UK Statutory Instrument 2001 United Kingdom

The Noise Emission in the Environment by Equipment for use Outdoors Regulations 2001

At a glance

Enforced by

OPSS

What's here

26 compliance obligations

Penalty landscape

3 of 26 obligations carry imprisonment (3 months). 3 carry different penalties and 20 have no criminal penalty — flagged in the list below.

Who this Act binds

Business-side actors with duties under this Act, ranked by how often they appear.

  • Manufacturer 16
  • Any Person 4
  • Responsible Person 2
  • Director or Officer 2

Plus 2 non-business duties on Crown ministers, regulators, local authorities or tribunals — shown collapsed under each section below.

Other Acts binding the same actors

For each actor bound by this Act, the other UK Acts that bind them most often. Useful for understanding the full compliance landscape facing each role.

Manufacturers also bound by 82 other Acts (top 5 shown)
Any Person also bound by 749 other Acts (top 5 shown)
Responsible Persons also bound by 56 other Acts (top 5 shown)
Directors and Officers also bound by 224 other Acts (top 5 shown)

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

s.sch007

(ANNEX IV to the Directive)

2 years imprisonment
  • Use correct format and size for CE/UK markings and noise level labels Manufacturer
s.sch008

(ANNEX V to the Directive)

  • Maintain technical documentation and ensure noise compliance for equipment Manufacturer
  • Maintain technical records and affix conformity marking on all outdoor equipment Manufacturer
s.sch009

(ANNEX VI to the Directive)

  • Maintain technical files and undergo noise assessment for equipment Manufacturer
  • Prepare technical documents and get approved body checks for noise compliance Manufacturer
s.sch010

(ANNEX VII to the Directive)

  • Apply for unit verification for noise emission compliance Manufacturer
  • Declare and certify noise‑emission compliance for outdoor equipment Manufacturer
s.sch011

(ANNEX VIII to the Directive)

  • Implement a Full Quality Assurance system for equipment noise emissions Manufacturer
  • Set up and maintain a quality assurance system for noise compliance Manufacturer
s.sch012a

Approved body requirements

  • Ensure impartial inspections and hold liability insurance Any Person
  • Ensure independence and competence of equipment verification bodies Director or Officer
Browse 894 other Schedules — structural / supplementary
s.sch003

Type of equipment Net installed power P (in kW )...

s.sch004

Aerial access platforms with combustion engines

s.sch004

Concrete-breakers and picks, hand held

s.sch004

Concrete or mortar mixer

s.sch004

Construction winch

s.sch004

Conveying and spraying machine for concrete and mortar

s.sch004

Conveyor belt

s.sch004

Cooling equipment on vehicles

s.sch004

Dozer

s.sch004

Drill rig

s.sch004

Dumper

s.sch004

Equipment for loading and unloading of silos or tanks on trucks

s.sch004

Brush cutter

s.sch004

Excavator, hydraulic or rope-operated

s.sch004

Excavator-loader

s.sch004

Glass recycling container

s.sch004

Grader

s.sch004

Grass trimmer/grass edge trimmer

s.sch004

Hedge trimmer

s.sch004

High pressure flusher

s.sch004

High pressure water jet machine

s.sch004

Hydraulic hammer

s.sch004

Hydraulic power pack

s.sch004

Builders’ hoist for the transport of goods

s.sch004

Joint cutter

s.sch004

Landfill compactor, loader-type with bucket

s.sch004

Lawnmower

s.sch004

Lawn trimmer/lawn edge trimmer

s.sch004

Leaf blower

s.sch004

Leaf collector

s.sch004

Lift truck, combustion-engine driven, counterbalanced

s.sch004

Loader

s.sch004

Mobile crane

s.sch004

Mobile waste container

s.sch004

Building site band saw machine

s.sch004

Motor hoe

s.sch004

Paver-finisher

s.sch004

Piling equipment

s.sch004

Pipelayer

s.sch004

Piste caterpillar

s.sch004

Power generator

s.sch004

Power sweeper

s.sch004

Refuse collection vehicle

s.sch004

Road-milling machine

s.sch004

Scarifier

s.sch004

Building site circular saw bench

s.sch004

Shredder/chipper

s.sch004

Snow-removing machine with rotating tools

s.sch004

Suction vehicle

s.sch004

Tower crane

s.sch004

Trencher

s.sch004

Truck mixer

s.sch004

Water pump unit

s.sch004

Welding generator

s.sch004

Chain saw, portable

s.sch004

Combined high pressure flusher and suction vehicle

s.sch004

Compaction machine

s.sch004

Compressor

s.sch006

Equipment that is tested free of load

s.sch006

Concrete-breakers and picks, hand-held

s.sch006

Fan speed

s.sch006

Concrete or mortar mixers

s.sch006

Test of powered equipment free of load

s.sch006

Construction winches

s.sch006

Test of powered equipment under load

s.sch006

Conveying and spraying machines for concrete and mortar

s.sch006

Test of hand-operated equipment

s.sch006

Conveyor Belts

s.sch006

Cooling equipment on vehicles

s.sch006

Dozers

s.sch006

Drill rigs

s.sch006

Dumpers

s.sch006

Equipment for loading and unloading tanks or silos on trucks

s.sch006

Excavators

s.sch006

Excavator-loaders

s.sch006

Glass recycling containers

s.sch006

Graders

s.sch006

Grass trimmers/grass edge trimmers

s.sch006

Hedge trimmers

s.sch006

High pressure flushers

s.sch006

High pressure water jet machines

s.sch006

Hydraulic hammers

s.sch006

Hydraulic power packs

s.sch006

Joint cutters

s.sch006

Landfill compactors

s.sch006

Lawnmowers

s.sch006

Lawn trimmers/lawn edge trimmers

s.sch006

Leaf blowers

s.sch006

Leaf collectors

s.sch006

Lift trucks

s.sch006

Loaders

s.sch006

Mobile Cranes

s.sch006

Mobile waste containers

s.sch006

Motor hoes

s.sch006

Paver-finishers

s.sch006

Piling equipment

s.sch006

Pipelayers

s.sch006

Piste caterpillars

s.sch006

Power generators

s.sch006

Power sweepers

s.sch006

Refuse collection vehicles

s.sch006

Road milling machines

s.sch006

Scarifiers

s.sch006

Shredders/Chippers

s.sch006

Snow removing machines with rotating tools

s.sch006

Suction vehicles

s.sch006

Tower cranes

s.sch006

Trenchers

s.sch006

Truck Mixers

s.sch006

Water pump units

s.sch006

Welding generators

s.sch006

Combined High Pressure Flushers and Suction Vehicles

s.sch006

Compaction Machines

s.sch006

Compressors

s.sch006n

Annex III - METHODS TO MEASURE AIRBORNE NOISE EMITTED BY EQUIPMENT FOR USE OUTDOORS

s.sch008

This Schedule describes the procedure whereby the manufacturer, or his...

s.sch008

The manufacturer, or his authorised representative established in the European...

s.sch008

The technical documentation must enable the conformity of the equipment...

s.sch008

The manufacturer must take all measures necessary in order that...

s.sch009

This Schedule describes the procedure whereby the manufacturer, or his...

s.sch009

The manufacturer, or his authorised representative established in the European...

s.sch009

The technical documentation must enable the conformity of the equipment...

s.sch009

The manufacturer must take all measures necessary in order that...

s.sch009

Evaluation by the approved body prior to placing on the...

s.sch009

Evaluation by the approved body during production The manufacturer, or...

s.sch010

This Schedule describes the procedure whereby the manufacturer, or his...

s.sch010

The application for a unit verification must be lodged by...

s.sch010

The approved body must: — examine whether the equipment has...

s.sch010

Where the equipment meets the provisions of these Regulations, the...

s.sch010

The manufacturer, or his authorised representative established in the European...

s.sch011

This Schedule describes the procedure whereby the manufacturer who satisfies...

s.sch011

The manufacturer must operate an approved quality assurance system for...

s.sch011

The manufacturer must, for a period ending at least 10...

s.sch011

Each approved body must give the other approved bodies the...

s.sch012a

(1) The body, its director and its staff responsible for...

s.sch012a

The body and its staff must carry out the assessments...

s.sch012a

The body must have at its disposal the necessary staff...

s.sch012a

The staff responsible for inspection must have—

s.sch012a

The body must be able to demonstrate the impartiality of...

s.sch012a

The remuneration of the inspection staff must not depend on...

s.sch012a

The body must have, and must satisfy the Secretary of...

s.sch012a

The body must ensure that its staff observe professional secrecy...

s.sch012a

Paragraph 8 does not prevent the staff from providing the...

s.sch013

Enforcement authorities

s.sch013

False information

s.sch013

Obstruction etc. of officers of enforcement authorities etc.

s.sch013

Extension of time for bringing summary proceedings

s.sch013

Forfeiture: England and Wales and Northern Ireland

s.sch013

Forfeiture: Scotland

s.sch013

Recovery of expenses of enforcement

s.sch013

Service of documents etc.

s.sch013

Savings for certain privileges

s.sch013

Savings for action taken under other enactments

s.sch013

Test purchases

s.sch013

Powers of search etc.

s.sch013

Provisions supplemental to paragraph 3

s.sch013

Appeals against detention of equipment

s.sch013

Suspension notices

s.sch013

Appeals against suspension notices

s.sch013

Power to require production of documents and information etc.

s.sch013

Contravention of a suspension notice

s.schedule/11/part/paragraph/wrapper743n2

schedule/11/part/paragraph/wrapper743n2

s.schedule/11/part/paragraph/wrapper744n2

schedule/11/part/paragraph/wrapper744n2

s.schedule/11/part/paragraph/wrapper745n2

schedule/11/part/paragraph/wrapper745n2

s.schedule/12/part/paragraph/wrapper746n2

schedule/12/part/paragraph/wrapper746n2

s.schedule/1/part/paragraph/wrapper10n2

Definition: Annex I Schedule 4, Item 12. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper11n2

dozers (<500 kW)

s.schedule/1/part/paragraph/wrapper12n2

Definition: Annex I Schedule 4, Item 16. Measurement : Annex...

s.schedule/1/part/paragraph/wrapper13n2

dumpers (<500 kW)

s.schedule/1/part/paragraph/wrapper14n2

Definition: Annex I Schedule 4, Item 18. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper15n2

excavators, hydraulic or rope-operated (<500 kW)

s.schedule/1/part/paragraph/wrapper16n2

Definition: Annex I Schedule 4, Item 20. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper17n2

excavator-loaders (<500 kW)

s.schedule/1/part/paragraph/wrapper18n2

Definition: Annex I Schedule 4, Item 21. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper19n2

graders (<500 kW)

s.schedule/1/part/paragraph/wrapper1n2

builders’ hoists for the transport of goods (combustion-engine driven)

s.schedule/1/part/paragraph/wrapper20n2

Definition: Annex I Schedule 4, Item 23. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper21n2

hydraulic power packs

s.schedule/1/part/paragraph/wrapper22n2

Definition: Annex I Schedule 4, Item 29. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper23n2

landfill compactors, loader-type with bucket (<500 kW)

s.schedule/1/part/paragraph/wrapper24n2

Definition: Annex I Schedule 4, Item 31. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper25n2

lawnmowers (excluding agricultural and forestry equipment, and multi-purpose devices, the...

s.schedule/1/part/paragraph/wrapper26n2

Definition: Annex I Schedule 4, Item 32. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper27n2

lawn trimmers/lawn edge trimmers

s.schedule/1/part/paragraph/wrapper28n2

Definition: Annex I Schedule 4, Item 33. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper29n2

lift trucks, combustion-engine driven, counterbalanced (excluding “other counterbalanced lift trucks"...

s.schedule/1/part/paragraph/wrapper2n2

Definition: Annex I Schedule 4, Item 3. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper30n2

Definition: Annex I Schedule 4, Item 36. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper31n2

loaders (<500 kW)

s.schedule/1/part/paragraph/wrapper32n2

Definition: Annex I Schedule 4, Item 37. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper33n2

mobile cranes

s.schedule/1/part/paragraph/wrapper34n2

Definition: Annex I Schedule 4, Item 38. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper35n2

motor hoes (<3 kW)

s.schedule/1/part/paragraph/wrapper36n2

Definition: Annex I Schedule 4, Item 40. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper37n2

paver-finishers (excluding paver-finishers equipped with a high-compaction screed)

s.schedule/1/part/paragraph/wrapper38n2

Definition: Annex I Schedule 4, Item 41. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper39n2

power generators (<400 kW)

s.schedule/1/part/paragraph/wrapper3n2

compaction machines (only vibrating and non-vibrating rollers, vibratory plates and...

s.schedule/1/part/paragraph/wrapper40n2

Definition: Annex I Schedule 4, Item 45. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper41n2

tower cranes

s.schedule/1/part/paragraph/wrapper42n2

Definition: Annex I Schedule 4, Item 53. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper43n2

welding generators

s.schedule/1/part/paragraph/wrapper44n2

Definition: Annex I Schedule 4, Item 57. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper4n2

Definition: Annex I Schedule 4, Item 8. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper5n2

compressors (<350 kW)

s.schedule/1/part/paragraph/wrapper6n2

Definition: Annex I Schedule 4, Item 9. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper7n2

concrete-breakers and picks, hand-held

s.schedule/1/part/paragraph/wrapper8n2

Definition: Annex I Schedule 4, Item 10. Measurement: Annex III...

s.schedule/1/part/paragraph/wrapper9n2

construction winches (combustion-engine driven)

s.schedule/2/part/paragraph/wrapper100n2

Definition: Annex I Schedule 4, Item 42. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper101n2

pipelayers

s.schedule/2/part/paragraph/wrapper102n2

Definition: Annex I Schedule 4, Item 43. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper103n2

piste caterpillars

s.schedule/2/part/paragraph/wrapper104n2

Definition: Annex I Schedule 4, Item 44. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper105n2

power generators ( ≥400 kW)

s.schedule/2/part/paragraph/wrapper106n2

Definition: Annex I Schedule 4, Item 45. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper107n2

power sweepers

s.schedule/2/part/paragraph/wrapper108n2

Definition: Annex I Schedule 4, Item 46. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper109n2

refuse collection vehicles

s.schedule/2/part/paragraph/wrapper110n2

Definition: Annex I Schedule 4, Item 47. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper111n2

road milling machines

s.schedule/2/part/paragraph/wrapper112n2

Definition: Annex I Schedule 4, Item 48. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper113n2

scarifiers

s.schedule/2/part/paragraph/wrapper114n2

Definition: Annex I Schedule 4, Item 49. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper115n2

shredders/chippers

s.schedule/2/part/paragraph/wrapper116n2

Definition: Annex I Schedule 4, Item 50. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper117n2

snow-removing machines with rotating tools (self-propelled, excluding attachments)

s.schedule/2/part/paragraph/wrapper118n2

Definition: Annex I Schedule 4, Item 51. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper119n2

suction vehicles

s.schedule/2/part/paragraph/wrapper120n2

Definition: Annex I Schedule 4, Item 52. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper121n2

trenchers

s.schedule/2/part/paragraph/wrapper122n2

Definition: Annex I Schedule 4, Item 54. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper123n2

truck mixers

s.schedule/2/part/paragraph/wrapper124n2

Definition: Annex I Schedule 4, Item 55. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper125n2

water pump units (not for use under water)

s.schedule/2/part/paragraph/wrapper126n2

Definition: Annex I Schedule 4, Item 56. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper45n2

aerial access platforms with combustion engine

s.schedule/2/part/paragraph/wrapper46n2

Definition: Annex I Schedule 4, Item 1. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper47n2

brush cutters

s.schedule/2/part/paragraph/wrapper48n2

Definition: Annex I Schedule 4, Item 2. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper49n2

builders’ hoists for the transport of goods (with electric motor)...

s.schedule/2/part/paragraph/wrapper50n2

Definition: Annex I Schedule 4, Item 3. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper51n2

building site band saw machines

s.schedule/2/part/paragraph/wrapper52n2

Definition: Annex I Schedule 4, Item 4. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper53n2

building site circular saw benches

s.schedule/2/part/paragraph/wrapper54n2

Definition: Annex I Schedule 4, Item 5. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper55n2

chain saws, portable

s.schedule/2/part/paragraph/wrapper56n2

Definition: Annex I Schedule 4, Item 6. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper57n2

combined high pressure flushers and suction vehicles

s.schedule/2/part/paragraph/wrapper58n2

Definition: Annex I Schedule 4, Item 7. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper59n2

compaction machines (explosion rammers only)

s.schedule/2/part/paragraph/wrapper60n2

Definition: Annex I Schedule 4, Item 8. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper61n2

concrete or mortar mixers

s.schedule/2/part/paragraph/wrapper62n2

Definition: Annex I Schedule 4, Item 11. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper63n2

construction winches (with electric motor)

s.schedule/2/part/paragraph/wrapper64n2

Definition: Annex I Schedule 4, Item 12. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper65n2

conveying and spraying machines for concrete and mortar

s.schedule/2/part/paragraph/wrapper66n2

Definition: Annex I Schedule 4, Item 13. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper67n2

conveyor belts

s.schedule/2/part/paragraph/wrapper68n2

Definition: Annex I Schedule 4, Item 14. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper69n2

cooling equipment on vehicles

s.schedule/2/part/paragraph/wrapper70n2

Definition: Annex I Schedule 4, Item 15. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper71n2

drill rigs

s.schedule/2/part/paragraph/wrapper72n2

Definition: Annex I Schedule 4, Item 17. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper73n2

equipment for loading and unloading silos or tanks on trucks...

s.schedule/2/part/paragraph/wrapper74n2

Definition: Annex I Schedule 4, Item 19. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper75n2

glass recycling containers

s.schedule/2/part/paragraph/wrapper76n2

Definition: Annex I Schedule 4, Item 22. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper77n2

grass trimmers/grass edge trimmers

s.schedule/2/part/paragraph/wrapper78n2

Definition: Annex I Schedule 4, Item 24. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper79n2

hedge trimmers

s.schedule/2/part/paragraph/wrapper80n2

Definition: Annex I Schedule 4, Item 25. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper81n2

high pressure flushers

s.schedule/2/part/paragraph/wrapper82n2

Definition: Annex I Schedule 4, Item 26. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper83n2

high pressure water jet machines

s.schedule/2/part/paragraph/wrapper84n2

Definition: Annex I Schedule 4, Item 27. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper85n2

hydraulic hammers

s.schedule/2/part/paragraph/wrapper86n2

Definition: Annex I Schedule 4, Item 28. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper87n2

joint cutters

s.schedule/2/part/paragraph/wrapper88n2

Definition: Annex I Schedule 4, Item 30. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper89n2

leaf blowers

s.schedule/2/part/paragraph/wrapper90n2

Definition: Annex I Schedule 4, Item 34. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper91n2

leaf collectors

s.schedule/2/part/paragraph/wrapper92n2

Definition: Annex I Schedule 4, Item 35. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper93n2

lift trucks, combustion-engine driven, counterbalanced (only “other counterbalanced lift trucks"...

s.schedule/2/part/paragraph/wrapper94n2

Definition: Annex I Schedule 4, Item 36. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper95n2

mobile waste containers

s.schedule/2/part/paragraph/wrapper96n2

Definition: Annex I Schedule 4, Item 39. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper97n2

paver-finishers (equipped with a high-compaction screed)

s.schedule/2/part/paragraph/wrapper98n2

Definition: Annex I Schedule 4, Item 41. Measurement: Annex III...

s.schedule/2/part/paragraph/wrapper99n2

piling equipment

s.schedule/4/part/paragraph/wrapper129n2

Excluded are the following categories of device: — fans, i.e....

s.schedule/4/part/paragraph/wrapper130n2

These machines may be mounted on trucks, trailers or special...

s.schedule/4/part/paragraph/wrapper131n2

The refrigeration unit may be powered by means of an...

s.schedule/4/part/paragraph/wrapper132n2

Drill rigs are stationary during drilling. They may move from...

s.schedule/4/part/paragraph/wrapper133n2

The cutting devices are either: — rigid cutting elements, or...

s.schedule/4/part/paragraph/wrapper134n2

Also a walk-behind or ride-on grass cutting machine or a...

s.schedule/5/part/paragraph/wrapper135n2

The EC declaration of conformity must contain the following particulars:...

s.schedule/6/part/1/paragraph/wrapper136n2

Scope

s.schedule/6/part/1/paragraph/wrapper137n2

Part A of this Schedule for each type of equipment...

s.schedule/6/part/1/paragraph/wrapper138n2

Part B of this Schedule for each type of equipment...

s.schedule/6/part/1/paragraph/wrapper139n2

When testing specific types of equipment, the manufacturer or his...

s.schedule/6/part/a/paragraph/wrapper140n2

For the determination of the sound power level of equipment...

s.schedule/6/part/a/paragraph/wrapper141n2

The test is carried out with the equipment in a...

s.schedule/6/part/a/paragraph/wrapper142n2

If the machine is powered by a generator or from...

s.schedule/6/part/a/paragraph/wrapper143n2

If the machine is powered by battery, the battery shall...

s.schedule/6/part/a/paragraph/wrapper144n2

The speed used and the corresponding net power are stated...

s.schedule/6/part/a/paragraph/wrapper145n2

If the equipment is fitted with several engines, they must...

s.schedule/6/part/a/paragraph/wrapper146n2

The speed or velocity of the equipment during the test...

s.schedule/6/part/a/paragraph/wrapper147n2

If the equipment is fitted with several engines and/or aggregates...

s.schedule/6/part/a/paragraph/wrapper148n2

For each type of equipment that is to be tested...

s.schedule/6/part/a/paragraph/wrapper149n2

The report shall contain the technical data necessary to identify...

s.schedule/6/part/a/paragraph/wrapper152n2

schedule/6/part/A/paragraph/wrapper152n2

s.schedule/6/part/b/paragraph/wrapper153n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper154n2

Test area

s.schedule/6/part/b/paragraph/wrapper155n2

Reflecting surface of concrete or non-porous asphalt

s.schedule/6/part/b/paragraph/wrapper156n2

Environmental correction K2A

s.schedule/6/part/b/paragraph/wrapper157n2

K2A = 0

s.schedule/6/part/b/paragraph/wrapper158n2

Measurement surface/number of microphone positions/measuring distance (i) If the largest...

s.schedule/6/part/b/paragraph/wrapper159n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper160n2

The noise tests shall be carried out according to Part...

s.schedule/6/part/b/paragraph/wrapper161n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper162n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper163n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper164n2

Test area

s.schedule/6/part/b/paragraph/wrapper165n2

ISO 10884:1995

s.schedule/6/part/b/paragraph/wrapper166n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper167n2

ISO 10884:1995

s.schedule/6/part/b/paragraph/wrapper168n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper169n2

ISO 10884:1995, point 5.3

s.schedule/6/part/b/paragraph/wrapper170n2

Period(s) of observation

s.schedule/6/part/b/paragraph/wrapper171n2

ISO 10884:1995

s.schedule/6/part/b/paragraph/wrapper172n2

The geometrical centre of the engine shall be positioned above...

s.schedule/6/part/b/paragraph/wrapper173n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper174n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper175n2

ISO 7960:1995, Annex J withd = 1m

s.schedule/6/part/b/paragraph/wrapper176n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper177n2

Corresponding to ISO 7960:1995, Annex J (point J2(b) only)

s.schedule/6/part/b/paragraph/wrapper178n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper179n2

Corresponding to ISO 7960:1995, Annex J

s.schedule/6/part/b/paragraph/wrapper180n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper181n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper182n2

ISO 7960:1995, Annex A, measurement distanced = 1m

s.schedule/6/part/b/paragraph/wrapper183n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper184n2

ISO 7960:1995, Annex A (point A2(b) only)

s.schedule/6/part/b/paragraph/wrapper185n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper186n2

ISO 7960:1995 Annex A

s.schedule/6/part/b/paragraph/wrapper187n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper188n2

Test area

s.schedule/6/part/b/paragraph/wrapper189n2

ISO 9207:1995

s.schedule/6/part/b/paragraph/wrapper190n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper191n2

ISO 9207:1995

s.schedule/6/part/b/paragraph/wrapper192n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper193n2

Full load sawing wood/engine at maximum revolution without load

s.schedule/6/part/b/paragraph/wrapper194n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper195n2

ISO 9207:1995 points 6.3 and 6.4

s.schedule/6/part/b/paragraph/wrapper196n2

The resulting sound power level Lwa is calculated by: L...

s.schedule/6/part/b/paragraph/wrapper197n2

See No. 0 (ii) Vibrating rollers for ride-on operators

s.schedule/6/part/b/paragraph/wrapper198n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper199n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper200n2

The vibrating roller shall be installed on one or more...

s.schedule/6/part/b/paragraph/wrapper201n2

Test under load

s.schedule/6/part/b/paragraph/wrapper202n2

The machine shall be tested in a stationary position with...

s.schedule/6/part/b/paragraph/wrapper203n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper204n2

The period of observation shall be at least 15 seconds....

s.schedule/6/part/b/paragraph/wrapper205n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper206n2

Test area

s.schedule/6/part/b/paragraph/wrapper207n2

EN 500-4 rev. 1:1998, Annex C

s.schedule/6/part/b/paragraph/wrapper208n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper209n2

EN 500-4 rev. 1:1998, Annex C

s.schedule/6/part/b/paragraph/wrapper210n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper211n2

EN 500-4 rev. 1:1998, Annex C

s.schedule/6/part/b/paragraph/wrapper212n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper213n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper214n2

hemisphere/six microphone positions according to Part A item 5/according to...

s.schedule/6/part/b/paragraph/wrapper215n2

or

s.schedule/6/part/b/paragraph/wrapper216n2

parallelepiped according to ISO 3744:1995 with measurement distanced = 1m...

s.schedule/6/part/b/paragraph/wrapper217n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper218n2

The compressors shall be installed on the reflecting plane; skid-mounted...

s.schedule/6/part/b/paragraph/wrapper219n2

Test under load

s.schedule/6/part/b/paragraph/wrapper220n2

The compressor under test shall have been warmed up and...

s.schedule/6/part/b/paragraph/wrapper221n2

The determination of the sound power level shall be made...

s.schedule/6/part/b/paragraph/wrapper222n2

Should the layout of the complete plant be such that...

s.schedule/6/part/b/paragraph/wrapper223n2

During test the gas exhausted from the compressor shall be...

s.schedule/6/part/b/paragraph/wrapper224n2

Care shall be taken that air discharge does not introduce...

s.schedule/6/part/b/paragraph/wrapper225n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper226n2

The period of observation shall be at least 15 seconds....

s.schedule/6/part/b/paragraph/wrapper227n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper228n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper229n2

Hemisphere/six microphone positions according to Part A item 5 and...

s.schedule/6/part/b/paragraph/wrapper230n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper231n2

All appliances shall be tested in the vertical position.

s.schedule/6/part/b/paragraph/wrapper232n2

If the test appliance has got an air exhaust, its...

s.schedule/6/part/b/paragraph/wrapper233n2

Support of the appliance

s.schedule/6/part/b/paragraph/wrapper234n2

The appliance shall be coupled during the test run to...

s.schedule/6/part/b/paragraph/wrapper235n2

Block characteristics

s.schedule/6/part/b/paragraph/wrapper236n2

The block shall be in the shape of a cube...

s.schedule/6/part/b/paragraph/wrapper237n2

Quality of the concrete

s.schedule/6/part/b/paragraph/wrapper238n2

The quality of the concrete shall correspond to C 50/60...

s.schedule/6/part/b/paragraph/wrapper239n2

The cube shall be reinforced by 8 mm-diameter steel rods...

s.schedule/6/part/b/paragraph/wrapper240n2

Supporting tool

s.schedule/6/part/b/paragraph/wrapper241n2

The tool shall be sealed into the block and shall...

s.schedule/6/part/b/paragraph/wrapper242n2

Suitable treatment shall be carried out to integrate the two...

s.schedule/6/part/b/paragraph/wrapper243n2

The block shall remain mechanically sound, particularly at the point...

s.schedule/6/part/b/paragraph/wrapper244n2

Positioning of the cube

s.schedule/6/part/b/paragraph/wrapper245n2

The cube shall be set in a pit cemented throughout,...

s.schedule/6/part/b/paragraph/wrapper246n2

The opening in the screening slab through which the tool...

s.schedule/6/part/b/paragraph/wrapper247n2

Test under load

s.schedule/6/part/b/paragraph/wrapper248n2

The appliance tested shall be connected to the supporting tool....

s.schedule/6/part/b/paragraph/wrapper249n2

The test appliance shall be operated in stable conditions having...

s.schedule/6/part/b/paragraph/wrapper250n2

The test appliance shall be operated at the maximum power...

s.schedule/6/part/b/paragraph/wrapper251n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper252n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper253n2

schedule/6/part/B/paragraph/wrapper253n2

s.schedule/6/part/b/paragraph/wrapper254n2

schedule/6/part/B/paragraph/wrapper254n2

s.schedule/6/part/b/paragraph/wrapper255n2

The value of A should be such that the screening...

s.schedule/6/part/b/paragraph/wrapper256n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper257n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper258n2

The mixing device (drum) shall be filled to its rated...

s.schedule/6/part/b/paragraph/wrapper259n2

The mixing device shall be operated at least at the...

s.schedule/6/part/b/paragraph/wrapper260n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper261n2

The period of observation shall be at least 15 seconds....

s.schedule/6/part/b/paragraph/wrapper262n2

The geometrical centre of the engine shall be positioned above...

s.schedule/6/part/b/paragraph/wrapper263n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper264n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper265n2

Test under load (i) For machines conveying and spraying concrete:...

s.schedule/6/part/b/paragraph/wrapper266n2

The conveying system and the pipe shall be filled with...

s.schedule/6/part/b/paragraph/wrapper267n2

The conveying system and the pipe shall be filled with...

s.schedule/6/part/b/paragraph/wrapper268n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper269n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper270n2

The geometrical centre of the engine shall be positioned above...

s.schedule/6/part/b/paragraph/wrapper271n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper272n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper273n2

The cooling equipment shall be installed in a real or...

s.schedule/6/part/b/paragraph/wrapper274n2

Cooling equipment installed in cargo-space refrigeration units which have a...

s.schedule/6/part/b/paragraph/wrapper275n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper276n2

The period of observation shall be at least 15 seconds....

s.schedule/6/part/b/paragraph/wrapper277n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper278n2

Test area

s.schedule/6/part/b/paragraph/wrapper279n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper280n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper281n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper282n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper283n2

Crawler dozers shall be tested on the test site corresponding...

s.schedule/6/part/b/paragraph/wrapper284n2

Test under load

s.schedule/6/part/b/paragraph/wrapper285n2

ISO 6395:1988, Annex B

s.schedule/6/part/b/paragraph/wrapper286n2

Period(s) of observation and consideration of different operating conditions, if...

s.schedule/6/part/b/paragraph/wrapper287n2

ISO 6395:1988, Annex B

s.schedule/6/part/b/paragraph/wrapper288n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper289n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper290n2

EN 791:1995, Annex A

s.schedule/6/part/b/paragraph/wrapper291n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper292n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper293n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper294n2

Test area

s.schedule/6/part/b/paragraph/wrapper295n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper296n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper297n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper298n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper299n2

Equivalent ISO 6395:1988, Annex C, with the following amendment:

s.schedule/6/part/b/paragraph/wrapper300n2

C4.3, second paragraph is replaced by: The engine shall be...

s.schedule/6/part/b/paragraph/wrapper301n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper302n2

ISO 6395:1988, Annex C

s.schedule/6/part/b/paragraph/wrapper303n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper304n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper305n2

The equipment shall be tested with the truck in a...

s.schedule/6/part/b/paragraph/wrapper306n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper307n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper308n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper309n2

Test area

s.schedule/6/part/b/paragraph/wrapper310n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper311n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper312n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper313n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper314n2

ISO 6395:1988, Annex A

s.schedule/6/part/b/paragraph/wrapper315n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper316n2

ISO 6395:1988, Annex A

s.schedule/6/part/b/paragraph/wrapper317n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper318n2

Test area

s.schedule/6/part/b/paragraph/wrapper319n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper320n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper321n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper322n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper323n2

ISO 6395:1988, Annex D

s.schedule/6/part/b/paragraph/wrapper324n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper325n2

ISO 6395:1988, Annex D

s.schedule/6/part/b/paragraph/wrapper326n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper327n2

For the purpose of this noise test code the single-event...

s.schedule/6/part/b/paragraph/wrapper328n2

Environmental correction K2A

s.schedule/6/part/b/paragraph/wrapper329n2

Measurement in the open air

s.schedule/6/part/b/paragraph/wrapper330n2

K2A = 0

s.schedule/6/part/b/paragraph/wrapper331n2

Measurements indoors

s.schedule/6/part/b/paragraph/wrapper332n2

The value of the constant K2A, determined in accordance with...

s.schedule/6/part/b/paragraph/wrapper333n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper334n2

The glass bottles are defined as follows: — capacity: 75cl...

s.schedule/6/part/b/paragraph/wrapper335n2

The testing operator holds each bottle by its neck and...

s.schedule/6/part/b/paragraph/wrapper336n2

Period(s) of observation/determination of resulting sound power if more than...

s.schedule/6/part/b/paragraph/wrapper337n2

The A-weighted single-event sound pressure level is preferably simultaneously measured...

s.schedule/6/part/b/paragraph/wrapper338n2

The A-weighted single-event sound power level averaged over the measurement...

s.schedule/6/part/b/paragraph/wrapper339n2

The A-weighted single-event sound pressure level averaged over all 120...

s.schedule/6/part/b/paragraph/wrapper340n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper341n2

Test area

s.schedule/6/part/b/paragraph/wrapper342n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper343n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper344n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper345n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper346n2

Corresponding to ISO 6395:1988, Annex B

s.schedule/6/part/b/paragraph/wrapper347n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper348n2

ISO 6395:1988, Annex B

s.schedule/6/part/b/paragraph/wrapper349n2

The trimmer shall be positioned by a suitable device in...

s.schedule/6/part/b/paragraph/wrapper350n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper351n2

Test area

s.schedule/6/part/b/paragraph/wrapper352n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper353n2

in case of dispute, measurements shall be carried out in...

s.schedule/6/part/b/paragraph/wrapper354n2

Environmental correction K2A

s.schedule/6/part/b/paragraph/wrapper355n2

Measurement in the open air

s.schedule/6/part/b/paragraph/wrapper356n2

K2A = 0

s.schedule/6/part/b/paragraph/wrapper357n2

Measurements indoors

s.schedule/6/part/b/paragraph/wrapper358n2

The value of the constant K2A, determined without the artificial...

s.schedule/6/part/b/paragraph/wrapper359n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper360n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper361n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper362n2

The hedge trimmer shall be held in the natural manner...

s.schedule/6/part/b/paragraph/wrapper363n2

Test under load

s.schedule/6/part/b/paragraph/wrapper364n2

The hedge clipper shall be operated at its nominal speed...

s.schedule/6/part/b/paragraph/wrapper365n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper366n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper367n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper368n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper369n2

The high pressure flusher shall be tested in a stationary...

s.schedule/6/part/b/paragraph/wrapper370n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper371n2

The period of observation shall at least be 30 seconds....

s.schedule/6/part/b/paragraph/wrapper372n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper373n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper374n2

Parallelepiped/according to EN ISO 3744:1995 with measurement distanced = 1m...

s.schedule/6/part/b/paragraph/wrapper375n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper376n2

The high pressure water jet machine shall be installed on...

s.schedule/6/part/b/paragraph/wrapper377n2

Test under load

s.schedule/6/part/b/paragraph/wrapper378n2

The high-pressure cleaning machine shall be brought to its steady-state...

s.schedule/6/part/b/paragraph/wrapper379n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper380n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper381n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper382n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper383n2

Hemisphere/six microphone positions according to Part A, item 5/r=10 m...

s.schedule/6/part/b/paragraph/wrapper384n2

Operating conditions during tests

s.schedule/6/part/b/paragraph/wrapper385n2

For the test the hammer is attached to a carrier...

s.schedule/6/part/b/paragraph/wrapper386n2

Carrier

s.schedule/6/part/b/paragraph/wrapper387n2

The carrier for the test hammer shall meet the requirements...

s.schedule/6/part/b/paragraph/wrapper388n2

Mounting

s.schedule/6/part/b/paragraph/wrapper389n2

Mechanical mounting as well as connections (hoses, pipes ...) must...

s.schedule/6/part/b/paragraph/wrapper390n2

Hammer stability and static hold force

s.schedule/6/part/b/paragraph/wrapper391n2

The hammer shall be firmly held down by the carrier...

s.schedule/6/part/b/paragraph/wrapper392n2

Tool

s.schedule/6/part/b/paragraph/wrapper393n2

A blunt tool shall be used in the measurements. The...

s.schedule/6/part/b/paragraph/wrapper394n2

Test under load

s.schedule/6/part/b/paragraph/wrapper395n2

Hydraulic input and power and oil flow

s.schedule/6/part/b/paragraph/wrapper396n2

Operating conditions of the hydraulic hammer shall be appropriately adjusted,...

s.schedule/6/part/b/paragraph/wrapper397n2

Care shall be taken that the total uncertainty of the...

s.schedule/6/part/b/paragraph/wrapper398n2

Adjustable components having effect on the hammer power

s.schedule/6/part/b/paragraph/wrapper399n2

Pre-settings of all accumulators, pressure central valves and other possible...

s.schedule/6/part/b/paragraph/wrapper400n2

Quantities to be measured

s.schedule/6/part/b/paragraph/wrapper401n2

p s The mean value of the hydraulic supply fine...

s.schedule/6/part/b/paragraph/wrapper402n2

Q The mean value of the breaker inlet oil flow...

s.schedule/6/part/b/paragraph/wrapper403n2

T The oil temperature must lie between + 40/+ 60°...

s.schedule/6/part/b/paragraph/wrapper404n2

Pa The prefill gas pressure of all accumulators must be...

s.schedule/6/part/b/paragraph/wrapper405n2

Parameters to be evaluated from the measured operating parameters:

s.schedule/6/part/b/paragraph/wrapper406n2

P IN Hydraulic input power of the breaker P IN...

s.schedule/6/part/b/paragraph/wrapper407n2

Hydraulic supply line pressure measurement, ps —ps must be measured...

s.schedule/6/part/b/paragraph/wrapper408n2

Breaker inlet oil flow, Q —Q must be measured from...

s.schedule/6/part/b/paragraph/wrapper409n2

Measuring point of the oil temperature, T —T must be...

s.schedule/6/part/b/paragraph/wrapper410n2

Period of observation/determination of resulting sound power level

s.schedule/6/part/b/paragraph/wrapper411n2

The period of observation shall be at least 15 seconds....

s.schedule/6/part/b/paragraph/wrapper412n2

The measurements are repeated three times, or more if necessary....

s.schedule/6/part/b/paragraph/wrapper413n2

schedule/6/part/B/paragraph/wrapper413n2

s.schedule/6/part/b/paragraph/wrapper414n2

schedule/6/part/B/paragraph/wrapper414n2

s.schedule/6/part/b/paragraph/wrapper415n2

Definitions

s.schedule/6/part/b/paragraph/wrapper416n2

d Tool diameter (mm)

s.schedule/6/part/b/paragraph/wrapper417n2

d 1 Anvil diameter, 1200±100 mm

s.schedule/6/part/b/paragraph/wrapper418n2

d 2 Inner diameter of the anvil support structure, ≤...

s.schedule/6/part/b/paragraph/wrapper419n2

d 3 Diameter of the test block deck, ≤ 2200...

s.schedule/6/part/b/paragraph/wrapper420n2

d 4 Diameter of the tool opening in the deck,...

s.schedule/6/part/b/paragraph/wrapper421n2

d 5 Diameter of the tool seal, ≤1000 mm

s.schedule/6/part/b/paragraph/wrapper422n2

h¹ Visible tool length between the lowest part of the...

s.schedule/6/part/b/paragraph/wrapper423n2

h 2 Tool seal thickness above the deck, ≤20 mm...

s.schedule/6/part/b/paragraph/wrapper424n2

h 3 Distance between deck upper surface and anvil upper...

s.schedule/6/part/b/paragraph/wrapper425n2

h 4 Isolating foam rubber deck seal thickness, ≤30 mm...

s.schedule/6/part/b/paragraph/wrapper426n2

h 5 Anvil thickness, 350 ±50 mm

s.schedule/6/part/b/paragraph/wrapper427n2

h 6 Tool penetration, ≤50 mm

s.schedule/6/part/b/paragraph/wrapper428n2

If the quadratic shape of the test block structure is...

s.schedule/6/part/b/paragraph/wrapper429n2

The empty space between the deck and the anvil can...

s.schedule/6/part/b/paragraph/wrapper430n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper431n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper432n2

The hydraulic power pack shall be installed on the reflecting...

s.schedule/6/part/b/paragraph/wrapper433n2

Test under load

s.schedule/6/part/b/paragraph/wrapper434n2

During testing, no tools shall be coupled to the hydraulic...

s.schedule/6/part/b/paragraph/wrapper435n2

The hydraulic power pack shall be brought to its steady-state...

s.schedule/6/part/b/paragraph/wrapper436n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper437n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper438n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper439n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper440n2

The joint cutter shall be equipped with the largest possible...

s.schedule/6/part/b/paragraph/wrapper441n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper442n2

The period of observation shall be at least 15 seconds....

s.schedule/6/part/b/paragraph/wrapper443n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper444n2

Test area

s.schedule/6/part/b/paragraph/wrapper445n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper446n2

In case of dispute, measurements shall be carried out in...

s.schedule/6/part/b/paragraph/wrapper447n2

Environmental correction K2A

s.schedule/6/part/b/paragraph/wrapper448n2

Measurement in the open air

s.schedule/6/part/b/paragraph/wrapper449n2

K2A = 0

s.schedule/6/part/b/paragraph/wrapper450n2

Measurements indoors

s.schedule/6/part/b/paragraph/wrapper451n2

The value of the constant K2A, determined without the artificial...

s.schedule/6/part/b/paragraph/wrapper452n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper453n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper454n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper455n2

If the wheels of the lawnmower could cause a compression...

s.schedule/6/part/b/paragraph/wrapper456n2

Test free of load

s.schedule/6/part/b/paragraph/wrapper457n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper458n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper459n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper460n2

The trimmer shall be positioned by a suitable device in...

s.schedule/6/part/b/paragraph/wrapper461n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper462n2

Test area

s.schedule/6/part/b/paragraph/wrapper463n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper464n2

In case of dispute, measurements shall be carried out in...

s.schedule/6/part/b/paragraph/wrapper465n2

Environmental correction K2A

s.schedule/6/part/b/paragraph/wrapper466n2

Measurement in the open air

s.schedule/6/part/b/paragraph/wrapper467n2

K2A = 0

s.schedule/6/part/b/paragraph/wrapper468n2

Measurements indoors

s.schedule/6/part/b/paragraph/wrapper469n2

The value of the constant K2A, determined without artificial surface...

s.schedule/6/part/b/paragraph/wrapper470n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper471n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper472n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper473n2

The leaf blower shall be positioned in the natural manner...

s.schedule/6/part/b/paragraph/wrapper474n2

Test under load

s.schedule/6/part/b/paragraph/wrapper475n2

The leaf blower shall be operated at its nominal speed...

s.schedule/6/part/b/paragraph/wrapper476n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper477n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper478n2

Note: If a leaf blower can be also used as...

s.schedule/6/part/b/paragraph/wrapper479n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper480n2

Test area

s.schedule/6/part/b/paragraph/wrapper481n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper482n2

In case of dispute, measurements shall be carried out in...

s.schedule/6/part/b/paragraph/wrapper483n2

Environmental correction K2A

s.schedule/6/part/b/paragraph/wrapper484n2

Measurement in the open air

s.schedule/6/part/b/paragraph/wrapper485n2

K2A = 0

s.schedule/6/part/b/paragraph/wrapper486n2

Measurements indoors

s.schedule/6/part/b/paragraph/wrapper487n2

The value of the constant K2A, determined without artificial surface...

s.schedule/6/part/b/paragraph/wrapper488n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper489n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper490n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper491n2

The leaf collector shall be positioned in the natural manner...

s.schedule/6/part/b/paragraph/wrapper492n2

Test under load

s.schedule/6/part/b/paragraph/wrapper493n2

The leaf collector shall be operated at its nominal speed...

s.schedule/6/part/b/paragraph/wrapper494n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper495n2

The period of observation shall be at least 15 seconds....

s.schedule/6/part/b/paragraph/wrapper496n2

Note: If a leaf collector can be also used as...

s.schedule/6/part/b/paragraph/wrapper497n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper498n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper499n2

Lifting condition

s.schedule/6/part/b/paragraph/wrapper500n2

With the truck stationary the load (non-sound absorbent material, eg...

s.schedule/6/part/b/paragraph/wrapper501n2

Drive condition

s.schedule/6/part/b/paragraph/wrapper502n2

Drive the truck, without load, at full acceleration from standstill...

s.schedule/6/part/b/paragraph/wrapper503n2

If the truck has a multi-gear transmission, select the gear...

s.schedule/6/part/b/paragraph/wrapper504n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper505n2

The periods of observation are: — for lifting condition: the...

s.schedule/6/part/b/paragraph/wrapper506n2

The resulting sound power level for all types of lift...

s.schedule/6/part/b/paragraph/wrapper507n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper508n2

Test area

s.schedule/6/part/b/paragraph/wrapper509n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper510n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper511n2

ISO 6395:1988

s.schedule/6/part/b/paragraph/wrapper512n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper513n2

Crawler loaders shall be tested on the test site corresponding...

s.schedule/6/part/b/paragraph/wrapper514n2

Test under load

s.schedule/6/part/b/paragraph/wrapper515n2

ISO 6395:1988, Annex C

s.schedule/6/part/b/paragraph/wrapper516n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper517n2

ISO 6395:1988, Annex C

s.schedule/6/part/b/paragraph/wrapper518n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper519n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper520n2

If the crane is equipped with outriggers, they shall be...

s.schedule/6/part/b/paragraph/wrapper521n2

Test under load

s.schedule/6/part/b/paragraph/wrapper522n2

The mobile crane to be tested shall be presented in...

s.schedule/6/part/b/paragraph/wrapper523n2

Before carrying out any measurement, the engine and the hydraulic...

s.schedule/6/part/b/paragraph/wrapper524n2

If the mobile crane is equipped with several engines, the...

s.schedule/6/part/b/paragraph/wrapper525n2

If the engine of the mobile crane is fitted with...

s.schedule/6/part/b/paragraph/wrapper526n2

The mobile crane shall be measured under the following three...

s.schedule/6/part/b/paragraph/wrapper527n2

For all working conditions the following shall apply: — Engine...

s.schedule/6/part/b/paragraph/wrapper528n2

The mobile crane shall be loaded with a load which...

s.schedule/6/part/b/paragraph/wrapper529n2

With the boom adjusted to an angle of 40° to...

s.schedule/6/part/b/paragraph/wrapper530n2

The test starts with raising the short jib from the...

s.schedule/6/part/b/paragraph/wrapper531n2

With the jib adjusted to an angle of 40° to...

s.schedule/6/part/b/paragraph/wrapper532n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper533n2

The resulting sound power level is calculated by:

s.schedule/6/part/b/paragraph/wrapper534n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper535n2

Test area — Reflecting surface of concrete or non-porous asphalt...

s.schedule/6/part/b/paragraph/wrapper536n2

Environmental correction K2A

s.schedule/6/part/b/paragraph/wrapper537n2

Measurement in the open air

s.schedule/6/part/b/paragraph/wrapper538n2

K2A = 0

s.schedule/6/part/b/paragraph/wrapper539n2

Measurement indoors

s.schedule/6/part/b/paragraph/wrapper540n2

The value of the constant K2A, determined in accordance with...

s.schedule/6/part/b/paragraph/wrapper541n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper542n2

Hemisphere/six microphone positions according to Part A item five/r =...

s.schedule/6/part/b/paragraph/wrapper543n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper544n2

Test No. 1: Free shutting down of the lid along...

s.schedule/6/part/b/paragraph/wrapper545n2

To minimise his influence on the measurements, the operator shall...

s.schedule/6/part/b/paragraph/wrapper546n2

The measurement is carried out during the following cycle, repeated...

s.schedule/6/part/b/paragraph/wrapper547n2

Note: If necessary the operator can move temporarily to raise...

s.schedule/6/part/b/paragraph/wrapper548n2

Test No. 2 Complete opening of the lid

s.schedule/6/part/b/paragraph/wrapper549n2

To minimise his influence on the measurements, the operator shall...

s.schedule/6/part/b/paragraph/wrapper550n2

To prevent any moving of the container, wheels shall be...

s.schedule/6/part/b/paragraph/wrapper551n2

The measurement is carried out during the following cycle: —...

s.schedule/6/part/b/paragraph/wrapper552n2

Test No. 3: Rolling of the container over an artificial...

s.schedule/6/part/b/paragraph/wrapper553n2

For this test, an artificial test track, simulating an irregular...

s.schedule/6/part/b/paragraph/wrapper554n2

Note: Every strip can be composed of several 400 mm...

s.schedule/6/part/b/paragraph/wrapper555n2

An example of adequate track is given in Figures 39.1...

s.schedule/6/part/b/paragraph/wrapper556n2

The operator is situated at the lid hinge side.

s.schedule/6/part/b/paragraph/wrapper557n2

The measurement is carried out while the operator draws the...

s.schedule/6/part/b/paragraph/wrapper558n2

During the test, for a 2-wheel container, the angle between...

s.schedule/6/part/b/paragraph/wrapper559n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper560n2

Test Nos 1 and 2: Free shutting down of the...

s.schedule/6/part/b/paragraph/wrapper561n2

If possible, the measurements are carried out simultaneously at the...

s.schedule/6/part/b/paragraph/wrapper562n2

The A-weighted single-event sound pressure level is measured for each...

s.schedule/6/part/b/paragraph/wrapper563n2

Test No. 3: Rolling the container over an artificial irregular...

s.schedule/6/part/b/paragraph/wrapper564n2

The period of observation T shall be equal to the...

s.schedule/6/part/b/paragraph/wrapper565n2

The sound power level LWArolling is equal to the mean...

s.schedule/6/part/b/paragraph/wrapper566n2

The resulting sound power level is calculated by:

s.schedule/6/part/b/paragraph/wrapper567n2

schedule/6/part/B/paragraph/wrapper567n2

s.schedule/6/part/b/paragraph/wrapper568n2

schedule/6/part/B/paragraph/wrapper568n2

s.schedule/6/part/b/paragraph/wrapper569n2

schedule/6/part/B/paragraph/wrapper569n2

s.schedule/6/part/b/paragraph/wrapper570n2

The tool shall be disconnected during measurement.

s.schedule/6/part/b/paragraph/wrapper571n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper572n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper573n2

The engine of the machine shall operate at the nominal...

s.schedule/6/part/b/paragraph/wrapper574n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper575n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper576n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper577n2

Test area

s.schedule/6/part/b/paragraph/wrapper578n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper579n2

The piling equipment is installed at the top of a...

s.schedule/6/part/b/paragraph/wrapper580n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper581n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper582n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper583n2

Environmental correction K2A

s.schedule/6/part/b/paragraph/wrapper584n2

Measurement in the open air

s.schedule/6/part/b/paragraph/wrapper585n2

K2A = 0

s.schedule/6/part/b/paragraph/wrapper586n2

Measurement indoors

s.schedule/6/part/b/paragraph/wrapper587n2

The value of the constant K2A, determined without artificial surface...

s.schedule/6/part/b/paragraph/wrapper588n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper589n2

Hemisphere/six microphone positions according to Part A item 5/according to...

s.schedule/6/part/b/paragraph/wrapper590n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper591n2

The power generators shall be installed on the reflecting plane;...

s.schedule/6/part/b/paragraph/wrapper592n2

Test under load

s.schedule/6/part/b/paragraph/wrapper593n2

ISO 8528-10:1998, point 9

s.schedule/6/part/b/paragraph/wrapper594n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper595n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper596n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper597n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper598n2

The power sweeper shall be tested in a stationary position....

s.schedule/6/part/b/paragraph/wrapper599n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper600n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper601n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper602n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper603n2

The refuse collection vehicle shall be tested in a stationary...

s.schedule/6/part/b/paragraph/wrapper604n2

The refuse collection vehicle and the hopper receiving the waste...

s.schedule/6/part/b/paragraph/wrapper605n2

If the engine speed is automatically accelerated when the compaction...

s.schedule/6/part/b/paragraph/wrapper606n2

If the engine speed for the compaction system is not...

s.schedule/6/part/b/paragraph/wrapper607n2

Materials are emptied in bulk with the lifting device into...

s.schedule/6/part/b/paragraph/wrapper608n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper609n2

The period of observation shall be:

s.schedule/6/part/b/paragraph/wrapper610n2

The resulting sound power level is calculated by:

s.schedule/6/part/b/paragraph/wrapper611n2

Note: In the case of a refuse collection vehicle only...

s.schedule/6/part/b/paragraph/wrapper612n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper613n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper614n2

The longitudinal axis of the road milling machine shall be...

s.schedule/6/part/b/paragraph/wrapper615n2

Test under load

s.schedule/6/part/b/paragraph/wrapper616n2

The road milling machine shall be brought to its steady...

s.schedule/6/part/b/paragraph/wrapper617n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper618n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper619n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper620n2

Test area

s.schedule/6/part/b/paragraph/wrapper621n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper622n2

In case of dispute, measurements shall be carried out in...

s.schedule/6/part/b/paragraph/wrapper623n2

Environmental correction K2A

s.schedule/6/part/b/paragraph/wrapper624n2

Measurement in the open air

s.schedule/6/part/b/paragraph/wrapper625n2

K2A = 0

s.schedule/6/part/b/paragraph/wrapper626n2

Measurement indoors

s.schedule/6/part/b/paragraph/wrapper627n2

The value of the constant K2A, determined without artificial surface...

s.schedule/6/part/b/paragraph/wrapper628n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper629n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper630n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper631n2

The scarifier shall be operated with the engine at its...

s.schedule/6/part/b/paragraph/wrapper632n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper633n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper634n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper635n2

Test area

s.schedule/6/part/b/paragraph/wrapper636n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper637n2

Environmental correction K2A

s.schedule/6/part/b/paragraph/wrapper638n2

Measurement in the open air

s.schedule/6/part/b/paragraph/wrapper639n2

K2A = 0

s.schedule/6/part/b/paragraph/wrapper640n2

Measurements indoors

s.schedule/6/part/b/paragraph/wrapper641n2

The value of the constant K2A, determined without artificial surface...

s.schedule/6/part/b/paragraph/wrapper642n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper643n2

ISO 11094:1991

s.schedule/6/part/b/paragraph/wrapper644n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper645n2

Test under load

s.schedule/6/part/b/paragraph/wrapper646n2

The shredder/chipper shall be tested chipping one or more pieces...

s.schedule/6/part/b/paragraph/wrapper647n2

The work-cycle consists of chipping a round piece of wood...

s.schedule/6/part/b/paragraph/wrapper648n2

Period of observation/determination of resulting sound power level

s.schedule/6/part/b/paragraph/wrapper649n2

The period of observation shall end when there is no...

s.schedule/6/part/b/paragraph/wrapper650n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper651n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper652n2

The snow blower shall be tested in a stationary position....

s.schedule/6/part/b/paragraph/wrapper653n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper654n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper655n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper656n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper657n2

The suction vehicle shall be tested in a stationary position....

s.schedule/6/part/b/paragraph/wrapper658n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper659n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper660n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper661n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper662n2

Measurement at ground-level

s.schedule/6/part/b/paragraph/wrapper663n2

Hemisphere/six microphone positions according to Part A paragraph 5/according to...

s.schedule/6/part/b/paragraph/wrapper664n2

Measurements carried out at jib-height.

s.schedule/6/part/b/paragraph/wrapper665n2

Where the lifting mechanism is located at the jib-height, the...

s.schedule/6/part/b/paragraph/wrapper666n2

Where the measurement is carried out with the lifting mechanism...

s.schedule/6/part/b/paragraph/wrapper667n2

The microphone positions shall be as follows (see Figure 53.1):...

s.schedule/6/part/b/paragraph/wrapper668n2

Four microphone positions on a horizontal plane passing through the...

s.schedule/6/part/b/paragraph/wrapper669n2

The other two microphone positions shall be located at the...

s.schedule/6/part/b/paragraph/wrapper670n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper671n2

Measurement of lifting mechanism

s.schedule/6/part/b/paragraph/wrapper672n2

The lifting mechanism during the test shall be mounted in...

s.schedule/6/part/b/paragraph/wrapper673n2

The mounted crane shall be placed on a flat reflecting...

s.schedule/6/part/b/paragraph/wrapper674n2

The lifting mechanism shall be at least 12 m above...

s.schedule/6/part/b/paragraph/wrapper675n2

The lifting mechanism shall be fixed to a flat reflecting...

s.schedule/6/part/b/paragraph/wrapper676n2

Measurement of the energy generator.

s.schedule/6/part/b/paragraph/wrapper677n2

Where the energy generator is attached to the crane, whether...

s.schedule/6/part/b/paragraph/wrapper678n2

Where the lifting mechanism is situated on the jib stay,...

s.schedule/6/part/b/paragraph/wrapper679n2

Where the energy source powering the crane is independent from...

s.schedule/6/part/b/paragraph/wrapper680n2

Where the energy generator is attached to the crane, the...

s.schedule/6/part/b/paragraph/wrapper681n2

During the test the lifting mechanism and the energy generator...

s.schedule/6/part/b/paragraph/wrapper682n2

Test free of load

s.schedule/6/part/b/paragraph/wrapper683n2

The energy generator incorporated in the crane shall operate at...

s.schedule/6/part/b/paragraph/wrapper684n2

The lifting mechanism shall operate free of load, with its...

s.schedule/6/part/b/paragraph/wrapper685n2

Test under load

s.schedule/6/part/b/paragraph/wrapper686n2

The energy generator incorporated in the crane shall operate at...

s.schedule/6/part/b/paragraph/wrapper687n2

Period(s) of observation/determination of resulting sound power level if more...

s.schedule/6/part/b/paragraph/wrapper688n2

For the measurement of the sound pressure level of the...

s.schedule/6/part/b/paragraph/wrapper689n2

(tr +tf) seconds: t r being the period in seconds...

s.schedule/6/part/b/paragraph/wrapper690n2

The root mean square value at microphone position i shall...

s.schedule/6/part/b/paragraph/wrapper691n2

Figure 53.1 Arrangement of microphone positions where the lifting mechanism...

s.schedule/6/part/b/paragraph/wrapper692n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper693n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper694n2

The truck mixer shall be tested in a stationary position....

s.schedule/6/part/b/paragraph/wrapper695n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper696n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper697n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper698n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper699n2

Parallelepiped/according to EN ISO 3744:1995 with measurement distanced = 1...

s.schedule/6/part/b/paragraph/wrapper700n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper701n2

The water pump unit shall be installed on the reflecting...

s.schedule/6/part/b/paragraph/wrapper702n2

Test under load

s.schedule/6/part/b/paragraph/wrapper703n2

The engine must operate at the point of best efficiency...

s.schedule/6/part/b/paragraph/wrapper704n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper705n2

The period of observation shall at least be 15 seconds....

s.schedule/6/part/b/paragraph/wrapper706n2

Basic noise emission standard

s.schedule/6/part/b/paragraph/wrapper707n2

Environmental correction K2A

s.schedule/6/part/b/paragraph/wrapper708n2

Measurement in the open air

s.schedule/6/part/b/paragraph/wrapper709n2

K2A = 0

s.schedule/6/part/b/paragraph/wrapper710n2

Measurement indoors

s.schedule/6/part/b/paragraph/wrapper711n2

The value of the constant K2A, determined in accordance with...

s.schedule/6/part/b/paragraph/wrapper712n2

Measurement surface/number of microphone positions/measuring distance

s.schedule/6/part/b/paragraph/wrapper713n2

Hemisphere/6 microphone positions according to Part A item 5/according to...

s.schedule/6/part/b/paragraph/wrapper714n2

Ifl2 m: a parallelepiped according to EN ISO 3744:1995 may...

s.schedule/6/part/b/paragraph/wrapper715n2

Operating conditions during test

s.schedule/6/part/b/paragraph/wrapper716n2

The welding generators shall be installed on the reflecting plane;...

s.schedule/6/part/b/paragraph/wrapper717n2

Test under load

s.schedule/6/part/b/paragraph/wrapper718n2

ISO 8528-10:1998, point 9.

s.schedule/6/part/b/paragraph/wrapper719n2

Period of observation

s.schedule/6/part/b/paragraph/wrapper720n2

The period of observation shall at least be 15 seconds....

s.schedule/7/part/paragraph/wrapper721n2

The CE UK conformity marking must consist of the initials...

s.schedule/7/part/paragraph/wrapper722n2

schedule/7/part/paragraph/wrapper722n2

s.schedule/7/part/paragraph/wrapper723n2

If the CE UK marking is reduced or enlarged according...

s.schedule/7/part/paragraph/wrapper724n2

The indication of the guaranteed sound power level must consist...

s.schedule/7/part/paragraph/wrapper725n2

schedule/7/part/paragraph/wrapper725n2

s.schedule/7/part/paragraph/wrapper726n2

If the indication is reduced or enlarged according to the...

s.008

Permissible sound power level of equipment

  • Ensure equipment meets noise emission limits and is correctly marked Manufacturer
  • Ensure outdoor equipment meets noise limits and is properly marked Manufacturer
s.012

Provision of data

  • Send declaration of conformity to Secretary of State within 28 days Manufacturer
  • Send declaration of conformity to the Secretary of State and EU Commission Responsible Person
s.017

Enforcement

Other duties (1) — Crown / regulator
  • OPSS must issue a compliance notice before taking further enforcement action Statutory regulator
s.019

Penalties

3 months imprisonment
  • Breach of noise emission or marking requirements for outdoor equipment Any Person
  • Breach of Noise Emission Regulations (regulation 18) Any Person
s.register of approved bodies

Register of approved bodies

Other duties (1) — Crown / regulator
  • Secretary of State must maintain a public register of approved bodies Crown / Minister / Government department
Browse 58 other sections — procedural / definitional / commencement
s.001

Citation, commencement and revocation

s.002

Interpretation

s.002

Fan speed

s.002

Test of powered equipment free of load

s.002

Test of powered equipment under load

s.002

Test of hand-operated equipment

s.003

Application

s.003

The manufacturer must lodge an application for assessment of his...

s.003

The quality assurance system must ensure compliance of the product...

s.003

It must contain in particular an adequate description of: —...

s.003

The manufacturer must undertake to fulfil the obligations arising out...

s.004

Excluded equipment

s.004

The purpose of surveillance is to make sure that the...

s.004

The manufacturer must allow the approved body entrance for inspection...

s.004

The approved body shall periodically carry out audits to make...

s.004

Additionally the approved body may pay unexpected visits to the...

s.005

These Regulations shall not apply to equipment placed on the...

s.006

(1) Subject to paragraph (2), these Regulations shall not apply...

s.007

General duty relating to placing on the market or putting into service

s.008

Permissible sound power level of equipment

s.009

Exceptions to placing on the market and putting into service of certain equipment

s.010

Conformity assessment procedures

s.011

CE marking and indication of the guaranteed sound power level

s.012

Provision of data

s.012

Obligations which are met by complying with obligations in the Directive

s.012

Further use of UK marking

s.012

Qualifying Northern Ireland Goods

s.013

Approved Bodies

s.014

(1) The Secretary of State may from time to time...

s.014

Register of approved bodies

s.015

Fees

s.016

Conditions for equipment being taken to conform

s.017

Enforcement

s.018

Offences

s.019

Penalties

s.020

Defence of due diligence

s.021

Liability of persons other than the principal offender

s.022

Consequential amendments

s.023

Transitional provision in relation to EU Exit

s.further use of uk marking

Further use of UK marking

s.obligations which are met by complying with obliga

Obligations which are met by complying with obligations in the Directive

s.qualifying northern ireland goods

Qualifying Northern Ireland Goods

Enforcement and responsible bodies

The regulators that administer or enforce this legislation.

Office for Product Safety and Standards

Product safety regulator responsible for ensuring consumer products are safe. Enforces product safety regulations, UKCA marking requirements, and works with market surveillance …

Explore more

Browse legislation

Find other UK business legislation with related guidance.

Regulators

Learn more about the bodies that enforce this legislation.