- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Statutory Undertaker120
Any Person5
Client1
Applicant1
Plus 5 duties on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Statutory Undertaker — also bound by 179 other Acts
Water Industry Act 1991
53 duties
Any Person — also bound by 2340 other Acts
Human Medicines Regulations 2012
184 duties
Merchant Shipping Act 1995
144 duties
Insolvency (England and Wales) Rules 2016
104 duties
Communications Act 2003
92 duties
Road Traffic Act 1988
92 duties
Client — also bound by 62 other Acts
Building Regulations 2010
12 duties
Applicant — also bound by 307 other Acts
Human Medicines Regulations 2012
42 duties
The Land Registration Rules 2003
25 duties
Regulation (EU) No 1178/2011 (Aircrew)
20 duties
Value Added Tax Regulations 1995
18 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
Part 1
PRELIMINARY
0 of 3 sections shown3 other sections in this Part — procedural and definitional
s.art001
Citation and commencement
s.art002
Interpretation
s.art003
Electronic communications
Part 2
WORK PROVISIONS
1 of 24 sections shown
s.art022
Authority to survey and investigate the land
Regulated
- Notify landowners and obtain consents before surveying landStatutory Undertaker
23 other sections in this Part — procedural and definitional
s.art004
Development consent granted by the Order
s.art005
Maintenance of authorised development
s.art006
Operation of the authorised development
s.art007
Disapplication of legislative provisions
s.art008
Interaction with the 1968 Act
s.art009
Benefit of this Order
s.art010
Consent to transfer benefit of the Order
s.art011
Guarantees in respect of payment of compensation
s.art012
Application of the permit scheme
s.art013
Street works
s.art014
Power to alter layout, etc., of streets
s.art015
Permanent stopping up of specified street and private means of access
s.art016
Temporary prohibition or restriction of use of streets, private means of access and public rights of way and authorising vehicular use on public rights of way
s.art017
Permanent closure and diversion of, and creation of new public rights of way and authorising vehicular use on public rights of way
s.art018
Access to the authorised development
s.art019
Agreements with street authorities
s.art020
Traffic regulation measures
s.art021
Discharge of water
s.art023
Protective works to buildings
s.art024
Felling or lopping of trees
s.art025
Works in the river Thames: conditions
s.art026
Oversailing rights
s.art027
Power to dredge
Part 3
POWERS OF ACQUISITION AND POSSESSION OF LAND
0 of 14 sections shown14 other sections in this Part — procedural and definitional
s.art028
Compulsory acquisition of land
s.art029
Time limit for exercise of authority to acquire land compulsorily
s.art030
Compulsory acquisition of rights
s.art031
Acquisition of subsoil or airspace only
s.art032
Private rights
s.art033
Power to override easements and other rights
s.art034
Application of the 1981 Act
s.art035
Modification of Part 1 of the 1965 Act
s.art036
Rights under or over streets
s.art037
Temporary use of land for carrying out the authorised development
s.art038
Temporary use of land for maintaining the authorised development
s.art039
Statutory undertakers
s.art040
Apparatus and rights of statutory undertakers in stopped up streets
s.art041
Recovery of costs of new connections
Part 4
MISCELLANEOUS AND GENERAL
0 of 13 sections shown13 other sections in this Part — procedural and definitional
s.art042
Deemed marine licence
s.art043
Application of landlord and tenant law
s.art044
Defence to proceedings in respect of statutory nuisance
s.art045
Protective provisions
s.art046
Certification of plans etc.
s.art047
Service of notices
s.art048
Procedures in relation to certain approvals etc.
s.art049
Arbitration
s.art050
Crossness Local Nature Reserve
s.art051
Planning permission, etc.
s.art052
No double recovery
s.art053
Byelaws relating to the Crossness Nature Reserve
s.art054
Fixed penalty notices relating to byelaws
Schedules
Schedules
131 of 207 shown
s.sch002
Emergency preparedness and response plan
Regulated
- Prepare and maintain an approved emergency preparedness and response plan before commissioningStatutory Undertaker
s.sch002
Lighting strategy
Regulated
- Submit and maintain an approved lighting strategy before developmentStatutory Undertaker
s.sch002
Surface and foul water drainage
Regulated
- Get drainage strategy approved before starting constructionClient
s.sch002
Operational environmental management plan
Regulated
- Submit operational environmental management plan for approval before commissioningAny Person
s.sch002
Skills and employment plan
Regulated
- Submit and implement a skills and employment plan before starting Work No. 1Statutory Undertaker
s.sch002
Jetty works environmental design scheme
Regulated
- Submit and follow approved jetty works environmental design schemeStatutory Undertaker
s.sch002
River wall
Regulated
- Submit river wall condition survey to Environment Agency before starting workStatutory Undertaker
s.sch002
Flood risk mitigation
Regulated
- Manage flood risk mitigation and notify authorities before 50-year operation extensionStatutory Undertaker
s.sch002
Navigation risk assessment
Regulated
- Update and submit navigation risk assessment for Work No. 4Statutory Undertaker
s.sch002
Time limit
Regulated
- Begin authorised development within 7 years of Order coming into forceStatutory Undertaker
s.sch002
Control of noise during operation
Regulated
- Submit and comply with an approved noise mitigation planStatutory Undertaker
s.sch002
Ground conditions investigations and assessments strategy
Regulated
- Submit ground conditions strategy for approval before starting workStatutory Undertaker
s.sch002
Archaeological mitigation strategy
Regulated
- Submit archaeological mitigation strategy and record Belvedere jetty before worksStatutory Undertaker
s.sch002
Decommissioning environmental management plan
Regulated
- Submit and implement a decommissioning environmental management planStatutory Undertaker
s.sch002
Decommissioning traffic management plan
Regulated
- Submit decommissioning traffic management plan for approval before works startStatutory Undertaker
s.sch002
Heat Strategy
Regulated
- Submit heat strategy and obtain planning approval before starting developmentStatutory Undertaker
s.sch002
Approved details and amendments to them
Regulated
Other duties (1) — Crown / regulator
- Approving bodies must only approve amendments if no new environmental effectsStatutory regulator
s.sch002
Notice of date of final commissioning
Regulated
- Notify authorities of final commissioning date within 7 daysStatutory Undertaker
s.sch002
Code of construction practice
Regulated
- Submit and follow an approved code of construction practice before buildingStatutory Undertaker
s.sch002
Construction Hours
Regulated
- Restrict construction hours to permitted timesStatutory Undertaker
s.sch002
Construction traffic management plan
Regulated
- Submit and follow a construction traffic management plan before starting workStatutory Undertaker
s.sch011
Sediment sampling
Regulated
- Submit sediment sampling plan and carry out sampling per MMO approvalStatutory Undertaker
s.sch011
Marine Noise Registry
Regulated
- Submit pile driving and explosive noise data to the Marine Noise RegistryStatutory Undertaker
s.sch011
Piling
Regulated
- Use soft-start techniques for percussive pilingStatutory Undertaker
s.sch011
Dredging
Regulated
- Do not carry out licensed water injection dredging from 1 June to 30 AugustAny Person
s.sch011
Concrete and cement
Regulated
- Prevent water pollution from concrete and cement operationsStatutory Undertaker
s.sch011
Coatings and treatments
Regulated
- Ensure coatings and treatments are suitable for river use and follow approved guidelinesStatutory Undertaker
s.sch011
Pollution and spills
Regulated
- Prevent pollution and manage spills/waste during the projectStatutory Undertaker
s.sch011
Post activities
Regulated
- Remove structures/waste and notify MMO within specified timesStatutory Undertaker
s.sch011
Disposal
Regulated
- Report disposal material location and quantities to MMO twice yearlyStatutory Undertaker
s.sch011
Contacts
Regulated
- Submit applications and notifications via MMO marine case management systemStatutory Undertaker
s.sch011
The undertaker shall ensure that only inert material of natural...
Regulated
- Screen out non-inert material before disposing at MMO-approved siteStatutory Undertaker
s.sch011
The material to be disposed of within the disposal site...
Regulated
- Place disposed material evenly within disposal site boundariesStatutory Undertaker
s.sch011
Agents, contractors and subcontractors
Regulated
- Notify MMO of agents, contractors and subcontractors before licensed activities startStatutory Undertaker
s.sch011
Dropped Objects
Regulated
- Report dropped objects and remove obstructions from the seabedStatutory Undertaker
s.sch011
Marine written scheme of archaeological investigation
Regulated
- Carry out licensed activities in line with approved archaeological mitigation strategyAny Person
s.sch011
Notice of determination
Regulated
Other duties (1) — Crown / regulator
- MMO must give notice of determination to undertaker as soon as reasonably practicableStatutory regulator
s.sch011
Notifications regarding licensed activities
Regulated
- Notify the MMO before and after licensed construction and maintenanceStatutory Undertaker
s.sch011
(1) The undertaker must provide the following information to the...
Regulated
- Notify MMO of contractors, vessels and any changes before licensed workStatutory Undertaker
s.sch011
The undertaker must ensure that a copy of this licence...
Regulated
- Ensure agents and contractors read and understand the licenceStatutory Undertaker
s.sch011
Copies of this licence must be available for inspection at...
Regulated
- Keep licence copies at registered office and site officeStatutory Undertaker
s.sch011
The masters or transport managers responsible for the vessels that...
Regulated
- Make licence available for inspection on vessels during licensed activitiesStatutory Undertaker
s.sch012
(1) Subject to sub-paragraphs (2) and (3), if by reason...
Regulated
- Pay for damage to utility apparatus or interruption to supply caused by your worksStatutory Undertaker
s.sch012
Indemnity
Regulated
- Indemnify SGN for damage caused by your construction worksStatutory Undertaker
s.sch012
Co-operation
Regulated
- Co-operate with each other on utility works for safety and efficiencyStatutory Undertaker
s.sch012
Access
Regulated
- Provide alternative access if SGN's apparatus is obstructedStatutory Undertaker
s.sch012
Notices
Regulated
- Send submitted plans to SGN at the specified addressStatutory Undertaker
s.sch012
Regardless of any provision in this Order or anything shown...
Regulated
- Acquire apparatus on REPL land only by agreementStatutory Undertaker
s.sch012
The undertaker must ensure that REPL is at liberty at...
Regulated
- Allow REPL access to streets for maintenance and worksStatutory Undertaker
s.sch012
(1) If, in the exercise of the powers conferred by...
Regulated
- Protect REPL's apparatus rights before acquiring land or relocating equipmentStatutory Undertaker
s.sch012
(1) Not less than 28 days before starting the execution...
Regulated
- Submit works plans for approval and execute in accordance with approved plansStatutory Undertaker
s.sch012
(1) Subject to the following provisions of this paragraph, the...
Regulated
- Repay reasonable expenses incurred by REPL for apparatus workStatutory Undertaker
s.sch012
Where in consequence of the proposed construction or maintenance of...
Regulated
- Co-ordinate works safely and efficiently with REPL when apparatus is affectedStatutory Undertaker
s.sch012
If in consequence of any agreement reached or the powers...
Regulated
- Provide alternative access when you block REPL's apparatusStatutory Undertaker
s.sch012
(1) Subject to sub-paragraphs (2) and (3), if by reason...
Regulated
- Bear costs and indemnify REPL for damage or service interruption caused by your worksStatutory Undertaker
s.sch012
Regardless of any provision in this Order or anything shown...
Regulated
- Do not acquire apparatus within RRRL land without agreementStatutory Undertaker
s.sch012
The undertaker must ensure that each RRRL Entity is at...
Regulated
- Allow RRRL Entities access to streets for maintenance and operationsStatutory Undertaker
s.sch012
(1) If, in the exercise of the powers conferred by...
Regulated
- Do not extinguish rights or relocate RRRL apparatus until equivalent alternative apparatus is operational and rights grantedStatutory Undertaker
s.sch012
(1) Not less than 28 days before starting the execution...
Regulated
- Submit works plans to RRRL Entities for approval before starting workStatutory Undertaker
s.sch012
(1) Subject to the following provisions of this paragraph, the...
Regulated
- Repay RRRL Entity’s reasonable expenses for apparatus workStatutory Undertaker
s.sch012
Where in consequence of the proposed construction or maintenance of...
Regulated
- Coordinate works when removing or protecting apparatusStatutory Undertaker
s.sch012
If in consequence of any agreement reached or the powers...
Regulated
- Provide alternative access to obstructed apparatusStatutory Undertaker
s.sch012
(1) Subject to sub-paragraphs (2) and (3), if by reason...
Regulated
- Pay costs and indemnify RRRL Entities for damage caused by your worksStatutory Undertaker
s.sch012
(1) Subject to sub-paragraphs (2) to (4), if as the...
Regulated
- Pay for damage to telecoms equipment and compensate the operatorStatutory Undertaker
s.sch012
Submission and approval of plans
Regulated
- Submit plans to Agency and obtain approval before constructing specified workStatutory Undertaker
s.sch012
Dredging
Regulated
- Submit dredging activity details to the Agency before workStatutory Undertaker
s.sch012
Construction of protective works
Regulated
- Construct protective works at your own expense when required by the AgencyStatutory Undertaker
s.sch012
Timing of works and service of notices
Regulated
- Notify the Agency of construction start and completion, and build works on timeStatutory Undertaker
s.sch012
Works not in accordance with this Part of this Schedule
Regulated
- Obtain consent and comply with Agency conditions for specified worksStatutory Undertaker
s.sch012
Remediating impaired drainage work
Regulated
- Repair impaired or damaged drainage works caused by your projectStatutory Undertaker
s.sch012
Agency access
Regulated
- Notify Environment Agency and provide alternative access if flood defence access is blockedStatutory Undertaker
s.sch012
Free passage of fish
Regulated
- Prevent interruption to fish passage and repair damage to fisheryStatutory Undertaker
s.sch012
Costs and indemnity
Regulated
- Your business must indemnify the Agency for its reasonable costsStatutory Undertaker
s.sch012
(1) The undertaker is responsible for and indemnifies the Agency...
Regulated
- Indemnify the Agency against costs and losses from the authorised developmentStatutory Undertaker
s.sch012
Apparatus in stopped up streets and public rights of way
Regulated
- Grant legal easements to TWUL for apparatus in stopped up streetsStatutory Undertaker
s.sch012
Access Road
Regulated
- Do not block or remove access road without TWUL's approval and new rightsStatutory Undertaker
s.sch012
Protective works to buildings
Regulated
- Do not obstruct access to apparatus during protective building worksStatutory Undertaker
s.sch012
Acquisition of land or interests
Regulated
- Do not acquire TWUL apparatus without agreementStatutory Undertaker
s.sch012
Removal of apparatus
Regulated
- Ensure TWUL's apparatus is not removed until alternative apparatus is operationalStatutory Undertaker
s.sch012
Facilities and rights for alternative apparatus
Regulated
- Grant alternative apparatus rights to TWUL on agreed or arbitrated termsStatutory Undertaker
s.sch012
Retained apparatus
Regulated
- Submit works plan and obtain approval before working near TWUL apparatusStatutory Undertaker
s.sch012
Expenses and costs
Regulated
- Repay TWUL for expenses from apparatus work caused by your projectStatutory Undertaker
s.sch012
(1) Subject to sub-paragraphs (2) and (3), if by reason...
Regulated
- Pay for damage to Thames Water apparatus caused by your worksStatutory Undertaker
s.sch012
Cooperation
Regulated
- Coordinate works with TWUL for safety and efficiencyStatutory Undertaker
s.sch012
At all times the undertaker shall procure that its employees,...
Regulated
- Ensure employees and contractors minimise damage to TWUL's undertakingStatutory Undertaker
s.sch012
In this Part of this Schedule, where the agreement or...
Regulated
Other duties (1) — Crown / regulator
- Thames Water must not unreasonably withhold or delay agreementStatutory regulator
s.sch012
Use of statutory powers
Regulated
- Comply with the Order when carrying out works at TWUL's requestStatutory Undertaker
s.sch012
Regardless of any provision in this Order or anything shown...
Regulated
- Acquire apparatus only by agreement with the ownerStatutory Undertaker
s.sch012
Ground works and surveys
Regulated
- Notify Thames Water before altering ground level near their apparatusStatutory Undertaker
s.sch012
The undertaker must provide written notice to TWUL as soon...
Regulated
- Notify TWUL before ground intrusive surveys near apparatusStatutory Undertaker
s.sch012
Consultation
Regulated
- Consult TWUL on draft documents before submitting plans to planning authorityStatutory Undertaker
s.sch012
At least 56 days prior to the submission of the...
Regulated
- Invite TWUL to review LaBARDS 56 days before submissionStatutory Undertaker
s.sch012
Notices and applications
Regulated
- Submit notices and applications to Thames Water by emailStatutory Undertaker
s.sch012
Approval of detailed design
Regulated
- Obtain PLA approval before starting specified works or functionsStatutory Undertaker
s.sch012
(1) If, in the exercise of the powers conferred by...
Regulated
- Do not remove utility apparatus until alternative is operationalStatutory Undertaker
s.sch012
As built drawings
Regulated
- Provide as-built drawings to the Port of London AuthorityStatutory Undertaker
s.sch012
Discharges, etc.
Regulated
- Obtain PLA consent before discharging water or depositing material into the ThamesStatutory Undertaker
s.sch012
The undertaker must not, in exercise of the powers conferred...
Regulated
- Do not damage or interfere with River Thames banks/beds without approvalStatutory Undertaker
s.sch012
Navigational lights, buoys, etc.
Regulated
- Display navigation lights and lay buoys as the PLA requiresStatutory Undertaker
s.sch012
Directions as to lights
Regulated
- Comply with PLA Harbour Master's lighting directions on the River ThamesStatutory Undertaker
s.sch012
Permanent lights on tidal works
Regulated
- Exhibit lights and take steps to prevent danger to navigation as directed by PLAStatutory Undertaker
s.sch012
Removal, etc. of the PLA’s moorings and buoys
Regulated
- Pay for removal or alteration of PLA moorings and buoys caused by your projectStatutory Undertaker
s.sch012
Sedimentation, etc. remedial action
Regulated
- Your business must remedy Thames sedimentation or scouring caused by its worksStatutory Undertaker
s.sch012
Protective action
Regulated
- Fix work that doesn't meet approval conditions or damages the ThamesStatutory Undertaker
s.sch012
(1) Where, in accordance with the provisions of this Part...
Regulated
- Grant alternative apparatus rights on agreed terms or submit to arbitrationStatutory Undertaker
s.sch012
Abandoned or decayed works
Regulated
- Repair or remove abandoned or decayed works in the ThamesStatutory Undertaker
s.sch012
Facilities for navigation
Regulated
- Do not interfere with navigational aids and provide facilities for navigationStatutory Undertaker
s.sch012
Consideration for dredged material
Regulated
- Pay consideration to PLA for dredged material soldStatutory Undertaker
s.sch012
Protection for the PLA’s functions
Regulated
- Obtain PLA Harbour Master's consent before removing vessels or things from the ThamesStatutory Undertaker
s.sch012
Indemnity
Regulated
- Indemnify the Port of London Authority against losses from your worksStatutory Undertaker
s.sch012
Consultation
Regulated
- Consult the PLA on draft plans and any updates before submissionStatutory Undertaker
s.sch012
(1) Not less than 28 days before starting the execution...
Regulated
- Submit plans to utility companies before starting near their apparatusStatutory Undertaker
s.sch012
Regardless of any provision in this Order or anything shown...
Regulated
- Obtain prior written agreement from utility undertaker before acquiring apparatusStatutory Undertaker
s.sch012
(1) If, in the exercise of the powers conferred by...
Regulated
- Do not remove utility apparatus until alternative is installed and workingStatutory Undertaker
s.sch012
(1) Where, in accordance with the provisions of this Part...
Regulated
- Provide facilities and rights for alternative utility apparatus on agreed or arbitrated termsStatutory Undertaker
s.sch012
(1) Not less than 28 days before starting the execution...
Regulated
- Submit works plans to utility companies before starting near their apparatusStatutory Undertaker
s.sch012
(1) Subject to the following provisions of this paragraph, the...
Regulated
- Repay utility undertaker's expenses for apparatus workStatutory Undertaker
s.sch012
(1) Subject to sub-paragraphs (2) and (3), if by reason...
Regulated
- Pay costs and compensate utility companies for damage caused by your construction worksStatutory Undertaker
s.sch012
Where in consequence of the proposed construction of any of...
Regulated
- Coordinate and cooperate on utility apparatus works for safety and efficiencyStatutory Undertaker
s.sch012
(1) Subject to the following provisions of this paragraph, the...
Regulated
- Repay utility companies' costs for moving or protecting their equipmentStatutory Undertaker
s.sch012
Apparatus of SGN in stopped up streets
Regulated
- Grant legal easements for SGN's apparatus before stopping up streetsStatutory Undertaker
s.sch012
Protective works to buildings
Regulated
- Protect SGN's gas apparatus from damage during building worksStatutory Undertaker
s.sch012
Removal of apparatus
Regulated
- Don't remove gas apparatus until replacement is operationalStatutory Undertaker
s.sch012
Facilities and rights for alternative apparatus
Regulated
- Grant alternative apparatus rights on no less favourable terms to SGNStatutory Undertaker
s.sch012
Retained apparatus: protection of SGN
Regulated
- Submit plans and ground monitoring scheme to SGN before starting works near gas apparatusStatutory Undertaker
s.sch014
Applications made for consent, agreement or approval
Regulated
Other duties (1) — Crown / regulator
- Relevant authority must decide consent applications within 9 weeks or they are deemed grantedStatutory regulator
s.sch014
Further information and consultation
Regulated
Other duties (1) — Crown / regulator
- Relevant authority must request further information within deadlines or lose the rightCrown / Minister / Government department
s.sch014
Appeals
Regulated
- Follow the appeal process to challenge relevant authority decisionsStatutory Undertaker
s.sch015
Timetable
Regulated
- Follow the arbitration timetable for exchanging statements and evidenceApplicant
s.sch015
Procedure
Regulated
- Follow arbitration procedure for Cory Decarbonisation Project disputesAny Person
s.sch015
Confidentiality
Regulated
- Keep arbitration hearings private and information confidentialAny Person
76 other schedules
s.sch001
Ancillary Works
s.sch002
Interpretation
s.sch002
Landscape, biodiversity, access and recreation delivery strategy
s.sch002
Detailed design
s.sch002
Permitted preliminary works
s.sch003
The following provisions do not apply in so far as...
s.sch004
Interpretation
s.sch008
Interpretation
s.sch009
Compensation enactments
s.sch009
(1) Without limitation on the scope of paragraph 1, the...
s.sch009
(1) Without limitation on the scope of paragraph 1, the...
s.sch009
Application of Part 1 of the 1965 Act
s.sch009
(1) The modifications referred to in paragraph 4(a) are as...
s.sch011
In this licence— “the 2008 Act” means the Planning Act...
s.sch011
Method statement
s.sch011
Time periods
s.sch011
Variations of approvals of Part 2 Conditions
s.sch011
Meaning of “application”
s.sch011
Further information regarding application
s.sch011
Determination of application
s.sch011
Details of such licensed marine activities
s.sch011
Code of construction practice
s.sch012
For the protection of the utility undertakers referred to in...
s.sch012
Expenses
s.sch012
Enactments and agreements
s.sch012
Arbitration
s.sch012
For the protection of REPL as referred to in this...
s.sch012
In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch012
Nothing in this Part of this Schedule affects the provisions...
s.sch012
(1) Where, in accordance with the provisions of this Part...
s.sch012
Nothing in this Part of this Schedule affects the provisions...
s.sch012
For the protection of each RRRL Entity as referred to...
s.sch012
For the protection of any operator, the following provisions have...
s.sch012
In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch012
(1) Where, in accordance with the provisions of this Part...
s.sch012
Nothing in this Part of this Schedule affects the provisions...
s.sch012
In this Part of this Schedule— “the 2003 Act” means...
s.sch012
The exercise of the powers of article 39 (statutory undertakers)...
s.sch012
This Part of this Schedule does not apply to—
s.sch012
Nothing in this Part of this Schedule affects the provisions...
s.sch012
Application
s.sch012
Interpretation
s.sch012
In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch012
Maintenance of works
s.sch012
The Thames Flood Acts works
s.sch012
This Part of this Schedule does not apply to apparatus...
s.sch012
Disputes
s.sch012
Application
s.sch012
Interpretation
s.sch012
On street apparatus
s.sch012
Regardless of the temporary prohibition or restriction of use of...
s.sch012
Nothing in this Part of this Schedule affects the provisions...
s.sch012
If TWUL does not respond to the invitation to which...
s.sch012
Any dispute as to the reasonableness of any suggestions made...
s.sch012
The provisions of this Part of this Schedule have effect,...
s.sch012
Interpretation
s.sch012
Removal of temporary works
s.sch012
Survey of riverbed
s.sch012
Restriction on powers contained in Part 3 of this Order
s.sch012
Disputes
s.sch012
For the protection of the utility undertakers referred to in...
s.sch012
In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch012
This Part of this Schedule does not apply to apparatus...
s.sch012
Regardless of the temporary prohibition or restriction of use of...
s.sch012
Nothing in this Part of this Schedule affects the provisions...
s.sch012
Application
s.sch012
Interpretation
s.sch012
On Street Apparatus
s.sch012
Acquisition of land
s.sch014
Interpretation
s.sch014
Anticipatory steps towards compliance with any requirement
s.sch014
Application to protective provisions
s.sch015
Commencing an arbitration
s.sch015
Time periods
s.sch015
Arbitrator’s powers
s.sch015
Costs
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.