UK Statutory Instrument 2022 United Kingdom

The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022

At a glance

Enforced by

Environment Agency, Ofgem

What's here

129 compliance obligations

Who this Act binds

Business-side actors with duties under this Act, ranked by how often they appear.

  • Statutory Undertaker 112
  • Any Person 5
  • Contractor 1
  • Client 1

Plus 10 non-business duties on Crown ministers, regulators, local authorities or tribunals — shown collapsed under each section below.

Other Acts binding the same actors

For each actor bound by this Act, the other UK Acts that bind them most often. Useful for understanding the full compliance landscape facing each role.

Statutory Undertakers also bound by 169 other Acts (top 5 shown)
Any Person also bound by 2338 other Acts (top 5 shown)
Contractors also bound by 178 other Acts (top 5 shown)
Clients also bound by 65 other Acts (top 5 shown)

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Part 1 — PRELIMINARY

Browse 2 other sections in this Part — procedural / definitional / commencement
s.art001

Citation and commencement

s.art002

Interpretation

Part 2 — PRINCIPAL POWERS

Browse 6 other sections in this Part — procedural / definitional / commencement
s.art003

Development consent etc. granted by the Order

s.art004

Maintenance of authorised development

s.art005

Operation of authorised development

s.art006

Benefit of the Order

s.art007

Consent to transfer benefit of the Order

s.art008

Application and modification of statutory provisions

Part 3 — STREETS

Browse 5 other sections in this Part — procedural / definitional / commencement
s.art009

Street works

s.art010

Power to alter layout, etc., of streets

s.art011

Construction and maintenance of new or altered means of access

s.art012

Access to works

s.art013

Agreements with street authorities

Part 4 — SUPPLEMENTAL POWERS

Browse 4 other sections in this Part — procedural / definitional / commencement
s.art014

Discharge of water

s.art015

Authority to survey and investigate the land

s.art016

Temporary interference with canal and public rights of navigation

s.art017

Use of private roads for construction

Part 5 — POWERS OF ACQUISITION

Browse 14 other sections in this Part — procedural / definitional / commencement
s.art018

Compulsory acquisition of land

s.art019

Statutory authority to override easements and other rights

s.art020

Time limit for exercise of authority to acquire land compulsorily

s.art021

Compulsory acquisition of rights etc.

s.art022

Private rights

s.art023

Application of the 1981 Act and Part 1 of the 1961 Act

s.art024

Acquisition of subsoil or airspace only

s.art025

Modification of Part 1 of the 1965 Act

s.art026

Rights under or over streets

s.art027

Temporary use of land for carrying out the authorised development

s.art028

Temporary use of land for maintaining the authorised development

s.art029

Statutory undertakers

s.art030

Apparatus and rights of statutory undertakers in streets

s.art031

Recovery of costs of new connections

Part 6 — OPERATIONS

Browse 3 other sections in this Part — procedural / definitional / commencement
s.art032

Crown Rights

s.art033

Felling or lopping of trees and removal of hedgerows

s.art034

Protective works to buildings

Part 7 — MISCELLANEOUS AND GENERAL

Browse 11 other sections in this Part — procedural / definitional / commencement
s.art035

Protective provision

s.art036

Restoration works

s.art037

Application of landlord and tenant law

s.art038

Operational land for purposes of the 1990 Act

s.art039

Deemed marine licence under the Marine and Coast Access Act 2009

s.art040

Defence to proceedings in respect of statutory nuisance

s.art041

Certification of plans etc.

s.art042

Service of notices

s.art043

Procedure in relation to certain approvals etc.

s.art044

Arbitration

s.art045

Guarantees in respect of payment of compensation

Schedules

s.sch002

Site security

  • Submit and maintain site security scheme before operation Any Person
s.sch002

Fire prevention

  • Submit and implement fire appliance access plans for approval Statutory Undertaker
s.sch002

Surface water drainage

  • Submit and implement approved surface water drainage plans Statutory Undertaker
s.sch002

Foul water drainage

  • Submit and implement approved foul water drainage plans Statutory Undertaker
s.sch002

Flood risk mitigation

Other duties (1) — Crown / regulator
  • Submit and implement flood risk mitigation schemes before construction and operation Crown / Minister / Government department
s.sch002

Contaminated land and groundwater

  • Submit and implement approved contamination remediation scheme Statutory Undertaker
s.sch002

Archaeology

  • Submit and follow archaeological investigation scheme before construction Contractor
s.sch002

Construction environmental management plan

  • Submit and follow a construction environmental management plan Statutory Undertaker
s.sch002

Protection of highway surfaces

  • Submit highway condition survey details and carry out repairs as approved Statutory Undertaker
s.sch002

Temporary haul road (traffic management and protection)

  • Maintain temporary haul road and implement traffic management for abnormal loads Statutory Undertaker
s.sch002

Commencement of the authorised development

  • Commence development within 7 years and notify planning authority 14 days before Statutory Undertaker
s.sch002

Temporary haul road (biodiversity protection)

  • Carry out Work No. 10A with biodiversity measures and submit ecologist's report Statutory Undertaker
s.sch002

Temporary haul road (removal and restoration)

  • Remove temporary haul road and restore site after commissioning Statutory Undertaker
s.sch002

Pilfrey laydown (design)

  • Retain and maintain the Pilfrey laydown area in accordance with the approved plans Statutory Undertaker
s.sch002

Pilfrey laydown (removal and restoration)

  • Remove Pilfrey laydown and restore land within 3 months after commissioning Statutory Undertaker
s.sch002

Construction hours

  • Comply with construction hours and delivery restrictions Statutory Undertaker
s.sch002

Control of noise and vibration - construction

  • Submit and implement a noise and vibration control scheme for construction Statutory Undertaker
s.sch002

Control of noise - operation

  • Submit and implement a noise management scheme before commercial operation Statutory Undertaker
s.sch002

Notice of commencement and completion of commissioning

  • Notify planning authority of commissioning start and completion Statutory Undertaker
s.sch002

Piling and penetrative foundation design

  • Submit and follow approved piling and foundation design method statement Statutory Undertaker
s.sch002

Restoration of land used temporarily for construction

  • Submit restoration scheme and restore land used temporarily for construction Statutory Undertaker
s.sch002

Combined heat and power

  • Design for and review heat export opportunities Statutory Undertaker
s.sch002

Carbon capture and compression plant

  • Keep land available for carbon capture pipeline and infrastructure Statutory Undertaker
s.sch002

Aviation warning lighting

  • Submit aviation warning lighting details and obtain approval before construction Statutory Undertaker
s.sch002

Air safety

  • Submit site heights and crane details for aviation charting before starting construction Statutory Undertaker
s.sch002

Employment, skills and training plan

  • Submit and implement an employment and skills plan for local residents Client
s.sch002

Decommissioning

  • Submit decommissioning environmental management plan for approval Statutory Undertaker
s.sch002

Requirement for written approval

Other duties (1) — Crown / regulator
  • Relevant planning authority or other person must give approvals in writing Local authority
s.sch002

Notice of commencement of commercial use

  • Notify planning authority before or within 14 days of starting commercial use Statutory Undertaker
s.sch002

Amendments agreed by the relevant planning authority

Other duties (1) — Crown / regulator
  • Relevant planning authority must ensure non-material amendments agreed for Keadby 3 do not cause new environmental effects Local authority
s.sch002

Detailed design

  • Submit detailed design plans for approval before starting construction Statutory Undertaker
s.sch002

Landscaping and biodiversity protection management and enhancement

  • Submit and implement landscaping and biodiversity plans for the development Statutory Undertaker
s.sch002

Highway accesses

  • Get highway access designs approved before starting construction Statutory Undertaker
s.sch002

Means of enclosure

  • Submit and implement plans for site fencing, keep sites secure, and maintain permanent fencing Any Person
s.sch009

Applications made under Requirements

Other duties (1) — Crown / regulator
  • Local planning authority must decide your application within 8 weeks or it is deemed granted Local authority
s.sch009

Further information and consultation

Other duties (1) — Crown / regulator
  • Planning authority must request further information or consult within statutory deadlines Local authority
s.sch009

Appeals

Other duties (1) — Crown / regulator
  • Planning authority appeals process Crown / Minister / Government department
s.sch010

Retained apparatus: protection of gas undertaker

  • Submit plans to National Grid before starting gas pipeline works Statutory Undertaker
s.sch010

(1) Subject to sub-paragraphs (2) and (3), if by reason...

  • Pay costs and indemnify Northern Powergrid for damage caused by your works Statutory Undertaker
s.sch010

Where in consequence of the proposed construction of any of...

  • Co-ordinate works safely and co-operate with Northern Powergrid Statutory Undertaker
s.sch010

If in consequence of an agreement reached in accordance with...

  • Provide alternative access to Northern Powergrid's apparatus if obstructed Statutory Undertaker
s.sch010

The plans submitted to Northern Powergrid by the undertaker pursuant...

  • Submit plans to Northern Powergrid at the correct address Statutory Undertaker
s.sch010

Indemnity

  • Indemnify National Grid and provide security before construction Statutory Undertaker
s.sch010

Co-operation

  • Co-ordinate construction works with National Grid for safety and efficiency Statutory Undertaker
s.sch010

Access

  • Provide alternative access to National Grid apparatus if obstructed Statutory Undertaker
s.sch010

Notices

  • Send plans to National Grid via specified email address Statutory Undertaker
s.sch010

Powers requiring the Canal and River Trust’s consent

  • Obtain Canal and River Trust consent before interfering with the waterway Statutory Undertaker
s.sch010

Fencing

  • Install fencing where the engineer requires it Statutory Undertaker
s.sch010

Approval of plans, protective works etc.

  • Get Canal and River Trust approval for construction plans before starting work Statutory Undertaker
s.sch010

Design of works

  • Consult and collaborate with Canal and River Trust on design and environmental effects Statutory Undertaker
s.sch010

Notice of works

  • Give 30 days' notice of works to the engineer Statutory Undertaker
s.sch010

Lighting

  • Provide temporary and signal lighting for navigation safety during works Statutory Undertaker
s.sch010

Prevention of pollution

  • Prevent pollution of the waterway during construction Statutory Undertaker
s.sch010

Access to work – provision of information

  • Allow engineer access to works and provide construction information Statutory Undertaker
s.sch010

Alterations to the waterway

  • Pay costs of waterway alterations required due to construction Statutory Undertaker
s.sch010

Maintenance of works

  • Maintain works to prevent detriment on notice from Canal and River Trust Statutory Undertaker
s.sch010

Repayment of the Canal and River Trust’s fees, etc.

  • Repay Canal and River Trust’s fees for protective works and supervision Statutory Undertaker
s.sch010

Regardless of any provision in this Order or anything shown...

  • Do not acquire apparatus without reaching agreement Statutory Undertaker
s.sch010

(1) If, in the exercise of the powers conferred by...

  • Do not remove utility apparatus until alternative is provided and operational Statutory Undertaker
s.sch010

Apparatus of National Grid in stopped up streets

  • Grant legal easements to National Grid before permanently stopping up a street Statutory Undertaker
s.sch010

(1) Where, in accordance with the provisions of this Part,...

  • Provide alternative apparatus facilities on agreed or arbitrated terms Statutory Undertaker
s.sch010

(1) Not less than twenty-eight days before starting the execution...

  • Submit works plans to utility companies before starting construction near their apparatus Statutory Undertaker
s.sch010

(1) Subject to the following provisions of this paragraph, the...

  • Pay utility companies for work caused by your construction Statutory Undertaker
s.sch010

(1) Subject to sub-paragraphs (2) and (3), if by reason...

  • Pay utility costs for damage or interruption caused by your construction work Statutory Undertaker
s.sch010

(1) Subject to sub-paragraphs (2) to (4), if as the...

  • Pay compensation for damage to electronic communications apparatus Statutory Undertaker
s.sch010

Protective works to buildings

  • Do not obstruct National Grid's apparatus and pay for any damage caused Statutory Undertaker
s.sch010

(1) Where under this Part of this Schedule Network Rail...

  • Network Rail must co-operate to avoid delays and resolve procedure conflicts Any Person
s.sch010

(1) The undertaker must not exercise the powers conferred by—...

  • Do not exercise powers over railway property without Network Rail's consent Statutory Undertaker
s.sch010

(1) The undertaker must, before commencing construction of any specified...

  • Submit construction plans to Network Rail for approval before starting work Statutory Undertaker
s.sch010

The undertaker must— (a) at all times afford reasonable facilities...

  • Provide access and information to the engineer during construction Statutory Undertaker
s.sch010

Network Rail must at all times afford reasonable facilities to...

Other duties (1) — Crown / regulator
  • Network Rail must provide access and information to the undertaker Statutory regulator
s.sch010

(1) If any permanent or temporary alterations or additions to...

  • Pay Network Rail for alterations needed to protect railway safety Statutory Undertaker
s.sch010

The undertaker must repay to Network Rail all reasonable fees,...

  • Repay Network Rail's reasonable costs for specified works and protective measures Statutory Undertaker
s.sch010

If at any time after the completion of a specified...

  • Maintain specified works to avoid adversely affecting railway property Statutory Undertaker
s.sch010

The undertaker must not provide any illumination or illuminated sign...

  • Consult Network Rail before installing any illumination or sign near their railway Statutory Undertaker
s.sch010

Network Rail must, on receipt of a request from the...

Other duties (1) — Crown / regulator
  • Network Rail must provide cost estimates on request Statutory regulator
s.sch010

In the assessment of any sums payable to Network Rail...

  • Ignore inflated Network Rail claims caused by unnecessary actions Statutory Undertaker
s.sch010

The undertaker must give written notice to Network Rail if...

  • Notify Network Rail before transferring the Order’s benefits Statutory Undertaker
s.sch010

Removal of apparatus

  • Do not remove National Grid apparatus until replacement is live Statutory Undertaker
s.sch010

The undertaker must no later than 28 days from the...

  • Provide certified plans to Network Rail within 28 days Statutory Undertaker
s.sch010

The undertaker hereby agrees not to exercise its powers under...

  • Do not exercise Order powers without full compliance with this Part Statutory Undertaker
s.sch010

Interaction with the NGC Pipeline Network

  • Use reasonable endeavours to avoid conflict with the NGC Pipeline Network Statutory Undertaker
s.sch010

Carbon dioxide export connections works

  • Do not carry out Work No.7B without National Grid's agreement Statutory Undertaker
s.sch010

Without limiting any other provision of this Order, where NGC...

  • Use reasonable endeavours to coordinate NGC's Work No.7B with the authorised development Statutory Undertaker
s.sch010

(1) Before beginning to construct any carbon dioxide export connection...

  • Submit plans to NGC before building CO2 export connection Statutory Undertaker
s.sch010

Facilities and rights for alternative apparatus

  • Provide alternative apparatus rights no less favourable to National Grid Statutory Undertaker
s.sch010

(1) Any approval of NGC required under this Schedule—

  • NGC must respond to approval requests within 56 days and not unreasonably withhold Any Person
s.sch010

(1) The undertaker must give to NGC not less than...

  • Notify NGC before and after starting CO₂ export connection construction Statutory Undertaker
s.sch010

Acquisition of land

  • You must not take NGC's land rights without their agreement Statutory Undertaker
s.sch010

Protective works to buildings

  • Do not obstruct access to NGC apparatus or pipeline sites Statutory Undertaker
s.sch010

Removal of NGC apparatus

  • Do not remove NGC apparatus until alternative supply is operational Statutory Undertaker
s.sch010

Specified works plan approval

  • Submit and follow approved plans for works near NGC pipelines Statutory Undertaker
s.sch010

(1) Subject to sub-paragraph (5), any specified work, and all...

  • Construct specified works to NGC's satisfaction and in accordance with approved plans Statutory Undertaker
s.sch010

Expenses and costs

  • Repay NGC's reasonable expenses for apparatus protection and carbon dioxide export works Statutory Undertaker
s.sch010

Retained apparatus: protection of electricity undertaker

  • Get National Grid approval for construction near their apparatus Statutory Undertaker
s.sch010

Indemnity

  • Indemnify NGC for damage or supply interruptions caused by construction works Statutory Undertaker
s.sch010

Co-operation

  • Coordinate works with NGC for safety and efficiency Statutory Undertaker
s.sch010

Regardless of any provision in this Order or anything shown...

  • Obtain Northern Powergrid's agreement before acquiring their apparatus or overriding their interests Statutory Undertaker
s.sch010

(1) If, in the exercise of the powers conferred by...

  • Ensure alternative apparatus for Northern Powergrid before removing existing cables Statutory Undertaker
s.sch010

(1) Where, in accordance with the provisions of this Part...

  • Grant alternative apparatus facilities to Northern Powergrid on agreed terms Statutory Undertaker
s.sch010

(1) Not less than 48 days before starting the execution...

  • Submit works plans to Northern Powergrid before starting near their apparatus Statutory Undertaker
s.sch011

DESIGN PARAMETERS

  • Comply with maximum building and structure dimensions Statutory Undertaker
s.sch013

The undertaker must notify the MMO in writing of any...

  • Notify MMO of agents, contractors or subcontractors carrying out licensed activities Statutory Undertaker
s.sch013

The undertaker must notify the MMO in writing of any...

  • Notify MMO of vessels carrying out licensed activities Statutory Undertaker
s.sch013

During Construction, Operation and Maintenance

  • Ensure marine-suitable coatings and treatments used per HSE or EA guidelines Statutory Undertaker
s.sch013

The undertaker must not discharge waste concrete slurry or wash...

  • Prevent concrete and cement pollution entering the river Statutory Undertaker
s.sch013

During licensed activities all wastes must be stored in designated...

  • Store all wastes in designated, isolated, bunded areas during licensed activities Statutory Undertaker
s.sch013

(1) Vibratory piling must be used as standard, with percussive...

  • Use vibratory piling as standard with soft-start for percussive piling Statutory Undertaker
s.sch013

Piling must not be undertaken between 01 September and 31...

  • Do not carry out piling during salmon migration season and only between 7am and 7pm Statutory Undertaker
s.sch013

The undertaker must comply with the lighting, hazard marking and...

  • Comply with ABP Humber’s lighting and hazard marking requirements Statutory Undertaker
s.sch013

The undertaker must ensure any rock material used in the...

  • Use only clean, sourced rock material in construction Statutory Undertaker
s.sch013

In the event that any rock or stone material is...

  • Report lost rock or stone material below mean high water springs Statutory Undertaker
s.sch013

(1) The undertaker must report all dropped objects to the...

  • Report dropped objects to MMO within 24 hours Statutory Undertaker
s.sch013

Post Construction

  • Clear site equipment and waste within six weeks of completion Statutory Undertaker
s.sch013

The undertaker must ensure that the MMO Local Enforcement Office...

  • Notify MMO of completion of licensed activities within 10 days Statutory Undertaker
s.sch013

The undertaker must complete post-works bathymetry of the areas specified...

  • Complete post-works bathymetry survey and share results with navigational authorities Statutory Undertaker
s.sch013

General

  • Report oil, fuel or chemical spills in marine environment to MMO within 12 hours Statutory Undertaker
s.sch013

Notifications and Inspections

  • Distribute and display marine licence, allow inspections, and notify mariners Statutory Undertaker
Browse 82 other Schedules — structural / supplementary
s.sch002

Interpretation

s.sch002

Temporary haul road (prior approval of restoration scheme)

s.sch002

Construction traffic management plan

s.sch002

Construction worker travel plan

s.sch002

Local liaison committee

s.sch002

Approved details and amendments to them

s.sch002

External lighting

s.sch006

Interpretation

s.sch007

Compensation enactments

s.sch007

(1) Without limitation on the scope of paragraph 1, the...

s.sch007

(1) Without limitation on the scope of paragraph 1, the...

s.sch007

Application of Part 1 of the 1965 Act

s.sch007

(1) The modifications referred to in paragraph 4(a) are as...

s.sch009

In this Schedule— “business day” means a day other than...

s.sch009

Fees

s.sch010

Application

s.sch010

(1) Subject to the following provisions of this paragraph, the...

s.sch010

Nothing in this Part of this Schedule affects the provisions...

s.sch010

Expenses

s.sch010

Enactments and agreements

s.sch010

Arbitration

s.sch010

Interpretation

s.sch010

Interpretation

s.sch010

Survey of waterway

s.sch010

Construction of specified works

s.sch010

On Street Apparatus

s.sch010

Making good of detriment; compensation and indemnity, etc.

s.sch010

Arbitration

s.sch010

Capitalised sums

s.sch010

For the protection of the utility undertakers referred to in...

s.sch010

In this Part of this Schedule— “alternative apparatus” means alternative...

s.sch010

This Part does not apply to apparatus in respect of...

s.sch010

Nothing in this Part affects the provisions of any enactment...

s.sch010

(1) For the protection of any operator, the following provisions...

s.sch010

The exercise of the powers of article 29 (statutory undertakers)...

s.sch010

This Part of this Schedule does not apply to—

s.sch010

Nothing in this Part affects the provisions of any enactment...

s.sch010

The provisions of this Part of this Schedule have effect,...

s.sch010

In this Schedule— “asset protection agreement” means an agreement to...

s.sch010

(1) Any specified work and any protective works to be...

s.sch010

Acquisition of land

s.sch010

(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...

s.sch010

Any additional expenses which Network Rail may reasonably incur in...

s.sch010

(1) The undertaker must pay to Network Rail all reasonable...

s.sch010

The undertaker and Network Rail may, subject in the case...

s.sch010

In Nothing in this Order, or in any enactment incorporated...

s.sch010

In relation to any dispute arising under this part of...

s.sch010

Application

s.sch010

Section A and paragraph 88 of Section B of this...

s.sch010

Interpretation

s.sch010

On street apparatus

s.sch010

Facilities and rights for alternative apparatus

s.sch010

Disputes

s.sch010

For the protection of Northern Powergrid the following provisions have...

s.sch010

In this Part of this Schedule— “1991 Act” means the...

s.sch010

This Part of this Schedule does not apply to apparatus...

s.sch011

Maximum parameters for buildings and structures are set out at...

s.sch011

The finished ground level in respect of Work No. 1A,...

s.sch011

Maximum parameters of the A18 Gatehouse building (Work No. 8B)...

s.sch011

Maximum parameters for length (m), width (m) or diameter (m)...

s.sch013

(1) In this licence the definitions in article 2 must...

s.sch013

(1) The undertaker must submit a marine method statement (MMS)...

s.sch013

The undertaker must complete pre-works bathymetry of the areas specified...

s.sch013

The storage, handling, transport and use of fuels, lubricants, chemicals...

s.sch013

Subject to the conditions, this licence authorises the undertaker to...

s.sch013

Conditions Discharge

s.sch013

Licensed activities are authorised in relation to the construction, maintenance...

s.sch013

The substances or articles authorised for deposit associated with the...

s.sch013

The undertaker may engage in the licensed activities in the...

s.sch013

The coordinates in Table 9 are defined in accordance with...

s.sch013

Pre-construction

Other sections — not classified into a Part

These sections sit outside the numbered Parts — usually provisions added or moved by later amendments.

s.014

Discharge of water

  • Obtain consent and follow safety protocols for discharging water Statutory Undertaker
s.036

Restoration works

  • Restore site land and infrastructure if construction does not start Statutory Undertaker
s.042

Service of notices

  • Follow specific rules when sending or receiving formal notices Any Person
Browse 35 other sections

Enforcement and responsible bodies

The regulators that administer or enforce this legislation.

Environmental protection in England. Regulates waste, emissions, water quality, flood risk, and environmental permits for industrial activities. Enforces environmental law and issues …

Office of Gas and Electricity Markets

Regulates gas and electricity markets in Great Britain. Issues licences for generation, transmission, distribution, and supply. Protects consumers and promotes competition. Also …

Explore more

Browse legislation

Find other UK business legislation with related guidance.

Regulators

Learn more about the bodies that enforce this legislation.