Northern Ireland Statutory Rule 2016 United Kingdom

The Offshore Installations (Offshore Safety Directive) (Safety Case etc.) Regulations (Northern Ireland) 2016

At a glance

What's here

27 compliance obligations

Who this Act binds

Business-side actors with duties under this Act, ranked by how often they appear.

  • Responsible Person 12
  • Operator 12
  • Licence Holder 1
  • Landlord 1
  • Any Person 1

Other Acts binding the same actors

For each actor bound by this Act, the other UK Acts that bind them most often. Useful for understanding the full compliance landscape facing each role.

Responsible Persons also bound by 104 other Acts (top 5 shown)
Operators also bound by 730 other Acts (top 5 shown)
Licence Holders also bound by 221 other Acts (top 5 shown)
Landlords also bound by 216 other Acts (top 5 shown)
Any Person also bound by 2337 other Acts (top 5 shown)

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

s.sch006

A description of the verification scheme which complies with regulation...

  • Create and maintain a verification scheme for safety-critical elements Operator
s.sch008

A description of how the duty holder has ensured, or...

  • Describe how you comply with fire and explosion emergency rules Responsible Person
s.sch011

The name and address of each duty holder preparing the...

  • Include names and addresses of all duty holders in notification and confirm their agreement Responsible Person
Browse 208 other Schedules — structural / supplementary
s.sch001

Interpretation

s.sch001

Offshore installations

s.sch001

Wells

s.sch001

Pipelines

s.sch001

Mines

s.sch001

Gas Importation and Storage

s.sch001

Production of Energy from Water or Wind

s.sch001

Underground Coal Gasification

s.sch001

Other activities

s.sch002

The responsibility of officers of the duty holder for ensuring,...

s.sch002

Formal command and control systems that include officers and senior...

s.sch002

Measures for building and maintaining a strong safety culture with...

s.sch002

The approach to competency at all levels of the duty...

s.sch002

Measures for rewarding and recognising desired behaviours.

s.sch002

The evaluation of the duty holder’s capabilities and goals.

s.sch002

The extent and intensity of process auditing.

s.sch002

Measures for maintenance of safety and environmental protection standards as...

s.sch002

The extent to which the particulars in paragraphs 1 to...

s.sch003

The need to take appropriate measures to ensure as far...

s.sch003

The need to pay particular attention to evaluation of the...

s.sch003

The need to adopt suitable measures to use suitable technical...

s.sch003

The need to ensure there is a suitable framework for...

s.sch003

The need to pay particular attention to building and maintaining...

s.sch004

Organisational structure and personnel roles and responsibilities.

s.sch004

The measures in place for participating in tripartite consultations and...

s.sch004

Identification and evaluation of major hazards as well as their...

s.sch004

Integration of environmental impact into major accident risk assessments in...

s.sch004

Controls of the major hazards during normal operations.

s.sch004

Emergency planning and response.

s.sch004

Limitation of damage to the environment.

s.sch004

Management of change.

s.sch004

Monitoring of performance.

s.sch004

Audit and review arrangements.

s.sch005

The principles to be applied by the duty holder—

s.sch005

The arrangements for the making and preservation of records showing—...

s.sch005

The arrangements for communicating the matters specified in paragraph 4...

s.sch005

The arrangements for review of the scheme.

s.sch005

The arrangements for the communication to the verifier of information...

s.sch005

The nature and frequency of examination and testing.

s.sch005

The arrangements for the making and preservation of records showing—...

s.sch005

The arrangements for communicating the matters specified in paragraph 4...

s.sch005

The arrangements for review and revision of the scheme.

s.sch005

The principles to be applied by the well operator—

s.sch005

The arrangements for the communication to the well examiner of...

s.sch005

The nature and frequency of examination.

s.sch006

The name and address of the operator of the installation....

s.sch006

A general description of the safety and environmental management system...

s.sch006

Where a non-production installation is to be converted for use...

s.sch006

Where a production installation is to be moved to a...

s.sch006

A general description of the means by which the management...

s.sch006

A description of the design process from an initial concept...

s.sch006

A description of— (a) the chosen design concept in relation...

s.sch006

A suitable plan of the intended location of the installation...

s.sch006

A description of any environmental, meteorological and seabed limitations on...

s.sch006

Particulars of the types of operation, and activities in connection...

s.sch006

A description of— (a) the principal systems on the installation;...

s.sch007

The name and address of the operator of the installation....

s.sch007

A suitable plan of the location of the installation and...

s.sch007

A description, with suitable diagrams, of the installation, including a...

s.sch007

Particulars of the types of operation, and activities in connection...

s.sch007

Particulars of the plant and arrangements for—

s.sch007

A description of any pipeline with the potential to cause...

s.sch007

A description of how the operator has ensured, or will...

s.sch007

Particulars of information obtained pursuant to the PFEER Regulations and...

s.sch007

In respect of operations to be conducted from the installation,...

s.sch007

A description of the plant used and arrangements made for...

s.sch007

A description of the measures taken or to be taken...

s.sch007

The maximum number of persons— (a) expected to be on...

s.sch007

Arrangements for the maintenance of control systems to prevent damage...

s.sch007

The description of the internal emergency response arrangements.

s.sch007

The assessment produced pursuant to paragraph 2(j) of Schedule 2...

s.sch007

Particulars of any combined operations which may involve the installation,...

s.sch007

Any other relevant details.

s.sch007

A copy of the operator’s corporate major accident prevention policy,...

s.sch007

A summary of any worker involvement in the preparation of...

s.sch007

An adequate description of the operator’s safety and environmental management...

s.sch007

A description of the verification scheme which complies with regulation...

s.sch007

A description of the extent to which the operator has...

s.sch007

A description of the main requirements in the specification for...

s.sch007

In paragraph 8(d) “pipeline operator”, in relation to a pipeline,...

s.sch008

The name and address of the owner of the installation....

s.sch008

A description, with suitable diagrams, of the installation, including a...

s.sch008

Particulars of the types of operation, and activities in connection...

s.sch008

Particulars of the plant and arrangements for the control of—...

s.sch008

In respect of operations to be conducted from the installation,...

s.sch008

A description of the plant used and arrangements made for...

s.sch008

A description of the measures taken or to be taken...

s.sch008

The description of the internal emergency response arrangements.

s.sch008

The assessment produced pursuant to paragraph 2(j) of Schedule 2...

s.sch008

Particulars of any combined operations which may involve the installation,...

s.sch008

The maximum number of persons— (a) expected to be on...

s.sch008

Any other relevant details.

s.sch008

A copy of the owner’s corporate major accident prevention policy,...

s.sch008

A summary of any worker involvement in the preparation of...

s.sch008

An adequate description of the owner’s safety and environmental management...

s.sch008

A description of the verification scheme which complies with regulation...

s.sch008

A description of the main requirements in the specification for...

s.sch008

Particulars of— (a) the limits of the environmental and meteorological...

s.sch008

A description of the arrangements for— (a) identifying the risks...

s.sch009

The name and address of the operator of the installation....

s.sch009

The maximum number of persons expected to be on the...

s.sch009

A summary of any worker involvement in the revised safety...

s.sch009

The dates on which dismantling is expected to commence and...

s.sch009

A description of how the proposed arrangements, methods and procedures...

s.sch009

In the case of the dismantling of a fixed production...

s.sch009

A description of how the operator will comply with regulation...

s.sch009

A description of arrangements made for protecting persons on the...

s.sch009

Sufficient details to update the description of the internal emergency...

s.sch010

The name and address of the well operator.

s.sch010

Where a well operation is to be carried out from...

s.sch010

The report made under regulation 11(2)(b) in relation to the...

s.sch010

A risk assessment incorporating a description of—

s.sch010

Where a well is to be constructed, modified or maintained...

s.sch010

Particulars of information obtained pursuant to the PFEER Regulations and...

s.sch010

In respect of a well operation to be conducted, particulars...

s.sch010

An adequate description of the well operator’s safety and environmental...

s.sch010

Where the well operation is to be carried out—

s.sch010

Particulars of the fluids to be used to control the...

s.sch010

Particulars of any plant, not described in the current safety...

s.sch010

Particulars of the type of well, its number, and slot...

s.sch010

A description of the well operation and a programme of...

s.sch010

A description of— (a) any activities on or in connection...

s.sch010

In the case of a well which is to be...

s.sch010

In the case of an existing well—

s.sch011

The name and address of the duty holder submitting the...

s.sch011

A description of the combined operation and a programme of...

s.sch011

Particulars of any plant to be used in connection with...

s.sch011

A summary of the joint review referred to in paragraph...

s.sch011

A description, by reference to a bridging document authorised by...

s.sch012

Effective risk management.

s.sch012

Reliability assessment for safety and environmental-critical systems.

s.sch012

Management and supervision of major hazard operations.

s.sch012

Competency of key post holders.

s.sch012

Reliable decision making.

s.sch012

Effectively integrating safety and environmental management systems between operators and...

s.sch012

Key performance indicators.

s.sch012

Improving well integrity, well control equipment and barriers and monitoring...

s.sch012

Improving primary containment.

s.sch012

Improving secondary containment that restricts escalation of an incipient major...

s.sch013

In this Schedule— “appeal” means an appeal under regulation 37;...

s.sch013

(1) Where, after the hearing, the appointed person proposes to...

s.sch013

The appointed person shall notify the decision on the appeal,...

s.sch013

The Department or the Secretary of State, as appropriate, shall...

s.sch013

Before the determination of an appeal, the appointed person shall...

s.sch013

An appointed person may give such directions as the appointed...

s.sch013

The Department or the Secretary of State, as appropriate, may...

s.sch013

(1) Subject to the following sub-paragraphs of this paragraph, a...

s.sch013

(1) Not later than 21 days before the date of...

s.sch013

(1) The parties are entitled to appear at the hearing....

s.sch013

(1) All hearings shall be held in private.

s.sch014

Offshore Installations (Safety Representatives and Safety Committees) Regulations 1989

s.sch014

(1) Regulation 4 (Application) is amended as follows.

s.sch014

In regulation 5(1) (Notification concerning offshore installations) for “no later...

s.sch014

In regulation 20(1) (Certificates of exemption) after “workers at work”...

s.sch014

After regulation 21 insert— Obligation to notify death or loss...

s.sch014

For Schedule 1 substitute— SCHEDULE1 PREMISES AND ACTIVITIES WITHIN THE...

s.sch014

After Schedule 2 insert— SCHEDULE 3 FORM TO NOTIFY THE...

s.sch014

Offshore Installations (Prevention of Fire and Explosion, and Emergency Response) Regulations (Northern Ireland) 1995

s.sch014

In regulation 2(1) (Interpretation)— (a) after the definition of “the...

s.sch014

(1) Regulation 3 (Application) is amended as follows.

s.sch014

In regulation 4(2) (General duty) after “regulations 6 to 21”...

s.sch014

In regulation 2 (Interpretation)— (a) after the definition of “the...

s.sch014

For regulation 5(3)(c) (Assessment) substitute— (c) notify—

s.sch014

(1) Regulation 6 (Preparation for emergencies) is amended as follows....

s.sch014

In regulation 22(1) (Certificates of exemption) after “workers at work”...

s.sch014

After regulation 22 insert— Inventory of equipment etc. (1) This regulation applies only in relation to external waters....

s.sch014

For Schedule 1 substitute— SCHEDULE 1 PREMISES AND ACTIVITIES WITHIN...

s.sch014

Offshore Installations and Wells (Design and Construction, etc.) Regulations (Northern Ireland) 1996

s.sch014

In regulation 2(1) (Interpretation)— (a) after the definition of “the...

s.sch014

In regulation 3 (Application) (a) in paragraph (1) after “territorial...

s.sch014

In regulation 9 (Reporting of danger to an installation)—

s.sch014

In regulation 12 (Additional requirements)— (a) in paragraph (1) omit...

s.sch014

In regulation 18A(1)(a) (Safety representative entitlement to summary of current...

s.sch014

In regulation 13(2) (General duty) after “regulations 14 to 19...

s.sch014

In regulation 18 (Arrangements for examination) omit paragraphs (5), (6)...

s.sch014

In regulation 23(1) (Certificates of exemption) after “safety and health...

s.sch014

Omit regulation 24 (Transitional provision).

s.sch014

Reporting of Injuries, Diseases and Dangerous Occurrences Regulations (Northern Ireland) 1997

s.sch014

Offshore Installations (Safety Case) Regulations (Northern Ireland) 2007

s.sch014

(1) Subject to paragraph (2), for “relevant waters” substitute “internal...

s.sch014

(1) Regulation 2 (Interpretation) is amended as follows.

s.sch014

In regulation 4 (Application) omit paragraph (1).

s.sch014

In regulation 6(2) (Design and relocation notifications for production installation)...

s.sch014

In regulation 23(2)(c)(i) (Duties of installation operators and owners, and...

s.sch014

In regulation 7(1) (Safety case for production installation) in the...

s.sch014

In regulation 14(3)(c) (Revision of safety case) after “location” insert...

s.sch014

In paragraph 10 of Schedule 2 (Particulars to be included...

s.sch014

Health and Safety (Fees) Regulations (Northern Ireland) 2012

s.sch014

Offshore Installations and Pipeline Works (First-Aid) Regulations (Northern Ireland) 1993

s.sch014

In regulation 2 (Interpretation)— in paragraph (b) of the definition...

s.sch014

Offshore Installations and Pipeline Works (Management and Administration) Regulations (Northern Ireland) 1995

s.sch014

In regulation 2(1) (Interpretation)— (a) before the definition of “activity”...

s.sch014

(1) Regulation 3 (Meaning of “offshore installation”) is amended as...

s.sch015

Interpretation

s.sch015

Where revisions to current safety case under paragraph 9(2) may...

s.sch015

Where paragraph 10(b) applies to a safety case, paragraph 1(a)...

s.sch015

Improvement notices issued before the end of the transitional period

s.sch015

Prohibition notices issued before the end of the transitional period

s.sch015

Design etc. notifications

s.sch015

Where a notification under the 2007 regime is not completed...

s.sch015

General saving of the 2007 regime

s.sch015

Continued application of the 2007 regime to existing and proposed non-production installations

s.sch015

Continued application of the 2007 regime to existing and proposed production installations

s.sch015

Continued application of the 2007 regime to well operations

s.sch015

Design notification for production installations to be established during transitional period

s.sch015

Design notification: election to prepare notification under these Regulations

s.sch015

Election to prepare a safety case under these Regulations

s.sch015

Treatment of current safety cases for installations continuing under the 2007 regime

s.005

Duties of licensee

  • Ensure operator is capable and performs its duties Licence Holder
s.007

Corporate major accident prevention policy

  • Prepare and implement a corporate major accident prevention policy Operator
s.008

Safety and environmental management system

  • Prepare and maintain a safety and environmental management system document Responsible Person
s.009

Establishment of verification scheme

  • Establish a verification scheme for safety-critical equipment Responsible Person
s.010

Other provisions as to verification schemes

  • Manage the verification scheme for your offshore installation Responsible Person
s.011

Establishment of a well examination scheme

  • Set up a written well examination scheme before adopting the well design Operator
s.012

Other provisions as to well examination schemes

  • Manage well examination scheme and ensure qualified personnel allocation Operator
s.015

Design and relocation notifications for production installation

  • Notify the competent authority before establishing or moving a production installation Operator
s.017

Safety case for production installation

  • Prepare and submit a safety case before operating your production installation Operator
s.019

Design notification and safety case for non-production installation to be converted

  • Send design notification to regulator before converting a non-production installation Any Person
s.020

Safety case for dismantling fixed installation

  • Update safety case before dismantling a fixed offshore installation Operator
s.021

Notification of well operations

  • Notify the competent authority before starting well operations Operator
s.022

Notification of combined operations

  • Notify competent authority before starting combined offshore operations Responsible Person
s.023

Review of safety case

  • Review your offshore installation safety case every 5 years Responsible Person
s.024

Revision of safety case

  • Revise your offshore safety case when significant changes are made Responsible Person
s.025

Power of competent authority in relation to safety cases and related documents

  • Comply with safety case revision directions, document demands, and suspension orders Responsible Person
s.026

Power of the competent authority to prohibit operations

  • Do not operate if the competent authority says your safety measures are insufficient Operator
s.027

Keeping of documents

  • Keep required offshore safety documents at a Northern Ireland address and on the installation Responsible Person
s.028

Duty to conform with safety case and notifications of operation

  • Follow your safety case and stick to your operational plans Responsible Person
s.029

Duty to control risk

  • Control risk of major accident and notify regulator within 24 hours Operator
s.030

Internal emergency response

  • Perform internal emergency response duties for offshore installations Responsible Person
s.031

Communication of national arrangements for confidential reporting of safety concerns etc.

  • Communicate confidential reporting arrangements to workers and include in training Operator
s.032

Standards and guidance on best practice

  • Cooperate with regulator to develop best-practice standards and guidance Operator
s.033

Notification of major accident etc.

  • Notify the competent authority of major accidents without delay Landlord
Browse 16 other sections — procedural / definitional / commencement
s.001

Citation and commencement

s.002

Interpretation

s.003

Communication and storage of information by electronic means

s.004

Application within the territorial sea or a designated area

s.006

Capacity of operator to meet requirements

s.013

Description of verification scheme and well examination scheme

s.014

Defence

s.016

Management and control of major accident hazards

s.018

Safety case for non-production installation

s.034

Information on operations conducted outside of the European Union , Northern Ireland and external waters

s.035

Exemptions

s.036

Enforcement

s.037

Appeals

s.038

Amendments and revocations

s.039

Transitional provisions and savings

s.040

Penalties

Explore more