- Enforced by
- Environment Agency, Ofgem
- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Statutory Undertaker119
Any Person5
Contractor1
Client1
Plus 10 duties on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Statutory Undertaker — also bound by 179 other Acts
Any Person — also bound by 2340 other Acts
Human Medicines Regulations 2012
184 duties
Merchant Shipping Act 1995
144 duties
Insolvency (England and Wales) Rules 2016
104 duties
Communications Act 2003
92 duties
Road Traffic Act 1988
92 duties
Contractor — also bound by 173 other Acts
Client — also bound by 62 other Acts
Building Regulations 2010
12 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
Schedules
Schedules
126 of 201 shown
s.sch002
Site security
Regulated
- Submit and maintain site security scheme before operationAny Person
s.sch002
Fire prevention
Regulated
- Submit and implement fire appliance access plans for approvalStatutory Undertaker
s.sch002
Surface water drainage
Regulated
- Submit and implement approved surface water drainage plansStatutory Undertaker
s.sch002
Foul water drainage
Regulated
- Submit and implement approved foul water drainage plansStatutory Undertaker
s.sch002
Flood risk mitigation
Regulated
Other duties (1) — Crown / regulator
- Submit and implement flood risk mitigation schemes before construction and operationCrown / Minister / Government department
s.sch002
Contaminated land and groundwater
Regulated
- Submit and implement approved contamination remediation schemeStatutory Undertaker
s.sch002
Archaeology
Regulated
- Submit and follow archaeological investigation scheme before constructionContractor
s.sch002
Construction environmental management plan
Regulated
- Submit and follow a construction environmental management planStatutory Undertaker
s.sch002
Protection of highway surfaces
Regulated
- Submit highway condition survey details and carry out repairs as approvedStatutory Undertaker
s.sch002
Temporary haul road (traffic management and protection)
Regulated
- Maintain temporary haul road and implement traffic management for abnormal loadsStatutory Undertaker
s.sch002
Commencement of the authorised development
Regulated
- Commence development within 7 years and notify planning authority 14 days beforeStatutory Undertaker
s.sch002
Temporary haul road (biodiversity protection)
Regulated
- Carry out Work No. 10A with biodiversity measures and submit ecologist's reportStatutory Undertaker
s.sch002
Temporary haul road (removal and restoration)
Regulated
- Remove temporary haul road and restore site after commissioningStatutory Undertaker
s.sch002
Temporary haul road (prior approval of restoration scheme)
Regulated
- Submit road removal and restoration scheme for approvalStatutory Undertaker
s.sch002
Pilfrey laydown (design)
Regulated
- Retain and maintain the Pilfrey laydown area in accordance with the approved plansStatutory Undertaker
s.sch002
Pilfrey laydown (removal and restoration)
Regulated
- Remove Pilfrey laydown and restore land within 3 months after commissioningStatutory Undertaker
s.sch002
Construction traffic management plan
Regulated
- Get construction traffic management plan approved before starting constructionStatutory Undertaker
s.sch002
Construction worker travel plan
Regulated
- Submit and implement construction worker travel planStatutory Undertaker
s.sch002
Construction hours
Regulated
- Comply with construction hours and delivery restrictionsStatutory Undertaker
s.sch002
Control of noise and vibration - construction
Regulated
- Submit and implement a noise and vibration control scheme for constructionStatutory Undertaker
s.sch002
Control of noise - operation
Regulated
- Submit and implement a noise management scheme before commercial operationStatutory Undertaker
s.sch002
Notice of commencement and completion of commissioning
Regulated
- Notify planning authority of commissioning start and completionStatutory Undertaker
s.sch002
Piling and penetrative foundation design
Regulated
- Submit and follow approved piling and foundation design method statementStatutory Undertaker
s.sch002
Restoration of land used temporarily for construction
Regulated
- Submit restoration scheme and restore land used temporarily for constructionStatutory Undertaker
s.sch002
Combined heat and power
Regulated
- Design for and review heat export opportunitiesStatutory Undertaker
s.sch002
Carbon capture and compression plant
Regulated
- Keep land available for carbon capture pipeline and infrastructureStatutory Undertaker
s.sch002
Aviation warning lighting
Regulated
- Submit aviation warning lighting details and obtain approval before constructionStatutory Undertaker
s.sch002
Air safety
Regulated
- Submit site heights and crane details for aviation charting before starting constructionStatutory Undertaker
s.sch002
Employment, skills and training plan
Regulated
- Submit and implement an employment and skills plan for local residentsClient
s.sch002
Decommissioning
Regulated
- Submit decommissioning environmental management plan for approvalStatutory Undertaker
s.sch002
Requirement for written approval
Regulated
Other duties (1) — Crown / regulator
- Relevant planning authority or other person must give approvals in writingLocal authority
s.sch002
Notice of commencement of commercial use
Regulated
- Notify planning authority before or within 14 days of starting commercial useStatutory Undertaker
s.sch002
Amendments agreed by the relevant planning authority
Regulated
Other duties (1) — Crown / regulator
- Relevant planning authority must ensure non-material amendments agreed for Keadby 3 do not cause new environmental effectsLocal authority
s.sch002
Detailed design
Regulated
- Submit detailed design plans for approval before starting constructionStatutory Undertaker
s.sch002
Landscaping and biodiversity protection management and enhancement
Regulated
- Submit and implement landscaping and biodiversity plans for the developmentStatutory Undertaker
s.sch002
Highway accesses
Regulated
- Get highway access designs approved before starting constructionStatutory Undertaker
s.sch002
Means of enclosure
Regulated
- Submit and implement plans for site fencing, keep sites secure, and maintain permanent fencingAny Person
s.sch009
PROCEDURE FOR DISCHARGE OF REQUIREMENTS (opens in a new tab)
Regulated
Other duties (1) — Crown / regulator
- Local planning authority must decide on 'Requirement' applications within 8 weeksLocal authority
s.sch009
Applications made under Requirements
Regulated
Other duties (1) — Crown / regulator
- Local planning authority must decide your application within 8 weeks or it is deemed grantedLocal authority
s.sch009
Further information and consultation
Regulated
Other duties (1) — Crown / regulator
- Planning authority must request further information or consult within statutory deadlinesLocal authority
s.sch009
Appeals
Regulated
Other duties (1) — Crown / regulator
- Planning authority appeals processCrown / Minister / Government department
s.sch010
Retained apparatus: protection of gas undertaker
Regulated
- Submit plans to National Grid before starting gas pipeline worksStatutory Undertaker
s.sch010
(1) Subject to sub-paragraphs (2) and (3), if by reason...
Regulated
- Pay costs and indemnify Northern Powergrid for damage caused by your worksStatutory Undertaker
s.sch010
Where in consequence of the proposed construction of any of...
Regulated
- Co-ordinate works safely and co-operate with Northern PowergridStatutory Undertaker
s.sch010
If in consequence of an agreement reached in accordance with...
Regulated
- Provide alternative access to Northern Powergrid's apparatus if obstructedStatutory Undertaker
s.sch010
The plans submitted to Northern Powergrid by the undertaker pursuant...
Regulated
- Submit plans to Northern Powergrid at the correct addressStatutory Undertaker
s.sch010
Indemnity
Regulated
- Indemnify National Grid and provide security before constructionStatutory Undertaker
s.sch010
Co-operation
Regulated
- Co-ordinate construction works with National Grid for safety and efficiencyStatutory Undertaker
s.sch010
Access
Regulated
- Provide alternative access to National Grid apparatus if obstructedStatutory Undertaker
s.sch010
Notices
Regulated
- Send plans to National Grid via specified email addressStatutory Undertaker
s.sch010
Powers requiring the Canal and River Trust’s consent
Regulated
- Obtain Canal and River Trust consent before interfering with the waterwayStatutory Undertaker
s.sch010
Fencing
Regulated
- Install fencing where the engineer requires itStatutory Undertaker
s.sch010
Survey of waterway
Regulated
- Undertaker must survey waterway before and after constructionStatutory Undertaker
s.sch010
Approval of plans, protective works etc.
Regulated
- Get Canal and River Trust approval for construction plans before starting workStatutory Undertaker
s.sch010
Design of works
Regulated
- Consult and collaborate with Canal and River Trust on design and environmental effectsStatutory Undertaker
s.sch010
Notice of works
Regulated
- Give 30 days' notice of works to the engineerStatutory Undertaker
s.sch010
Lighting
Regulated
- Provide temporary and signal lighting for navigation safety during worksStatutory Undertaker
s.sch010
Prevention of pollution
Regulated
- Prevent pollution of the waterway during constructionStatutory Undertaker
s.sch010
Access to work – provision of information
Regulated
- Allow engineer access to works and provide construction informationStatutory Undertaker
s.sch010
Alterations to the waterway
Regulated
- Pay costs of waterway alterations required due to constructionStatutory Undertaker
s.sch010
Maintenance of works
Regulated
- Maintain works to prevent detriment on notice from Canal and River TrustStatutory Undertaker
s.sch010
Repayment of the Canal and River Trust’s fees, etc.
Regulated
- Repay Canal and River Trust’s fees for protective works and supervisionStatutory Undertaker
s.sch010
Regardless of any provision in this Order or anything shown...
Regulated
- Do not acquire apparatus without reaching agreementStatutory Undertaker
s.sch010
(1) If, in the exercise of the powers conferred by...
Regulated
- Do not remove utility apparatus until alternative is provided and operationalStatutory Undertaker
s.sch010
Apparatus of National Grid in stopped up streets
Regulated
- Grant legal easements to National Grid before permanently stopping up a streetStatutory Undertaker
s.sch010
(1) Where, in accordance with the provisions of this Part,...
Regulated
- Provide alternative apparatus facilities on agreed or arbitrated termsStatutory Undertaker
s.sch010
(1) Not less than twenty-eight days before starting the execution...
Regulated
- Submit works plans to utility companies before starting construction near their apparatusStatutory Undertaker
s.sch010
(1) Subject to the following provisions of this paragraph, the...
Regulated
- Pay utility companies for work caused by your constructionStatutory Undertaker
s.sch010
(1) Subject to sub-paragraphs (2) and (3), if by reason...
Regulated
- Pay utility costs for damage or interruption caused by your construction workStatutory Undertaker
s.sch010
(1) Subject to sub-paragraphs (2) to (4), if as the...
Regulated
- Pay compensation for damage to electronic communications apparatusStatutory Undertaker
s.sch010
Protective works to buildings
Regulated
- Do not obstruct National Grid's apparatus and pay for any damage causedStatutory Undertaker
s.sch010
(1) Where under this Part of this Schedule Network Rail...
Regulated
- Network Rail must co-operate to avoid delays and resolve procedure conflictsAny Person
s.sch010
(1) The undertaker must not exercise the powers conferred by—...
Regulated
- Do not exercise powers over railway property without Network Rail's consentStatutory Undertaker
s.sch010
(1) The undertaker must, before commencing construction of any specified...
Regulated
- Submit construction plans to Network Rail for approval before starting workStatutory Undertaker
s.sch010
The undertaker must— (a) at all times afford reasonable facilities...
Regulated
- Provide access and information to the engineer during constructionStatutory Undertaker
s.sch010
Network Rail must at all times afford reasonable facilities to...
Regulated
Other duties (1) — Crown / regulator
- Network Rail must provide access and information to the undertakerStatutory regulator
s.sch010
(1) If any permanent or temporary alterations or additions to...
Regulated
- Pay Network Rail for alterations needed to protect railway safetyStatutory Undertaker
s.sch010
The undertaker must repay to Network Rail all reasonable fees,...
Regulated
- Repay Network Rail's reasonable costs for specified works and protective measuresStatutory Undertaker
s.sch010
If at any time after the completion of a specified...
Regulated
- Maintain specified works to avoid adversely affecting railway propertyStatutory Undertaker
s.sch010
The undertaker must not provide any illumination or illuminated sign...
Regulated
- Consult Network Rail before installing any illumination or sign near their railwayStatutory Undertaker
s.sch010
Any additional expenses which Network Rail may reasonably incur in...
Regulated
- Repay Network Rail's reasonable additional expenses for railway property alterationsStatutory Undertaker
s.sch010
Network Rail must, on receipt of a request from the...
Regulated
Other duties (1) — Crown / regulator
- Network Rail must provide cost estimates on requestStatutory regulator
s.sch010
In the assessment of any sums payable to Network Rail...
Regulated
- Ignore inflated Network Rail claims caused by unnecessary actionsStatutory Undertaker
s.sch010
The undertaker must give written notice to Network Rail if...
Regulated
- Notify Network Rail before transferring the Order’s benefitsStatutory Undertaker
s.sch010
Removal of apparatus
Regulated
- Do not remove National Grid apparatus until replacement is liveStatutory Undertaker
s.sch010
The undertaker must no later than 28 days from the...
Regulated
- Provide certified plans to Network Rail within 28 daysStatutory Undertaker
s.sch010
The undertaker hereby agrees not to exercise its powers under...
Regulated
- Do not exercise Order powers without full compliance with this PartStatutory Undertaker
s.sch010
Interaction with the NGC Pipeline Network
Regulated
- Use reasonable endeavours to avoid conflict with the NGC Pipeline NetworkStatutory Undertaker
s.sch010
Carbon dioxide export connections works
Regulated
- Do not carry out Work No.7B without National Grid's agreementStatutory Undertaker
s.sch010
Without limiting any other provision of this Order, where NGC...
Regulated
- Use reasonable endeavours to coordinate NGC's Work No.7B with the authorised developmentStatutory Undertaker
s.sch010
(1) Before beginning to construct any carbon dioxide export connection...
Regulated
- Submit plans to NGC before building CO2 export connectionStatutory Undertaker
s.sch010
Facilities and rights for alternative apparatus
Regulated
- Provide alternative apparatus rights no less favourable to National GridStatutory Undertaker
s.sch010
(1) Any approval of NGC required under this Schedule—
Regulated
- NGC must respond to approval requests within 56 days and not unreasonably withholdAny Person
s.sch010
(1) The undertaker must give to NGC not less than...
Regulated
- Notify NGC before and after starting CO₂ export connection constructionStatutory Undertaker
s.sch010
Acquisition of land
Regulated
- You must not take NGC's land rights without their agreementStatutory Undertaker
s.sch010
Protective works to buildings
Regulated
- Do not obstruct access to NGC apparatus or pipeline sitesStatutory Undertaker
s.sch010
Removal of NGC apparatus
Regulated
- Do not remove NGC apparatus until alternative supply is operationalStatutory Undertaker
s.sch010
Specified works plan approval
Regulated
- Submit and follow approved plans for works near NGC pipelinesStatutory Undertaker
s.sch010
(1) Subject to sub-paragraph (5), any specified work, and all...
Regulated
- Construct specified works to NGC's satisfaction and in accordance with approved plansStatutory Undertaker
s.sch010
Expenses and costs
Regulated
- Repay NGC's reasonable expenses for apparatus protection and carbon dioxide export worksStatutory Undertaker
s.sch010
Retained apparatus: protection of electricity undertaker
Regulated
- Get National Grid approval for construction near their apparatusStatutory Undertaker
s.sch010
Indemnity
Regulated
- Indemnify NGC for damage or supply interruptions caused by construction worksStatutory Undertaker
s.sch010
Co-operation
Regulated
- Coordinate works with NGC for safety and efficiencyStatutory Undertaker
s.sch010
Regardless of any provision in this Order or anything shown...
Regulated
- Obtain Northern Powergrid's agreement before acquiring their apparatus or overriding their interestsStatutory Undertaker
s.sch010
(1) If, in the exercise of the powers conferred by...
Regulated
- Ensure alternative apparatus for Northern Powergrid before removing existing cablesStatutory Undertaker
s.sch010
(1) Where, in accordance with the provisions of this Part...
Regulated
- Grant alternative apparatus facilities to Northern Powergrid on agreed termsStatutory Undertaker
s.sch010
(1) Not less than 48 days before starting the execution...
Regulated
- Submit works plans to Northern Powergrid before starting near their apparatusStatutory Undertaker
s.sch011
DESIGN PARAMETERS (opens in a new tab)
Regulated
- Comply with maximum building and structure dimensionsStatutory Undertaker
s.sch013
The undertaker must complete pre-works bathymetry of the areas specified...
Regulated
- Complete pre-works bathymetry surveys and share resultsStatutory Undertaker
s.sch013
The undertaker must notify the MMO in writing of any...
Regulated
- Notify MMO of agents, contractors or subcontractors carrying out licensed activitiesStatutory Undertaker
s.sch013
The undertaker must notify the MMO in writing of any...
Regulated
- Notify MMO of vessels carrying out licensed activitiesStatutory Undertaker
s.sch013
During Construction, Operation and Maintenance
Regulated
- Ensure marine-suitable coatings and treatments used per HSE or EA guidelinesStatutory Undertaker
s.sch013
The undertaker must not discharge waste concrete slurry or wash...
Regulated
- Prevent concrete and cement pollution entering the riverStatutory Undertaker
s.sch013
During licensed activities all wastes must be stored in designated...
Regulated
- Store all wastes in designated, isolated, bunded areas during licensed activitiesStatutory Undertaker
s.sch013
(1) Vibratory piling must be used as standard, with percussive...
Regulated
- Use vibratory piling as standard with soft-start for percussive pilingStatutory Undertaker
s.sch013
Piling must not be undertaken between 01 September and 31...
Regulated
- Do not carry out piling during salmon migration season and only between 7am and 7pmStatutory Undertaker
s.sch013
The undertaker must comply with the lighting, hazard marking and...
Regulated
- Comply with ABP Humber’s lighting and hazard marking requirementsStatutory Undertaker
s.sch013
The undertaker must ensure any rock material used in the...
Regulated
- Use only clean, sourced rock material in constructionStatutory Undertaker
s.sch013
In the event that any rock or stone material is...
Regulated
- Report lost rock or stone material below mean high water springsStatutory Undertaker
s.sch013
(1) The undertaker must report all dropped objects to the...
Regulated
- Report dropped objects to MMO within 24 hoursStatutory Undertaker
s.sch013
Post Construction
Regulated
- Clear site equipment and waste within six weeks of completionStatutory Undertaker
s.sch013
The undertaker must ensure that the MMO Local Enforcement Office...
Regulated
- Notify MMO of completion of licensed activities within 10 daysStatutory Undertaker
s.sch013
The undertaker must complete post-works bathymetry of the areas specified...
Regulated
- Complete post-works bathymetry survey and share results with navigational authoritiesStatutory Undertaker
s.sch013
General
Regulated
- Report oil, fuel or chemical spills in marine environment to MMO within 12 hoursStatutory Undertaker
s.sch013
Notifications and Inspections
Regulated
- Distribute and display marine licence, allow inspections, and notify marinersStatutory Undertaker
s.sch013
Pre-construction
Regulated
- Submit construction environmental management plan for approval before work startsStatutory Undertaker
75 other schedules
s.sch002
REQUIREMENTS (opens in a new tab)
s.sch002
Interpretation
s.sch002
Local liaison committee
s.sch002
Approved details and amendments to them
s.sch002
External lighting
s.sch005
ACCESS - THOSE PARTS OF THE ACCESS TO BE MAINTAINED AT THE PUBLIC EXPENSE (opens in a new tab)
s.sch006
NEW RIGHTS (opens in a new tab)
s.sch006
Interpretation
s.sch007
Compensation enactments
s.sch007
(1) Without limitation on the scope of paragraph 1, the...
s.sch007
(1) Without limitation on the scope of paragraph 1, the...
s.sch007
Application of Part 1 of the 1965 Act
s.sch007
(1) The modifications referred to in paragraph 4(a) are as...
s.sch009
In this Schedule— “business day” means a day other than...
s.sch009
Fees
s.sch010
Application
s.sch010
(1) Subject to the following provisions of this paragraph, the...
s.sch010
Nothing in this Part of this Schedule affects the provisions...
s.sch010
Expenses
s.sch010
Enactments and agreements
s.sch010
Arbitration
s.sch010
Interpretation
s.sch010
Interpretation
s.sch010
Construction of specified works
s.sch010
On Street Apparatus
s.sch010
Making good of detriment; compensation and indemnity, etc.
s.sch010
Arbitration
s.sch010
Capitalised sums
s.sch010
For the protection of the utility undertakers referred to in...
s.sch010
In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch010
This Part does not apply to apparatus in respect of...
s.sch010
Nothing in this Part affects the provisions of any enactment...
s.sch010
(1) For the protection of any operator, the following provisions...
s.sch010
The exercise of the powers of article 29 (statutory undertakers)...
s.sch010
This Part of this Schedule does not apply to—
s.sch010
Nothing in this Part affects the provisions of any enactment...
s.sch010
The provisions of this Part of this Schedule have effect,...
s.sch010
In this Schedule— “asset protection agreement” means an agreement to...
s.sch010
(1) Any specified work and any protective works to be...
s.sch010
Acquisition of land
s.sch010
(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...
s.sch010
(1) The undertaker must pay to Network Rail all reasonable...
s.sch010
The undertaker and Network Rail may, subject in the case...
s.sch010
In Nothing in this Order, or in any enactment incorporated...
s.sch010
In relation to any dispute arising under this part of...
s.sch010
Application
s.sch010
Section A and paragraph 88 of Section B of this...
s.sch010
Interpretation
s.sch010
On street apparatus
s.sch010
Facilities and rights for alternative apparatus
s.sch010
Disputes
s.sch010
For the protection of Northern Powergrid the following provisions have...
s.sch010
In this Part of this Schedule— “1991 Act” means the...
s.sch010
This Part of this Schedule does not apply to apparatus...
s.sch011
Maximum parameters for buildings and structures are set out at...
s.sch011
The finished ground level in respect of Work No. 1A,...
s.sch011
Maximum parameters of the A18 Gatehouse building (Work No. 8B)...
s.sch011
Maximum parameters for length (m), width (m) or diameter (m)...
s.sch013
(1) In this licence the definitions in article 2 must...
s.sch013
(1) The undertaker must submit a marine method statement (MMS)...
s.sch013
The storage, handling, transport and use of fuels, lubricants, chemicals...
s.sch013
Subject to the conditions, this licence authorises the undertaker to...
s.sch013
Conditions Discharge
s.sch013
Licensed activities are authorised in relation to the construction, maintenance...
s.sch013
The substances or articles authorised for deposit associated with the...
s.sch013
The undertaker may engage in the licensed activities in the...
s.sch013
The coordinates in Table 9 are defined in accordance with...
s.007
Consent to transfer benefit of the Order
Regulated
- Notify the Secretary of State before transferring project benefitsStatutory Undertaker
s.011
Construction and maintenance of new or altered means of access
Regulated
- Maintain new or altered road access for 12 monthsStatutory Undertaker
s.014
Discharge of water
Regulated
- Obtain consent and follow safety protocols for discharging waterStatutory Undertaker
s.015
Authority to survey and investigate the land
Regulated
- Give 14 days' notice before surveying land and compensate for damageStatutory Undertaker
s.019
Statutory authority to override easements and other rights
Regulated
- Pay compensation for interfering with land rights or contract restrictionsStatutory Undertaker
s.036
Restoration works
Regulated
- Restore site land and infrastructure if construction does not startStatutory Undertaker
s.041
Certification of plans etc.
Regulated
- Submit project plans and documents for certificationStatutory Undertaker
s.042
Service of notices
Regulated
- Follow specific rules when sending or receiving formal noticesAny Person
s.043
Procedure in relation to certain approvals etc.
Regulated
Other duties (1) — Crown / regulator
- Authorities must provide written decisions without unreasonable delayStatutory regulator
s.045
Guarantees in respect of payment of compensation
Regulated
- Secure compensation guarantees before exercising land and street powersStatutory Undertaker
35 other provisions
s.001
Citation and commencement
s.002
Interpretation
s.003
Development consent etc. granted by the Order
s.004
Maintenance of authorised development
s.005
Operation of authorised development
s.006
Benefit of the Order
s.008
Application and modification of statutory provisions
s.009
Street works
s.010
Power to alter layout, etc., of streets
s.012
Access to works
s.013
Agreements with street authorities
s.016
Temporary interference with canal and public rights of navigation
s.017
Use of private roads for construction
s.018
Compulsory acquisition of land
s.020
Time limit for exercise of authority to acquire land compulsorily
s.021
Compulsory acquisition of rights etc.
s.022
Private rights
s.023
Application of the 1981 Act and Part 1 of the 1961 Act
s.024
Acquisition of subsoil or airspace only
s.025
Modification of Part 1 of the 1965 Act
s.026
Rights under or over streets
s.027
Temporary use of land for carrying out the authorised development
s.028
Temporary use of land for maintaining the authorised development
s.029
Statutory undertakers
s.030
Apparatus and rights of statutory undertakers in streets
s.031
Recovery of costs of new connections
s.032
Crown Rights
s.033
Felling or lopping of trees and removal of hedgerows
s.034
Protective works to buildings
s.035
Protective provision
s.037
Application of landlord and tenant law
s.038
Operational land for purposes of the 1990 Act
s.039
Deemed marine licence under the Marine and Coast Access Act 2009
s.040
Defence to proceedings in respect of statutory nuisance
s.044
Arbitration
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.