The Cory Decarbonisation Project Order 2025

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker120 Any Person5 Client1 Applicant1

Plus 5 duties on the regulator, Crown ministers and public bodies — folded into the section list below.

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Any Person — also bound by 2340 other Acts
Client — also bound by 62 other Acts
Applicant — also bound by 307 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

Part 1

PRELIMINARY

0 of 3 sections shown
3 other sections in this Part — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Electronic communications
Part 2

WORK PROVISIONS

1 of 24 sections shown
s.art022 Authority to survey and investigate the land Regulated
  • Notify landowners and obtain consents before surveying landStatutory Undertaker
23 other sections in this Part — procedural and definitional
s.art004 Development consent granted by the Order
s.art005 Maintenance of authorised development
s.art006 Operation of the authorised development
s.art007 Disapplication of legislative provisions
s.art008 Interaction with the 1968 Act
s.art009 Benefit of this Order
s.art010 Consent to transfer benefit of the Order
s.art011 Guarantees in respect of payment of compensation
s.art012 Application of the permit scheme
s.art013 Street works
s.art014 Power to alter layout, etc., of streets
s.art015 Permanent stopping up of specified street and private means of access
s.art016 Temporary prohibition or restriction of use of streets, private means of access and public rights of way and authorising vehicular use on public rights of way
s.art017 Permanent closure and diversion of, and creation of new public rights of way and authorising vehicular use on public rights of way
s.art018 Access to the authorised development
s.art019 Agreements with street authorities
s.art020 Traffic regulation measures
s.art021 Discharge of water
s.art023 Protective works to buildings
s.art024 Felling or lopping of trees
s.art025 Works in the river Thames: conditions
s.art026 Oversailing rights
s.art027 Power to dredge
Part 3

POWERS OF ACQUISITION AND POSSESSION OF LAND

0 of 14 sections shown
14 other sections in this Part — procedural and definitional
s.art028 Compulsory acquisition of land
s.art029 Time limit for exercise of authority to acquire land compulsorily
s.art030 Compulsory acquisition of rights
s.art031 Acquisition of subsoil or airspace only
s.art032 Private rights
s.art033 Power to override easements and other rights
s.art034 Application of the 1981 Act
s.art035 Modification of Part 1 of the 1965 Act
s.art036 Rights under or over streets
s.art037 Temporary use of land for carrying out the authorised development
s.art038 Temporary use of land for maintaining the authorised development
s.art039 Statutory undertakers
s.art040 Apparatus and rights of statutory undertakers in stopped up streets
s.art041 Recovery of costs of new connections
Part 4

MISCELLANEOUS AND GENERAL

0 of 13 sections shown
13 other sections in this Part — procedural and definitional
s.art042 Deemed marine licence
s.art043 Application of landlord and tenant law
s.art044 Defence to proceedings in respect of statutory nuisance
s.art045 Protective provisions
s.art046 Certification of plans etc.
s.art047 Service of notices
s.art048 Procedures in relation to certain approvals etc.
s.art049 Arbitration
s.art050 Crossness Local Nature Reserve
s.art051 Planning permission, etc.
s.art052 No double recovery
s.art053 Byelaws relating to the Crossness Nature Reserve
s.art054 Fixed penalty notices relating to byelaws
Schedules

Schedules

131 of 207 shown
s.sch002 Emergency preparedness and response plan Regulated
  • Prepare and maintain an approved emergency preparedness and response plan before commissioningStatutory Undertaker
s.sch002 Lighting strategy Regulated
  • Submit and maintain an approved lighting strategy before developmentStatutory Undertaker
s.sch002 Surface and foul water drainage Regulated
  • Get drainage strategy approved before starting constructionClient
s.sch002 Operational environmental management plan Regulated
  • Submit operational environmental management plan for approval before commissioningAny Person
s.sch002 Skills and employment plan Regulated
  • Submit and implement a skills and employment plan before starting Work No. 1Statutory Undertaker
s.sch002 Jetty works environmental design scheme Regulated
  • Submit and follow approved jetty works environmental design schemeStatutory Undertaker
s.sch002 River wall Regulated
  • Submit river wall condition survey to Environment Agency before starting workStatutory Undertaker
s.sch002 Flood risk mitigation Regulated
  • Manage flood risk mitigation and notify authorities before 50-year operation extensionStatutory Undertaker
s.sch002 Navigation risk assessment Regulated
  • Update and submit navigation risk assessment for Work No. 4Statutory Undertaker
s.sch002 Time limit Regulated
  • Begin authorised development within 7 years of Order coming into forceStatutory Undertaker
s.sch002 Control of noise during operation Regulated
  • Submit and comply with an approved noise mitigation planStatutory Undertaker
s.sch002 Ground conditions investigations and assessments strategy Regulated
  • Submit ground conditions strategy for approval before starting workStatutory Undertaker
s.sch002 Archaeological mitigation strategy Regulated
  • Submit archaeological mitigation strategy and record Belvedere jetty before worksStatutory Undertaker
s.sch002 Decommissioning environmental management plan Regulated
  • Submit and implement a decommissioning environmental management planStatutory Undertaker
s.sch002 Decommissioning traffic management plan Regulated
  • Submit decommissioning traffic management plan for approval before works startStatutory Undertaker
s.sch002 Heat Strategy Regulated
  • Submit heat strategy and obtain planning approval before starting developmentStatutory Undertaker
s.sch002 Approved details and amendments to them Regulated
Other duties (1) — Crown / regulator
  • Approving bodies must only approve amendments if no new environmental effectsStatutory regulator
s.sch002 Notice of date of final commissioning Regulated
  • Notify authorities of final commissioning date within 7 daysStatutory Undertaker
s.sch002 Code of construction practice Regulated
  • Submit and follow an approved code of construction practice before buildingStatutory Undertaker
s.sch002 Construction Hours Regulated
  • Restrict construction hours to permitted timesStatutory Undertaker
s.sch002 Construction traffic management plan Regulated
  • Submit and follow a construction traffic management plan before starting workStatutory Undertaker
s.sch011 Sediment sampling Regulated
  • Submit sediment sampling plan and carry out sampling per MMO approvalStatutory Undertaker
s.sch011 Marine Noise Registry Regulated
  • Submit pile driving and explosive noise data to the Marine Noise RegistryStatutory Undertaker
s.sch011 Piling Regulated
  • Use soft-start techniques for percussive pilingStatutory Undertaker
s.sch011 Dredging Regulated
  • Do not carry out licensed water injection dredging from 1 June to 30 AugustAny Person
s.sch011 Concrete and cement Regulated
  • Prevent water pollution from concrete and cement operationsStatutory Undertaker
s.sch011 Coatings and treatments Regulated
  • Ensure coatings and treatments are suitable for river use and follow approved guidelinesStatutory Undertaker
s.sch011 Pollution and spills Regulated
  • Prevent pollution and manage spills/waste during the projectStatutory Undertaker
s.sch011 Post activities Regulated
  • Remove structures/waste and notify MMO within specified timesStatutory Undertaker
s.sch011 Disposal Regulated
  • Report disposal material location and quantities to MMO twice yearlyStatutory Undertaker
s.sch011 Contacts Regulated
  • Submit applications and notifications via MMO marine case management systemStatutory Undertaker
s.sch011 The undertaker shall ensure that only inert material of natural... Regulated
  • Screen out non-inert material before disposing at MMO-approved siteStatutory Undertaker
s.sch011 The material to be disposed of within the disposal site... Regulated
  • Place disposed material evenly within disposal site boundariesStatutory Undertaker
s.sch011 Agents, contractors and subcontractors Regulated
  • Notify MMO of agents, contractors and subcontractors before licensed activities startStatutory Undertaker
s.sch011 Dropped Objects Regulated
  • Report dropped objects and remove obstructions from the seabedStatutory Undertaker
s.sch011 Marine written scheme of archaeological investigation Regulated
  • Carry out licensed activities in line with approved archaeological mitigation strategyAny Person
s.sch011 Notice of determination Regulated
Other duties (1) — Crown / regulator
  • MMO must give notice of determination to undertaker as soon as reasonably practicableStatutory regulator
s.sch011 Notifications regarding licensed activities Regulated
  • Notify the MMO before and after licensed construction and maintenanceStatutory Undertaker
s.sch011 (1) The undertaker must provide the following information to the... Regulated
  • Notify MMO of contractors, vessels and any changes before licensed workStatutory Undertaker
s.sch011 The undertaker must ensure that a copy of this licence... Regulated
  • Ensure agents and contractors read and understand the licenceStatutory Undertaker
s.sch011 Copies of this licence must be available for inspection at... Regulated
  • Keep licence copies at registered office and site officeStatutory Undertaker
s.sch011 The masters or transport managers responsible for the vessels that... Regulated
  • Make licence available for inspection on vessels during licensed activitiesStatutory Undertaker
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if by reason... Regulated
  • Pay for damage to utility apparatus or interruption to supply caused by your worksStatutory Undertaker
s.sch012 Indemnity Regulated
  • Indemnify SGN for damage caused by your construction worksStatutory Undertaker
s.sch012 Co-operation Regulated
  • Co-operate with each other on utility works for safety and efficiencyStatutory Undertaker
s.sch012 Access Regulated
  • Provide alternative access if SGN's apparatus is obstructedStatutory Undertaker
s.sch012 Notices Regulated
  • Send submitted plans to SGN at the specified addressStatutory Undertaker
s.sch012 Regardless of any provision in this Order or anything shown... Regulated
  • Acquire apparatus on REPL land only by agreementStatutory Undertaker
s.sch012 The undertaker must ensure that REPL is at liberty at... Regulated
  • Allow REPL access to streets for maintenance and worksStatutory Undertaker
s.sch012 (1) If, in the exercise of the powers conferred by... Regulated
  • Protect REPL's apparatus rights before acquiring land or relocating equipmentStatutory Undertaker
s.sch012 (1) Not less than 28 days before starting the execution... Regulated
  • Submit works plans for approval and execute in accordance with approved plansStatutory Undertaker
s.sch012 (1) Subject to the following provisions of this paragraph, the... Regulated
  • Repay reasonable expenses incurred by REPL for apparatus workStatutory Undertaker
s.sch012 Where in consequence of the proposed construction or maintenance of... Regulated
  • Co-ordinate works safely and efficiently with REPL when apparatus is affectedStatutory Undertaker
s.sch012 If in consequence of any agreement reached or the powers... Regulated
  • Provide alternative access when you block REPL's apparatusStatutory Undertaker
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if by reason... Regulated
  • Bear costs and indemnify REPL for damage or service interruption caused by your worksStatutory Undertaker
s.sch012 Regardless of any provision in this Order or anything shown... Regulated
  • Do not acquire apparatus within RRRL land without agreementStatutory Undertaker
s.sch012 The undertaker must ensure that each RRRL Entity is at... Regulated
  • Allow RRRL Entities access to streets for maintenance and operationsStatutory Undertaker
s.sch012 (1) If, in the exercise of the powers conferred by... Regulated
  • Do not extinguish rights or relocate RRRL apparatus until equivalent alternative apparatus is operational and rights grantedStatutory Undertaker
s.sch012 (1) Not less than 28 days before starting the execution... Regulated
  • Submit works plans to RRRL Entities for approval before starting workStatutory Undertaker
s.sch012 (1) Subject to the following provisions of this paragraph, the... Regulated
  • Repay RRRL Entity’s reasonable expenses for apparatus workStatutory Undertaker
s.sch012 Where in consequence of the proposed construction or maintenance of... Regulated
  • Coordinate works when removing or protecting apparatusStatutory Undertaker
s.sch012 If in consequence of any agreement reached or the powers... Regulated
  • Provide alternative access to obstructed apparatusStatutory Undertaker
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if by reason... Regulated
  • Pay costs and indemnify RRRL Entities for damage caused by your worksStatutory Undertaker
s.sch012 (1) Subject to sub-paragraphs (2) to (4), if as the... Regulated
  • Pay for damage to telecoms equipment and compensate the operatorStatutory Undertaker
s.sch012 Submission and approval of plans Regulated
  • Submit plans to Agency and obtain approval before constructing specified workStatutory Undertaker
s.sch012 Dredging Regulated
  • Submit dredging activity details to the Agency before workStatutory Undertaker
s.sch012 Construction of protective works Regulated
  • Construct protective works at your own expense when required by the AgencyStatutory Undertaker
s.sch012 Timing of works and service of notices Regulated
  • Notify the Agency of construction start and completion, and build works on timeStatutory Undertaker
s.sch012 Works not in accordance with this Part of this Schedule Regulated
  • Obtain consent and comply with Agency conditions for specified worksStatutory Undertaker
s.sch012 Remediating impaired drainage work Regulated
  • Repair impaired or damaged drainage works caused by your projectStatutory Undertaker
s.sch012 Agency access Regulated
  • Notify Environment Agency and provide alternative access if flood defence access is blockedStatutory Undertaker
s.sch012 Free passage of fish Regulated
  • Prevent interruption to fish passage and repair damage to fisheryStatutory Undertaker
s.sch012 Costs and indemnity Regulated
  • Your business must indemnify the Agency for its reasonable costsStatutory Undertaker
s.sch012 (1) The undertaker is responsible for and indemnifies the Agency... Regulated
  • Indemnify the Agency against costs and losses from the authorised developmentStatutory Undertaker
s.sch012 Apparatus in stopped up streets and public rights of way Regulated
  • Grant legal easements to TWUL for apparatus in stopped up streetsStatutory Undertaker
s.sch012 Access Road Regulated
  • Do not block or remove access road without TWUL's approval and new rightsStatutory Undertaker
s.sch012 Protective works to buildings Regulated
  • Do not obstruct access to apparatus during protective building worksStatutory Undertaker
s.sch012 Acquisition of land or interests Regulated
  • Do not acquire TWUL apparatus without agreementStatutory Undertaker
s.sch012 Removal of apparatus Regulated
  • Ensure TWUL's apparatus is not removed until alternative apparatus is operationalStatutory Undertaker
s.sch012 Facilities and rights for alternative apparatus Regulated
  • Grant alternative apparatus rights to TWUL on agreed or arbitrated termsStatutory Undertaker
s.sch012 Retained apparatus Regulated
  • Submit works plan and obtain approval before working near TWUL apparatusStatutory Undertaker
s.sch012 Expenses and costs Regulated
  • Repay TWUL for expenses from apparatus work caused by your projectStatutory Undertaker
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if by reason... Regulated
  • Pay for damage to Thames Water apparatus caused by your worksStatutory Undertaker
s.sch012 Cooperation Regulated
  • Coordinate works with TWUL for safety and efficiencyStatutory Undertaker
s.sch012 At all times the undertaker shall procure that its employees,... Regulated
  • Ensure employees and contractors minimise damage to TWUL's undertakingStatutory Undertaker
s.sch012 In this Part of this Schedule, where the agreement or... Regulated
Other duties (1) — Crown / regulator
  • Thames Water must not unreasonably withhold or delay agreementStatutory regulator
s.sch012 Use of statutory powers Regulated
  • Comply with the Order when carrying out works at TWUL's requestStatutory Undertaker
s.sch012 Regardless of any provision in this Order or anything shown... Regulated
  • Acquire apparatus only by agreement with the ownerStatutory Undertaker
s.sch012 Ground works and surveys Regulated
  • Notify Thames Water before altering ground level near their apparatusStatutory Undertaker
s.sch012 The undertaker must provide written notice to TWUL as soon... Regulated
  • Notify TWUL before ground intrusive surveys near apparatusStatutory Undertaker
s.sch012 Consultation Regulated
  • Consult TWUL on draft documents before submitting plans to planning authorityStatutory Undertaker
s.sch012 At least 56 days prior to the submission of the... Regulated
  • Invite TWUL to review LaBARDS 56 days before submissionStatutory Undertaker
s.sch012 Notices and applications Regulated
  • Submit notices and applications to Thames Water by emailStatutory Undertaker
s.sch012 Approval of detailed design Regulated
  • Obtain PLA approval before starting specified works or functionsStatutory Undertaker
s.sch012 (1) If, in the exercise of the powers conferred by... Regulated
  • Do not remove utility apparatus until alternative is operationalStatutory Undertaker
s.sch012 As built drawings Regulated
  • Provide as-built drawings to the Port of London AuthorityStatutory Undertaker
s.sch012 Discharges, etc. Regulated
  • Obtain PLA consent before discharging water or depositing material into the ThamesStatutory Undertaker
s.sch012 The undertaker must not, in exercise of the powers conferred... Regulated
  • Do not damage or interfere with River Thames banks/beds without approvalStatutory Undertaker
s.sch012 Navigational lights, buoys, etc. Regulated
  • Display navigation lights and lay buoys as the PLA requiresStatutory Undertaker
s.sch012 Directions as to lights Regulated
  • Comply with PLA Harbour Master's lighting directions on the River ThamesStatutory Undertaker
s.sch012 Permanent lights on tidal works Regulated
  • Exhibit lights and take steps to prevent danger to navigation as directed by PLAStatutory Undertaker
s.sch012 Removal, etc. of the PLA’s moorings and buoys Regulated
  • Pay for removal or alteration of PLA moorings and buoys caused by your projectStatutory Undertaker
s.sch012 Sedimentation, etc. remedial action Regulated
  • Your business must remedy Thames sedimentation or scouring caused by its worksStatutory Undertaker
s.sch012 Protective action Regulated
  • Fix work that doesn't meet approval conditions or damages the ThamesStatutory Undertaker
s.sch012 (1) Where, in accordance with the provisions of this Part... Regulated
  • Grant alternative apparatus rights on agreed terms or submit to arbitrationStatutory Undertaker
s.sch012 Abandoned or decayed works Regulated
  • Repair or remove abandoned or decayed works in the ThamesStatutory Undertaker
s.sch012 Facilities for navigation Regulated
  • Do not interfere with navigational aids and provide facilities for navigationStatutory Undertaker
s.sch012 Consideration for dredged material Regulated
  • Pay consideration to PLA for dredged material soldStatutory Undertaker
s.sch012 Protection for the PLA’s functions Regulated
  • Obtain PLA Harbour Master's consent before removing vessels or things from the ThamesStatutory Undertaker
s.sch012 Indemnity Regulated
  • Indemnify the Port of London Authority against losses from your worksStatutory Undertaker
s.sch012 Consultation Regulated
  • Consult the PLA on draft plans and any updates before submissionStatutory Undertaker
s.sch012 (1) Not less than 28 days before starting the execution... Regulated
  • Submit plans to utility companies before starting near their apparatusStatutory Undertaker
s.sch012 Regardless of any provision in this Order or anything shown... Regulated
  • Obtain prior written agreement from utility undertaker before acquiring apparatusStatutory Undertaker
s.sch012 (1) If, in the exercise of the powers conferred by... Regulated
  • Do not remove utility apparatus until alternative is installed and workingStatutory Undertaker
s.sch012 (1) Where, in accordance with the provisions of this Part... Regulated
  • Provide facilities and rights for alternative utility apparatus on agreed or arbitrated termsStatutory Undertaker
s.sch012 (1) Not less than 28 days before starting the execution... Regulated
  • Submit works plans to utility companies before starting near their apparatusStatutory Undertaker
s.sch012 (1) Subject to the following provisions of this paragraph, the... Regulated
  • Repay utility undertaker's expenses for apparatus workStatutory Undertaker
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if by reason... Regulated
  • Pay costs and compensate utility companies for damage caused by your construction worksStatutory Undertaker
s.sch012 Where in consequence of the proposed construction of any of... Regulated
  • Coordinate and cooperate on utility apparatus works for safety and efficiencyStatutory Undertaker
s.sch012 (1) Subject to the following provisions of this paragraph, the... Regulated
  • Repay utility companies' costs for moving or protecting their equipmentStatutory Undertaker
s.sch012 Apparatus of SGN in stopped up streets Regulated
  • Grant legal easements for SGN's apparatus before stopping up streetsStatutory Undertaker
s.sch012 Protective works to buildings Regulated
  • Protect SGN's gas apparatus from damage during building worksStatutory Undertaker
s.sch012 Removal of apparatus Regulated
  • Don't remove gas apparatus until replacement is operationalStatutory Undertaker
s.sch012 Facilities and rights for alternative apparatus Regulated
  • Grant alternative apparatus rights on no less favourable terms to SGNStatutory Undertaker
s.sch012 Retained apparatus: protection of SGN Regulated
  • Submit plans and ground monitoring scheme to SGN before starting works near gas apparatusStatutory Undertaker
s.sch014 Applications made for consent, agreement or approval Regulated
Other duties (1) — Crown / regulator
  • Relevant authority must decide consent applications within 9 weeks or they are deemed grantedStatutory regulator
s.sch014 Further information and consultation Regulated
Other duties (1) — Crown / regulator
  • Relevant authority must request further information within deadlines or lose the rightCrown / Minister / Government department
s.sch014 Appeals Regulated
  • Follow the appeal process to challenge relevant authority decisionsStatutory Undertaker
s.sch015 Timetable Regulated
  • Follow the arbitration timetable for exchanging statements and evidenceApplicant
s.sch015 Procedure Regulated
  • Follow arbitration procedure for Cory Decarbonisation Project disputesAny Person
s.sch015 Confidentiality Regulated
  • Keep arbitration hearings private and information confidentialAny Person
76 other schedules
s.sch001 Ancillary Works
s.sch002 Interpretation
s.sch002 Landscape, biodiversity, access and recreation delivery strategy
s.sch002 Detailed design
s.sch002 Permitted preliminary works
s.sch003 The following provisions do not apply in so far as...
s.sch004 Interpretation
s.sch008 Interpretation
s.sch009 Compensation enactments
s.sch009 (1) Without limitation on the scope of paragraph 1, the...
s.sch009 (1) Without limitation on the scope of paragraph 1, the...
s.sch009 Application of Part 1 of the 1965 Act
s.sch009 (1) The modifications referred to in paragraph 4(a) are as...
s.sch011 In this licence— “the 2008 Act” means the Planning Act...
s.sch011 Method statement
s.sch011 Time periods
s.sch011 Variations of approvals of Part 2 Conditions
s.sch011 Meaning of “application”
s.sch011 Further information regarding application
s.sch011 Determination of application
s.sch011 Details of such licensed marine activities
s.sch011 Code of construction practice
s.sch012 For the protection of the utility undertakers referred to in...
s.sch012 Expenses
s.sch012 Enactments and agreements
s.sch012 Arbitration
s.sch012 For the protection of REPL as referred to in this...
s.sch012 In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch012 Nothing in this Part of this Schedule affects the provisions...
s.sch012 (1) Where, in accordance with the provisions of this Part...
s.sch012 Nothing in this Part of this Schedule affects the provisions...
s.sch012 For the protection of each RRRL Entity as referred to...
s.sch012 For the protection of any operator, the following provisions have...
s.sch012 In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch012 (1) Where, in accordance with the provisions of this Part...
s.sch012 Nothing in this Part of this Schedule affects the provisions...
s.sch012 In this Part of this Schedule— “the 2003 Act” means...
s.sch012 The exercise of the powers of article 39 (statutory undertakers)...
s.sch012 This Part of this Schedule does not apply to—
s.sch012 Nothing in this Part of this Schedule affects the provisions...
s.sch012 Application
s.sch012 Interpretation
s.sch012 In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch012 Maintenance of works
s.sch012 The Thames Flood Acts works
s.sch012 This Part of this Schedule does not apply to apparatus...
s.sch012 Disputes
s.sch012 Application
s.sch012 Interpretation
s.sch012 On street apparatus
s.sch012 Regardless of the temporary prohibition or restriction of use of...
s.sch012 Nothing in this Part of this Schedule affects the provisions...
s.sch012 If TWUL does not respond to the invitation to which...
s.sch012 Any dispute as to the reasonableness of any suggestions made...
s.sch012 The provisions of this Part of this Schedule have effect,...
s.sch012 Interpretation
s.sch012 Removal of temporary works
s.sch012 Survey of riverbed
s.sch012 Restriction on powers contained in Part 3 of this Order
s.sch012 Disputes
s.sch012 For the protection of the utility undertakers referred to in...
s.sch012 In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch012 This Part of this Schedule does not apply to apparatus...
s.sch012 Regardless of the temporary prohibition or restriction of use of...
s.sch012 Nothing in this Part of this Schedule affects the provisions...
s.sch012 Application
s.sch012 Interpretation
s.sch012 On Street Apparatus
s.sch012 Acquisition of land
s.sch014 Interpretation
s.sch014 Anticipatory steps towards compliance with any requirement
s.sch014 Application to protective provisions
s.sch015 Commencing an arbitration
s.sch015 Time periods
s.sch015 Arbitrator’s powers
s.sch015 Costs