- Enforced by
- HSE
- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Responsible Person19
Operator14
Any Person2
Licence Holder1
Plus 1 duty on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Responsible Person — also bound by 108 other Acts
MH(CT)(S)A 2003
30 duties
Operator — also bound by 746 other Acts
Regulation (EU) No 965/2012 (Air Operations)
203 duties
Space Industry Regulations 2021
76 duties
Any Person — also bound by 2340 other Acts
Human Medicines Regulations 2012
184 duties
Merchant Shipping Act 1995
144 duties
Insolvency (England and Wales) Rules 2016
104 duties
Communications Act 2003
92 duties
Road Traffic Act 1988
92 duties
Licence Holder — also bound by 225 other Acts
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
s.005
Duties of licensee
Regulated
- Ensure appointed operator is competent and performs its dutiesLicence Holder
s.006
Design and relocation notifications for production installation
Regulated
- Send design and relocation notifications to HSE for offshore production installationsOperator
s.007
Safety case for production installation
Regulated
- Submit safety case to HSE and obtain acceptance before operating production installationOperator
s.008
Safety case for non-production installation
Regulated
- Prepare and submit a safety case for non-production installationsAny Person
s.009
Design notification and safety case for non-production installation to be converted
Regulated
- Submit design notification and safety case when converting offshore installationsAny Person
s.010
Notification of combined operations
Regulated
- Notify HSE before starting combined offshore operationsResponsible Person
s.011
Safety case for dismantling fixed installation
Regulated
- Update and submit safety case before dismantling a fixed installationOperator
s.012
Management of health and safety and control of major accident hazards
Regulated
- Demonstrate health and safety management in your safety caseResponsible Person
s.013
Review of safety case
Regulated
- Review your safety case every 5 years or when directed by HSEResponsible Person
s.014
Revision of safety case
Regulated
- Revise and submit your offshore safety case for material changesResponsible Person
s.015
Power of Executive in relation to safety cases and related documents
Regulated
- Revise and submit your offshore safety case when directed by the HSEResponsible Person
s.016
Duty to conform with safety case
Regulated
- Follow the procedures set out in your safety caseResponsible Person
s.017
Notification of well operations
Regulated
- Notify the HSE before starting well operationsOperator
s.018
Keeping of documents
Regulated
- Keep and maintain offshore installation safety and audit documentsResponsible Person
s.019
Verification schemes
Regulated
- Establish and implement an independent verification scheme for offshore safetyResponsible Person
s.020
Review and revision of verification schemes
Regulated
- Review and update your installation's verification schemeResponsible Person
s.021
Continuing effect of verification schemes
Regulated
- Maintain and implement your installation's verification schemeResponsible Person
s.review
Review
Regulated
Other duties (1) — Crown / regulator
- Secretary of State must periodically review and report on these RegulationsCrown / Minister / Government department
10 other provisions — procedural and definitional
s.001
Citation and commencement
s.002
Interpretation
s.003
Communication and storage of information by electronic means
s.004
Application
s.022
Defence
s.023
Exemptions
s.024
Appeals
s.025
Amendments
s.026
Revocation
s.027
Transitional provisions
Schedules
Schedules
19 of 91 shown
s.sch001
Where a production installation is to be moved to a...
Regulated
- Explain why your production installation is suitable for its new locationOperator
s.sch001
A general description of the means by which the management...
Regulated
- Describe how your management system controls major accident risks during design and constructionOperator
s.sch002
PARTICULARS TO BE INCLUDED IN A SAFETY CASE FOR THE OPERATION OF A PRODUCTION INSTALLATION (opens in a new tab)
Regulated
- Include specific particulars in the offshore production safety caseOperator
s.sch002
A description of how the duty holder has ensured, or...
Regulated
- Describe compliance with PFEER regulation 4(1) in your safety caseResponsible Person
s.sch002
A description of the main requirements in the specification for...
Regulated
- Describe design requirements, safe limits, and pipeline cooperation in safety caseResponsible Person
s.sch002
Particulars of any combined operations which may involve the installation,...
Regulated
- Plan and coordinate safety for combined offshore operationsOperator
s.sch002
A description of the extent to which the duty holder...
Regulated
- Describe how HSE concerns are reflected in your safety caseResponsible Person
s.sch002
A summary of how any safety representatives for that installation...
Regulated
- Include summary of safety representative consultation in safety caseResponsible Person
s.sch002
A description of any pipeline with the potential to cause...
Regulated
- Describe pipelines with major accident potential in your safety caseOperator
s.sch003
Particulars of any combined operations which may involve the installation,...
Regulated
- Coordinate management systems and jointly review safety for combined operationsResponsible Person
s.sch003
A description of how the duty holder has ensured, or...
Regulated
- Include PFEER compliance description in your safety caseResponsible Person
s.sch003
A description of arrangements made for protecting persons on the...
Regulated
- Describe arrangements to protect persons from toxic gasOperator
s.sch004
The name and address of each duty holder preparing the...
Regulated
- Include all duty holders' names and addresses in combined operations notificationResponsible Person
s.sch005
A summary of how any safety representatives for that installation...
Regulated
- Include summary of safety representative consultation in safety case revisionsOperator
s.sch005
A description of how the duty holder will comply with...
Regulated
- Include description of compliance with PFEER dismantling requirements in safety caseResponsible Person
s.sch006
Where a well operation is to be carried out by...
Regulated
- Provide site conditions data and coordinate safety for well operationsOperator
s.sch006
In the case of an existing well—
Regulated
- Include detailed well information in the safety caseOperator
s.sch007
The principles to be applied by the duty holder for...
Regulated
- Include principles for selecting persons in your verification schemeResponsible Person
s.sch007
The arrangements for the making and preservation of records showing—...
Regulated
- Make and preserve records of examination, testing and remedial actionsOperator
72 other schedules
s.sch001
The name and address of the operator of the installation....
s.sch001
A description of the design process from an initial concept...
s.sch001
A description of— (a) the chosen design concept, including suitable...
s.sch001
A description of— (a) the principal systems on the installation;...
s.sch001
A suitable plan of the intended location of the installation...
s.sch001
Particulars of the types of operation, and activities in connection...
s.sch001
A summary of the verification scheme prepared pursuant to sub-paragraph...
s.sch001
Where a non-production installation is to be converted for use...
s.sch002
The name and address of the operator of the installation....
s.sch002
A description of arrangements made for protecting persons on the...
s.sch002
A description of the measures taken or to be taken...
s.sch002
A description, with suitable diagrams, of— (a) the main and...
s.sch002
A suitable plan of the location of the installation and...
s.sch002
Particulars of the types of operation, and activities in connection...
s.sch002
The maximum number of persons— (a) expected to be on...
s.sch002
Particulars of the plant and arrangements for the control of...
s.sch003
PARTICULARS TO BE INCLUDED IN A SAFETY CASE FOR A NON-PRODUCTION INSTALLATION (opens in a new tab)
s.sch003
The name and address of the owner of the installation....
s.sch003
A description of the main requirements in the specification for...
s.sch003
Particulars of— (a) the limits of the environmental conditions beyond...
s.sch003
A description of the arrangements for— (a) identifying the routes...
s.sch003
A summary of how any safety representatives for that installation...
s.sch003
A description, with suitable diagrams, of— (a) the main and...
s.sch003
Particulars of the types of operation, and activities in connection...
s.sch003
The maximum number of persons— (a) expected to be on...
s.sch003
Particulars of the plant and arrangements for the control of...
s.sch003
A description of the measures taken or to be taken...
s.sch004
A description of how the management systems for the installations...
s.sch004
Particulars of any plant to be used in connection with...
s.sch004
A summary of the joint review referred to in paragraph...
s.sch004
A description of the combined operation and a programme of...
s.sch005
The name and address of the operator of the installation....
s.sch005
The dates on which dismantling is expected to commence and...
s.sch005
The maximum number of persons expected to be on the...
s.sch005
A description of arrangements made for protecting persons on the...
s.sch005
A description of how the proposed arrangements, methods and procedures...
s.sch006
The name and address of the well operator.
s.sch006
Where the well operation is to be carried out—
s.sch006
Particulars of the fluids to be used to control the...
s.sch006
Particulars of any plant, not described in the current safety...
s.sch006
Particulars of the type of well, its number, and slot...
s.sch006
A description of the well operation and a programme of...
s.sch006
A description of— (a) any activities on or in connection...
s.sch006
In the case of a well which is to be...
s.sch007
Arrangements for the communication of information necessary for the proper...
s.sch007
The nature and frequency of examination and testing.
s.sch007
Arrangements for review and revision of the scheme.
s.sch007
Arrangements for communicating the matters specified in paragraph 5 to...
s.sch008
APPEALS (opens in a new tab)
s.sch008
In this Schedule— “appeal” means an appeal under regulation 24;...
s.sch008
(1) Where, after the hearing, the appointed person proposes to...
s.sch008
The appointed person shall notify the decision on the appeal,...
s.sch008
The Secretary of State shall direct that an appeal shall...
s.sch008
Before the determination of an appeal, the appointed person shall...
s.sch008
An appointed person may give such directions as he thinks...
s.sch008
The Secretary of State may pay to an appointed person...
s.sch008
(1) Subject to the following sub-paragraphs of this paragraph, a...
s.sch008
(1) Not later than 21 days before the date of...
s.sch008
(1) The parties shall be entitled to appear at the...
s.sch008
(1) All hearings shall be held in private.
s.sch009
AMENDMENTS (opens in a new tab)
s.sch009
In the Offshore Installations (Safety Representatives and Safety Committees) Regulations...
s.sch009
In the Offshore Installations and Pipeline Works (Management and Administration)...
s.sch009
In the Offshore Installations (Prevention of Fire and Explosion, and...
s.sch009
In the Offshore Installations and Wells (Design and Construction, etc.)...
s.sch009
In the Diving at Work Regulations 1997 omit paragraph 4...
s.sch009
In the Health and Safety (Fees) Regulations 2005 —
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.