UK Statutory Instrument 2024 United Kingdom

The HyNet Carbon Dioxide Pipeline Order 2024

At a glance

What's here

4 compliance obligations

Who this Act binds

Business-side actors with duties under this Act, ranked by how often they appear.

  • Statutory Undertaker 3
  • Contractor 1

Other Acts binding the same actors

For each actor bound by this Act, the other UK Acts that bind them most often. Useful for understanding the full compliance landscape facing each role.

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

s.sch010

(1) Subject to sub-paragraphs (2) to (4), if as a...

  • Pay costs and compensation for damage to telecoms apparatus or service interruption Statutory Undertaker
s.sch010

The parties shall hold the CTS Meetings fortnightly during detailed...

  • Hold fortnightly CTS meetings and cooperate on traffic coordination schedule Contractor
s.sch010

Railway

  • Comply with railway safety standards, use trenchless crossings, allow inspection, and cooperate with Encirc on train schedules Statutory Undertaker
s.sch010

General

  • Refer disputes under this Part to arbitration unless otherwise agreed Statutory Undertaker
Browse 360 other Schedules — structural / supplementary
s.sch002

Interpretation

s.sch002

Contaminated land and groundwater: Part A - Stanlow

s.sch002

Archaeology

s.sch002

Landscape and ecological management plan

s.sch002

Ecological surveys

s.sch002

Biodiversity Net Gain

s.sch002

Construction hours

s.sch002

Operational noise

s.sch002

Provision of ‘as built’ details

s.sch002

Restoration of land

s.sch002

Operational and maintenance environmental management plan

s.sch002

Time limits

s.sch002

Decommissioning environmental management plan

s.sch002

Written approval

s.sch002

Amendments to approved details

s.sch002

Anticipatory steps towards compliance with any requirement

s.sch002

(1) Where an application has been made to a discharging...

s.sch002

Multiple discharging authorities

s.sch002

Further information

s.sch002

Fees

s.sch002

Appeals

s.sch002

Outcome of appeals

s.sch002

Stages of authorised development

s.sch002

Interpretation

s.sch002

(1) The description of each stage in the written scheme...

s.sch002

Scheme design

s.sch002

Construction environmental management plan

s.sch002

Construction traffic

s.sch002

Highway accesses

s.sch002

Surface water drainage

s.sch009

Compensation enactments

s.sch009

(1) Without limitation on the scope of paragraph 1, the...

s.sch009

(1) Without limitation on the scope of paragraph (1), the...

s.sch009

Application of Part 1 of the 1965 Act

s.sch009

(1) The modifications referred to in sub-paragraph (1) are as...

s.sch010

The provisions of this Part have effect unless otherwise agreed...

s.sch010

Miscellaneous

s.sch010

On Street Apparatus

s.sch010

Acquisition of land

s.sch010

Removal of apparatus

s.sch010

Facilities and rights for alternative apparatus

s.sch010

Retained apparatus: Protection of SP Manweb as Electricity Undertaker

s.sch010

Expenses

s.sch010

Indemnity

s.sch010

Enactments and agreements

s.sch010

Co-operation

s.sch010

Access

s.sch010

The provisions of this Part have effect unless otherwise agreed...

s.sch010

Arbitration

s.sch010

Notices

s.sch010

The provisions of this Part have effect unless otherwise agreed...

s.sch010

In this Part— “construction” includes execution, placing, alteration and reconstruction...

s.sch010

Rights of access

s.sch010

Expenses

s.sch010

The undertaker must pay to CF Fertilisers all reasonable and...

s.sch010

(1) Notwithstanding anything to the contrary in this Part of...

s.sch010

For the protection of Wales and West Utilities as referred...

s.sch010

In this Part— “alternative apparatus” means alternative apparatus adequate to...

s.sch010

In this Part— “the 2003 Act” means the Communications Act...

s.sch010

Apparatus in streets

s.sch010

Regardless of the temporary prohibition or restriction of use of...

s.sch010

Acquisition of land

s.sch010

Removal of apparatus

s.sch010

Facilities and rights for alternative apparatus

s.sch010

Retained apparatus

s.sch010

Expenses and costs

s.sch010

(1) Subject to sub-paragraph (2), if by reason or in...

s.sch010

Enactments and agreements

s.sch010

The provisions of this Part have effect unless otherwise agreed...

s.sch010

The exercise of the powers conferred by article 36 (statutory...

s.sch010

In this Part— “alternative apparatus” means alternative apparatus adequate to...

s.sch010

On street apparatus

s.sch010

Acquisition of land

s.sch010

Removal of apparatus

s.sch010

Facilities and rights for alternative apparatus

s.sch010

Retained apparatus

s.sch010

Expenses and costs

s.sch010

(1) Subject to sub-paragraph (2), if by reason or in...

s.sch010

Miscellaneous

s.sch010

Application

s.sch010

Interpretation

s.sch010

Apparatus of UU Water stopped up in street

s.sch010

Discharge of Water, foul and surface water

s.sch010

Protective works to buildings

s.sch010

Removal of apparatus

s.sch010

Facilities and rights for alternative apparatus

s.sch010

Retained apparatus: protection of UU Water

s.sch010

Expenses

s.sch010

Indemnity

s.sch010

Enactments and agreements

s.sch010

Application

s.sch010

Co-operation

s.sch010

Access

s.sch010

Arbitration

s.sch010

Notices

s.sch010

For the protection of United Kingdom Oil Pipelines Limited

s.sch010

Application

s.sch010

Interpretation

s.sch010

On Street Apparatus

s.sch010

Acquisition or possession of land

s.sch010

Removal of apparatus

s.sch010

Interpretation

s.sch010

UKOP replacement facilities and rights

s.sch010

Retained apparatus

s.sch010

Expenses and costs

s.sch010

Miscellaneous

s.sch010

Co-operation

s.sch010

Access

s.sch010

Arbitration

s.sch010

Notices

s.sch010

Deviation of authorised development

s.sch010

The provisions of this Part of this Schedule have effect,...

s.sch010

On Street Apparatus

s.sch010

In this Part of this Schedule— “alternative access road(s)” means...

s.sch010

(1) Where Peel is asked to give its consent pursuant...

s.sch010

(1) The undertaker must before commencing construction of any specified...

s.sch010

(1) Any specified work must, when commenced, be constructed—

s.sch010

(1) The undertaker must pay to Peel all reasonable and...

s.sch010

(1) The undertaker must consult with Peel prior to submitting...

s.sch010

The undertaker will procure that in carrying out Work No....

s.sch010

The provisions of this Part have effect unless otherwise agreed...

s.sch010

In this Part— “Ash Road bridge” means the rail bridge...

s.sch010

Rights of access

s.sch010

Apparatus of statutory undertakers in temporarily restricted streets

s.sch010

Rights of access – Grinsome Road to the Protos Site

s.sch010

The undertaker shall use all reasonable but commercially prudent endeavours...

s.sch010

Rights of access – Ash Road (South)

s.sch010

Rights of Access – Abnormal Loads

s.sch010

Construction Traffic Management Plan

s.sch010

Co-operation

s.sch010

The undertaker and Encirc must use all reasonable but commercially...

s.sch010

The undertaker shall ensure that the pipeline is buried to...

s.sch010

Protective works to buildings

s.sch010

Specified work

s.sch010

Any specified work must, when commenced, be constructed-

s.sch010

Expenses

s.sch010

Notices

s.sch010

Application

s.sch010

Interpretation

s.sch010

Approvals

s.sch010

(1) Prior to the commencement of the works the undertaker...

s.sch010

No crossing is to take place until a monitoring regime...

s.sch010

In this Part— “alternative apparatus” means alternative apparatus adequate to...

s.sch010

Acquisition of land

s.sch010

Technical Approval from WM in accordance with DMRB CG300 is...

s.sch010

Approval under this Part may be sought in one or...

s.sch010

Any approval of the WM under this Part may be...

s.sch010

The undertaker must contact any owners or operators of apparatus...

s.sch010

The undertaker must pay a fee of £250 to the...

s.sch010

Indemnity

s.sch010

The undertaker (or any person carrying out works on its...

s.sch010

Traffic management

s.sch010

The undertaker must execute the works in strict accordance with...

s.sch010

Inspections

s.sch010

Removal of apparatus

s.sch010

Exercise of the right to inspect under paragraph 209 must...

s.sch010

(1) The undertaker must compensate the WM in respect of...

s.sch010

Reinstatement

s.sch010

(1) Where, in the reasonable opinion of the WM, any...

s.sch010

Any and all reasonable costs associated with the reinstatement work...

s.sch010

Notice of completion of Works

s.sch010

The undertaker must supply the WM with as built records...

s.sch010

The undertaker must submit a Geotechnical Feedback Report (GFR as...

s.sch010

After the apparatus has been placed, the undertaker must not...

s.sch010

Arbitration

s.sch010

Facilities and rights for alternative apparatus

s.sch010

Notices

s.sch010

Maintenance

s.sch010

Application etc.,

s.sch010

Interpretation

s.sch010

General

s.sch010

Notwithstanding the limits of deviation permitted pursuant to article 6...

s.sch010

References to any standards, manuals, contracts, regulations and directives including...

s.sch010

Prior approvals and security

s.sch010

Construction of the specified works

s.sch010

Payments

s.sch010

Retained apparatus: protection of electricity undertaker

s.sch010

Condition survey and as built details

s.sch010

Insurance

s.sch010

Indemnity

s.sch010

Maintenance of the specified works

s.sch010

Land

s.sch010

Expert Determination

s.sch010

The provisions of this Part of this Schedule have effect...

s.sch010

In this Part of this Schedule— “Consents” means approvals, consents,...

s.sch010

Highway condition and highway assets surveys

s.sch010

HGV route remediation

s.sch010

Expenses

s.sch010

Specified work

s.sch010

(1) Where, under this Order, any street works require to...

s.sch010

The provisions of this Part of this Schedule apply for...

s.sch010

In this Part of this Schedule— “construction” includes execution, placing,...

s.sch010

(1) Before beginning to construct any specified work, the undertaker...

s.sch010

The requirements or conditions which the drainage authority may make...

s.sch010

(1) Any specified work in relation to an ordinary watercourse,...

s.sch010

(1) From the commencement of the construction of any specified...

s.sch010

Subject to paragraph 247(5)(b), if by reason of the construction...

s.sch010

(1) The undertaker must make reasonable compensation to the drainage...

s.sch010

Indemnity

s.sch010

Any dispute arising between the undertaker and the drainage authority...

s.sch010

Application

s.sch010

Interpretation

s.sch010

Acquisition of Apparatus

s.sch010

Prior to the carrying out of any Restricted Works or...

s.sch010

Where the undertaker acquires land which is subject to any...

s.sch010

Where the undertaker takes temporary possession of any land or...

s.sch010

Removal of Apparatus and Rights for Alternative Apparatus

s.sch010

The parties must use all reasonable endeavours to produce a...

s.sch010

The undertaker must afford to Exolum the necessary facilities and...

s.sch010

Enactments and agreements

s.sch010

Any Alternative Apparatus is to be constructed in land owned...

s.sch010

After the details for the works for Alternative Apparatus to...

s.sch010

The following paragraphs 263 and 264 only apply if:

s.sch010

In the circumstances set out in paragraph 262, if the...

s.sch010

Nothing in paragraph 263 authorises the undertaker to execute the...

s.sch010

Facilities and Rights for Alternative Apparatus

s.sch010

Alternative Rights must be granted before any Alternative Apparatus is...

s.sch010

The parties agree that the Alternative Rights be granted by...

s.sch010

Nothing in this Schedule or contained in the Alternative Rights...

s.sch010

If the facilities and rights to be afforded by the...

s.sch010

Co-operation

s.sch010

Retained Apparatus and Alternative Apparatus: protection

s.sch010

No Restricted Works are to be commenced until the Plan...

s.sch010

Any approval by Exolum of the Plan of works submitted...

s.sch010

Exolum will be entitled to watch and inspect the execution...

s.sch010

Where reasonably required by either party, in view of the...

s.sch010

If in consequence of the works notified to Exolum by...

s.sch010

Nothing in paragraphs 270 to 275 precludes the undertaker from...

s.sch010

Where Exolum reasonably requires Protective Works, the parties must use...

s.sch010

The undertaker must afford to Exolum the necessary facilities and...

s.sch010

Any Protective Works are to be constructed in land owned...

s.sch010

Access

s.sch010

After the details for the Protective Works to be provided...

s.sch010

Where the undertaker needs to carry out emergency works—

s.sch010

In this Part of this Schedule, “emergency works” means works...

s.sch010

Cathodic protection testing

s.sch010

The Parties must carry out the works and enter into...

s.sch010

Expenses

s.sch010

Provided that Exolum takes all reasonable steps to minimise the...

s.sch010

The scrap value (if any) of any Apparatus removed under...

s.sch010

Upon the submission of proper and reasonable estimates of costs...

s.sch010

Damage to property and other losses

s.sch010

Arbitration

s.sch010

The fact that any act or thing may have been...

s.sch010

The undertaker and Exolum must at all times take reasonable...

s.sch010

The undertaker warrants that— (a) the information it or any...

s.sch010

Exolum must give to the undertaker reasonable notice of any...

s.sch010

Insurance

s.sch010

The undertaker must maintain such insurance for the construction period...

s.sch010

Co-operation and reasonableness

s.sch010

Exolum must use all reasonable endeavours to co-operate with the...

s.sch010

The undertaker and Exolum must act reasonably in respect of...

s.sch010

Emergency circumstances

s.sch010

On street apparatus

s.sch010

Notices

s.sch010

In the following circumstances, Exolum may on written notice to...

s.sch010

The parties agree to act in good faith and in...

s.sch010

Exolum is not liable for any costs, expenses, losses or...

s.sch010

Escalation of differences

s.sch010

The undertaker and Exolum will each nominate a representative who...

s.sch010

If the meeting between senior executives fails to result in...

s.sch010

Dispute resolution

s.sch010

The parties will agree on the appointment of an independent...

s.sch010

If the parties are unable to agree on an Expert...

s.sch010

The Expert is required to prepare a written decision including...

s.sch010

Application

s.sch010

If the Expert dies or becomes unwilling or incapable of...

s.sch010

The parties are entitled to make submissions to the Expert...

s.sch010

The Expert will act as an expert and not as...

s.sch010

The Expert may direct that any legal costs and expenses...

s.sch010

The dispute resolution procedure set out in this Schedule will...

s.sch010

Miscellaneous

s.sch010

No failure or delay by a party to exercise any...

s.sch010

(1) The following provisions apply for the protection of the...

s.sch010

(1) Subject to sub-paragraph (4) the undertaker must, for the...

s.sch010

Interpretation

s.sch010

On Street Apparatus

s.sch010

Apparatus of statutory undertakers in temporarily restricted streets

s.sch010

Protective works to buildings

s.sch010

Acquisition of land

s.sch010

Removal of apparatus

s.sch010

Facilities and rights for alternative apparatus

s.sch010

Retained apparatus: protection of gas undertaker

s.sch010

Acquisition of land

s.sch010

Expenses

s.sch010

Indemnity

s.sch010

Enactments and agreements

s.sch010

Co-operation

s.sch010

Access

s.sch010

Arbitration

s.sch010

Notices

s.sch010

Application

s.sch010

Interpretation

s.sch010

On Street apparatus

s.sch010

Removal of apparatus

s.sch010

Apparatus of Cadent in stopped up streets

s.sch010

Protective works to buildings

s.sch010

Acquisition of land

s.sch010

Removal of apparatus

s.sch010

Facilities and rights for alternative apparatus

s.sch010

Retained apparatus: protection of Cadent

s.sch010

Expenses

s.sch010

Enactments and agreements

s.sch010

Co-operation

s.sch010

Access

s.sch010

Facilities and rights for alternative apparatus

s.sch010

Arbitration

s.sch010

Notices

s.sch010

The following provisions of this Part of this Schedule have...

s.sch010

In this Part of this Schedule— “asset protection agreement” means...

s.sch010

(1) Where under this Part of this Schedule Network Rail...

s.sch010

(1) The undertaker must not exercise the powers conferred by—...

s.sch010

(1) The undertaker must before commencing construction of any specified...

s.sch010

(1) Any protective works to be constructed by virtue of...

s.sch010

The undertaker must- (a) at all times afford reasonable facilities...

s.sch010

Network Rail must at all times afford reasonable facilities to...

s.sch010

Retained apparatus

s.sch010

(1) If any permanent or temporary alterations or additions to...

s.sch010

The undertaker must repay to Network Rail all reasonable fees,...

s.sch010

If at any time after the completion of a specified...

s.sch010

The undertaker must not provide any illumination or illuminated sign...

s.sch010

Any additional expenses which Network Rail may reasonably incur in...

s.sch010

(1) The undertaker must pay to Network Rail all reasonable...

s.sch010

Network Rail must, on receipt of a request from the...

s.sch010

In the assessment of any sums payable to Network Rail...

s.sch010

The undertaker and Network Rail may, subject in the case...

s.sch010

Nothing in this Order, or in any enactment incorporated with...

s.sch010

Expenses and costs

s.sch010

The undertaker must give written notice to Network Rail if...

s.sch010

The undertaker must no later than 28 days from the...

s.sch010

Interpretation

s.sch010

Powers requiring the Canal & River Trust’s consent

s.sch010

Fencing

s.sch010

Survey of waterway

s.sch010

Approval of plans, protective works etc.

s.sch010

Design of works

s.sch010

Notice of works

s.sch010

Construction of specified works

s.sch010

(1) Subject to sub-paragraph (2), if by reason or in...

s.sch010

Prevention of pollution

s.sch010

Access to work – provision of information

s.sch010

Alterations to the waterway

s.sch010

Maintenance of works

s.sch010

Repayment of the Canal & River Trust’s fees, etc.

s.sch010

Making good of detriment; compensation and indemnity, etc.

s.sch010

Arbitration

s.sch010

Capitalised sums

s.sch010

Application

s.sch010

Interpretation

s.sch012

Primary objective

s.sch012

Time periods

s.sch012

Timetable

s.sch012

Procedure

s.sch012

Arbitrator’s powers

s.sch012

Costs

s.sch012

Confidentiality

s.schedule/1/part/1/paragraph/1n1

In the Borough of Cheshire West and Chester

s.schedule/1/part/1/paragraph/1n2

In the County of Flintshire

s.schedule/1/part/1/paragraph/1n3

In the Borough of Cheshire West and Chester

s.schedule/1/part/1/paragraph/1n4

In the County of Flintshire

Browse 231 other sections — procedural / definitional / commencement
s.art001

Citation and commencement

s.art002

Interpretation

s.art003

Development consent etc. granted by the Order

s.art004

Operation and use of the authorised development

s.art005

Power to maintain the authorised development

s.art006

Limits of deviation

s.art007

Benefit of the Order

s.art008

Application and modification of legislative provisions

s.art009

Defence to proceedings in respect of statutory nuisance

s.art010

Street works

s.art011

Power to alter layout, etc. of streets

s.art012

Application of the 1991 Act

s.art013

Temporary restriction of public rights of way

s.art014

Stopping up of public rights of way

s.art015

Temporary restriction of use of streets

s.art016

Access to works

s.art017

Agreements with street authorities

s.art018

Use of private roads

s.art019

Traffic regulation

s.art020

Discharge of water

s.art021

Maintenance of drainage works

s.art022

Authority to survey and investigate the land

s.art023

Protective work to buildings

s.art024

Compulsory acquisition of land

s.art025

Time limit for exercise of authority to acquire land compulsorily

s.art026

Compulsory acquisition of rights and restrictive covenants

s.art027

Statutory authority to override easements and other rights

s.art028

Compulsory acquisition of land: minerals

s.art029

Private rights

s.art030

Application of the 1981 Act

s.art031

Acquisition of subsoil or airspace only

s.art032

Modification of Part 1 of the 1965 Act

s.art033

Rights under or over streets

s.art034

Temporary use of land for carrying out the authorised development

s.art035

Temporary use of land for maintaining the authorised development

s.art036

Statutory undertakers

s.art037

Recovery of costs of new connections

s.art038

Application of landlord and tenant law

s.art039

Felling or lopping of trees and removal of hedgerows

s.art040

Trees subject to Tree Preservation Orders

s.art041

Crown rights

s.art042

Protective provisions

s.art043

Operational land for the purposes of the 1990 Act

s.art044

Certification of plans, etc.

s.art045

Service of notices

s.art046

No double recovery

s.art047

Arbitration

s.para.100

Work No. 18A: Creation and use of a temporary construction...

s.para.101

Work No. 19: Construction of an underground Carbon Dioxide (CO2)...

s.para.102

as shown on Sheets 8 and 9 of the Works...

s.para.103

Work No. 19A: The creation and use of a temporary...

s.para.104

Work No. 19B: Creation and use of a temporary construction...

s.para.105

Work No. 19C: Creation and use of a temporary access...

s.para.106

Work No. 20: Construction of a BVS at Rock Bank,...

s.para.107

Work No. 20A: The creation and use of a temporary...

s.para.108

Work No. 21: The creation and use of a permanent...

s.para.109

Work No. 22: Construction of an underground Carbon Dioxide (CO2)...

s.para.110

as shown on Sheet 9 of the Works Plans.

s.para.111

Work No. 23: Construction of an underground Carbon Dioxide (CO2)...

s.para.112

as shown on Sheet 9 of the Works Plans.

s.para.113

Work No. 23A: Creation and use of a temporary construction...

s.para.114

Work No. 23B: The creation and use of a temporary...

s.para.115

Work No. 24: Construction of an underground Carbon Dioxide (CO2)...

s.para.116

as shown on Sheet 9 of the Works Plans.

s.para.117

Work No. 24A: Creation and use of a temporary construction...

s.para.118

Work No. 25: Construction of an underground Carbon Dioxide (CO2)...

s.para.119

as shown on Sheets 9, 10 and 11 of the...

s.para.120

Work No. 25A: Creation and use of a permanent access...

s.para.121

Work No. 26: Construction of a BVS at Mollington, at...

s.para.122

Work No. 26A: The creation and use of a temporary...

s.para.123

Work No. 27: The creation and use of a permanent...

s.para.124

Work No. 28: Construction of an underground Carbon Dioxide (CO2)...

s.para.125

as shown on Sheets 10, 11 and 12 of the...

s.para.126

Work No. 28A: Creation and use of a temporary construction...

s.para.127

Work No. 28B: Creation and use of a permanent access...

s.para.128

Work No. 28C: Creation and use of a permanent access...

s.para.130

as shown on Sheet 12 of the Works Plans.

s.para.131

Work No. 29A: The creation and use of a temporary...

s.para.132

Work No. 30: Construction of an underground Carbon Dioxide (CO2)...

s.para.133

as shown on Sheets 12 and 13 of the Works...

s.para.134

Work No. 30A: The creation and use of a temporary...

s.para.135

Work No. 30B: Creation and use of a permanent access...

s.para.136

Work No. 30C: Creation and use of a permanent access...

s.para.137

Work No. 30D: The creation and use of a temporary...

s.para.138

Work No. 30E: Creation and use of a temporary construction...

s.para.139

Work No. 31: Construction of an underground Carbon Dioxide (CO2)...

s.para.140

as shown on Sheets 13 and 14 of the Works...

s.para.141

Work No. 31A: The creation and use of a temporary...

s.para.142

Work No. 31B: Creation and use of a permanent access...

s.para.143

Work No. 31C: The creation and use of a temporary...

s.para.144

Work No. 32: Construction of an underground Carbon Dioxide (CO2)...

s.para.145

as shown on Sheets 14 and 15 of the Works...

s.para.146

Work No. 32A: Creation and use of a temporary construction...

s.para.147

Work No. 33: Construction of an underground Carbon Dioxide (CO2)...

s.para.148

as shown on Sheets 14, 15 and 16 of the...

s.para.149

Work No. 33A: Creation and use of a permanent access...

s.para.150

Work No. 33B: Creation and use of a permanent access...

s.para.151

Work No. 33C: Creation and use of a permanent access...

s.para.152

Work No. 34: Construction of an underground Carbon Dioxide (CO2)...

s.para.153

as shown on Sheet 16 of the Works Plans.

s.para.154

Work No. 34A: Creation and use of a temporary construction...

s.para.155

Work No. 35: Construction of an underground Carbon Dioxide (CO2)...

s.para.156

as shown on Sheets 16 and 17 of the Works...

s.para.157

Work No. 35A: Creation and use of a permanent access...

s.para.158

Work No. 36 – Construction of a BVS at Aston...

s.para.159

Work No. 36A: The creation and use of a temporary...

s.para.160

Work No. 37: The creation and use of a permanent...

s.para.161

Work No. 38: Construction of an underground Carbon Dioxide (CO2)...

s.para.162

as shown on Sheet 17 of the Works Plans.

s.para.163

Work No. 38A: Creation and use of a temporary construction...

s.para.164

Work No. 38B: Creation and use of a permanent construction...

s.para.165

Work No. 39: Construction of an underground Carbon Dioxide (CO2)...

s.para.166

as shown on Sheet 17 of the Works Plans.

s.para.167

Work No. 39A: Creation and use of a temporary construction...

s.para.168

Work No. 39B: The creation and use of a temporary...

s.para.169

Work No. 40: Construction of an underground Carbon Dioxide (CO2)...

s.para.170

as shown on Sheets 17 and 18 of the Works...

s.para.171

Work No. 40A: Creation and use of a temporary construction...

s.para.172

Work No. 40B: The creation and use of a temporary...

s.para.173

Work No. 40C: Creation and use of a permanent access...

s.para.174

Work No. 41: Construction of an underground Carbon Dioxide (CO2)...

s.para.175

as shown on Sheets 17 and 18 of the Works...

s.para.176

Work No. 41A: Number not used

s.para.177

Work No. 41B: Creation and use of a temporary construction...

s.para.178

Work No. 41C: Creation and use of a permanent access...

s.para.179

Work No. 41D: Number not used

s.para.180

Work No. 42: Construction of an underground Carbon Dioxide (CO2)...

s.para.181

as shown on Sheets 18 and 19 of the Works...

s.para.182

Work No. 42A: Creation and use of a permanent access...

s.para.183

Work No. 43: Construction of an underground Carbon Dioxide (CO2)...

s.para.184

as shown on Sheet 19 of the Works Plans.

s.para.185

Work No. 43A: The creation and use of a temporary...

s.para.186

Work No. 43B: Creation and use of a permanent access...

s.para.187

Work No. 43C: Creation and use of a temporary construction...

s.para.188

Work No. 43D: The creation and use of a temporary...

s.para.189

Work No 43E:Construction of a concrete, embedded pipe bridge structure...

s.para.190

Work No. 44: Construction of an underground Carbon Dioxide (CO2)...

s.para.191

as shown on Sheets 19 and 20 of the Works...

s.para.192

Work No. 44A: The creation and use of a permanent...

s.para.193

Work No. 44B: Creation and use of a temporary construction...

s.para.194

Work No. 44C: The creation and use of a temporary...

s.para.195

Work No. 45: Construction of an AGI at Northop Hall,...

s.para.196

Work No 45A: The creation and use of a temporary...

s.para.197

Work No. 45B: The creation and use of a permanent...

s.para.198

Work No. 46: The creation and use of a temporary...

s.para.199

Work No. 47: Construction of an underground Carbon Dioxide (CO2)...

s.para.200

as shown on Sheets 20, 21 and 22 of the...

s.para.201

Work No. 47A: Creation and use of a temporary construction...

s.para.202

Work No. 47B: Creation and use of a temporary construction...

s.para.203

Work No. 48: Construction of an AGI at Flint, within...

s.para.204

Work No. 48A: The creation and use of a temporary...

s.para.205

Work No. 49: The creation and use of a permanent...

s.para.206

Work No. 50: Construction of an underground Carbon Dioxide (CO2)...

s.para.207

as shown on Sheets 22 and 23 of the Works...

s.para.208

Work No. 51: Construction of a BVS at Cornist Lane,...

s.para.209

Work No. 51A: The creation and use of a temporary...

s.para.210

Work No. 51B: The creation and use of a temporary...

s.para.211

Work No. 52: The creation and use of a permanent...

s.para.212

Work No. 53: Construction of a BVS at Pentre Halkyn...

s.para.213

Work No. 53A: The creation and use of a temporary...

s.para.214

Work No. 53B: The creation and use of a temporary...

s.para.215

Work No. 54: The creation and use of a permanent...

s.para.216

Work No. 55: Construction of a BVS at Babell, at...

s.para.217

Work No. 55A: The creation and use of a temporary...

s.para.218

Work No. 55B: The creation and use of a temporary...

s.para.219

Work No. 56: The creation and use of a permanent...

s.para.220

Work No 57: the provision of environmental and ecological mitigation...

s.para.222

Work No. 57B: Creation of environmental mitigation south-west of Stanlow...

s.para.223

Work No. 57C: Creation of environmental mitigation north of the...

s.para.224

Work No. 57D: Creation of environmental mitigation south of the...

s.para.225

Work No. 57E: Creation of environmental mitigation east of River...

s.para.226

Work No. 57F: Creation of environmental mitigation west of River...

s.para.227

Work No. 57G: Creation of environmental mitigation north of the...

s.para.229

Work No. 57I: Creation of environmental mitigation west of Aston...

s.para.230

Work No 57J: Creation of environmental mitigation on land east...

s.para.231

Work No 57K: Creation of environmental mitigation at Alltami Brook...

s.para.232

Work No 57L: Creation of environmental mitigation east of Brookside...

s.para.233

Work No 57M: Creation of environmental mitigation west of Work...

s.para.234

Work No 57N: Creation of environmental mitigation west of Work...

s.para.235

And in connection with Work Nos. 1 to 57N, and...

s.para.49

Work No. 1A: The creation and use of a temporary...

s.para.50

Work No. 2: The creation and use of a permanent...

s.para.51

Work No. 3: The creation and use of a permanent...

s.para.52

Work No. 3A: The creation and use of a temporary...

s.para.53

Work No. 3B: The creation and use of a permanent...

s.para.54

Work No. 4: Construction of an underground Carbon Dioxide (CO2)...

s.para.55

as shown on Sheets 1 and 2 of the Works...

s.para.56

Work No. 5: Construction of an underground Carbon Dioxide (CO2)...

s.para.57

as shown on Sheets 2 and 3 of the Works...

s.para.58

Work No. 5A: Creation and use of a temporary construction...

s.para.59

Work No. 5B: Creation and use of a temporary construction...

s.para.60

Work No 5C: The creation and use of a temporary...

s.para.61

Work No. 6: Construction of an underground Carbon Dioxide (CO2)...

s.para.62

as shown on Sheets 2, 3 and 4 of the...

s.para.63

Work No. 6A: The creation and use of a temporary...

s.para.64

Work No. 6B: The creation and use of a temporary...

s.para.65

Work No. 6C: Creation and use of a temporary construction...

s.para.66

Work No. 6D: Creation and use of a temporary construction...

s.para.67

Work No. 6E: Creation and use of a temporary construction...

s.para.68

Work No. 7: Construction of two underground Carbon Dioxide (CO2)...

s.para.69

as shown on Sheets 3 and 4 of the Works...

s.para.70

Work No. 8: The creation and use of a temporary...

s.para.71

Work No. 9: Construction of an AGI at Stanlow within...

s.para.72

Work No. 9A: The creation and use of a temporary...

s.para.73

Work No. 10: The creation and use of a permanent...

s.para.74

Work No. 11: Construction of an underground Carbon Dioxide (CO2)...

s.para.75

as shown on Sheets 3, 4 and 5 of the...

s.para.76

Work No. 12: Construction of an underground Carbon Dioxide (CO2)...

s.para.77

as shown on Sheets 4 and 5 of the Works...

s.para.78

Work No. 12A: Creation and use of a permanent access...

s.para.79

Work No. 13: Construction of an underground Carbon Dioxide (CO2)...

s.para.80

as shown on Sheets 5 and 6 of the Works...

s.para.81

Work No. 13A: The creation and use of a temporary...

s.para.82

Work No. 14: Construction of an underground Carbon Dioxide (CO2)...

s.para.83

as shown on Sheets 5 and 6 of the Works...

s.para.84

Work No. 14A: Creation and use of permanent access from...

s.para.85

Work No. 15: Construction of an underground Carbon Dioxide (CO2)...

s.para.86

as shown on Sheets 6 and 7 of the Works...

s.para.87

Work No. 15A: The creation and use of a temporary...

s.para.88

Work No. 15B: Creation and use of a temporary construction...

s.para.89

Work No. 15C: Creation and use of a permanent access...

s.para.90

Work No. 16: Construction of an underground Carbon Dioxide (CO2)...

s.para.91

as shown on Sheet 7 of the Works Plans.

s.para.92

Work No. 16A: Creation and use of a permanent access...

s.para.93

Work No. 16B: Creation and use of a temporary construction...

s.para.94

Work No. 17: Construction of an underground Carbon Dioxide (CO2)...

s.para.95

as shown on sheets 7 and 8 of the Works...

s.para.96

Work No. 17A: Creation and use of a permanent access...

s.para.97

Work No. 17B: Creation and use of a permanent access...

s.para.98

Work No. 18: Construction of an underground Carbon Dioxide (CO2)...

s.para.99

as shown on Sheet 8 of the Works Plans.

Explore more