UK Statutory Instrument SI 2024/436 United Kingdom

The HyNet Carbon Dioxide Pipeline Order 2024

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker3 Contractor1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Contractor — also bound by 173 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

231 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent etc. granted by the Order
s.art004 Operation and use of the authorised development
s.art005 Power to maintain the authorised development
s.art006 Limits of deviation
s.art007 Benefit of the Order
s.art008 Application and modification of legislative provisions
s.art009 Defence to proceedings in respect of statutory nuisance
s.art010 Street works
s.art011 Power to alter layout, etc. of streets
s.art012 Application of the 1991 Act
s.art013 Temporary restriction of public rights of way
s.art014 Stopping up of public rights of way
s.art015 Temporary restriction of use of streets
s.art016 Access to works
s.art017 Agreements with street authorities
s.art018 Use of private roads
s.art019 Traffic regulation
s.art020 Discharge of water
s.art021 Maintenance of drainage works
s.art022 Authority to survey and investigate the land
s.art023 Protective work to buildings
s.art024 Compulsory acquisition of land
s.art025 Time limit for exercise of authority to acquire land compulsorily
s.art026 Compulsory acquisition of rights and restrictive covenants
s.art027 Statutory authority to override easements and other rights
s.art028 Compulsory acquisition of land: minerals
s.art029 Private rights
s.art030 Application of the 1981 Act
s.art031 Acquisition of subsoil or airspace only
s.art032 Modification of Part 1 of the 1965 Act
s.art033 Rights under or over streets
s.art034 Temporary use of land for carrying out the authorised development
s.art035 Temporary use of land for maintaining the authorised development
s.art036 Statutory undertakers
s.art037 Recovery of costs of new connections
s.art038 Application of landlord and tenant law
s.art039 Felling or lopping of trees and removal of hedgerows
s.art040 Trees subject to Tree Preservation Orders
s.art041 Crown rights
s.art042 Protective provisions
s.art043 Operational land for the purposes of the 1990 Act
s.art044 Certification of plans, etc.
s.art045 Service of notices
s.art046 No double recovery
s.art047 Arbitration
s.para.100 Work No. 18A: Creation and use of a temporary construction...
s.para.101 Work No. 19: Construction of an underground Carbon Dioxide (CO2)...
s.para.102 as shown on Sheets 8 and 9 of the Works...
s.para.103 Work No. 19A: The creation and use of a temporary...
s.para.104 Work No. 19B: Creation and use of a temporary construction...
s.para.105 Work No. 19C: Creation and use of a temporary access...
s.para.106 Work No. 20: Construction of a BVS at Rock Bank,...
s.para.107 Work No. 20A: The creation and use of a temporary...
s.para.108 Work No. 21: The creation and use of a permanent...
s.para.109 Work No. 22: Construction of an underground Carbon Dioxide (CO2)...
s.para.110 as shown on Sheet 9 of the Works Plans.
s.para.111 Work No. 23: Construction of an underground Carbon Dioxide (CO2)...
s.para.112 as shown on Sheet 9 of the Works Plans.
s.para.113 Work No. 23A: Creation and use of a temporary construction...
s.para.114 Work No. 23B: The creation and use of a temporary...
s.para.115 Work No. 24: Construction of an underground Carbon Dioxide (CO2)...
s.para.116 as shown on Sheet 9 of the Works Plans.
s.para.117 Work No. 24A: Creation and use of a temporary construction...
s.para.118 Work No. 25: Construction of an underground Carbon Dioxide (CO2)...
s.para.119 as shown on Sheets 9, 10 and 11 of the...
s.para.120 Work No. 25A: Creation and use of a permanent access...
s.para.121 Work No. 26: Construction of a BVS at Mollington, at...
s.para.122 Work No. 26A: The creation and use of a temporary...
s.para.123 Work No. 27: The creation and use of a permanent...
s.para.124 Work No. 28: Construction of an underground Carbon Dioxide (CO2)...
s.para.125 as shown on Sheets 10, 11 and 12 of the...
s.para.126 Work No. 28A: Creation and use of a temporary construction...
s.para.127 Work No. 28B: Creation and use of a permanent access...
s.para.128 Work No. 28C: Creation and use of a permanent access...
s.para.130 as shown on Sheet 12 of the Works Plans.
s.para.131 Work No. 29A: The creation and use of a temporary...
s.para.132 Work No. 30: Construction of an underground Carbon Dioxide (CO2)...
s.para.133 as shown on Sheets 12 and 13 of the Works...
s.para.134 Work No. 30A: The creation and use of a temporary...
s.para.135 Work No. 30B: Creation and use of a permanent access...
s.para.136 Work No. 30C: Creation and use of a permanent access...
s.para.137 Work No. 30D: The creation and use of a temporary...
s.para.138 Work No. 30E: Creation and use of a temporary construction...
s.para.139 Work No. 31: Construction of an underground Carbon Dioxide (CO2)...
s.para.140 as shown on Sheets 13 and 14 of the Works...
s.para.141 Work No. 31A: The creation and use of a temporary...
s.para.142 Work No. 31B: Creation and use of a permanent access...
s.para.143 Work No. 31C: The creation and use of a temporary...
s.para.144 Work No. 32: Construction of an underground Carbon Dioxide (CO2)...
s.para.145 as shown on Sheets 14 and 15 of the Works...
s.para.146 Work No. 32A: Creation and use of a temporary construction...
s.para.147 Work No. 33: Construction of an underground Carbon Dioxide (CO2)...
s.para.148 as shown on Sheets 14, 15 and 16 of the...
s.para.149 Work No. 33A: Creation and use of a permanent access...
s.para.150 Work No. 33B: Creation and use of a permanent access...
s.para.151 Work No. 33C: Creation and use of a permanent access...
s.para.152 Work No. 34: Construction of an underground Carbon Dioxide (CO2)...
s.para.153 as shown on Sheet 16 of the Works Plans.
s.para.154 Work No. 34A: Creation and use of a temporary construction...
s.para.155 Work No. 35: Construction of an underground Carbon Dioxide (CO2)...
s.para.156 as shown on Sheets 16 and 17 of the Works...
s.para.157 Work No. 35A: Creation and use of a permanent access...
s.para.158 Work No. 36 – Construction of a BVS at Aston...
s.para.159 Work No. 36A: The creation and use of a temporary...
s.para.160 Work No. 37: The creation and use of a permanent...
s.para.161 Work No. 38: Construction of an underground Carbon Dioxide (CO2)...
s.para.162 as shown on Sheet 17 of the Works Plans.
s.para.163 Work No. 38A: Creation and use of a temporary construction...
s.para.164 Work No. 38B: Creation and use of a permanent construction...
s.para.165 Work No. 39: Construction of an underground Carbon Dioxide (CO2)...
s.para.166 as shown on Sheet 17 of the Works Plans.
s.para.167 Work No. 39A: Creation and use of a temporary construction...
s.para.168 Work No. 39B: The creation and use of a temporary...
s.para.169 Work No. 40: Construction of an underground Carbon Dioxide (CO2)...
s.para.170 as shown on Sheets 17 and 18 of the Works...
s.para.171 Work No. 40A: Creation and use of a temporary construction...
s.para.172 Work No. 40B: The creation and use of a temporary...
s.para.173 Work No. 40C: Creation and use of a permanent access...
s.para.174 Work No. 41: Construction of an underground Carbon Dioxide (CO2)...
s.para.175 as shown on Sheets 17 and 18 of the Works...
s.para.176 Work No. 41A: Number not used
s.para.177 Work No. 41B: Creation and use of a temporary construction...
s.para.178 Work No. 41C: Creation and use of a permanent access...
s.para.179 Work No. 41D: Number not used
s.para.180 Work No. 42: Construction of an underground Carbon Dioxide (CO2)...
s.para.181 as shown on Sheets 18 and 19 of the Works...
s.para.182 Work No. 42A: Creation and use of a permanent access...
s.para.183 Work No. 43: Construction of an underground Carbon Dioxide (CO2)...
s.para.184 as shown on Sheet 19 of the Works Plans.
s.para.185 Work No. 43A: The creation and use of a temporary...
s.para.186 Work No. 43B: Creation and use of a permanent access...
s.para.187 Work No. 43C: Creation and use of a temporary construction...
s.para.188 Work No. 43D: The creation and use of a temporary...
s.para.189 Work No 43E:Construction of a concrete, embedded pipe bridge structure...
s.para.190 Work No. 44: Construction of an underground Carbon Dioxide (CO2)...
s.para.191 as shown on Sheets 19 and 20 of the Works...
s.para.192 Work No. 44A: The creation and use of a permanent...
s.para.193 Work No. 44B: Creation and use of a temporary construction...
s.para.194 Work No. 44C: The creation and use of a temporary...
s.para.195 Work No. 45: Construction of an AGI at Northop Hall,...
s.para.196 Work No 45A: The creation and use of a temporary...
s.para.197 Work No. 45B: The creation and use of a permanent...
s.para.198 Work No. 46: The creation and use of a temporary...
s.para.199 Work No. 47: Construction of an underground Carbon Dioxide (CO2)...
s.para.200 as shown on Sheets 20, 21 and 22 of the...
s.para.201 Work No. 47A: Creation and use of a temporary construction...
s.para.202 Work No. 47B: Creation and use of a temporary construction...
s.para.203 Work No. 48: Construction of an AGI at Flint, within...
s.para.204 Work No. 48A: The creation and use of a temporary...
s.para.205 Work No. 49: The creation and use of a permanent...
s.para.206 Work No. 50: Construction of an underground Carbon Dioxide (CO2)...
s.para.207 as shown on Sheets 22 and 23 of the Works...
s.para.208 Work No. 51: Construction of a BVS at Cornist Lane,...
s.para.209 Work No. 51A: The creation and use of a temporary...
s.para.210 Work No. 51B: The creation and use of a temporary...
s.para.211 Work No. 52: The creation and use of a permanent...
s.para.212 Work No. 53: Construction of a BVS at Pentre Halkyn...
s.para.213 Work No. 53A: The creation and use of a temporary...
s.para.214 Work No. 53B: The creation and use of a temporary...
s.para.215 Work No. 54: The creation and use of a permanent...
s.para.216 Work No. 55: Construction of a BVS at Babell, at...
s.para.217 Work No. 55A: The creation and use of a temporary...
s.para.218 Work No. 55B: The creation and use of a temporary...
s.para.219 Work No. 56: The creation and use of a permanent...
s.para.220 Work No 57: the provision of environmental and ecological mitigation...
s.para.222 Work No. 57B: Creation of environmental mitigation south-west of Stanlow...
s.para.223 Work No. 57C: Creation of environmental mitigation north of the...
s.para.224 Work No. 57D: Creation of environmental mitigation south of the...
s.para.225 Work No. 57E: Creation of environmental mitigation east of River...
s.para.226 Work No. 57F: Creation of environmental mitigation west of River...
s.para.227 Work No. 57G: Creation of environmental mitigation north of the...
s.para.229 Work No. 57I: Creation of environmental mitigation west of Aston...
s.para.230 Work No 57J: Creation of environmental mitigation on land east...
s.para.231 Work No 57K: Creation of environmental mitigation at Alltami Brook...
s.para.232 Work No 57L: Creation of environmental mitigation east of Brookside...
s.para.233 Work No 57M: Creation of environmental mitigation west of Work...
s.para.234 Work No 57N: Creation of environmental mitigation west of Work...
s.para.235 And in connection with Work Nos. 1 to 57N, and...
s.para.49 Work No. 1A: The creation and use of a temporary...
s.para.50 Work No. 2: The creation and use of a permanent...
s.para.51 Work No. 3: The creation and use of a permanent...
s.para.52 Work No. 3A: The creation and use of a temporary...
s.para.53 Work No. 3B: The creation and use of a permanent...
s.para.54 Work No. 4: Construction of an underground Carbon Dioxide (CO2)...
s.para.55 as shown on Sheets 1 and 2 of the Works...
s.para.56 Work No. 5: Construction of an underground Carbon Dioxide (CO2)...
s.para.57 as shown on Sheets 2 and 3 of the Works...
s.para.58 Work No. 5A: Creation and use of a temporary construction...
s.para.59 Work No. 5B: Creation and use of a temporary construction...
s.para.60 Work No 5C: The creation and use of a temporary...
s.para.61 Work No. 6: Construction of an underground Carbon Dioxide (CO2)...
s.para.62 as shown on Sheets 2, 3 and 4 of the...
s.para.63 Work No. 6A: The creation and use of a temporary...
s.para.64 Work No. 6B: The creation and use of a temporary...
s.para.65 Work No. 6C: Creation and use of a temporary construction...
s.para.66 Work No. 6D: Creation and use of a temporary construction...
s.para.67 Work No. 6E: Creation and use of a temporary construction...
s.para.68 Work No. 7: Construction of two underground Carbon Dioxide (CO2)...
s.para.69 as shown on Sheets 3 and 4 of the Works...
s.para.70 Work No. 8: The creation and use of a temporary...
s.para.71 Work No. 9: Construction of an AGI at Stanlow within...
s.para.72 Work No. 9A: The creation and use of a temporary...
s.para.73 Work No. 10: The creation and use of a permanent...
s.para.74 Work No. 11: Construction of an underground Carbon Dioxide (CO2)...
s.para.75 as shown on Sheets 3, 4 and 5 of the...
s.para.76 Work No. 12: Construction of an underground Carbon Dioxide (CO2)...
s.para.77 as shown on Sheets 4 and 5 of the Works...
s.para.78 Work No. 12A: Creation and use of a permanent access...
s.para.79 Work No. 13: Construction of an underground Carbon Dioxide (CO2)...
s.para.80 as shown on Sheets 5 and 6 of the Works...
s.para.81 Work No. 13A: The creation and use of a temporary...
s.para.82 Work No. 14: Construction of an underground Carbon Dioxide (CO2)...
s.para.83 as shown on Sheets 5 and 6 of the Works...
s.para.84 Work No. 14A: Creation and use of permanent access from...
s.para.85 Work No. 15: Construction of an underground Carbon Dioxide (CO2)...
s.para.86 as shown on Sheets 6 and 7 of the Works...
s.para.87 Work No. 15A: The creation and use of a temporary...
s.para.88 Work No. 15B: Creation and use of a temporary construction...
s.para.89 Work No. 15C: Creation and use of a permanent access...
s.para.90 Work No. 16: Construction of an underground Carbon Dioxide (CO2)...
s.para.91 as shown on Sheet 7 of the Works Plans.
s.para.92 Work No. 16A: Creation and use of a permanent access...
s.para.93 Work No. 16B: Creation and use of a temporary construction...
s.para.94 Work No. 17: Construction of an underground Carbon Dioxide (CO2)...
s.para.95 as shown on sheets 7 and 8 of the Works...
s.para.96 Work No. 17A: Creation and use of a permanent access...
s.para.97 Work No. 17B: Creation and use of a permanent access...
s.para.98 Work No. 18: Construction of an underground Carbon Dioxide (CO2)...
s.para.99 as shown on Sheet 8 of the Works Plans.
Schedules

Schedules

4 of 364 shown
s.sch010 (1) Subject to sub-paragraphs (2) to (4), if as a... Regulated
  • Pay costs and compensation for damage to telecoms apparatus or service interruptionStatutory Undertaker
s.sch010 The parties shall hold the CTS Meetings fortnightly during detailed... Regulated
  • Hold fortnightly CTS meetings and cooperate on traffic coordination scheduleContractor
s.sch010 Railway Regulated
  • Comply with railway safety standards, use trenchless crossings, allow inspection, and cooperate with Encirc on train schedulesStatutory Undertaker
s.sch010 General Regulated
  • Refer disputes under this Part to arbitration unless otherwise agreedStatutory Undertaker
360 other schedules
s.sch002 Interpretation
s.sch002 Contaminated land and groundwater: Part A - Stanlow
s.sch002 Archaeology
s.sch002 Landscape and ecological management plan
s.sch002 Ecological surveys
s.sch002 Biodiversity Net Gain
s.sch002 Construction hours
s.sch002 Operational noise
s.sch002 Provision of ‘as built’ details
s.sch002 Restoration of land
s.sch002 Operational and maintenance environmental management plan
s.sch002 Time limits
s.sch002 Decommissioning environmental management plan
s.sch002 Written approval
s.sch002 Amendments to approved details
s.sch002 Anticipatory steps towards compliance with any requirement
s.sch002 (1) Where an application has been made to a discharging...
s.sch002 Multiple discharging authorities
s.sch002 Further information
s.sch002 Fees
s.sch002 Appeals
s.sch002 Outcome of appeals
s.sch002 Stages of authorised development
s.sch002 Interpretation
s.sch002 (1) The description of each stage in the written scheme...
s.sch002 Scheme design
s.sch002 Construction environmental management plan
s.sch002 Construction traffic
s.sch002 Highway accesses
s.sch002 Surface water drainage
s.sch009 Compensation enactments
s.sch009 (1) Without limitation on the scope of paragraph 1, the...
s.sch009 (1) Without limitation on the scope of paragraph (1), the...
s.sch009 Application of Part 1 of the 1965 Act
s.sch009 (1) The modifications referred to in sub-paragraph (1) are as...
s.sch010 The provisions of this Part have effect unless otherwise agreed...
s.sch010 Miscellaneous
s.sch010 On Street Apparatus
s.sch010 Acquisition of land
s.sch010 Removal of apparatus
s.sch010 Facilities and rights for alternative apparatus
s.sch010 Retained apparatus: Protection of SP Manweb as Electricity Undertaker
s.sch010 Expenses
s.sch010 Indemnity
s.sch010 Enactments and agreements
s.sch010 Co-operation
s.sch010 Access
s.sch010 The provisions of this Part have effect unless otherwise agreed...
s.sch010 Arbitration
s.sch010 Notices
s.sch010 The provisions of this Part have effect unless otherwise agreed...
s.sch010 In this Part— “construction” includes execution, placing, alteration and reconstruction...
s.sch010 Rights of access
s.sch010 Expenses
s.sch010 The undertaker must pay to CF Fertilisers all reasonable and...
s.sch010 (1) Notwithstanding anything to the contrary in this Part of...
s.sch010 For the protection of Wales and West Utilities as referred...
s.sch010 In this Part— “alternative apparatus” means alternative apparatus adequate to...
s.sch010 In this Part— “the 2003 Act” means the Communications Act...
s.sch010 Apparatus in streets
s.sch010 Regardless of the temporary prohibition or restriction of use of...
s.sch010 Acquisition of land
s.sch010 Removal of apparatus
s.sch010 Facilities and rights for alternative apparatus
s.sch010 Retained apparatus
s.sch010 Expenses and costs
s.sch010 (1) Subject to sub-paragraph (2), if by reason or in...
s.sch010 Enactments and agreements
s.sch010 The provisions of this Part have effect unless otherwise agreed...
s.sch010 The exercise of the powers conferred by article 36 (statutory...
s.sch010 In this Part— “alternative apparatus” means alternative apparatus adequate to...
s.sch010 On street apparatus
s.sch010 Acquisition of land
s.sch010 Removal of apparatus
s.sch010 Facilities and rights for alternative apparatus
s.sch010 Retained apparatus
s.sch010 Expenses and costs
s.sch010 (1) Subject to sub-paragraph (2), if by reason or in...
s.sch010 Miscellaneous
s.sch010 Application
s.sch010 Interpretation
s.sch010 Apparatus of UU Water stopped up in street
s.sch010 Discharge of Water, foul and surface water
s.sch010 Protective works to buildings
s.sch010 Removal of apparatus
s.sch010 Facilities and rights for alternative apparatus
s.sch010 Retained apparatus: protection of UU Water
s.sch010 Expenses
s.sch010 Indemnity
s.sch010 Enactments and agreements
s.sch010 Application
s.sch010 Co-operation
s.sch010 Access
s.sch010 Arbitration
s.sch010 Notices
s.sch010 For the protection of United Kingdom Oil Pipelines Limited
s.sch010 Application
s.sch010 Interpretation
s.sch010 On Street Apparatus
s.sch010 Acquisition or possession of land
s.sch010 Removal of apparatus
s.sch010 Interpretation
s.sch010 UKOP replacement facilities and rights
s.sch010 Retained apparatus
s.sch010 Expenses and costs
s.sch010 Miscellaneous
s.sch010 Co-operation
s.sch010 Access
s.sch010 Arbitration
s.sch010 Notices
s.sch010 Deviation of authorised development
s.sch010 The provisions of this Part of this Schedule have effect,...
s.sch010 On Street Apparatus
s.sch010 In this Part of this Schedule— “alternative access road(s)” means...
s.sch010 (1) Where Peel is asked to give its consent pursuant...
s.sch010 (1) The undertaker must before commencing construction of any specified...
s.sch010 (1) Any specified work must, when commenced, be constructed—
s.sch010 (1) The undertaker must pay to Peel all reasonable and...
s.sch010 (1) The undertaker must consult with Peel prior to submitting...
s.sch010 The undertaker will procure that in carrying out Work No....
s.sch010 The provisions of this Part have effect unless otherwise agreed...
s.sch010 In this Part— “Ash Road bridge” means the rail bridge...
s.sch010 Rights of access
s.sch010 Apparatus of statutory undertakers in temporarily restricted streets
s.sch010 Rights of access – Grinsome Road to the Protos Site
s.sch010 The undertaker shall use all reasonable but commercially prudent endeavours...
s.sch010 Rights of access – Ash Road (South)
s.sch010 Rights of Access – Abnormal Loads
s.sch010 Construction Traffic Management Plan
s.sch010 Co-operation
s.sch010 The undertaker and Encirc must use all reasonable but commercially...
s.sch010 The undertaker shall ensure that the pipeline is buried to...
s.sch010 Protective works to buildings
s.sch010 Specified work
s.sch010 Any specified work must, when commenced, be constructed-
s.sch010 Expenses
s.sch010 Notices
s.sch010 Application
s.sch010 Interpretation
s.sch010 Approvals
s.sch010 (1) Prior to the commencement of the works the undertaker...
s.sch010 No crossing is to take place until a monitoring regime...
s.sch010 In this Part— “alternative apparatus” means alternative apparatus adequate to...
s.sch010 Acquisition of land
s.sch010 Technical Approval from WM in accordance with DMRB CG300 is...
s.sch010 Approval under this Part may be sought in one or...
s.sch010 Any approval of the WM under this Part may be...
s.sch010 The undertaker must contact any owners or operators of apparatus...
s.sch010 The undertaker must pay a fee of £250 to the...
s.sch010 Indemnity
s.sch010 The undertaker (or any person carrying out works on its...
s.sch010 Traffic management
s.sch010 The undertaker must execute the works in strict accordance with...
s.sch010 Inspections
s.sch010 Removal of apparatus
s.sch010 Exercise of the right to inspect under paragraph 209 must...
s.sch010 (1) The undertaker must compensate the WM in respect of...
s.sch010 Reinstatement
s.sch010 (1) Where, in the reasonable opinion of the WM, any...
s.sch010 Any and all reasonable costs associated with the reinstatement work...
s.sch010 Notice of completion of Works
s.sch010 The undertaker must supply the WM with as built records...
s.sch010 The undertaker must submit a Geotechnical Feedback Report (GFR as...
s.sch010 After the apparatus has been placed, the undertaker must not...
s.sch010 Arbitration
s.sch010 Facilities and rights for alternative apparatus
s.sch010 Notices
s.sch010 Maintenance
s.sch010 Application etc.,
s.sch010 Interpretation
s.sch010 General
s.sch010 Notwithstanding the limits of deviation permitted pursuant to article 6...
s.sch010 References to any standards, manuals, contracts, regulations and directives including...
s.sch010 Prior approvals and security
s.sch010 Construction of the specified works
s.sch010 Payments
s.sch010 Retained apparatus: protection of electricity undertaker
s.sch010 Condition survey and as built details
s.sch010 Insurance
s.sch010 Indemnity
s.sch010 Maintenance of the specified works
s.sch010 Land
s.sch010 Expert Determination
s.sch010 The provisions of this Part of this Schedule have effect...
s.sch010 In this Part of this Schedule— “Consents” means approvals, consents,...
s.sch010 Highway condition and highway assets surveys
s.sch010 HGV route remediation
s.sch010 Expenses
s.sch010 Specified work
s.sch010 (1) Where, under this Order, any street works require to...
s.sch010 The provisions of this Part of this Schedule apply for...
s.sch010 In this Part of this Schedule— “construction” includes execution, placing,...
s.sch010 (1) Before beginning to construct any specified work, the undertaker...
s.sch010 The requirements or conditions which the drainage authority may make...
s.sch010 (1) Any specified work in relation to an ordinary watercourse,...
s.sch010 (1) From the commencement of the construction of any specified...
s.sch010 Subject to paragraph 247(5)(b), if by reason of the construction...
s.sch010 (1) The undertaker must make reasonable compensation to the drainage...
s.sch010 Indemnity
s.sch010 Any dispute arising between the undertaker and the drainage authority...
s.sch010 Application
s.sch010 Interpretation
s.sch010 Acquisition of Apparatus
s.sch010 Prior to the carrying out of any Restricted Works or...
s.sch010 Where the undertaker acquires land which is subject to any...
s.sch010 Where the undertaker takes temporary possession of any land or...
s.sch010 Removal of Apparatus and Rights for Alternative Apparatus
s.sch010 The parties must use all reasonable endeavours to produce a...
s.sch010 The undertaker must afford to Exolum the necessary facilities and...
s.sch010 Enactments and agreements
s.sch010 Any Alternative Apparatus is to be constructed in land owned...
s.sch010 After the details for the works for Alternative Apparatus to...
s.sch010 The following paragraphs 263 and 264 only apply if:
s.sch010 In the circumstances set out in paragraph 262, if the...
s.sch010 Nothing in paragraph 263 authorises the undertaker to execute the...
s.sch010 Facilities and Rights for Alternative Apparatus
s.sch010 Alternative Rights must be granted before any Alternative Apparatus is...
s.sch010 The parties agree that the Alternative Rights be granted by...
s.sch010 Nothing in this Schedule or contained in the Alternative Rights...
s.sch010 If the facilities and rights to be afforded by the...
s.sch010 Co-operation
s.sch010 Retained Apparatus and Alternative Apparatus: protection
s.sch010 No Restricted Works are to be commenced until the Plan...
s.sch010 Any approval by Exolum of the Plan of works submitted...
s.sch010 Exolum will be entitled to watch and inspect the execution...
s.sch010 Where reasonably required by either party, in view of the...
s.sch010 If in consequence of the works notified to Exolum by...
s.sch010 Nothing in paragraphs 270 to 275 precludes the undertaker from...
s.sch010 Where Exolum reasonably requires Protective Works, the parties must use...
s.sch010 The undertaker must afford to Exolum the necessary facilities and...
s.sch010 Any Protective Works are to be constructed in land owned...
s.sch010 Access
s.sch010 After the details for the Protective Works to be provided...
s.sch010 Where the undertaker needs to carry out emergency works—
s.sch010 In this Part of this Schedule, “emergency works” means works...
s.sch010 Cathodic protection testing
s.sch010 The Parties must carry out the works and enter into...
s.sch010 Expenses
s.sch010 Provided that Exolum takes all reasonable steps to minimise the...
s.sch010 The scrap value (if any) of any Apparatus removed under...
s.sch010 Upon the submission of proper and reasonable estimates of costs...
s.sch010 Damage to property and other losses
s.sch010 Arbitration
s.sch010 The fact that any act or thing may have been...
s.sch010 The undertaker and Exolum must at all times take reasonable...
s.sch010 The undertaker warrants that— (a) the information it or any...
s.sch010 Exolum must give to the undertaker reasonable notice of any...
s.sch010 Insurance
s.sch010 The undertaker must maintain such insurance for the construction period...
s.sch010 Co-operation and reasonableness
s.sch010 Exolum must use all reasonable endeavours to co-operate with the...
s.sch010 The undertaker and Exolum must act reasonably in respect of...
s.sch010 Emergency circumstances
s.sch010 On street apparatus
s.sch010 Notices
s.sch010 In the following circumstances, Exolum may on written notice to...
s.sch010 The parties agree to act in good faith and in...
s.sch010 Exolum is not liable for any costs, expenses, losses or...
s.sch010 Escalation of differences
s.sch010 The undertaker and Exolum will each nominate a representative who...
s.sch010 If the meeting between senior executives fails to result in...
s.sch010 Dispute resolution
s.sch010 The parties will agree on the appointment of an independent...
s.sch010 If the parties are unable to agree on an Expert...
s.sch010 The Expert is required to prepare a written decision including...
s.sch010 Application
s.sch010 If the Expert dies or becomes unwilling or incapable of...
s.sch010 The parties are entitled to make submissions to the Expert...
s.sch010 The Expert will act as an expert and not as...
s.sch010 The Expert may direct that any legal costs and expenses...
s.sch010 The dispute resolution procedure set out in this Schedule will...
s.sch010 Miscellaneous
s.sch010 No failure or delay by a party to exercise any...
s.sch010 (1) The following provisions apply for the protection of the...
s.sch010 (1) Subject to sub-paragraph (4) the undertaker must, for the...
s.sch010 Interpretation
s.sch010 On Street Apparatus
s.sch010 Apparatus of statutory undertakers in temporarily restricted streets
s.sch010 Protective works to buildings
s.sch010 Acquisition of land
s.sch010 Removal of apparatus
s.sch010 Facilities and rights for alternative apparatus
s.sch010 Retained apparatus: protection of gas undertaker
s.sch010 Acquisition of land
s.sch010 Expenses
s.sch010 Indemnity
s.sch010 Enactments and agreements
s.sch010 Co-operation
s.sch010 Access
s.sch010 Arbitration
s.sch010 Notices
s.sch010 Application
s.sch010 Interpretation
s.sch010 On Street apparatus
s.sch010 Removal of apparatus
s.sch010 Apparatus of Cadent in stopped up streets
s.sch010 Protective works to buildings
s.sch010 Acquisition of land
s.sch010 Removal of apparatus
s.sch010 Facilities and rights for alternative apparatus
s.sch010 Retained apparatus: protection of Cadent
s.sch010 Expenses
s.sch010 Enactments and agreements
s.sch010 Co-operation
s.sch010 Access
s.sch010 Facilities and rights for alternative apparatus
s.sch010 Arbitration
s.sch010 Notices
s.sch010 The following provisions of this Part of this Schedule have...
s.sch010 In this Part of this Schedule— “asset protection agreement” means...
s.sch010 (1) Where under this Part of this Schedule Network Rail...
s.sch010 (1) The undertaker must not exercise the powers conferred by—...
s.sch010 (1) The undertaker must before commencing construction of any specified...
s.sch010 (1) Any protective works to be constructed by virtue of...
s.sch010 The undertaker must- (a) at all times afford reasonable facilities...
s.sch010 Network Rail must at all times afford reasonable facilities to...
s.sch010 Retained apparatus
s.sch010 (1) If any permanent or temporary alterations or additions to...
s.sch010 The undertaker must repay to Network Rail all reasonable fees,...
s.sch010 If at any time after the completion of a specified...
s.sch010 The undertaker must not provide any illumination or illuminated sign...
s.sch010 Any additional expenses which Network Rail may reasonably incur in...
s.sch010 (1) The undertaker must pay to Network Rail all reasonable...
s.sch010 Network Rail must, on receipt of a request from the...
s.sch010 In the assessment of any sums payable to Network Rail...
s.sch010 The undertaker and Network Rail may, subject in the case...
s.sch010 Nothing in this Order, or in any enactment incorporated with...
s.sch010 Expenses and costs
s.sch010 The undertaker must give written notice to Network Rail if...
s.sch010 The undertaker must no later than 28 days from the...
s.sch010 Interpretation
s.sch010 Powers requiring the Canal & River Trust’s consent
s.sch010 Fencing
s.sch010 Survey of waterway
s.sch010 Approval of plans, protective works etc.
s.sch010 Design of works
s.sch010 Notice of works
s.sch010 Construction of specified works
s.sch010 (1) Subject to sub-paragraph (2), if by reason or in...
s.sch010 Prevention of pollution
s.sch010 Access to work – provision of information
s.sch010 Alterations to the waterway
s.sch010 Maintenance of works
s.sch010 Repayment of the Canal & River Trust’s fees, etc.
s.sch010 Making good of detriment; compensation and indemnity, etc.
s.sch010 Arbitration
s.sch010 Capitalised sums
s.sch010 Application
s.sch010 Interpretation
s.sch012 Primary objective
s.sch012 Time periods
s.sch012 Timetable
s.sch012 Procedure
s.sch012 Arbitrator’s powers
s.sch012 Costs
s.sch012 Confidentiality
s.schedule/1/part/1/paragraph/1n1 In the Borough of Cheshire West and Chester
s.schedule/1/part/1/paragraph/1n2 In the County of Flintshire
s.schedule/1/part/1/paragraph/1n3 In the Borough of Cheshire West and Chester
s.schedule/1/part/1/paragraph/1n4 In the County of Flintshire

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.