Business guidance

Rules, requirements and how-tos for running your business — organised by topic, with industry-specific guidance on the sector pages.

Guidance for energy & utilities

Show all guidance
Energy & Utilities

Apply for a Contract for Difference

A Contract for Difference pays a generator the gap between a fixed strike price and the market reference price, and takes the gap back when the market price is higher. Projects in Great Britain apply in an annual allocation round run by the National Energy System Operator.

Energy & Utilities

Apply for an electricity or gas licence in Northern Ireland

Generating, transmitting, distributing or supplying electricity, or supplying, conveying or storing gas, in Northern Ireland needs a licence from the Utility Regulator, and operating without one is a criminal offence. A GB licence from Ofgem does not cover Northern Ireland, so apply separately.

Manufacturing & Engineering

Apply for an environmental permit for a Part A(1) installation

If you run a Part A(1) installation in England, such as a combustion plant of 50MW thermal input or more, you need a bespoke permit from the Environment Agency before you operate. You must show best available techniques and, for new electricity-generating plant, decarbonisation readiness. Most new permits are decided within 4 months.

Energy & Utilities

Comply as an energy supplier

Supplying electricity or gas to customers needs an Ofgem licence, and supplying without one is a criminal offence. Domestic default tariffs must stay within Ofgem's quarterly price cap, and licence breaches can cost up to 10% of turnover.

Manufacturing & Engineering

Comply with UK Emissions Trading Scheme

If you run a regulated installation or aviation operation, or from 1 July 2026 qualifying ships, monitor your greenhouse gas emissions through the year, submit a verified report by 31 March and surrender enough allowances to cover them by 30 April. Missing these triggers automatic penalties.

Manufacturing & Engineering

Control and monitor air emissions

If your industrial activity releases pollutants to air, you need an environmental permit from the Environment Agency or your local authority, depending on its tier. The permit sets emission limits, monitoring and reporting duties, and operating without it or breaching it is an offence carrying up to five years in prison.

Energy & Utilities

Environmental Permit - Medium Combustion Plant

Medium combustion plant (MCP) with thermal input between 1MW and 50MW require an environmental permit from the Environment Agency.

Energy & Utilities

Gas network and gas safety rules

You need an Ofgem gas transporter licence and an HSE-accepted safety case before you convey gas through a network. Pipelines operating above 7 barg are major accident hazard pipelines with extra duties.

Energy & Utilities

Get an electricity generation licence

Generating electricity in the UK needs a licence from Ofgem in Great Britain or the Utility Regulator in Northern Ireland unless you are exempt, and unlicensed generation is a criminal offence. Most stations below 50MW are exempt under the Class Exemptions Order, but may still need permits and a grid connection.

Energy & Utilities

Get an Ofgem licence to supply, ship or transport gas

You need an Ofgem licence to supply gas, arrange its transport, convey it through pipes or help run a gas interconnector in Great Britain. Acting without one is a criminal offence with an unlimited fine on indictment. Gas transporters also need a safety case accepted by HSE.

Food, Drink & Hospitality

Get authorisation for a water activity in Scotland (EASR)

In Scotland, any activity affecting surface water or groundwater, such as abstraction, engineering or discharges, needs SEPA authorisation, and doing it without one is a criminal offence. SEPA decides which of four risk-based tiers your activity falls into, from general binding rules to a permit.

Energy & Utilities

Get development consent for an offshore wind farm

An offshore wind farm of more than 100MW in English waters needs a Development Consent Order from the Secretary of State. The order can deem the marine licence, but not the seabed rights from the Crown Estate or a grid connection, which you secure separately.

Energy & Utilities

Get paid for renewable electricity you generate

The Smart Export Guarantee pays you for renewable electricity exported to the grid from solar PV, wind, hydro, anaerobic digestion or micro-CHP up to 5MW. Large suppliers must offer a tariff above zero. You need MCS certification and an export meter, and cannot also take Feed-in Tariff export payments.

Energy & Utilities

Get the permits and safety consents for a hydrogen production site

A hydrogen production site needs planning permission and an environmental permit, and the hydrogen you hold on site sets the safety duties. Dangerous substances rules apply at any quantity, hazardous substances consent from 2 tonnes, and COMAH from 5 tonnes. Government support requires the Low Carbon Hydrogen Standard.

Energy & Utilities

Grid Connection Agreement

All electricity generators connecting to the GB electricity network require a connection agreement with either NESO (National Energy System Operator) (transmission) or a Distribution Network Operator (DNO).

Energy & Utilities

Grid Connection for Energy Projects

How to connect electricity generation projects to the UK grid. Understand the difference between DNO and National Grid routes, the G99 connection standard, and the April 2025 Ofgem reforms that promise £5 billion in savings and faster connection timelines.

Energy & Utilities

Marine Licence

Activities in the marine environment (below Mean High Water Springs) require a Marine Licence from the Marine Management Organisation (MMO) in England.

Manufacturing & Engineering

Meet your annual UK ETS obligations

If you run an installation covered by the UK Emissions Trading Scheme, you need a permit and registry account, must monitor emissions all year, submit a verified report by 31 March and surrender allowances to cover them by 30 April. Missing the surrender deadline brings a penalty for every allowance not surrendered.

Energy & Utilities

Meet your water industry regulatory duties

In England and Wales, water undertakers must be appointed by Ofwat, and all drinking water must meet the wholesomeness standards enforced by the Drinking Water Inspectorate. Taking raw water above the threshold needs an abstraction licence, and large raised reservoirs must be registered and inspected.

Energy & Utilities

Register a large reservoir and keep it safe

If your reservoir can hold 25,000 cubic metres or more of water above the natural level of the surrounding land, you must register it with the Environment Agency, appoint panel engineers, follow their safety directions and keep a certified flood plan. Failing to do so is a criminal offence.

Construction & Property

Respond to an infrastructure project that affects your property

If a nationally significant infrastructure project would take or affect your land or business premises, you can register to take part in the examination and ask for hearings. You may be able to make the promoter buy your property early, and you can claim compensation if land is taken.

Energy & Utilities

Run a heat network or steam supply business

The Energy Act 2023 brings heat networks under Ofgem, which authorises operators and enforces consumer protection in phases from 2024. Your steam and boiler plant also needs a written scheme of examination, and cooling plant with F-gases needs company and engineer certification.

Energy & Utilities

Run an electricity network business

Operating an electricity transmission or distribution network in Great Britain without an Ofgem licence is a criminal offence. Your licence brings price controls, industry codes and performance standards, and in Northern Ireland the networks are regulated by UREGNI instead.

Energy & Utilities

Understand how UREGNI regulates energy and water in Northern Ireland

One regulator, the Utility Regulator (UREGNI), covers electricity, gas and water in Northern Ireland. You need its licence to generate, transmit, distribute or supply electricity, or to convey, store or supply gas. Water comes from NI Water, whose prices it controls.

Energy & Utilities

Use land 300 metres or deeper for petroleum or geothermal work

Section 43 of the Infrastructure Act 2015 gives a right to use land at least 300 metres below the surface to search for, prepare for and exploit petroleum or deep geothermal energy, without the surface owner's consent. The right does not replace your licence, planning permission or environmental permits.

Manufacturing & Engineering

Water abstraction licences and drinking water quality in Northern Ireland

How water is regulated in Northern Ireland for two different kinds of business: a mill or other user that takes water from a river, lough or borehole and needs an abstraction and impoundment licence from NIEA, and a water undertaker that supplies drinking water and must meet the 2017 Water Quality Regulations enforced by the Drinking Water Inspectorate.

Energy & Utilities

Working in the civil nuclear industry

Regulatory compliance requirements for businesses operating in the civil nuclear industry including site licensing, security vetting, liability insurance, and decommissioning obligations under Office for Nuclear Regulation oversight.

General rules

Common requirements shown separately from guidance directly classified to this sector.