s.schedule/6/part/b/paragraph/wrapper553n2 For this test, an artificial test track, simulating an irregular... Regulated
  • Use a standardised artificial test track for noise testing of containersAny Person
s.schedule/6/part/b/paragraph/wrapper558n2 During the test, for a 2-wheel container, the angle between... Regulated
  • Ensure correct test setup for 2-wheel and 4-wheel containersOperator
s.schedule/7/part/paragraph/wrapper726n2 If the indication is reduced or enlarged according to the... Regulated
  • Scale sound power level label proportionally; keep height at least 40mm if possibleManufacturer
855 other schedules
s.sch003 Type of equipment Net installed power P (in kW )...
s.sch004 Aerial access platforms with combustion engines
s.sch004 Concrete-breakers and picks, hand held
s.sch004 Concrete or mortar mixer
s.sch004 Construction winch
s.sch004 Conveying and spraying machine for concrete and mortar
s.sch004 Conveyor belt
s.sch004 Cooling equipment on vehicles
s.sch004 Dozer
s.sch004 Drill rig
s.sch004 Dumper
s.sch004 Equipment for loading and unloading of silos or tanks on trucks
s.sch004 Brush cutter
s.sch004 Excavator, hydraulic or rope-operated
s.sch004 Excavator-loader
s.sch004 Glass recycling container
s.sch004 Grader
s.sch004 Grass trimmer/grass edge trimmer
s.sch004 Hedge trimmer
s.sch004 High pressure flusher
s.sch004 High pressure water jet machine
s.sch004 Hydraulic hammer
s.sch004 Hydraulic power pack
s.sch004 Builders’ hoist for the transport of goods
s.sch004 Joint cutter
s.sch004 Landfill compactor, loader-type with bucket
s.sch004 Lawnmower
s.sch004 Lawn trimmer/lawn edge trimmer
s.sch004 Leaf blower
s.sch004 Leaf collector
s.sch004 Lift truck, combustion-engine driven, counterbalanced
s.sch004 Loader
s.sch004 Mobile crane
s.sch004 Mobile waste container
s.sch004 Building site band saw machine
s.sch004 Motor hoe
s.sch004 Paver-finisher
s.sch004 Piling equipment
s.sch004 Pipelayer
s.sch004 Piste caterpillar
s.sch004 Power generator
s.sch004 Power sweeper
s.sch004 Refuse collection vehicle
s.sch004 Road-milling machine
s.sch004 Scarifier
s.sch004 Building site circular saw bench
s.sch004 Shredder/chipper
s.sch004 Snow-removing machine with rotating tools
s.sch004 Suction vehicle
s.sch004 Tower crane
s.sch004 Trencher
s.sch004 Truck mixer
s.sch004 Water pump unit
s.sch004 Welding generator
s.sch004 Chain saw, portable
s.sch004 Combined high pressure flusher and suction vehicle
s.sch004 Compaction machine
s.sch004 Compressor
s.sch006 Equipment that is tested free of load
s.sch006 Concrete-breakers and picks, hand-held
s.sch006 Concrete or mortar mixers
s.sch006 Construction winches
s.sch006 Conveying and spraying machines for concrete and mortar
s.sch006 Conveyor Belts
s.sch006 Cooling equipment on vehicles
s.sch006 Dozers
s.sch006 Drill rigs
s.sch006 Dumpers
s.sch006 Equipment for loading and unloading tanks or silos on trucks
s.sch006 Excavators
s.sch006 Excavator-loaders
s.sch006 Glass recycling containers
s.sch006 Graders
s.sch006 Grass trimmers/grass edge trimmers
s.sch006 Hedge trimmers
s.sch006 High pressure flushers
s.sch006 High pressure water jet machines
s.sch006 Hydraulic hammers
s.sch006 Hydraulic power packs
s.sch006 Joint cutters
s.sch006 Landfill compactors
s.sch006 Lawnmowers
s.sch006 Lawn trimmers/lawn edge trimmers
s.sch006 Leaf blowers
s.sch006 Leaf collectors
s.sch006 Lift trucks
s.sch006 Loaders
s.sch006 Mobile Cranes
s.sch006 Mobile waste containers
s.sch006 Motor hoes
s.sch006 Paver-finishers
s.sch006 Piling equipment
s.sch006 Pipelayers
s.sch006 Piste caterpillars
s.sch006 Power generators
s.sch006 Power sweepers
s.sch006 Refuse collection vehicles
s.sch006 Road milling machines
s.sch006 Scarifiers
s.sch006 Shredders/Chippers
s.sch006 Snow removing machines with rotating tools
s.sch006 Suction vehicles
s.sch006 Tower cranes
s.sch006 Trenchers
s.sch006 Truck Mixers
s.sch006 Water pump units
s.sch006 Welding generators
s.sch006 Combined High Pressure Flushers and Suction Vehicles
s.sch006 Compaction Machines
s.sch006 Compressors
s.sch006n Annex III - METHODS TO MEASURE AIRBORNE NOISE EMITTED BY EQUIPMENT FOR USE OUTDOORS
s.sch012a (1) The body, its director and its staff responsible for...
s.sch012a The staff responsible for inspection must have—
s.sch012a Paragraph 8 does not prevent the staff from providing the...
s.sch013 Enforcement authorities
s.sch013 Extension of time for bringing summary proceedings
s.sch013 Recovery of expenses of enforcement
s.sch013 Service of documents etc.
s.sch013 Savings for certain privileges
s.sch013 Savings for action taken under other enactments
s.sch013 Test purchases
s.sch013 Powers of search etc.
s.sch013 Provisions supplemental to paragraph 3
s.sch013 Appeals against detention of equipment
s.sch013 Suspension notices
s.sch013 Power to require production of documents and information etc.
s.schedule/11/part/paragraph/wrapper743n2 schedule/11/part/paragraph/wrapper743n2
s.schedule/11/part/paragraph/wrapper744n2 schedule/11/part/paragraph/wrapper744n2
s.schedule/11/part/paragraph/wrapper745n2 schedule/11/part/paragraph/wrapper745n2
s.schedule/12/part/paragraph/wrapper746n2 schedule/12/part/paragraph/wrapper746n2
s.schedule/1/part/paragraph/wrapper10n2 Definition: Annex I Schedule 4, Item 12. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper11n2 dozers (<500 kW)
s.schedule/1/part/paragraph/wrapper12n2 Definition: Annex I Schedule 4, Item 16. Measurement : Annex...
s.schedule/1/part/paragraph/wrapper13n2 dumpers (<500 kW)
s.schedule/1/part/paragraph/wrapper14n2 Definition: Annex I Schedule 4, Item 18. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper15n2 excavators, hydraulic or rope-operated (<500 kW)
s.schedule/1/part/paragraph/wrapper16n2 Definition: Annex I Schedule 4, Item 20. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper17n2 excavator-loaders (<500 kW)
s.schedule/1/part/paragraph/wrapper18n2 Definition: Annex I Schedule 4, Item 21. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper19n2 graders (<500 kW)
s.schedule/1/part/paragraph/wrapper1n2 builders’ hoists for the transport of goods (combustion-engine driven)
s.schedule/1/part/paragraph/wrapper20n2 Definition: Annex I Schedule 4, Item 23. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper21n2 hydraulic power packs
s.schedule/1/part/paragraph/wrapper22n2 Definition: Annex I Schedule 4, Item 29. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper23n2 landfill compactors, loader-type with bucket (<500 kW)
s.schedule/1/part/paragraph/wrapper24n2 Definition: Annex I Schedule 4, Item 31. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper25n2 lawnmowers (excluding agricultural and forestry equipment, and multi-purpose devices, the...
s.schedule/1/part/paragraph/wrapper26n2 Definition: Annex I Schedule 4, Item 32. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper27n2 lawn trimmers/lawn edge trimmers
s.schedule/1/part/paragraph/wrapper28n2 Definition: Annex I Schedule 4, Item 33. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper29n2 lift trucks, combustion-engine driven, counterbalanced (excluding “other counterbalanced lift trucks"...
s.schedule/1/part/paragraph/wrapper2n2 Definition: Annex I Schedule 4, Item 3. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper30n2 Definition: Annex I Schedule 4, Item 36. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper31n2 loaders (<500 kW)
s.schedule/1/part/paragraph/wrapper32n2 Definition: Annex I Schedule 4, Item 37. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper33n2 mobile cranes
s.schedule/1/part/paragraph/wrapper34n2 Definition: Annex I Schedule 4, Item 38. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper35n2 motor hoes (<3 kW)
s.schedule/1/part/paragraph/wrapper36n2 Definition: Annex I Schedule 4, Item 40. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper37n2 paver-finishers (excluding paver-finishers equipped with a high-compaction screed)
s.schedule/1/part/paragraph/wrapper38n2 Definition: Annex I Schedule 4, Item 41. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper39n2 power generators (<400 kW)
s.schedule/1/part/paragraph/wrapper3n2 compaction machines (only vibrating and non-vibrating rollers, vibratory plates and...
s.schedule/1/part/paragraph/wrapper40n2 Definition: Annex I Schedule 4, Item 45. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper41n2 tower cranes
s.schedule/1/part/paragraph/wrapper42n2 Definition: Annex I Schedule 4, Item 53. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper43n2 welding generators
s.schedule/1/part/paragraph/wrapper44n2 Definition: Annex I Schedule 4, Item 57. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper4n2 Definition: Annex I Schedule 4, Item 8. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper5n2 compressors (<350 kW)
s.schedule/1/part/paragraph/wrapper6n2 Definition: Annex I Schedule 4, Item 9. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper7n2 concrete-breakers and picks, hand-held
s.schedule/1/part/paragraph/wrapper8n2 Definition: Annex I Schedule 4, Item 10. Measurement: Annex III...
s.schedule/1/part/paragraph/wrapper9n2 construction winches (combustion-engine driven)
s.schedule/2/part/paragraph/wrapper100n2 Definition: Annex I Schedule 4, Item 42. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper101n2 pipelayers
s.schedule/2/part/paragraph/wrapper102n2 Definition: Annex I Schedule 4, Item 43. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper103n2 piste caterpillars
s.schedule/2/part/paragraph/wrapper104n2 Definition: Annex I Schedule 4, Item 44. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper105n2 power generators ( ≥400 kW)
s.schedule/2/part/paragraph/wrapper106n2 Definition: Annex I Schedule 4, Item 45. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper107n2 power sweepers
s.schedule/2/part/paragraph/wrapper108n2 Definition: Annex I Schedule 4, Item 46. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper109n2 refuse collection vehicles
s.schedule/2/part/paragraph/wrapper110n2 Definition: Annex I Schedule 4, Item 47. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper111n2 road milling machines
s.schedule/2/part/paragraph/wrapper112n2 Definition: Annex I Schedule 4, Item 48. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper113n2 scarifiers
s.schedule/2/part/paragraph/wrapper114n2 Definition: Annex I Schedule 4, Item 49. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper115n2 shredders/chippers
s.schedule/2/part/paragraph/wrapper116n2 Definition: Annex I Schedule 4, Item 50. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper117n2 snow-removing machines with rotating tools (self-propelled, excluding attachments)
s.schedule/2/part/paragraph/wrapper118n2 Definition: Annex I Schedule 4, Item 51. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper119n2 suction vehicles
s.schedule/2/part/paragraph/wrapper120n2 Definition: Annex I Schedule 4, Item 52. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper121n2 trenchers
s.schedule/2/part/paragraph/wrapper122n2 Definition: Annex I Schedule 4, Item 54. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper123n2 truck mixers
s.schedule/2/part/paragraph/wrapper124n2 Definition: Annex I Schedule 4, Item 55. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper125n2 water pump units (not for use under water)
s.schedule/2/part/paragraph/wrapper126n2 Definition: Annex I Schedule 4, Item 56. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper45n2 aerial access platforms with combustion engine
s.schedule/2/part/paragraph/wrapper46n2 Definition: Annex I Schedule 4, Item 1. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper47n2 brush cutters
s.schedule/2/part/paragraph/wrapper48n2 Definition: Annex I Schedule 4, Item 2. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper49n2 builders’ hoists for the transport of goods (with electric motor)...
s.schedule/2/part/paragraph/wrapper50n2 Definition: Annex I Schedule 4, Item 3. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper51n2 building site band saw machines
s.schedule/2/part/paragraph/wrapper52n2 Definition: Annex I Schedule 4, Item 4. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper53n2 building site circular saw benches
s.schedule/2/part/paragraph/wrapper54n2 Definition: Annex I Schedule 4, Item 5. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper55n2 chain saws, portable
s.schedule/2/part/paragraph/wrapper56n2 Definition: Annex I Schedule 4, Item 6. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper57n2 combined high pressure flushers and suction vehicles
s.schedule/2/part/paragraph/wrapper58n2 Definition: Annex I Schedule 4, Item 7. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper59n2 compaction machines (explosion rammers only)
s.schedule/2/part/paragraph/wrapper60n2 Definition: Annex I Schedule 4, Item 8. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper61n2 concrete or mortar mixers
s.schedule/2/part/paragraph/wrapper62n2 Definition: Annex I Schedule 4, Item 11. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper63n2 construction winches (with electric motor)
s.schedule/2/part/paragraph/wrapper64n2 Definition: Annex I Schedule 4, Item 12. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper65n2 conveying and spraying machines for concrete and mortar
s.schedule/2/part/paragraph/wrapper66n2 Definition: Annex I Schedule 4, Item 13. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper67n2 conveyor belts
s.schedule/2/part/paragraph/wrapper68n2 Definition: Annex I Schedule 4, Item 14. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper69n2 cooling equipment on vehicles
s.schedule/2/part/paragraph/wrapper70n2 Definition: Annex I Schedule 4, Item 15. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper71n2 drill rigs
s.schedule/2/part/paragraph/wrapper72n2 Definition: Annex I Schedule 4, Item 17. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper73n2 equipment for loading and unloading silos or tanks on trucks...
s.schedule/2/part/paragraph/wrapper74n2 Definition: Annex I Schedule 4, Item 19. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper75n2 glass recycling containers
s.schedule/2/part/paragraph/wrapper76n2 Definition: Annex I Schedule 4, Item 22. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper77n2 grass trimmers/grass edge trimmers
s.schedule/2/part/paragraph/wrapper78n2 Definition: Annex I Schedule 4, Item 24. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper79n2 hedge trimmers
s.schedule/2/part/paragraph/wrapper80n2 Definition: Annex I Schedule 4, Item 25. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper81n2 high pressure flushers
s.schedule/2/part/paragraph/wrapper82n2 Definition: Annex I Schedule 4, Item 26. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper83n2 high pressure water jet machines
s.schedule/2/part/paragraph/wrapper84n2 Definition: Annex I Schedule 4, Item 27. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper85n2 hydraulic hammers
s.schedule/2/part/paragraph/wrapper86n2 Definition: Annex I Schedule 4, Item 28. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper87n2 joint cutters
s.schedule/2/part/paragraph/wrapper88n2 Definition: Annex I Schedule 4, Item 30. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper89n2 leaf blowers
s.schedule/2/part/paragraph/wrapper90n2 Definition: Annex I Schedule 4, Item 34. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper91n2 leaf collectors
s.schedule/2/part/paragraph/wrapper92n2 Definition: Annex I Schedule 4, Item 35. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper93n2 lift trucks, combustion-engine driven, counterbalanced (only “other counterbalanced lift trucks"...
s.schedule/2/part/paragraph/wrapper94n2 Definition: Annex I Schedule 4, Item 36. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper95n2 mobile waste containers
s.schedule/2/part/paragraph/wrapper96n2 Definition: Annex I Schedule 4, Item 39. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper97n2 paver-finishers (equipped with a high-compaction screed)
s.schedule/2/part/paragraph/wrapper98n2 Definition: Annex I Schedule 4, Item 41. Measurement: Annex III...
s.schedule/2/part/paragraph/wrapper99n2 piling equipment
s.schedule/4/part/paragraph/wrapper129n2 Excluded are the following categories of device: — fans, i.e....
s.schedule/4/part/paragraph/wrapper130n2 These machines may be mounted on trucks, trailers or special...
s.schedule/4/part/paragraph/wrapper131n2 The refrigeration unit may be powered by means of an...
s.schedule/4/part/paragraph/wrapper132n2 Drill rigs are stationary during drilling. They may move from...
s.schedule/4/part/paragraph/wrapper133n2 The cutting devices are either: — rigid cutting elements, or...
s.schedule/4/part/paragraph/wrapper134n2 Also a walk-behind or ride-on grass cutting machine or a...
s.schedule/6/part/1/paragraph/wrapper136n2 Scope
s.schedule/6/part/1/paragraph/wrapper137n2 Part A of this Schedule for each type of equipment...
s.schedule/6/part/1/paragraph/wrapper138n2 Part B of this Schedule for each type of equipment...
s.schedule/6/part/1/paragraph/wrapper139n2 When testing specific types of equipment, the manufacturer or his...
s.schedule/6/part/a/paragraph/wrapper140n2 For the determination of the sound power level of equipment...
s.schedule/6/part/a/paragraph/wrapper141n2 The test is carried out with the equipment in a...
s.schedule/6/part/a/paragraph/wrapper142n2 If the machine is powered by a generator or from...
s.schedule/6/part/a/paragraph/wrapper143n2 If the machine is powered by battery, the battery shall...
s.schedule/6/part/a/paragraph/wrapper144n2 The speed used and the corresponding net power are stated...
s.schedule/6/part/a/paragraph/wrapper145n2 If the equipment is fitted with several engines, they must...
s.schedule/6/part/a/paragraph/wrapper146n2 The speed or velocity of the equipment during the test...
s.schedule/6/part/a/paragraph/wrapper147n2 If the equipment is fitted with several engines and/or aggregates...
s.schedule/6/part/a/paragraph/wrapper148n2 For each type of equipment that is to be tested...
s.schedule/6/part/a/paragraph/wrapper149n2 The report shall contain the technical data necessary to identify...
s.schedule/6/part/a/paragraph/wrapper152n2 schedule/6/part/A/paragraph/wrapper152n2
s.schedule/6/part/b/paragraph/wrapper153n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper154n2 Test area
s.schedule/6/part/b/paragraph/wrapper155n2 Reflecting surface of concrete or non-porous asphalt
s.schedule/6/part/b/paragraph/wrapper156n2 Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper157n2 K2A = 0
s.schedule/6/part/b/paragraph/wrapper158n2 Measurement surface/number of microphone positions/measuring distance (i) If the largest...
s.schedule/6/part/b/paragraph/wrapper159n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper160n2 The noise tests shall be carried out according to Part...
s.schedule/6/part/b/paragraph/wrapper161n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper162n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper163n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper164n2 Test area
s.schedule/6/part/b/paragraph/wrapper165n2 ISO 10884:1995
s.schedule/6/part/b/paragraph/wrapper166n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper167n2 ISO 10884:1995
s.schedule/6/part/b/paragraph/wrapper168n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper169n2 ISO 10884:1995, point 5.3
s.schedule/6/part/b/paragraph/wrapper170n2 Period(s) of observation
s.schedule/6/part/b/paragraph/wrapper171n2 ISO 10884:1995
s.schedule/6/part/b/paragraph/wrapper172n2 The geometrical centre of the engine shall be positioned above...
s.schedule/6/part/b/paragraph/wrapper173n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper174n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper175n2 ISO 7960:1995, Annex J withd = 1m
s.schedule/6/part/b/paragraph/wrapper176n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper177n2 Corresponding to ISO 7960:1995, Annex J (point J2(b) only)
s.schedule/6/part/b/paragraph/wrapper178n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper179n2 Corresponding to ISO 7960:1995, Annex J
s.schedule/6/part/b/paragraph/wrapper180n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper181n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper182n2 ISO 7960:1995, Annex A, measurement distanced = 1m
s.schedule/6/part/b/paragraph/wrapper183n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper184n2 ISO 7960:1995, Annex A (point A2(b) only)
s.schedule/6/part/b/paragraph/wrapper185n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper186n2 ISO 7960:1995 Annex A
s.schedule/6/part/b/paragraph/wrapper187n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper188n2 Test area
s.schedule/6/part/b/paragraph/wrapper189n2 ISO 9207:1995
s.schedule/6/part/b/paragraph/wrapper190n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper191n2 ISO 9207:1995
s.schedule/6/part/b/paragraph/wrapper192n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper193n2 Full load sawing wood/engine at maximum revolution without load
s.schedule/6/part/b/paragraph/wrapper194n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper195n2 ISO 9207:1995 points 6.3 and 6.4
s.schedule/6/part/b/paragraph/wrapper196n2 The resulting sound power level Lwa is calculated by: L...
s.schedule/6/part/b/paragraph/wrapper197n2 See No. 0 (ii) Vibrating rollers for ride-on operators
s.schedule/6/part/b/paragraph/wrapper198n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper199n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper200n2 The vibrating roller shall be installed on one or more...
s.schedule/6/part/b/paragraph/wrapper201n2 Test under load
s.schedule/6/part/b/paragraph/wrapper202n2 The machine shall be tested in a stationary position with...
s.schedule/6/part/b/paragraph/wrapper203n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper204n2 The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper205n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper206n2 Test area
s.schedule/6/part/b/paragraph/wrapper207n2 EN 500-4 rev. 1:1998, Annex C
s.schedule/6/part/b/paragraph/wrapper208n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper209n2 EN 500-4 rev. 1:1998, Annex C
s.schedule/6/part/b/paragraph/wrapper210n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper211n2 EN 500-4 rev. 1:1998, Annex C
s.schedule/6/part/b/paragraph/wrapper212n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper213n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper214n2 hemisphere/six microphone positions according to Part A item 5/according to...
s.schedule/6/part/b/paragraph/wrapper215n2 or
s.schedule/6/part/b/paragraph/wrapper216n2 parallelepiped according to ISO 3744:1995 with measurement distanced = 1m...
s.schedule/6/part/b/paragraph/wrapper217n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper218n2 The compressors shall be installed on the reflecting plane; skid-mounted...
s.schedule/6/part/b/paragraph/wrapper219n2 Test under load
s.schedule/6/part/b/paragraph/wrapper220n2 The compressor under test shall have been warmed up and...
s.schedule/6/part/b/paragraph/wrapper221n2 The determination of the sound power level shall be made...
s.schedule/6/part/b/paragraph/wrapper222n2 Should the layout of the complete plant be such that...
s.schedule/6/part/b/paragraph/wrapper223n2 During test the gas exhausted from the compressor shall be...
s.schedule/6/part/b/paragraph/wrapper224n2 Care shall be taken that air discharge does not introduce...
s.schedule/6/part/b/paragraph/wrapper225n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper226n2 The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper227n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper228n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper229n2 Hemisphere/six microphone positions according to Part A item 5 and...
s.schedule/6/part/b/paragraph/wrapper230n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper231n2 All appliances shall be tested in the vertical position.
s.schedule/6/part/b/paragraph/wrapper232n2 If the test appliance has got an air exhaust, its...
s.schedule/6/part/b/paragraph/wrapper233n2 Support of the appliance
s.schedule/6/part/b/paragraph/wrapper234n2 The appliance shall be coupled during the test run to...
s.schedule/6/part/b/paragraph/wrapper235n2 Block characteristics
s.schedule/6/part/b/paragraph/wrapper236n2 The block shall be in the shape of a cube...
s.schedule/6/part/b/paragraph/wrapper237n2 Quality of the concrete
s.schedule/6/part/b/paragraph/wrapper238n2 The quality of the concrete shall correspond to C 50/60...
s.schedule/6/part/b/paragraph/wrapper239n2 The cube shall be reinforced by 8 mm-diameter steel rods...
s.schedule/6/part/b/paragraph/wrapper240n2 Supporting tool
s.schedule/6/part/b/paragraph/wrapper241n2 The tool shall be sealed into the block and shall...
s.schedule/6/part/b/paragraph/wrapper242n2 Suitable treatment shall be carried out to integrate the two...
s.schedule/6/part/b/paragraph/wrapper243n2 The block shall remain mechanically sound, particularly at the point...
s.schedule/6/part/b/paragraph/wrapper244n2 Positioning of the cube
s.schedule/6/part/b/paragraph/wrapper245n2 The cube shall be set in a pit cemented throughout,...
s.schedule/6/part/b/paragraph/wrapper246n2 The opening in the screening slab through which the tool...
s.schedule/6/part/b/paragraph/wrapper247n2 Test under load
s.schedule/6/part/b/paragraph/wrapper248n2 The appliance tested shall be connected to the supporting tool....
s.schedule/6/part/b/paragraph/wrapper249n2 The test appliance shall be operated in stable conditions having...
s.schedule/6/part/b/paragraph/wrapper250n2 The test appliance shall be operated at the maximum power...
s.schedule/6/part/b/paragraph/wrapper251n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper252n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper253n2 schedule/6/part/B/paragraph/wrapper253n2
s.schedule/6/part/b/paragraph/wrapper254n2 schedule/6/part/B/paragraph/wrapper254n2
s.schedule/6/part/b/paragraph/wrapper255n2 The value of A should be such that the screening...
s.schedule/6/part/b/paragraph/wrapper256n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper257n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper258n2 The mixing device (drum) shall be filled to its rated...
s.schedule/6/part/b/paragraph/wrapper259n2 The mixing device shall be operated at least at the...
s.schedule/6/part/b/paragraph/wrapper260n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper261n2 The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper262n2 The geometrical centre of the engine shall be positioned above...
s.schedule/6/part/b/paragraph/wrapper263n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper264n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper265n2 Test under load (i) For machines conveying and spraying concrete:...
s.schedule/6/part/b/paragraph/wrapper266n2 The conveying system and the pipe shall be filled with...
s.schedule/6/part/b/paragraph/wrapper267n2 The conveying system and the pipe shall be filled with...
s.schedule/6/part/b/paragraph/wrapper268n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper269n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper270n2 The geometrical centre of the engine shall be positioned above...
s.schedule/6/part/b/paragraph/wrapper271n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper272n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper273n2 The cooling equipment shall be installed in a real or...
s.schedule/6/part/b/paragraph/wrapper274n2 Cooling equipment installed in cargo-space refrigeration units which have a...
s.schedule/6/part/b/paragraph/wrapper275n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper276n2 The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper277n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper278n2 Test area
s.schedule/6/part/b/paragraph/wrapper279n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper280n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper281n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper282n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper283n2 Crawler dozers shall be tested on the test site corresponding...
s.schedule/6/part/b/paragraph/wrapper284n2 Test under load
s.schedule/6/part/b/paragraph/wrapper285n2 ISO 6395:1988, Annex B
s.schedule/6/part/b/paragraph/wrapper286n2 Period(s) of observation and consideration of different operating conditions, if...
s.schedule/6/part/b/paragraph/wrapper287n2 ISO 6395:1988, Annex B
s.schedule/6/part/b/paragraph/wrapper288n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper289n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper290n2 EN 791:1995, Annex A
s.schedule/6/part/b/paragraph/wrapper291n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper292n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper293n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper294n2 Test area
s.schedule/6/part/b/paragraph/wrapper295n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper296n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper297n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper298n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper299n2 Equivalent ISO 6395:1988, Annex C, with the following amendment:
s.schedule/6/part/b/paragraph/wrapper300n2 C4.3, second paragraph is replaced by: The engine shall be...
s.schedule/6/part/b/paragraph/wrapper301n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper302n2 ISO 6395:1988, Annex C
s.schedule/6/part/b/paragraph/wrapper303n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper304n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper305n2 The equipment shall be tested with the truck in a...
s.schedule/6/part/b/paragraph/wrapper306n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper307n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper308n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper309n2 Test area
s.schedule/6/part/b/paragraph/wrapper310n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper311n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper312n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper313n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper314n2 ISO 6395:1988, Annex A
s.schedule/6/part/b/paragraph/wrapper315n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper316n2 ISO 6395:1988, Annex A
s.schedule/6/part/b/paragraph/wrapper317n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper318n2 Test area
s.schedule/6/part/b/paragraph/wrapper319n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper320n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper321n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper322n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper323n2 ISO 6395:1988, Annex D
s.schedule/6/part/b/paragraph/wrapper324n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper325n2 ISO 6395:1988, Annex D
s.schedule/6/part/b/paragraph/wrapper326n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper327n2 For the purpose of this noise test code the single-event...
s.schedule/6/part/b/paragraph/wrapper328n2 Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper329n2 Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper330n2 K2A = 0
s.schedule/6/part/b/paragraph/wrapper331n2 Measurements indoors
s.schedule/6/part/b/paragraph/wrapper332n2 The value of the constant K2A, determined in accordance with...
s.schedule/6/part/b/paragraph/wrapper333n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper334n2 The glass bottles are defined as follows: — capacity: 75cl...
s.schedule/6/part/b/paragraph/wrapper335n2 The testing operator holds each bottle by its neck and...
s.schedule/6/part/b/paragraph/wrapper336n2 Period(s) of observation/determination of resulting sound power if more than...
s.schedule/6/part/b/paragraph/wrapper337n2 The A-weighted single-event sound pressure level is preferably simultaneously measured...
s.schedule/6/part/b/paragraph/wrapper338n2 The A-weighted single-event sound power level averaged over the measurement...
s.schedule/6/part/b/paragraph/wrapper339n2 The A-weighted single-event sound pressure level averaged over all 120...
s.schedule/6/part/b/paragraph/wrapper340n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper341n2 Test area
s.schedule/6/part/b/paragraph/wrapper342n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper343n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper344n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper345n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper346n2 Corresponding to ISO 6395:1988, Annex B
s.schedule/6/part/b/paragraph/wrapper347n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper348n2 ISO 6395:1988, Annex B
s.schedule/6/part/b/paragraph/wrapper349n2 The trimmer shall be positioned by a suitable device in...
s.schedule/6/part/b/paragraph/wrapper350n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper351n2 Test area
s.schedule/6/part/b/paragraph/wrapper352n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper353n2 in case of dispute, measurements shall be carried out in...
s.schedule/6/part/b/paragraph/wrapper354n2 Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper355n2 Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper356n2 K2A = 0
s.schedule/6/part/b/paragraph/wrapper357n2 Measurements indoors
s.schedule/6/part/b/paragraph/wrapper358n2 The value of the constant K2A, determined without the artificial...
s.schedule/6/part/b/paragraph/wrapper359n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper360n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper361n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper362n2 The hedge trimmer shall be held in the natural manner...
s.schedule/6/part/b/paragraph/wrapper363n2 Test under load
s.schedule/6/part/b/paragraph/wrapper364n2 The hedge clipper shall be operated at its nominal speed...
s.schedule/6/part/b/paragraph/wrapper365n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper366n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper367n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper368n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper369n2 The high pressure flusher shall be tested in a stationary...
s.schedule/6/part/b/paragraph/wrapper370n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper371n2 The period of observation shall at least be 30 seconds....
s.schedule/6/part/b/paragraph/wrapper372n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper373n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper374n2 Parallelepiped/according to EN ISO 3744:1995 with measurement distanced = 1m...
s.schedule/6/part/b/paragraph/wrapper375n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper376n2 The high pressure water jet machine shall be installed on...
s.schedule/6/part/b/paragraph/wrapper377n2 Test under load
s.schedule/6/part/b/paragraph/wrapper378n2 The high-pressure cleaning machine shall be brought to its steady-state...
s.schedule/6/part/b/paragraph/wrapper379n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper380n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper381n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper382n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper383n2 Hemisphere/six microphone positions according to Part A, item 5/r=10 m...
s.schedule/6/part/b/paragraph/wrapper384n2 Operating conditions during tests
s.schedule/6/part/b/paragraph/wrapper385n2 For the test the hammer is attached to a carrier...
s.schedule/6/part/b/paragraph/wrapper386n2 Carrier
s.schedule/6/part/b/paragraph/wrapper387n2 The carrier for the test hammer shall meet the requirements...
s.schedule/6/part/b/paragraph/wrapper388n2 Mounting
s.schedule/6/part/b/paragraph/wrapper389n2 Mechanical mounting as well as connections (hoses, pipes ...) must...
s.schedule/6/part/b/paragraph/wrapper390n2 Hammer stability and static hold force
s.schedule/6/part/b/paragraph/wrapper391n2 The hammer shall be firmly held down by the carrier...
s.schedule/6/part/b/paragraph/wrapper392n2 Tool
s.schedule/6/part/b/paragraph/wrapper393n2 A blunt tool shall be used in the measurements. The...
s.schedule/6/part/b/paragraph/wrapper394n2 Test under load
s.schedule/6/part/b/paragraph/wrapper395n2 Hydraulic input and power and oil flow
s.schedule/6/part/b/paragraph/wrapper396n2 Operating conditions of the hydraulic hammer shall be appropriately adjusted,...
s.schedule/6/part/b/paragraph/wrapper397n2 Care shall be taken that the total uncertainty of the...
s.schedule/6/part/b/paragraph/wrapper398n2 Adjustable components having effect on the hammer power
s.schedule/6/part/b/paragraph/wrapper399n2 Pre-settings of all accumulators, pressure central valves and other possible...
s.schedule/6/part/b/paragraph/wrapper400n2 Quantities to be measured
s.schedule/6/part/b/paragraph/wrapper401n2 p s The mean value of the hydraulic supply fine...
s.schedule/6/part/b/paragraph/wrapper402n2 Q The mean value of the breaker inlet oil flow...
s.schedule/6/part/b/paragraph/wrapper403n2 T The oil temperature must lie between + 40/+ 60°...
s.schedule/6/part/b/paragraph/wrapper404n2 Pa The prefill gas pressure of all accumulators must be...
s.schedule/6/part/b/paragraph/wrapper405n2 Parameters to be evaluated from the measured operating parameters:
s.schedule/6/part/b/paragraph/wrapper406n2 P IN Hydraulic input power of the breaker P IN...
s.schedule/6/part/b/paragraph/wrapper407n2 Hydraulic supply line pressure measurement, ps —ps must be measured...
s.schedule/6/part/b/paragraph/wrapper408n2 Breaker inlet oil flow, Q —Q must be measured from...
s.schedule/6/part/b/paragraph/wrapper409n2 Measuring point of the oil temperature, T —T must be...
s.schedule/6/part/b/paragraph/wrapper410n2 Period of observation/determination of resulting sound power level
s.schedule/6/part/b/paragraph/wrapper411n2 The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper412n2 The measurements are repeated three times, or more if necessary....
s.schedule/6/part/b/paragraph/wrapper413n2 schedule/6/part/B/paragraph/wrapper413n2
s.schedule/6/part/b/paragraph/wrapper414n2 schedule/6/part/B/paragraph/wrapper414n2
s.schedule/6/part/b/paragraph/wrapper415n2 Definitions
s.schedule/6/part/b/paragraph/wrapper416n2 d Tool diameter (mm)
s.schedule/6/part/b/paragraph/wrapper417n2 d 1 Anvil diameter, 1200±100 mm
s.schedule/6/part/b/paragraph/wrapper418n2 d 2 Inner diameter of the anvil support structure, ≤...
s.schedule/6/part/b/paragraph/wrapper419n2 d 3 Diameter of the test block deck, ≤ 2200...
s.schedule/6/part/b/paragraph/wrapper420n2 d 4 Diameter of the tool opening in the deck,...
s.schedule/6/part/b/paragraph/wrapper421n2 d 5 Diameter of the tool seal, ≤1000 mm
s.schedule/6/part/b/paragraph/wrapper422n2 h¹ Visible tool length between the lowest part of the...
s.schedule/6/part/b/paragraph/wrapper423n2 h 2 Tool seal thickness above the deck, ≤20 mm...
s.schedule/6/part/b/paragraph/wrapper424n2 h 3 Distance between deck upper surface and anvil upper...
s.schedule/6/part/b/paragraph/wrapper425n2 h 4 Isolating foam rubber deck seal thickness, ≤30 mm...
s.schedule/6/part/b/paragraph/wrapper426n2 h 5 Anvil thickness, 350 ±50 mm
s.schedule/6/part/b/paragraph/wrapper427n2 h 6 Tool penetration, ≤50 mm
s.schedule/6/part/b/paragraph/wrapper428n2 If the quadratic shape of the test block structure is...
s.schedule/6/part/b/paragraph/wrapper429n2 The empty space between the deck and the anvil can...
s.schedule/6/part/b/paragraph/wrapper430n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper431n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper432n2 The hydraulic power pack shall be installed on the reflecting...
s.schedule/6/part/b/paragraph/wrapper433n2 Test under load
s.schedule/6/part/b/paragraph/wrapper434n2 During testing, no tools shall be coupled to the hydraulic...
s.schedule/6/part/b/paragraph/wrapper435n2 The hydraulic power pack shall be brought to its steady-state...
s.schedule/6/part/b/paragraph/wrapper436n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper437n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper438n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper439n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper440n2 The joint cutter shall be equipped with the largest possible...
s.schedule/6/part/b/paragraph/wrapper441n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper442n2 The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper443n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper444n2 Test area
s.schedule/6/part/b/paragraph/wrapper445n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper446n2 In case of dispute, measurements shall be carried out in...
s.schedule/6/part/b/paragraph/wrapper447n2 Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper448n2 Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper449n2 K2A = 0
s.schedule/6/part/b/paragraph/wrapper450n2 Measurements indoors
s.schedule/6/part/b/paragraph/wrapper451n2 The value of the constant K2A, determined without the artificial...
s.schedule/6/part/b/paragraph/wrapper452n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper453n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper454n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper455n2 If the wheels of the lawnmower could cause a compression...
s.schedule/6/part/b/paragraph/wrapper456n2 Test free of load
s.schedule/6/part/b/paragraph/wrapper457n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper458n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper459n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper460n2 The trimmer shall be positioned by a suitable device in...
s.schedule/6/part/b/paragraph/wrapper461n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper462n2 Test area
s.schedule/6/part/b/paragraph/wrapper463n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper464n2 In case of dispute, measurements shall be carried out in...
s.schedule/6/part/b/paragraph/wrapper465n2 Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper466n2 Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper467n2 K2A = 0
s.schedule/6/part/b/paragraph/wrapper468n2 Measurements indoors
s.schedule/6/part/b/paragraph/wrapper469n2 The value of the constant K2A, determined without artificial surface...
s.schedule/6/part/b/paragraph/wrapper470n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper471n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper472n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper473n2 The leaf blower shall be positioned in the natural manner...
s.schedule/6/part/b/paragraph/wrapper474n2 Test under load
s.schedule/6/part/b/paragraph/wrapper475n2 The leaf blower shall be operated at its nominal speed...
s.schedule/6/part/b/paragraph/wrapper476n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper477n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper478n2 Note: If a leaf blower can be also used as...
s.schedule/6/part/b/paragraph/wrapper479n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper480n2 Test area
s.schedule/6/part/b/paragraph/wrapper481n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper482n2 In case of dispute, measurements shall be carried out in...
s.schedule/6/part/b/paragraph/wrapper483n2 Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper484n2 Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper485n2 K2A = 0
s.schedule/6/part/b/paragraph/wrapper486n2 Measurements indoors
s.schedule/6/part/b/paragraph/wrapper487n2 The value of the constant K2A, determined without artificial surface...
s.schedule/6/part/b/paragraph/wrapper488n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper489n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper490n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper491n2 The leaf collector shall be positioned in the natural manner...
s.schedule/6/part/b/paragraph/wrapper492n2 Test under load
s.schedule/6/part/b/paragraph/wrapper493n2 The leaf collector shall be operated at its nominal speed...
s.schedule/6/part/b/paragraph/wrapper494n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper495n2 The period of observation shall be at least 15 seconds....
s.schedule/6/part/b/paragraph/wrapper496n2 Note: If a leaf collector can be also used as...
s.schedule/6/part/b/paragraph/wrapper497n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper498n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper499n2 Lifting condition
s.schedule/6/part/b/paragraph/wrapper500n2 With the truck stationary the load (non-sound absorbent material, eg...
s.schedule/6/part/b/paragraph/wrapper501n2 Drive condition
s.schedule/6/part/b/paragraph/wrapper502n2 Drive the truck, without load, at full acceleration from standstill...
s.schedule/6/part/b/paragraph/wrapper503n2 If the truck has a multi-gear transmission, select the gear...
s.schedule/6/part/b/paragraph/wrapper504n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper505n2 The periods of observation are: — for lifting condition: the...
s.schedule/6/part/b/paragraph/wrapper506n2 The resulting sound power level for all types of lift...
s.schedule/6/part/b/paragraph/wrapper507n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper508n2 Test area
s.schedule/6/part/b/paragraph/wrapper509n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper510n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper511n2 ISO 6395:1988
s.schedule/6/part/b/paragraph/wrapper512n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper513n2 Crawler loaders shall be tested on the test site corresponding...
s.schedule/6/part/b/paragraph/wrapper514n2 Test under load
s.schedule/6/part/b/paragraph/wrapper515n2 ISO 6395:1988, Annex C
s.schedule/6/part/b/paragraph/wrapper516n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper517n2 ISO 6395:1988, Annex C
s.schedule/6/part/b/paragraph/wrapper518n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper519n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper520n2 If the crane is equipped with outriggers, they shall be...
s.schedule/6/part/b/paragraph/wrapper521n2 Test under load
s.schedule/6/part/b/paragraph/wrapper522n2 The mobile crane to be tested shall be presented in...
s.schedule/6/part/b/paragraph/wrapper523n2 Before carrying out any measurement, the engine and the hydraulic...
s.schedule/6/part/b/paragraph/wrapper524n2 If the mobile crane is equipped with several engines, the...
s.schedule/6/part/b/paragraph/wrapper525n2 If the engine of the mobile crane is fitted with...
s.schedule/6/part/b/paragraph/wrapper526n2 The mobile crane shall be measured under the following three...
s.schedule/6/part/b/paragraph/wrapper527n2 For all working conditions the following shall apply: — Engine...
s.schedule/6/part/b/paragraph/wrapper528n2 The mobile crane shall be loaded with a load which...
s.schedule/6/part/b/paragraph/wrapper529n2 With the boom adjusted to an angle of 40° to...
s.schedule/6/part/b/paragraph/wrapper530n2 The test starts with raising the short jib from the...
s.schedule/6/part/b/paragraph/wrapper531n2 With the jib adjusted to an angle of 40° to...
s.schedule/6/part/b/paragraph/wrapper532n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper533n2 The resulting sound power level is calculated by:
s.schedule/6/part/b/paragraph/wrapper534n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper535n2 Test area — Reflecting surface of concrete or non-porous asphalt...
s.schedule/6/part/b/paragraph/wrapper536n2 Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper537n2 Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper538n2 K2A = 0
s.schedule/6/part/b/paragraph/wrapper539n2 Measurement indoors
s.schedule/6/part/b/paragraph/wrapper540n2 The value of the constant K2A, determined in accordance with...
s.schedule/6/part/b/paragraph/wrapper541n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper542n2 Hemisphere/six microphone positions according to Part A item five/r =...
s.schedule/6/part/b/paragraph/wrapper543n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper544n2 Test No. 1: Free shutting down of the lid along...
s.schedule/6/part/b/paragraph/wrapper545n2 To minimise his influence on the measurements, the operator shall...
s.schedule/6/part/b/paragraph/wrapper546n2 The measurement is carried out during the following cycle, repeated...
s.schedule/6/part/b/paragraph/wrapper547n2 Note: If necessary the operator can move temporarily to raise...
s.schedule/6/part/b/paragraph/wrapper548n2 Test No. 2 Complete opening of the lid
s.schedule/6/part/b/paragraph/wrapper549n2 To minimise his influence on the measurements, the operator shall...
s.schedule/6/part/b/paragraph/wrapper550n2 To prevent any moving of the container, wheels shall be...
s.schedule/6/part/b/paragraph/wrapper551n2 The measurement is carried out during the following cycle: —...
s.schedule/6/part/b/paragraph/wrapper552n2 Test No. 3: Rolling of the container over an artificial...
s.schedule/6/part/b/paragraph/wrapper554n2 Note: Every strip can be composed of several 400 mm...
s.schedule/6/part/b/paragraph/wrapper555n2 An example of adequate track is given in Figures 39.1...
s.schedule/6/part/b/paragraph/wrapper556n2 The operator is situated at the lid hinge side.
s.schedule/6/part/b/paragraph/wrapper557n2 The measurement is carried out while the operator draws the...
s.schedule/6/part/b/paragraph/wrapper559n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper560n2 Test Nos 1 and 2: Free shutting down of the...
s.schedule/6/part/b/paragraph/wrapper561n2 If possible, the measurements are carried out simultaneously at the...
s.schedule/6/part/b/paragraph/wrapper562n2 The A-weighted single-event sound pressure level is measured for each...
s.schedule/6/part/b/paragraph/wrapper563n2 Test No. 3: Rolling the container over an artificial irregular...
s.schedule/6/part/b/paragraph/wrapper564n2 The period of observation T shall be equal to the...
s.schedule/6/part/b/paragraph/wrapper565n2 The sound power level LWArolling is equal to the mean...
s.schedule/6/part/b/paragraph/wrapper566n2 The resulting sound power level is calculated by:
s.schedule/6/part/b/paragraph/wrapper567n2 schedule/6/part/B/paragraph/wrapper567n2
s.schedule/6/part/b/paragraph/wrapper568n2 schedule/6/part/B/paragraph/wrapper568n2
s.schedule/6/part/b/paragraph/wrapper569n2 schedule/6/part/B/paragraph/wrapper569n2
s.schedule/6/part/b/paragraph/wrapper570n2 The tool shall be disconnected during measurement.
s.schedule/6/part/b/paragraph/wrapper571n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper572n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper573n2 The engine of the machine shall operate at the nominal...
s.schedule/6/part/b/paragraph/wrapper574n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper575n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper576n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper577n2 Test area
s.schedule/6/part/b/paragraph/wrapper578n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper579n2 The piling equipment is installed at the top of a...
s.schedule/6/part/b/paragraph/wrapper580n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper581n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper582n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper583n2 Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper584n2 Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper585n2 K2A = 0
s.schedule/6/part/b/paragraph/wrapper586n2 Measurement indoors
s.schedule/6/part/b/paragraph/wrapper587n2 The value of the constant K2A, determined without artificial surface...
s.schedule/6/part/b/paragraph/wrapper588n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper589n2 Hemisphere/six microphone positions according to Part A item 5/according to...
s.schedule/6/part/b/paragraph/wrapper590n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper591n2 The power generators shall be installed on the reflecting plane;...
s.schedule/6/part/b/paragraph/wrapper592n2 Test under load
s.schedule/6/part/b/paragraph/wrapper593n2 ISO 8528-10:1998, point 9
s.schedule/6/part/b/paragraph/wrapper594n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper595n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper596n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper597n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper598n2 The power sweeper shall be tested in a stationary position....
s.schedule/6/part/b/paragraph/wrapper599n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper600n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper601n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper602n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper603n2 The refuse collection vehicle shall be tested in a stationary...
s.schedule/6/part/b/paragraph/wrapper604n2 The refuse collection vehicle and the hopper receiving the waste...
s.schedule/6/part/b/paragraph/wrapper605n2 If the engine speed is automatically accelerated when the compaction...
s.schedule/6/part/b/paragraph/wrapper606n2 If the engine speed for the compaction system is not...
s.schedule/6/part/b/paragraph/wrapper607n2 Materials are emptied in bulk with the lifting device into...
s.schedule/6/part/b/paragraph/wrapper608n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper609n2 The period of observation shall be:
s.schedule/6/part/b/paragraph/wrapper610n2 The resulting sound power level is calculated by:
s.schedule/6/part/b/paragraph/wrapper611n2 Note: In the case of a refuse collection vehicle only...
s.schedule/6/part/b/paragraph/wrapper612n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper613n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper614n2 The longitudinal axis of the road milling machine shall be...
s.schedule/6/part/b/paragraph/wrapper615n2 Test under load
s.schedule/6/part/b/paragraph/wrapper616n2 The road milling machine shall be brought to its steady...
s.schedule/6/part/b/paragraph/wrapper617n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper618n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper619n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper620n2 Test area
s.schedule/6/part/b/paragraph/wrapper621n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper622n2 In case of dispute, measurements shall be carried out in...
s.schedule/6/part/b/paragraph/wrapper623n2 Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper624n2 Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper625n2 K2A = 0
s.schedule/6/part/b/paragraph/wrapper626n2 Measurement indoors
s.schedule/6/part/b/paragraph/wrapper627n2 The value of the constant K2A, determined without artificial surface...
s.schedule/6/part/b/paragraph/wrapper628n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper629n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper630n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper631n2 The scarifier shall be operated with the engine at its...
s.schedule/6/part/b/paragraph/wrapper632n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper633n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper634n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper635n2 Test area
s.schedule/6/part/b/paragraph/wrapper636n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper637n2 Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper638n2 Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper639n2 K2A = 0
s.schedule/6/part/b/paragraph/wrapper640n2 Measurements indoors
s.schedule/6/part/b/paragraph/wrapper641n2 The value of the constant K2A, determined without artificial surface...
s.schedule/6/part/b/paragraph/wrapper642n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper643n2 ISO 11094:1991
s.schedule/6/part/b/paragraph/wrapper644n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper645n2 Test under load
s.schedule/6/part/b/paragraph/wrapper646n2 The shredder/chipper shall be tested chipping one or more pieces...
s.schedule/6/part/b/paragraph/wrapper647n2 The work-cycle consists of chipping a round piece of wood...
s.schedule/6/part/b/paragraph/wrapper648n2 Period of observation/determination of resulting sound power level
s.schedule/6/part/b/paragraph/wrapper649n2 The period of observation shall end when there is no...
s.schedule/6/part/b/paragraph/wrapper650n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper651n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper652n2 The snow blower shall be tested in a stationary position....
s.schedule/6/part/b/paragraph/wrapper653n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper654n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper655n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper656n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper657n2 The suction vehicle shall be tested in a stationary position....
s.schedule/6/part/b/paragraph/wrapper658n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper659n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper660n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper661n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper662n2 Measurement at ground-level
s.schedule/6/part/b/paragraph/wrapper663n2 Hemisphere/six microphone positions according to Part A paragraph 5/according to...
s.schedule/6/part/b/paragraph/wrapper664n2 Measurements carried out at jib-height.
s.schedule/6/part/b/paragraph/wrapper665n2 Where the lifting mechanism is located at the jib-height, the...
s.schedule/6/part/b/paragraph/wrapper666n2 Where the measurement is carried out with the lifting mechanism...
s.schedule/6/part/b/paragraph/wrapper667n2 The microphone positions shall be as follows (see Figure 53.1):...
s.schedule/6/part/b/paragraph/wrapper668n2 Four microphone positions on a horizontal plane passing through the...
s.schedule/6/part/b/paragraph/wrapper669n2 The other two microphone positions shall be located at the...
s.schedule/6/part/b/paragraph/wrapper670n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper671n2 Measurement of lifting mechanism
s.schedule/6/part/b/paragraph/wrapper672n2 The lifting mechanism during the test shall be mounted in...
s.schedule/6/part/b/paragraph/wrapper673n2 The mounted crane shall be placed on a flat reflecting...
s.schedule/6/part/b/paragraph/wrapper674n2 The lifting mechanism shall be at least 12 m above...
s.schedule/6/part/b/paragraph/wrapper675n2 The lifting mechanism shall be fixed to a flat reflecting...
s.schedule/6/part/b/paragraph/wrapper676n2 Measurement of the energy generator.
s.schedule/6/part/b/paragraph/wrapper677n2 Where the energy generator is attached to the crane, whether...
s.schedule/6/part/b/paragraph/wrapper678n2 Where the lifting mechanism is situated on the jib stay,...
s.schedule/6/part/b/paragraph/wrapper679n2 Where the energy source powering the crane is independent from...
s.schedule/6/part/b/paragraph/wrapper680n2 Where the energy generator is attached to the crane, the...
s.schedule/6/part/b/paragraph/wrapper681n2 During the test the lifting mechanism and the energy generator...
s.schedule/6/part/b/paragraph/wrapper682n2 Test free of load
s.schedule/6/part/b/paragraph/wrapper683n2 The energy generator incorporated in the crane shall operate at...
s.schedule/6/part/b/paragraph/wrapper684n2 The lifting mechanism shall operate free of load, with its...
s.schedule/6/part/b/paragraph/wrapper685n2 Test under load
s.schedule/6/part/b/paragraph/wrapper686n2 The energy generator incorporated in the crane shall operate at...
s.schedule/6/part/b/paragraph/wrapper687n2 Period(s) of observation/determination of resulting sound power level if more...
s.schedule/6/part/b/paragraph/wrapper688n2 For the measurement of the sound pressure level of the...
s.schedule/6/part/b/paragraph/wrapper689n2 (tr +tf) seconds: t r being the period in seconds...
s.schedule/6/part/b/paragraph/wrapper690n2 The root mean square value at microphone position i shall...
s.schedule/6/part/b/paragraph/wrapper691n2 Figure 53.1 Arrangement of microphone positions where the lifting mechanism...
s.schedule/6/part/b/paragraph/wrapper692n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper693n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper694n2 The truck mixer shall be tested in a stationary position....
s.schedule/6/part/b/paragraph/wrapper695n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper696n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper697n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper698n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper699n2 Parallelepiped/according to EN ISO 3744:1995 with measurement distanced = 1...
s.schedule/6/part/b/paragraph/wrapper700n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper701n2 The water pump unit shall be installed on the reflecting...
s.schedule/6/part/b/paragraph/wrapper702n2 Test under load
s.schedule/6/part/b/paragraph/wrapper703n2 The engine must operate at the point of best efficiency...
s.schedule/6/part/b/paragraph/wrapper704n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper705n2 The period of observation shall at least be 15 seconds....
s.schedule/6/part/b/paragraph/wrapper706n2 Basic noise emission standard
s.schedule/6/part/b/paragraph/wrapper707n2 Environmental correction K2A
s.schedule/6/part/b/paragraph/wrapper708n2 Measurement in the open air
s.schedule/6/part/b/paragraph/wrapper709n2 K2A = 0
s.schedule/6/part/b/paragraph/wrapper710n2 Measurement indoors
s.schedule/6/part/b/paragraph/wrapper711n2 The value of the constant K2A, determined in accordance with...
s.schedule/6/part/b/paragraph/wrapper712n2 Measurement surface/number of microphone positions/measuring distance
s.schedule/6/part/b/paragraph/wrapper713n2 Hemisphere/6 microphone positions according to Part A item 5/according to...
s.schedule/6/part/b/paragraph/wrapper714n2 Ifl2 m: a parallelepiped according to EN ISO 3744:1995 may...
s.schedule/6/part/b/paragraph/wrapper715n2 Operating conditions during test
s.schedule/6/part/b/paragraph/wrapper716n2 The welding generators shall be installed on the reflecting plane;...
s.schedule/6/part/b/paragraph/wrapper717n2 Test under load
s.schedule/6/part/b/paragraph/wrapper718n2 ISO 8528-10:1998, point 9.
s.schedule/6/part/b/paragraph/wrapper719n2 Period of observation
s.schedule/6/part/b/paragraph/wrapper720n2 The period of observation shall at least be 15 seconds....
s.schedule/7/part/paragraph/wrapper721n2 The CE UK conformity marking must consist of the initials...
s.schedule/7/part/paragraph/wrapper722n2 schedule/7/part/paragraph/wrapper722n2
s.schedule/7/part/paragraph/wrapper723n2 If the CE UK marking is reduced or enlarged according...
s.schedule/7/part/paragraph/wrapper724n2 The indication of the guaranteed sound power level must consist...
s.schedule/7/part/paragraph/wrapper725n2 schedule/7/part/paragraph/wrapper725n2

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.