UK Statutory Instrument 2015 United Kingdom

Offshore Installations (Offshore Safety Directive) (Safety Case etc.) Regulations 2015

At a glance

Enforced by

HSE, NSTA, OPRED

What's here

4 practical guides

Relevant guidance

Practical guides for businesses affected by this Act, ordered by how closely they engage with it.

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

Browse 189 other Schedules — structural / supplementary
s.sch001

The responsibility of officers of the duty holder for ensuring,...

s.sch001

Formal command and control systems that include officers and senior...

s.sch001

Measures for building and maintaining a strong safety culture with...

s.sch001

The approach to competency at all levels of the duty...

s.sch001

Measures for rewarding and recognising desired behaviours.

s.sch001

The evaluation of the duty holder's capabilities and goals.

s.sch001

The extent and intensity of process auditing.

s.sch001

Measures for maintenance of safety and environmental protection standards as...

s.sch001

The extent to which the particulars in paragraphs 1 to...

s.sch002

The need to take appropriate measures to ensure as far...

s.sch002

The need to pay particular attention to evaluation of the...

s.sch002

The need to adopt suitable measures to use suitable technical...

s.sch002

The need to ensure there is a suitable framework for...

s.sch002

The need to pay particular attention to building and maintaining...

s.sch003

Organisational structure and personnel roles and responsibilities.

s.sch003

The measures in place for participating in tripartite consultations and...

s.sch003

Identification and evaluation of major hazards as well as their...

s.sch003

Integration of environmental impact into major accident risk assessments in...

s.sch003

Controls of the major hazards during normal operations.

s.sch003

Emergency planning and response.

s.sch003

Limitation of damage to the environment.

s.sch003

Management of change.

s.sch003

Monitoring of performance.

s.sch003

Audit and review arrangements.

s.sch005

The name and address of the operator of the installation....

s.sch005

A general description of the safety and environmental management system...

s.sch005

Where a non-production installation is to be converted for use...

s.sch005

Where a production installation is to be moved to a...

s.sch005

A general description of the means by which the management...

s.sch005

A description of the design process from an initial concept...

s.sch005

A description of— (a) the chosen design concept in relation...

s.sch005

A suitable plan of the intended location of the installation...

s.sch005

A description of any environmental, meteorological and seabed limitations on...

s.sch005

Particulars of the types of operation, and activities in connection...

s.sch005

A description of— (a) the principal systems on the installation;...

s.sch005

A description of the verification scheme which complies with regulation...

s.sch006

The name and address of the operator of the installation....

s.sch006

A suitable plan of the location of the installation and...

s.sch006

A description, with suitable diagrams, of the installation, including a...

s.sch006

Particulars of the types of operation, and activities in connection...

s.sch006

Particulars of the plant and arrangements for—

s.sch006

A description of any pipeline with the potential to cause...

s.sch006

A description of how the operator has ensured, or will...

s.sch006

Particulars of information obtained pursuant to the PFEER Regulations and...

s.sch006

In respect of operations to be conducted from the installation,...

s.sch006

A description of the plant used and arrangements made for...

s.sch006

A description of the measures taken or to be taken...

s.sch006

The maximum number of persons— (a) expected to be on...

s.sch006

Arrangements for the maintenance of control systems to prevent damage...

s.sch006

The description of the internal emergency response arrangements.

s.sch006

The assessment produced pursuant to paragraph 2(j) of Schedule 2...

s.sch006

Particulars of any combined operations which may involve the installation,...

s.sch006

Any other relevant details.

s.sch006

A copy of the operator's corporate major accident prevention policy,...

s.sch006

A summary of any worker involvement in the preparation of...

s.sch006

An adequate description of the operator's safety and environmental management...

s.sch006

A description of the verification scheme which complies with regulation...

s.sch006

A description of the extent to which the operator has...

s.sch006

A description of the main requirements in the specification for...

s.sch006

In paragraph 8(d) “pipeline operator”, in relation to a pipeline,...

s.sch007

The name and address of the owner of the installation....

s.sch007

A description, with suitable diagrams, of the installation, including a...

s.sch007

Particulars of the types of operation, and activities in connection...

s.sch007

Particulars of the plant and arrangements for the control of—...

s.sch007

A description of how the duty holder has ensured, or...

s.sch007

In respect of operations to be conducted from the installation,...

s.sch007

A description of the plant used and arrangements made for...

s.sch007

A description of the measures taken or to be taken...

s.sch007

The description of the internal emergency response arrangements.

s.sch007

The assessment produced pursuant to paragraph 2(j) of Schedule 2...

s.sch007

Particulars of any combined operations which may involve the installation,...

s.sch007

The maximum number of persons— (a) expected to be on...

s.sch007

Any other relevant details.

s.sch007

A copy of the owner's corporate major accident prevention policy,...

s.sch007

A summary of any worker involvement in the preparation of...

s.sch007

An adequate description of the owner's safety and environmental management...

s.sch007

A description of the verification scheme which complies with regulation...

s.sch007

A description of the main requirements in the specification for...

s.sch007

Particulars of— (a) the limits of the environmental and meteorological...

s.sch007

A description of the arrangements for— (a) identifying the risks...

s.sch008

The name and address of the operator of the installation....

s.sch008

The maximum number of persons expected to be on the...

s.sch008

A summary of any worker involvement in the revised safety...

s.sch008

The dates on which dismantling is expected to commence and...

s.sch008

A description of how the proposed arrangements, methods and procedures...

s.sch008

In the case of the dismantling of a fixed production...

s.sch008

A description of how the operator will comply with regulation...

s.sch008

A description of arrangements made for protecting persons on the...

s.sch008

Sufficient details to update the description of the internal emergency...

s.sch009

The name and address of the well operator.

s.sch009

Where a well operation is to be carried out from...

s.sch009

The report made under regulation 11(2)(b) in relation to the...

s.sch009

A risk assessment incorporating a description of—

s.sch009

Where a well is to be constructed, modified or maintained...

s.sch009

Particulars of information obtained pursuant to the PFEER Regulations and...

s.sch009

In respect of a well operation to be conducted, particulars...

s.sch009

An adequate description of the well operator's safety and environmental...

s.sch009

Where the well operation is to be carried out—

s.sch009

Particulars of the fluids to be used to control the...

s.sch009

Particulars of any plant, not described in the current safety...

s.sch009

Particulars of the type of well, its number, and slot...

s.sch009

A description of the well operation and a programme of...

s.sch009

A description of— (a) any activities on or in connection...

s.sch009

In the case of a well which is to be...

s.sch009

In the case of an existing well—

s.sch010

The name and address of the duty holder submitting the...

s.sch010

The name and address of each duty holder preparing the...

s.sch010

A description of the combined operation and a programme of...

s.sch010

Particulars of any plant to be used in connection with...

s.sch010

A summary of the joint review referred to in paragraph...

s.sch010

A description, by reference to a bridging document authorised by...

s.sch011

Effective risk management.

s.sch011

Reliability assessment for safety and environmental-critical systems.

s.sch011

Management and supervision of major hazard operations.

s.sch011

Competency of key post holders.

s.sch011

Reliable decision making.

s.sch011

Effectively integrating safety and environmental management systems between operators and...

s.sch011

Key performance indicators.

s.sch011

Improving well integrity, well control equipment and barriers and monitoring...

s.sch011

Improving primary containment.

s.sch011

Improving secondary containment that restricts escalation of an incipient major...

s.sch012

In this Schedule— “appeal” means an appeal under regulation 37;...

s.sch012

(1) Where, after the hearing, the appointed person proposes to...

s.sch012

The appointed person must notify the decision on the appeal,...

s.sch012

The Secretary of State must direct that an appeal be...

s.sch012

Before the determination of an appeal, the appointed person must...

s.sch012

An appointed person may give such directions as the appointed...

s.sch012

The Secretary of State may pay to an appointed person...

s.sch012

(1) Subject to the following sub-paragraphs of this paragraph, a...

s.sch012

(1) Not later than 21 days before the date of...

s.sch012

(1) The parties are entitled to appear at the hearing....

s.sch012

(1) All hearings must be held in private.

s.sch013

Offshore Installations (Safety Representatives and Safety Committees) Regulations 1989

s.sch013

(1) Regulation 3 (meaning of “offshore installation”) is amended as...

s.sch013

(1) Regulation 4 (application) is amended as follows.

s.sch013

In regulation 5(1) (notification concerning offshore installations) for “no later...

s.sch013

In regulation 20(1) (certificates of exemption) after “workers at work”...

s.sch013

After regulation 21 insert— Obligation to notify death or loss...

s.sch013

After Schedule 2 insert— SCHEDULE 3 Form to notify the...

s.sch013

Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations 1995

s.sch013

In regulation 2(1) (interpretation)— (a) in the definition of the...

s.sch013

(1) Regulation 3 (application) is amended as follows.

s.sch013

In regulation 4(2) (general duty) after “regulations 6 to 21”...

s.sch013

In regulation 2 (interpretation)— (a) after the definition of “the...

s.sch013

For regulation 5(3)(c) (assessment) substitute— (c) notify—

s.sch013

(1) Regulation 6 (preparation for emergencies) is amended as follows....

s.sch013

In regulation 22(1) (certificates of exemption) after “workers at work”...

s.sch013

After regulation 22 insert— Inventory of equipment etc. (1) This regulation applies only in relation to external waters....

s.sch013

Offshore Installations and Wells (Design and Construction, etc.) Regulations 1996

s.sch013

(1) Regulation 2(1) (interpretation) is amended as follows.

s.sch013

In regulation 3(1)(b) (application)— (a) before “to and in relation...

s.sch013

In regulation 9 (reporting of danger to an installation)—

s.sch013

In regulation 12 (additional requirements)— (a) in paragraph (1) omit...

s.sch013

In regulation 13(2) (general duty) after “regulations 14 to 19...

s.sch013

In regulation 18A(1)(a) (safety representative entitlement to summary of current...

s.sch013

In regulation 18 (arrangements for examination) omit paragraphs (5), (6)...

s.sch013

In regulation 23(1) (certificates of exemption) after “safety and health...

s.sch013

Omit regulation 24 (transitional provisions).

s.sch013

Offshore Installations (Safety Case) Regulations 2005

s.sch013

(1) Subject to paragraph (2), for “relevant waters” substitute “...

s.sch013

(1) Regulation 2 (interpretation) is amended as follows.

s.sch013

In regulation 4 (application) omit paragraph (1).

s.sch013

In regulation 6(2) (design and relocation notifications for production installation)...

s.sch013

In regulation 7(1) (safety case for production installation) in the...

s.sch013

In regulation 14(3)(c) (revision of safety case) after “location” insert...

s.sch013

In regulation 23(2)(c)(i) (duties of installation operators and owners, and...

s.sch013

In paragraph 10 of Schedule 1 (particulars to be included...

s.sch013

Reporting of Injuries, Diseases and Dangerous Occurrences Regulations 2013

s.sch013

Health and Safety and Nuclear (Fees) Regulations 2015

s.sch013

Offshore Installations and Pipeline Works (First-Aid) Regulations 1989

s.sch013

In regulation 2 (interpretation)— (a) omit the definition of “the...

s.sch013

In regulation 3(b) (application of Regulations) for “articles 4 and...

s.sch013

Offshore Installations and Pipeline Works (Management and Administration) Regulations 1995

s.sch013

In regulation 2(1) (interpretation)— (a) omit the definition of “the...

s.sch014

Interpretation

s.sch014

Where revisions to current safety case under paragraph 9(2) may...

s.sch014

Where paragraph 10(b) applies to a safety case, paragraph (1)(a)...

s.sch014

Improvement notices issued before the end of the transitional period

s.sch014

Prohibition notices issued before the end of the transitional period

s.sch014

Design etc. notifications

s.sch014

Where a notification under the 2005 regime is not completed...

s.sch014

General saving of the 2005 regime

s.sch014

Continued application of the 2005 regime to existing and proposed non-production installations

s.sch014

Continued application of the 2005 regime to existing and proposed production installations

s.sch014

Continued application of the 2005 regime to well operations

s.sch014

Design notification for production installations to be established during transitional period

s.sch014

Design notification: election to prepare notification under these Regulations

s.sch014

Election to prepare a safety case under these Regulations

s.sch014

Treatment of current safety cases for installations continuing under the 2005 regime

Browse 47 other sections — procedural / definitional / commencement
s.001

Citation and commencement

s.002

Interpretation

s.003

Communication and storage of information by electronic means

s.004

Application and extent

s.005

Duties of licensee

s.006

Capacity of operator to meet requirements

s.007

Corporate major accident prevention policy

s.008

Safety and environmental management system

s.009

Establishment of verification scheme

s.010

Other provisions as to verification schemes

s.011

Establishment of well examination scheme

s.012

Other provisions as to well examination schemes

s.013

Description of verification scheme and well examination scheme

s.014

Defence

s.015

Design and relocation notifications for production installation

s.016

Management and control of major accident hazards

s.017

Safety case for production installation

s.018

Safety case for non-production installation

s.019

Design notification and safety case for non-production installation to be converted

s.020

Safety case for dismantling fixed installation

s.021

Notification of well operations

s.022

Notification of combined operations

s.023

Review of safety case

s.024

Revision of safety case

s.025

Power of competent authority in relation to safety cases and related documents

s.026

Power of the competent authority to prohibit operations

s.027

Keeping of documents

s.028

Duty to conform with safety case and notifications of operation

s.029

Duty to control risk

s.030

Internal emergency response

s.031

Communication of national arrangements for confidential reporting of safety concerns etc.

s.032

Standards and guidance on best practice

s.033

Notification of major accident etc.

s.034

Information on operations conducted outside of the European Union , Great Britain and external waters

s.035

Exemptions

s.036

Enforcement

s.037

Appeals

s.038

Amendments and revocations

s.039

Transitional provisions and savings

s.040

Penalties

s.041

Review

Enforcement and responsible bodies

The regulators that administer or enforce this legislation.

HSE

Primary

Health and Safety Executive

Workplace health, safety, and welfare regulation across all industries. Enforces the Health and Safety at Work Act 1974 and related regulations. Investigates …

North Sea Transition Authority

Licenses and regulates the UK oil and gas, offshore hydrogen, and carbon storage industries. Issues petroleum production licences and CO2 storage licences. …

Offshore Petroleum Regulator for Environment and Decommissioning

Regulates environmental aspects of offshore oil and gas, carbon storage, and gas unloading/storage. Issues environmental permits, approves oil spill response plans, and …

Explore more

Browse legislation

Find other UK business legislation with related guidance.

Regulators

Learn more about the bodies that enforce this legislation.