UK Statutory Instrument SI 2025/452 United Kingdom

The Cambridge Waste Water Treatment Plant Relocation Order 2025

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker3 Operator1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Operator — also bound by 746 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art021 Authority to survey and investigate the land Regulated
  • Give notice and obtain consents before entering land for surveysStatutory Undertaker
56 other provisions — procedural and definitional
s.art001 Citation and Commencement
s.art002 Interpretation
s.art003 Development consent etc granted by the Order
s.art004 Authorisation of use
s.art005 Maintenance of authorised development
s.art006 Limits of deviation
s.art007 Benefit of Order
s.art008 Transfer of benefit of Order
s.art009 Defence to proceedings in respect of statutory nuisance
s.art010 Street works
s.art011 Power to alter layout, etc, of streets
s.art012 Temporary stopping up of streets
s.art013 Public rights of way – creation, temporary stopping up and diversion
s.art014 Access to works
s.art015 Maintenance of highway works
s.art016 Speed limits
s.art017 Traffic regulation
s.art018 Agreements with highway authorities
s.art019 Discharge of water
s.art020 Protective works to buildings and structures
s.art022 Removal of human remains
s.art023 Felling or lopping of trees and removal of hedgerows
s.art024 Trees subject to tree preservation orders
s.art025 Trees in conservation areas
s.art026 Compulsory acquisition of land
s.art027 Time limit for exercise of authority to acquire land compulsorily
s.art028 Compulsory acquisition of rights and imposition of restrictive covenants
s.art029 Acquisition of subsoil only
s.art030 Acquisition of land limited to subsoil lying more than 7 metres beneath surface
s.art031 Private Rights
s.art032 Power to override easements and other rights
s.art033 Application and modification of the 1981 Act
s.art034 Modification of Part 1 of the 1965 Act
s.art035 Temporary use of land for carrying out the authorised development
s.art036 Temporary use of land for maintaining the authorised development
s.art037 Disregard of certain interests and improvements
s.art038 Set-off for enhancement in value of retained land
s.art039 No double recovery
s.art040 Compulsory acquisition of land – incorporation of the mineral code
s.art041 Statutory undertakers
s.art042 Recovery of costs of new connections
s.art043 Rights under or over streets
s.art044 Rights on the river Cam
s.art045 Application of landlord and tenant law
s.art046 Operational land for the purposes of the 1990 Act
s.art047 Protective Provisions
s.art048 Discharge of requirements and other approvals etc
s.art049 Application, disapplication and modification of legislative provisions
s.art050 Crown rights
s.art051 Certification of plans etc.
s.art052 Arbitration
s.art053 Service of notices
Schedules

Schedules

3 of 232 shown
s.sch015 The operator must give the undertaker reasonable notice of any... Regulated
  • Notify the undertaker of any claim or demand and do not settle without their consentOperator
s.sch015 Progress of the specified works Regulated
  • Keep local highway authority informed of works progress and arrange site meetingsStatutory Undertaker
s.sch015 Insurance Regulated
  • Take out and maintain insurance for works liabilityStatutory Undertaker
229 other schedules
s.sch001 Work No. 1 – HIGHWAY WORKS
s.sch001 Work No. 10 – SECONDARY TREATMENT MEMBRANE AERATED BIOFILM REACTOR (MABR)
s.sch001 Work No. 11 – SECONDARY TREATMENT (SETTLEMENT)
s.sch001 Work No. 12 – TREATED WATER COLLECTION CHAMBER
s.sch001 Work No. 13 – TERTIARY TREATMENT
s.sch001 Work No. 14 – STORMWATER MANAGEMENT
s.sch001 Work No. 15 – EARTH BUND & SOLAR PHOTOVOLTAIC PANELS (PV)
s.sch001 Work No. 16 – TERMINAL PUMPING STATION
s.sch001 Work No. 17 – EXISTING RISING AND GRAVITY MAIN DIVERSIONS
s.sch001 Work No. 18 – INTERCEPTION AND FIRST CONSTRUCTION SHAFT
s.sch001 Work No. 19 – GATEWAY BUILDING
s.sch001 Work No. 2 – PERMANENT ACCESS ROAD
s.sch001 Work No. 20 – TEMPORARY COMPOUND AREA
s.sch001 Work No. 21 – TEMPORARY SITE ESTABLISHMENT
s.sch001 Work No. 22 – WASTE WATER TREATMENT PLANT CONSTRUCTION WORKS AREA
s.sch001 Work No. 23 – LANDSCAPING AND ECOLOGICAL WORKS
s.sch001 Work No. 24 – LANDSCAPING AND ECOLOGICAL WORKS TEMPORARY WORK
s.sch001 Work No. 25 – TEMPORARY WORKING AREA COMPOUND
s.sch001 Work No. 26 – DIVERSION OF RIVERSIDE TUNNEL
s.sch001 Work No. 27 – TRANSFER TUNNEL
s.sch001 Work No. 28 – TRANSFER TUNNEL CONSTRUCTION AREA TEMPORARY COMPOUNDS
s.sch001 Work No. 29 – TEMPORARY ACCESS WORKS TO WORKS 28, 34 & 36 (WEST OF HORNINGSEA ROAD)
s.sch001 Work No. 3 –VISITOR PARKING
s.sch001 Work No. 30 – NETWORK RAIL MONITORING WORKS
s.sch001 Work No. 31 – FINAL EFFLUENT & STORM PIPELINE
s.sch001 Work No. 32 - OUTFALL
s.sch001 Work No. 33 – WATERBEACH PIPELINE NORTH
s.sch001 Work No. 34 – WATERBEACH PIPELINE CONSTRUCTION AREA AND COMPOUNDS
s.sch001 Work No. 35 – WATERBEACH PIPELINE SPUR TO TERMINAL PUMPING STATION
s.sch001 Work No. 36 – WATERBEACH PIPELINE SOUTH
s.sch001 Work No. 37 – TEMPORARY ACCESS WORKS FOR WORK Nos. 33 & 34
s.sch001 Work No. 38 – NEW BRIDLEWAY
s.sch001 Work No. 39 – ECOLOGICAL MITIGATION AREA
s.sch001 Work No. 4 – INLET WORKS & PRELIMINARY TREATMENT
s.sch001 Work No. 40 – DECOMMISSIONING EXISTING CAMBRIDGE WASTE WATER TREATMENT WORKS
s.sch001 Further works
s.sch001 Work No. 5 – ELECTRICAL SUPPLY AND POWER GENERATION
s.sch001 Work No. 6 – PRIMARY TREATMENT & CHEMICAL DOSING
s.sch001 Work No. 7 – WORKSHOP & PARKING
s.sch001 Work No. 8 – SLUDGE TREATMENT CENTRE
s.sch001 Work No. 9 – GAS TO GRID OR COMBINED HEAT AND POWER (CHP)
s.sch002 Outfall
s.sch002 Landscape, ecological and recreational management plan
s.sch002 Operational workers travel plan
s.sch002 Archaeological investigation mitigation strategy
s.sch002 Construction lighting
s.sch002 Drainage
s.sch002 Contamination risk
s.sch002 Decommissioning
s.sch002 Operational Asset Management Plan
s.sch002 Operational logistics traffic plan
s.sch002 Odour management plan
s.sch002 Carbon management plan
s.sch002 Operational water quality monitoring plan
s.sch002 Discovery centre
s.sch002 Operational Wildlife Hazard Management Plan
s.sch002 Biodiversity net gain
s.sch002 Temporary stopping up of public rights of way
s.sch002 Bridleway
s.sch002 Requirement for written approval
s.sch002 Approved details and amendments to them
s.sch002 Detailed design
s.sch002 Code of construction practice
s.sch002 Construction environmental management plans
s.sch013 The enactments for the time being in force with respect...
s.sch013 For Schedule 2A (counter-notice requiring purchase of land not in...
s.sch013 (1) Without limitation on the scope of paragraph 1, the...
s.sch013 (1) Without limitation on the scope of paragraph 1, the...
s.sch013 Application of Part 1 of the 1965 Act
s.sch013 For section 7 of the 1965 Act there is substituted...
s.sch013 The following provisions of the 1965 Act (which state the...
s.sch013 Section 11 (powers of entry) of the 1965 Act is...
s.sch013 Section 20 (tenants at will, etc) of the 1965 Act...
s.sch013 Section 22 (interests omitted from purchase) of the 1965 Act...
s.sch015 Application
s.sch015 Interpretation
s.sch015 Cash Deposit
s.sch015 Dispute provisions
s.sch015 Documents submitted for approval
s.sch015 Agreement Fee
s.sch015 Additional technical vetting costs
s.sch015 Submissions of Drawings
s.sch015 As built drawings
s.sch015 For the protection of the relevant navigation authority the following...
s.sch015 In this Part of this Schedule— “river work” means any...
s.sch015 River works
s.sch015 On-street apparatus
s.sch015 Details for approval
s.sch015 Intention to commence Work No. 31 and Work No. 32
s.sch015 Expenses
s.sch015 Indemnity
s.sch015 Disputes
s.sch015 For the protection of any operator, the following provisions have...
s.sch015 In this Part of this Schedule— “the 2003 Act” means...
s.sch015 The exercise of the powers conferred by this Order is...
s.sch015 (1) Subject to sub-paragraph (2) and paragraph 119 of this...
s.sch015 Temporary closure of streets
s.sch015 Any difference arising between the undertaker and the operator under...
s.sch015 This Part of this Schedule does not apply to—
s.sch015 Nothing in this Part of this Schedule affects the provisions...
s.sch015 For the protection of Cambridge Water the following provisions of...
s.sch015 This Part of this Schedule does not apply to apparatus...
s.sch015 In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch015 Apparatus of Cambridge Water
s.sch015 If, in the exercise of the powers conferred by this...
s.sch015 Regardless of any provision in this Order or anything shown...
s.sch015 Acquisition of land
s.sch015 Acquisition of land
s.sch015 Where the undertaker is notifying Cambridge Water of any proposed...
s.sch015 Before extinguishing any existing rights for Cambridge Water to use,...
s.sch015 Access
s.sch015 Unmapped apparatus
s.sch015 Costs
s.sch015 Expenses
s.sch015 Co-operation
s.sch015 The following provisions apply for the protection of the lead...
s.sch015 In this Part of this Schedule— “construction” includes execution, placing,...
s.sch015 (1) Before beginning to construct any specified work, the undertaker...
s.sch015 Removal of apparatus
s.sch015 Without limitation on the scope of paragraph 139 of this...
s.sch015 The undertaker must make reasonable compensation for costs, charges and...
s.sch015 (1) The undertaker must make reasonable compensation for liabilities, costs...
s.sch015 Any dispute arising between the undertaker and the lead local...
s.sch015 Facilities and rights for alternative apparatus
s.sch015 Retained apparatus
s.sch015 Expenses
s.sch015 Indemnity
s.sch015 Application
s.sch015 In this Part of this Schedule— “affected undertaker” means— any...
s.sch015 Interpretation
s.sch015 On street apparatus
s.sch015 Apparatus of Cadent in stopped up streets
s.sch015 Protective works to buildings
s.sch015 Acquisition of land
s.sch015 Removal of apparatus
s.sch015 Facilities and rights for alternative apparatus
s.sch015 Retained apparatus: protection of Cadent
s.sch015 Expenses
s.sch015 Indemnity
s.sch015 Precedence of the 1991 Act in respect of apparatus in the streets
s.sch015 Enactments and agreements
s.sch015 Co-operation
s.sch015 Access
s.sch015 Arbitration
s.sch015 Notices
s.sch015 The provisions of this Part of this Schedule have effect,...
s.sch015 In this Part of this Schedule— “asset protection agreement” means...
s.sch015 (1) Where under this Part of this Schedule Network Rail...
s.sch015 (1) The undertaker must before commencing construction of any specified...
s.sch015 (1) Any specified work and any protective works to be...
s.sch015 Removal of apparatus
s.sch015 The undertaker must— (a) at all times afford reasonable facilities...
s.sch015 Network Rail must at all times afford reasonable facilities to...
s.sch015 (1) If any permanent or temporary alterations or additions to...
s.sch015 The undertaker must repay to Network Rail all reasonable fees,...
s.sch015 (1) In this paragraph 44— “EMI” means, subject to sub-paragraph...
s.sch015 If at any time after the completion of a specified...
s.sch015 The undertaker must not provide any illumination or illuminated sign...
s.sch015 Any additional expenses which Network Rail may reasonably incur in...
s.sch015 (1) The undertaker must pay to Network Rail all reasonable...
s.sch015 Network Rail must, on receipt of a request from the...
s.sch015 Facilities and rights for alternative apparatus
s.sch015 In the assessment of any sums payable to Network Rail...
s.sch015 The undertaker and Network Rail may, subject in the case...
s.sch015 Nothing in this Order, or in any enactment incorporated with...
s.sch015 The undertaker must give written notice to Network Rail if...
s.sch015 The undertaker must no later than 28 days from the...
s.sch015 Application etc.,
s.sch015 Interpretation
s.sch015 General
s.sch015 References to any standards, manuals, contracts, Regulations and Directives including...
s.sch015 Works outside the Order limits
s.sch015 Retained apparatus
s.sch015 Prior approvals and security
s.sch015 Construction of the specified works
s.sch015 Payments
s.sch015 Provisional Certificate
s.sch015 Opening
s.sch015 Final condition survey
s.sch015 Defects Period
s.sch015 Final Certificate
s.sch015 Security
s.sch015 Commuted sums
s.sch015 Expenses and costs
s.sch015 Insurance
s.sch015 Indemnity
s.sch015 Maintenance of the specified works
s.sch015 Land or rights
s.sch015 Expert Determination
s.sch015 Application etc.
s.sch015 Interpretation
s.sch015 (1) Wherever in this Part of this Schedule provision is...
s.sch015 Dispositions
s.sch015 Prior approvals and security
s.sch015 Compensation
s.sch015 Construction of the specified works
s.sch015 Programme and method statement/commencement of the specified works
s.sch015 Deviations from approved programme and method statement and traffic management proposals
s.sch015 Completion of the works
s.sch015 Access, inspection and testing
s.sch015 Inspection and testing (covered work and foundations)
s.sch015 Statutory undertakers (highways)
s.sch015 Provisional Certificate of Completion
s.sch015 Maintenance and defects correction
s.sch015 Application
s.sch015 Stage 4 safety audit
s.sch015 Final Certificate
s.sch015 Indemnity
s.sch015 Variation to council specification and approved drawings
s.sch015 Default
s.sch015 CDM Regulations
s.sch015 Telecommunications apparatus
s.sch015 Commuted sum and asset fees
s.sch015 Safety Audit Costs
s.sch017 Introduction
s.sch017 Highways Act 1980
s.sch017 Party Wall etc Act 1996
s.sch017 Planning Act 2008 – Application of the 2010 Regulations (Community infrastructure Levy)
s.sch017 Town and Country Planning Act 1990
s.sch017 Flood and Water Management Act 2010
s.sch017 Control of Pollution Act 1974
s.sch017 Burial Act 1857
s.sch019 Primary objective
s.sch019 Time periods
s.sch019 Timetable
s.sch019 Procedure
s.sch019 Arbitrator’s powers
s.sch019 Costs
s.sch019 Confidentiality

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.