UK Statutory Instrument 2002 United Kingdom

The Railways (Interoperability) (High-Speed) Regulations 2002

At a glance

What's here

12 compliance obligations

Who this Act binds

Plus 4 non-business duties on Crown ministers, regulators, local authorities or tribunals — shown collapsed under each section below.

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

s.sch006

The body notified responsible for checking implementation must periodically carry...

Other duties (1) — Crown / regulator
  • Notified body must audit high-speed rail implementation and report Statutory regulator
s.sch006

In addition, the notified body may pay unexpected visits to...

Other duties (1) — Crown / regulator
  • Notified body must provide reports after unexpected visits Statutory regulator
s.sch006

Each body must periodically pass on relevant information concerning the...

  • Periodically report EC verification activity to the regulator
s.sch007

The body and the staff responsible for inspection must carry...

  • Conduct high-speed rail inspections with integrity and independence
s.sch007

That body must employ staff and possess the means required...

  • Employ staff and maintain resources for inspection checks
s.sch007

The body must take out civil liability insurance unless that...

  • Take out civil liability insurance for inspection activities
Browse 73 other Schedules — structural / supplementary
s.sch001

Infrastructure

s.sch001

Rolling Stock

s.sch001

Compatibility of infrastructure and rolling stock

s.sch002

basically structural areas: infrastructures energy control and command and signalling...

s.sch002

basically operational areas: maintenance environment operation users.

s.sch002

For the purposes of this Directive, the system constituting the...

s.sch002

BASIC PARAMETERS

s.sch002

For each subsystem, the list of aspects relating to interoperability...

s.sch002

Within the meaning of Article 5(3)(b), the following are regarded...

s.sch003

General requirements

s.sch003

Safety

s.sch003

The design, construction or assembly, maintenance and monitoring of safety-critical...

s.sch003

The parameters involved in the wheel/rail contact must meet the...

s.sch003

The components used must withstand any normal or exceptional stresses...

s.sch003

The design of fixed installations and rolling stock and the...

s.sch003

Any devices intended to be handled by users must be...

s.sch003

Reliability and availability The monitoring and maintenance of fixed or...

s.sch003

Health

s.sch003

Materials likely, by virtue of the way they are used,...

s.sch003

Those materials must be selected, deployed and used in such...

s.sch003

Environmental protection

s.sch003

The repercussions on the environment of the establishment and operation...

s.sch003

The materials used in the trains and infrastructures must prevent...

s.sch003

The rolling stock and energy-supply systems must be designed and...

s.sch003

Technical compatibility The technical characteristics of the infrastructures and fixed...

s.sch003

Requirements specific to each subsystem

s.sch003

Infrastructures

s.sch003

Safety Appropriate steps must be taken to prevent access to...

s.sch003

Energy

s.sch003

Safety Operation of the energy-supply systems must not impair the...

s.sch003

Environmental protection The functioning of the energy-supply systems must not...

s.sch003

The electricity supply systems used throughout the trans-European high-speed rail...

s.sch003

Control and command and signalling

s.sch003

Safety The control and command and signalling installation and procedures...

s.sch003

Technical compatibility All new high-speed infrastructures and all new high-speed...

s.sch003

Rolling stock

s.sch003

Safety The rolling-stock structures and those of the links between...

s.sch003

Reliability and availability The design of the vital equipment and...

s.sch003

Technical compatibility The electrical equipment must be compatible with the...

s.sch003

Maintenance

s.sch003

Health The technical installations and the procedures used in the...

s.sch003

Environmental protection The technical installations and the procedures used in...

s.sch003

Technical compatibility The maintenance installations on high-speed trains must be...

s.sch003

Environment

s.sch003

Health Operation of the trans-European high-speed rail system must remain...

s.sch003

Environmental protection Operation of the trans-European high-speed rail system must...

s.sch003

Operation

s.sch003

Safety Alignment of the network operating rules and the qualifications...

s.sch003

Reliability and availability The operation and maintenance periods, the training...

s.sch003

Technical compatibility The alignment of the operating rules of the...

s.sch004

multiple-use constituents These are constituents that are not specific to...

s.sch004

multiple-use constituents having specific characteristics These are multiple-use constituents which...

s.sch004

specific constituents These are constituents that are specific to railway...

s.sch004

EC declaration

s.sch004

EC declaration

s.sch004

Scope The EC declaration covers: either the assessment by a...

s.sch004

Contents of the EC declaration The EC declaration of conformity...

s.sch005

EC declaration of verification

s.sch006

EC verification

s.sch006

EC verification

s.sch006

The subsystem is checked at each of the following stages:...

s.sch006

The notified body responsible for EC verification draws up the...

s.sch006

The technical record accompanying the verification statement must be made...

s.sch006

Monitoring

s.sch006

The aim of EC monitoring is to ensure that the...

s.sch006

The notified body responsible for checking production must have permanent...

s.sch006

The complete record referred to in paragraph 4 must be...

s.sch006

The records and correspondence relating to the EC verification procedures...

s.sch007

The body, its Director and the staff responsible for carrying...

s.sch007

The staff responsible for the checks must possess: proper technical...

s.sch007

The independence of the staff responsible for inspections must be...

s.sch007

The staff of that body are bound by professional secrecy...

s.sch008

The rail network schemes are the following lines—

s.006

Requirement on notified bodies to carry out functions

Other duties (1) — Crown / regulator
  • Notified bodies must carry out requested checks for high-speed rail subsystems Statutory regulator
s.007

Notified bodies: certificates of conformity etc.

  • Notified body must give reasons and 28-day response period before refusing a certificate
s.008

Duties on notified bodies to consult

  • Notified bodies must consult each other to ensure consistent assessment procedures
s.020

Structural subsystems: appropriate verification assessment procedure

Other duties (1) — Crown / regulator
  • Notified body must verify structural subsystems and compile technical file Statutory regulator
s.023

Interoperability constituents: duties on operators

  • Ensure interoperability constituents are correctly installed, used and maintained
s.033

Notices relating to interoperability constituents not meeting the essential requirements

  • Contracting entities must comply with ORR notices prohibiting or restricting use of non-compliant high-speed rail components
Browse 32 other sections — procedural / definitional / commencement
sch. 4

sch. 4

s.001

Citation and commencement

s.002

Interpretation

s.003

Application of the Regulations

s.004

Notified bodies

s.005

Appointment of notified bodies by

s.009

Notified bodies: fees

s.010

The Strategic Rail Authority: fees

s.011

Interoperability constituents: prohibition on placing on the market

s.012

Interoperability constituents: duties on persons other than the person responsible

s.013

Structural subsystems: duties on a contracting entity

s.014

Structural subsystems: authorisation

s.015

Exemption from need to conform with the

s.016

Structural subsystems: screening decisions

s.017

Structural subsystems: staged works decisions

s.018

Fees payable to the supervisory authority

s.019

Interoperability constituents: appropriate assessment procedure

s.021

Effect of declarations

s.022

Accessibility compliance certificates

s.024

Structural subsystems: duties on owners

s.025

Interoperability constituents: position after placing on the market

s.026

Structural subsystems: duties in respect of registers

s.027

Notification of standards, technical specifications and technical rules to

s.028

Interoperability constituents: notification to the Commission

s.029

Notification to the Commission of additional checks

s.030

Interoperability constituents: recognition of assessments of other Member States

s.031

Enforcement in Great Britian

s.032

Enforcement in Northern Ireland

s.034

Defence of Due Diligence

s.035

Liability of persons other than the principal offender

s.036

Amendment of the Railways and Other Transport Systems (Approval of Works, Plant and Equipment) Regulations 1994

s.037

Transitional provisions and revocations

Explore more

Browse legislation

Find other UK business legislation with related guidance.