Business guidance

Rules, requirements and how-tos for running your business — organised by topic, with industry-specific guidance on the sector pages.

Guidance for energy & utilities

Show all guidance
Energy & Utilities

Apply for an electricity or gas licence in Northern Ireland

Step-by-step guide to applying to UREGNI for an electricity or gas licence in Northern Ireland. Covers the different licence types for electricity (generation, transmission, distribution, supply) and gas (supply, conveyance, storage), what UREGNI requires from applicants, the application process and timescales, and the criminal offence of operating without a licence.

Manufacturing & Engineering

COMAH Compliance for Chemical Sites

Meet COMAH requirements for sites holding dangerous substances.

Energy & Utilities

Comply as an energy supplier

Selling electricity or gas to customers over the public networks is a licensed activity with heavyweight ongoing obligations. Beyond getting the Ofgem supply licence, you must join the industry codes — the Balancing and Settlement Code for electricity, the Uniform Network Code for gas — keep domestic tariffs within the quarterly price cap, meet Ofgem's standards of conduct, and meet the renewable-scheme obligations: the Renewables Obligation, the Contracts for Difference levy and, for larger suppliers, the mandatory Smart Export Guarantee. Ofgem can fine suppliers up to 10% of turnover for licence-condition breaches.

Manufacturing & Engineering

Comply with UK Emissions Trading Scheme

How to meet your annual UK ETS compliance obligations if you operate a regulated installation, run aviation operations, or will be covered by maritime expansion from 2026. Covers the monitoring, reporting and verification (MRV) cycle, surrendering allowances, and penalties for non-compliance.

Energy & Utilities

Contracts for Difference (CfD)

The main government support mechanism for new low-carbon electricity generation. CfDs provide long-term price stability for renewable generators through competitive allocation rounds.

Manufacturing & Engineering

Control and monitor air emissions

How to comply with air emissions permit conditions for Part A and Part B regulated activities. Covers the difference between Environment Agency and local authority regulation, emission limits, MCERTS monitoring, stack testing, abatement equipment, and reporting requirements.

Energy & Utilities

Crown Estate Offshore Wind Seabed Leasing

Securing seabed rights is the critical first step for offshore wind projects in UK waters. The Crown Estate and Crown Estate Scotland manage competitive leasing rounds with option fees, operational rent, and up to 60-year lease terms.

Energy & Utilities

Crown Estate Seabed Lease

All offshore wind developments in English and Welsh waters require a seabed lease from The Crown Estate.

Energy & Utilities

Development Consent Order (DCO)

Offshore wind farms exceeding 100MW and other Nationally Significant Infrastructure Projects (NSIPs) require a Development Consent Order from the Secretary of State.

Energy & Utilities

Develop offshore wind projects and secure seabed leases

How to develop offshore wind projects in UK waters, from securing seabed rights through Crown Estate leasing rounds to obtaining Section 36 consent, safety zones, and grid connections. Covers England, Wales, Scotland, and Northern Ireland with differences in consenting regimes and landlords.

Energy & Utilities

Electricity Supply Licence

Businesses supplying electricity to consumers in Great Britain require a Supply Licence from Ofgem.

Energy & Utilities

Energy compliance checklist

A confirmation checklist for energy businesses. Work through the cross-cutting duties every energy business shares, then the section for what you operate — electricity generation, electricity networks, gas networks and gas manufacture, energy supply, or heat, steam and air conditioning.

Energy & Utilities

Environmental Permit - Medium Combustion Plant

Medium combustion plant (MCP) with thermal input between 1MW and 50MW require an environmental permit from the Environment Agency.

Manufacturing & Engineering

Environmental Permit - Part A(1) Installation

Large combustion plant (50MW thermal input and above) and other major industrial installations require a Part A(1) environmental permit.

Energy & Utilities

Gas network and gas safety rules

Conveying gas through pipes to premises needs an Ofgem gas transporter licence and an HSE-accepted safety case before you start — and gas manufacturing processes connected to a network, such as biomethane production, need their own safety case. High-pressure pipelines carry major-accident duties under the Pipelines Safety Regulations 1996, networks with more than one transporter need a Network Emergency Co-ordinator, and licensed transporters sit under the RIIO-GD price control. The Gas Act 1986 does not extend to Northern Ireland.

Energy & Utilities

Gas supply and shipper licensing

How to obtain a gas supply, shipper, transporter, or interconnector licence from Ofgem. Covers licence types, exemptions, application process, fees, standard conditions, HSE safety case requirements, and penalties for non-compliance. Applies to Great Britain only.

Energy & Utilities

Get an electricity generation licence

How to determine if you need an electricity generation licence from Ofgem (GB) or the Utility Regulator (NI). Covers licensing thresholds, exemptions, environmental permits, grid connections, and COMAH compliance for larger energy facilities.

Food, Drink & Hospitality

Get authorisation for a water activity in Scotland (EASR)

How to get authorisation for any activity affecting surface water or groundwater in Scotland — abstraction, impoundment, engineering in or near a water body, and discharges. Since 1 November 2025 water activities are authorised under the Environmental Authorisations (Scotland) Regulations 2018 (EASR), which replaced the Controlled Activities Regulations (CAR 2011) framework. Covers the four-tier authorisation system (General Binding Rules, notification, registration, permit), pre-application advice, fees, and enforcement, all administered by SEPA.

Energy & Utilities

Get paid for renewable electricity you generate

How to register for the Smart Export Guarantee (SEG) to receive payment for renewable electricity you export to the grid. Covers solar PV, wind, and other small-scale renewables up to 5MW.

Energy & Utilities

Grid Connection Agreement

All electricity generators connecting to the GB electricity network require a connection agreement with either NESO (National Energy System Operator) (transmission) or a Distribution Network Operator (DNO).

Energy & Utilities

Grid Connection for Energy Projects

How to connect electricity generation projects to the UK grid. Understand the difference between DNO and National Grid routes, the G99 connection standard, and the April 2025 Ofgem reforms that promise £5 billion in savings and faster connection timelines.

Energy & Utilities

Hydrogen Production Licensing and Compliance

Licensing, safety, and environmental requirements for hydrogen production facilities in the UK. Includes Low Carbon Hydrogen Standard certification, environmental permits, planning consent, COMAH compliance, and government funding through the Hydrogen Production Business Model.

Energy & Utilities

Marine Licence

Activities in the marine environment (below Mean High Water Springs) require a Marine Licence from the Marine Management Organisation (MMO) in England.

Energy & Utilities

Meet your water industry regulatory duties

A water supply business in the UK must hold an appointment or licence as a water undertaker, meet drinking water quality standards, comply with the water fittings regulations, register and inspect any large raised reservoir, hold an abstraction licence for raw-water collection and hold environmental permits for discharges. This guide takes you through each regulatory duty in turn.

Technology & Digital

Network and Information Systems (NIS) Regulations

The NIS Regulations 2018 (as amended in 2022) require operators of essential services and relevant digital service providers to implement appropriate security measures, report significant incidents within 72 hours, and cooperate with sector-specific competent authorities. The Cyber Security and Resilience Bill (introduced November 2025) will further expand scope to managed service providers, data centres, and critical suppliers.

Energy & Utilities

Offshore Wind Development Consent Orders (DCO)

Offshore wind projects over 100MW in English territorial waters require a Development Consent Order from the Secretary of State. Understand the specific thresholds, fees, timelines and 7-stage process for offshore wind NSIPs.

Energy & Utilities

Reservoir registration and safety inspections

How to register large raised reservoirs, appoint panel engineers, comply with inspection requirements, and meet safety obligations under the Reservoirs Act 1975 and devolved legislation in Scotland and Northern Ireland.

Energy & Utilities

Run a compliant energy business

Whatever energy business you run — generation, networks, gas, supply or heat — the same core duties apply. Health and safety carries unusual weight in this sector because of major-hazard risk, you must insure your employees, activities with emissions need an environmental permit from the right national regulator, large combustion installations are in the UK Emissions Trading Scheme, and sites holding dangerous substances above threshold quantities have COMAH major-accident duties.

Energy & Utilities

Run a heat network or steam supply business

Heat networks — district heating and cooling — are moving into formal regulation: the Energy Act 2023 makes Ofgem the regulator and brings in operator authorisation and consumer protection, phased in from 2024. Alongside that sit the plant-level duties: steam boilers and pressure systems need a written scheme of examination, air-conditioning plant containing F-gases needs certified handling, heat and steam plant in buildings must meet Building Regulations energy standards, CHP operators can certify under CHPQA for Climate Change Levy relief, and large undertakings must run ESOS energy audits every four years.

Energy & Utilities

Run an electricity network business

Electricity transmission and distribution are licensed monopoly activities in Great Britain. Transmission operators need an Ofgem transmission licence and must comply with the Grid Code and CUSC under the RIIO-T price control. Distribution network operators need a distribution licence, sit under the RIIO-ED price control and must meet Ofgem's guaranteed standards of performance. Businesses that build and adopt new connection assets follow the ICP accreditation or IDNO licence route. In Northern Ireland the networks are regulated by UREGNI.

Energy & Utilities

Set up and run a safe water supply operation

Every water collection, treatment and supply business must protect its workers and others affected by the work. This guide covers the workplace health and safety, fire safety, employers' liability insurance, equality and data protection duties that apply before you get into the sector-specific water industry regulatory requirements.

Manufacturing & Engineering

UK Emissions Trading Scheme (UK ETS) compliance

Complete guide to UK ETS obligations for installations, aviation operators, and maritime operators. Covers registration thresholds, annual reporting deadlines, verification requirements, allowance surrender, and penalties.

Energy & Utilities

Understand deep land rights and petroleum licensing for onshore energy

How deep level land access rights work for petroleum and geothermal exploration. Covers the 300m depth threshold, PEDL licensing, hydraulic fracturing consent requirements, and the 11 statutory safeguards. Includes differences between England/Wales and Scotland.

Energy & Utilities

Understanding UREGNI: utility regulation in Northern Ireland

How utility regulation works in Northern Ireland, where UREGNI (the Utility Regulator) oversees electricity, gas, and water as a single combined regulator. Covers why NI energy regulation is fundamentally different from Great Britain, the all-island Single Electricity Market shared with the Republic of Ireland, NI Water as a government-owned company, and what this means for businesses operating in or entering the NI energy market.

Energy & Utilities

Water supply: compliance checklist

Use this checklist to confirm your water collection, treatment and supply business meets its obligations. Work through the workplace items every business shares, then the water industry regulatory duties. If you answer no to any item that applies to you, follow the linked guide before you proceed.

Energy & Utilities

Which energy rules apply to your business

Energy businesses — electricity generators, network operators, gas transporters and manufacturers, energy suppliers and heat network operators — share one defining feature: most activities need an Ofgem licence or authorisation before you can operate, and operating without one can be a criminal offence. Beyond licensing, what you must do depends on what you operate. Work out which you are and follow the right guide — and if you operate in Northern Ireland, the Utility Regulator (UREGNI) licenses you separately.

Energy & Utilities

Which water supply rules apply to you

If you collect, treat or supply water you must meet workplace safety duties, hold an appointment or licence as a water undertaker, comply with drinking water quality standards and hold the environmental permits your operations need. Use this page to find which guides apply to your business.

Energy & Utilities

Working in the civil nuclear industry

Regulatory compliance requirements for businesses operating in the civil nuclear industry including site licensing, security vetting, liability insurance, and decommissioning obligations under Office for Nuclear Regulation oversight.

General rules

Common requirements shown separately from guidance directly classified to this sector.