164 other schedules
s.sch001
Formal command and control systems that include officers and senior...
s.sch001
Measures for building and maintaining a strong safety culture with...
s.sch001
Measures for rewarding and recognising desired behaviours.
s.sch001
The extent and intensity of process auditing.
s.sch001
Measures for maintenance of safety and environmental protection standards as...
s.sch001
The extent to which the particulars in paragraphs 1 to...
s.sch002
The need to take appropriate measures to ensure as far...
s.sch002
The need to pay particular attention to evaluation of the...
s.sch002
The need to adopt suitable measures to use suitable technical...
s.sch002
The need to ensure there is a suitable framework for...
s.sch002
The need to pay particular attention to building and maintaining...
s.sch003
Organisational structure and personnel roles and responsibilities.
s.sch003
The measures in place for participating in tripartite consultations and...
s.sch003
Identification and evaluation of major hazards as well as their...
s.sch003
Integration of environmental impact into major accident risk assessments in...
s.sch003
Controls of the major hazards during normal operations.
s.sch003
Emergency planning and response.
s.sch003
Limitation of damage to the environment.
s.sch003
Management of change.
s.sch003
Monitoring of performance.
s.sch003
Audit and review arrangements.
s.sch005
The name and address of the operator of the installation....
s.sch005
A general description of the safety and environmental management system...
s.sch005
Where a non-production installation is to be converted for use...
s.sch005
Where a production installation is to be moved to a...
s.sch005
A general description of the means by which the management...
s.sch005
A description of the design process from an initial concept...
s.sch005
A description of— (a) the chosen design concept in relation...
s.sch005
A suitable plan of the intended location of the installation...
s.sch005
A description of any environmental, meteorological and seabed limitations on...
s.sch005
Particulars of the types of operation, and activities in connection...
s.sch005
A description of— (a) the principal systems on the installation;...
s.sch005
A description of the verification scheme which complies with regulation...
s.sch006
A suitable plan of the location of the installation and...
s.sch006
A description, with suitable diagrams, of the installation, including a...
s.sch006
Particulars of the types of operation, and activities in connection...
s.sch006
Particulars of the plant and arrangements for—
s.sch006
A description of any pipeline with the potential to cause...
s.sch006
A description of how the operator has ensured, or will...
s.sch006
Particulars of information obtained pursuant to the PFEER Regulations and...
s.sch006
In respect of operations to be conducted from the installation,...
s.sch006
A description of the plant used and arrangements made for...
s.sch006
The maximum number of persons— (a) expected to be on...
s.sch006
Arrangements for the maintenance of control systems to prevent damage...
s.sch006
The description of the internal emergency response arrangements.
s.sch006
The assessment produced pursuant to paragraph 2(j) of Schedule 2...
s.sch006
Any other relevant details.
s.sch006
A copy of the operator's corporate major accident prevention policy,...
s.sch006
A description of the verification scheme which complies with regulation...
s.sch006
In paragraph 8(d) “pipeline operator”, in relation to a pipeline,...
s.sch007
The name and address of the owner of the installation....
s.sch007
A description, with suitable diagrams, of the installation, including a...
s.sch007
Particulars of the types of operation, and activities in connection...
s.sch007
Particulars of the plant and arrangements for the control of—...
s.sch007
In respect of operations to be conducted from the installation,...
s.sch007
A description of the measures taken or to be taken...
s.sch007
The description of the internal emergency response arrangements.
s.sch007
The assessment produced pursuant to paragraph 2(j) of Schedule 2...
s.sch007
The maximum number of persons— (a) expected to be on...
s.sch007
Any other relevant details.
s.sch007
A summary of any worker involvement in the preparation of...
s.sch007
An adequate description of the owner's safety and environmental management...
s.sch007
A description of the verification scheme which complies with regulation...
s.sch007
A description of the main requirements in the specification for...
s.sch007
Particulars of— (a) the limits of the environmental and meteorological...
s.sch007
A description of the arrangements for— (a) identifying the risks...
s.sch008
The name and address of the operator of the installation....
s.sch008
The maximum number of persons expected to be on the...
s.sch008
A summary of any worker involvement in the revised safety...
s.sch008
The dates on which dismantling is expected to commence and...
s.sch008
A description of how the proposed arrangements, methods and procedures...
s.sch008
In the case of the dismantling of a fixed production...
s.sch008
A description of how the operator will comply with regulation...
s.sch008
A description of arrangements made for protecting persons on the...
s.sch008
Sufficient details to update the description of the internal emergency...
s.sch009
The name and address of the well operator.
s.sch009
A risk assessment incorporating a description of—
s.sch009
Where a well is to be constructed, modified or maintained...
s.sch009
Particulars of information obtained pursuant to the PFEER Regulations and...
s.sch009
In respect of a well operation to be conducted, particulars...
s.sch009
Where the well operation is to be carried out—
s.sch009
Particulars of the fluids to be used to control the...
s.sch009
Particulars of any plant, not described in the current safety...
s.sch009
Particulars of the type of well, its number, and slot...
s.sch009
A description of the well operation and a programme of...
s.sch009
A description of— (a) any activities on or in connection...
s.sch009
In the case of a well which is to be...
s.sch009
In the case of an existing well—
s.sch010
A description of the combined operation and a programme of...
s.sch010
Particulars of any plant to be used in connection with...
s.sch010
A summary of the joint review referred to in paragraph...
s.sch010
A description, by reference to a bridging document authorised by...
s.sch011
Effective risk management.
s.sch011
Reliability assessment for safety and environmental-critical systems.
s.sch011
Management and supervision of major hazard operations.
s.sch011
Competency of key post holders.
s.sch011
Reliable decision making.
s.sch011
Effectively integrating safety and environmental management systems between operators and...
s.sch011
Key performance indicators.
s.sch011
Improving well integrity, well control equipment and barriers and monitoring...
s.sch011
Improving primary containment.
s.sch011
Improving secondary containment that restricts escalation of an incipient major...
s.sch012
In this Schedule— “appeal” means an appeal under regulation 37;...
s.sch012
Before the determination of an appeal, the appointed person must...
s.sch012
An appointed person may give such directions as the appointed...
s.sch012
The Secretary of State may pay to an appointed person...
s.sch012
(1) Subject to the following sub-paragraphs of this paragraph, a...
s.sch012
(1) Not later than 21 days before the date of...
s.sch012
(1) The parties are entitled to appear at the hearing....
s.sch012
(1) All hearings must be held in private.
s.sch013
Offshore Installations (Safety Representatives and Safety Committees) Regulations 1989
s.sch013
(1) Regulation 3 (meaning of “offshore installation”) is amended as...
s.sch013
(1) Regulation 4 (application) is amended as follows.
s.sch013
In regulation 5(1) (notification concerning offshore installations) for “no later...
s.sch013
In regulation 20(1) (certificates of exemption) after “workers at work”...
s.sch013
After Schedule 2 insert— SCHEDULE 3 Form to notify the...
s.sch013
Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations 1995
s.sch013
In regulation 2(1) (interpretation)— (a) in the definition of the...
s.sch013
(1) Regulation 3 (application) is amended as follows.
s.sch013
In regulation 4(2) (general duty) after “regulations 6 to 21”...
s.sch013
In regulation 2 (interpretation)— (a) after the definition of “the...
s.sch013
For regulation 5(3)(c) (assessment) substitute— (c) notify—
s.sch013
(1) Regulation 6 (preparation for emergencies) is amended as follows....
s.sch013
In regulation 22(1) (certificates of exemption) after “workers at work”...
s.sch013
Offshore Installations and Wells (Design and Construction, etc.) Regulations 1996
s.sch013
(1) Regulation 2(1) (interpretation) is amended as follows.
s.sch013
In regulation 3(1)(b) (application)— (a) before “to and in relation...
s.sch013
In regulation 9 (reporting of danger to an installation)—
s.sch013
In regulation 12 (additional requirements)— (a) in paragraph (1) omit...
s.sch013
In regulation 18A(1)(a) (safety representative entitlement to summary of current...
s.sch013
In regulation 18 (arrangements for examination) omit paragraphs (5), (6)...
s.sch013
In regulation 23(1) (certificates of exemption) after “safety and health...
s.sch013
Omit regulation 24 (transitional provisions).
s.sch013
Offshore Installations (Safety Case) Regulations 2005
s.sch013
(1) Subject to paragraph (2), for “relevant waters” substitute “...
s.sch013
(1) Regulation 2 (interpretation) is amended as follows.
s.sch013
In regulation 4 (application) omit paragraph (1).
s.sch013
In regulation 6(2) (design and relocation notifications for production installation)...
s.sch013
In regulation 7(1) (safety case for production installation) in the...
s.sch013
In regulation 14(3)(c) (revision of safety case) after “location” insert...
s.sch013
In regulation 23(2)(c)(i) (duties of installation operators and owners, and...
s.sch013
In paragraph 10 of Schedule 1 (particulars to be included...
s.sch013
Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013
s.sch013
Health and Safety and Nuclear (Fees) Regulations 2015
s.sch013
Offshore Installations and Pipeline Works (First-Aid) Regulations 1989
s.sch013
In regulation 2 (interpretation)— (a) omit the definition of “the...
s.sch013
In regulation 3(b) (application of Regulations) for “articles 4 and...
s.sch013
Offshore Installations and Pipeline Works (Management and Administration) Regulations 1995
s.sch013
In regulation 2(1) (interpretation)— (a) omit the definition of “the...
s.sch014
Interpretation
s.sch014
Where revisions to current safety case under paragraph 9(2) may...
s.sch014
Where paragraph 10(b) applies to a safety case, paragraph (1)(a)...
s.sch014
Improvement notices issued before the end of the transitional period
s.sch014
Prohibition notices issued before the end of the transitional period
s.sch014
Design etc. notifications
s.sch014
Where a notification under the 2005 regime is not completed...
s.sch014
General saving of the 2005 regime
s.sch014
Continued application of the 2005 regime to existing and proposed non-production installations
s.sch014
Continued application of the 2005 regime to existing and proposed production installations
s.sch014
Continued application of the 2005 regime to well operations
s.sch014
Design notification for production installations to be established during transitional period
s.sch014
Design notification: election to prepare notification under these Regulations
s.sch014
Election to prepare a safety case under these Regulations
s.sch014
Treatment of current safety cases for installations continuing under the 2005 regime