What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

50 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Electronic communications
s.art004 Development consent etc. granted by this Order
s.art005 Maintenance of authorised development
s.art006 Operation of authorised development
s.art007 Benefit of this Order
s.art008 Consent to transfer benefit of this Order
s.art009 Amendment and modification of statutory provisions
s.art010 Power to alter layout etc. of streets
s.art011 Street works
s.art012 Construction and maintenance of new or altered means of access
s.art013 Temporary stopping up of streets, public rights of way and access land
s.art014 Access to works
s.art015 Agreements with streets authorities
s.art016 Traffic regulation
s.art017 Discharge of water
s.art018 Felling or lopping of trees and removal of hedgerows
s.art019 Protective works to buildings
s.art020 Authority to survey and investigate the land
s.art021 Removal of human remains
s.art021 Supplemental land
s.art022 Compulsory acquisition of land
s.art023 Power to override easements and other rights
s.art024 Time limit for exercise of authority to acquire land compulsorily
s.art025 Compulsory acquisition of rights etc.
s.art026 Private rights
s.art027 Application of the 1981 Act
s.art028 Acquisition of subsoil and airspace only
s.art029 Modification of Part 1 of the 1965 Act
s.art030 Rights under or over streets
s.art031 Temporary use of land for carrying out the authorised development
s.art032 Temporary use of land for maintaining the authorised development
s.art033 Statutory undertakers
s.art034 Apparatus and rights of statutory undertakers in streets
s.art035 Recovery of costs of new connections
s.art036 Compulsory acquisition of land – incorporation of the mineral code
s.art037 Deemed marine licence
s.art038 Application of landlord and tenant law
s.art039 Operational land for purposes of the 1990 Act
s.art040 Defence to proceedings in respect of statutory nuisance
s.art041 Protection of interests
s.art042 Saving for Trinity House
s.art043 Crown Rights
s.art044 Procedure in relation to certain approvals
s.art045 Certification of plans etc.
s.art046 Service of notices
s.art047 Arbitration
s.art048 Funding for compulsory acquisition compensation
Schedules

Schedules

7 of 520 shown
s.sch011 (1) A marine method statement must be submitted to the... Regulated
  • Submit marine method statement and obtain MMO approval before starting licensed worksStatutory Undertaker
s.sch012 (1) Subject to sub-paragraphs (2) to (4), if as the... Regulated
  • Pay costs and compensation for damage to operator's electronic communications apparatusStatutory Undertaker
s.sch012 Insurance Regulated
  • Obtain and maintain insurance for works affecting SABICContractor
s.sch012 Removal of apparatus Regulated
  • Do not remove existing apparatus until alternative is operational (Net Zero Teesside)Statutory Undertaker
s.sch012 Insurance Regulated
  • Obtain and maintain insurance for works on the Sembcorp Protection CorridorContractor
s.sch012 Expenses Regulated
  • Pay reasonable expenses incurred by apparatus owners and SembcorpStatutory Undertaker
s.sch012 Insurance Regulated
  • Obtain and maintain insurance for works affecting HPUStatutory Undertaker
513 other schedules
s.sch002 Commencement of the authorised development
s.sch002 Fire prevention
s.sch002 Surface and foul water drainage
s.sch002 Flood risk mitigation
s.sch002 Contaminated land and groundwater
s.sch002 Archaeology
s.sch002 Protected species
s.sch002 Construction environmental management plan
s.sch002 Protection of highway surfaces
s.sch002 Construction traffic management plan
s.sch002 Construction workers travel plan
s.sch002 Notice of start and completion of commissioning
s.sch002 Construction hours
s.sch002 Control of noise - construction
s.sch002 Control of noise - operation
s.sch002 Piling and penetrative foundation design
s.sch002 Waste management on site - construction wastes
s.sch002 Restoration of land used temporarily for construction
s.sch002 Combined heat and power
s.sch002 Aviation warning lighting
s.sch002 Air safety
s.sch002 Local liaison group
s.sch002 Detailed design
s.sch002 Employment, skills and training plan
s.sch002 Carbon dioxide capture transfer and storage
s.sch002 Decommissioning
s.sch002 Requirement for written approval
s.sch002 Approved details and amendments to them
s.sch002 Amendments agreed by the relevant planning authority
s.sch002 Consultation with South Tees Development Corporation
s.sch002 Effluent nutrient nitrogen safeguarding scheme
s.sch002 Consultation with Sembcorp and TG entities
s.sch002 Landscape and biodiversity protection management and enhancement
s.sch002 Public rights of way and access land management
s.sch002 External lighting
s.sch002 Highway accesses
s.sch002 Means of enclosure
s.sch002 Site security
s.sch003 The York Potash Harbour Facilities Order 2016 is amended as...
s.sch003 In article 34 (protection of interests), for “11” substitute “12”....
s.sch003 After Schedule 11 insert new Schedule 12— SCHEDULE 12 FOR...
s.sch007 Interpretation
s.sch008 The enactments for the time being in force with respect...
s.sch008 (1) Without limitation to the scope of paragraph 1, the...
s.sch008 (1) Without limitation on the scope of paragraph 1, the...
s.sch008 Part 1 (compulsory purchase under Acquisition of Land Act 1946)...
s.sch008 (1) The modifications referred to in paragraph 4(a) are as...
s.sch010 (1) In this licence— “the 2004 Act” means the Energy...
s.sch010 Notifications and Inspections
s.sch010 Pre-construction
s.sch010 (1) The relevant undertaker must submit a CEMP covering the...
s.sch010 (1) A marine method statement must be submitted to the...
s.sch010 Reporting of engaged agents, contractors and vessels
s.sch010 Written scheme of archaeological investigation
s.sch010 Construction, Operation and Maintenance
s.sch010 The storage, handling, transport and use of fuels, lubricants, chemicals...
s.sch010 The relevant undertaker must— (a) not discharge waste concrete slurry...
s.sch010 During licensed activities all wastes must be stored in designated...
s.sch010 Details of licensed activities
s.sch010 (1) Vibratory or drilled “pin” piling must be used as...
s.sch010 (1) In the event that any rock material is misplaced...
s.sch010 UXO Clearance
s.sch010 Post Construction
s.sch010 Disposal
s.sch010 The relevant undertaker must ensure dredge arisings are disposed of...
s.sch010 The material to be disposed of within the disposal site...
s.sch010 The combined total volume of material for disposal at each...
s.sch010 Provision of Information
s.sch010 Amendments to plans etc.
s.sch010 The relevant undertaker may engage in the licensed activities related...
s.sch010 Maximum parameters
s.sch010 Safety Management
s.sch010 Provision of Information
s.sch010 The coordinates for the disposal sites notified to the MMO...
s.sch010 The coordinates in Table 9 and Table 10 are defined...
s.sch010 This licence remains in force until the authorised development has...
s.sch010 The provisions of section 72 (variation, suspension, revocation and transfer)...
s.sch010 With respect to any condition which requires the licensed activities...
s.sch010 General
s.sch011 (1) In this licence— “the 2004 Act” means the Energy...
s.sch011 Notifications and Inspections
s.sch011 Pre-construction
s.sch011 (1) The relevant undertaker must submit a CEMP covering the...
s.sch011 Reporting of engaged agents, contractors and vessels
s.sch011 Written scheme of archaeological investigation
s.sch011 Construction, Operation and Maintenance
s.sch011 The storage, handling, transport and use of fuels, lubricants, chemicals...
s.sch011 The relevant undertaker must— (a) not discharge waste concrete slurry...
s.sch011 During licensed activities all wastes must be stored in designated...
s.sch011 Details of licensed activities
s.sch011 (1) Vibratory or drilled “pin” piling must be used as...
s.sch011 (1) In the event that any rock material is misplaced...
s.sch011 UXO Clearance
s.sch011 Post Construction
s.sch011 Disposal
s.sch011 The relevant undertaker must ensure that only inert material of...
s.sch011 The material to be disposed of within the disposal site...
s.sch011 The volume of material for disposal at each of the...
s.sch011 Provision of Information
s.sch011 Amendments to plans etc.
s.sch011 The relevant undertaker may engage in the licensed activities related...
s.sch011 Maximum parameters
s.sch011 Safety Management
s.sch011 Provision of Information
s.sch011 The coordinates for the disposal sites notified to the MMO...
s.sch011 The coordinates in Table 11 and Table 12 are defined...
s.sch011 This licence remains in force until the authorised development has...
s.sch011 The provisions of section 72 (variation, suspension, revocation and transfer)...
s.sch011 With respect to any condition which requires the licensed activities...
s.sch011 General
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch012 (1) Any approval of INEOS required under paragraph 99 must...
s.sch012 Compliance with requirements, etc. applying to the INEOS operations
s.sch012 Indemnity
s.sch012 Arbitration
s.sch012 For the protection of Marlow Foods, the following provisions have...
s.sch012 In this Part of this Schedule— “Marlow Foods” means Marlow...
s.sch012 Regulation of powers
s.sch012 The undertaker must give to Marlow Foods not less than...
s.sch012 Co-operation
s.sch012 Indemnity
s.sch012 Enactments and agreements
s.sch012 Arbitration
s.sch012 The provisions of this Part of this Schedule have effect,...
s.sch012 (1) In this Part of this Schedule— “construction” includes execution,...
s.sch012 (1) Where under this Part of this Schedule Network Rail...
s.sch012 The undertaker must not under the powers of this Order...
s.sch012 (1) The undertaker must before commencing construction of any specified...
s.sch012 (1) Any specified work and any protective works to be...
s.sch012 The undertaker must— (a) at all times afford reasonable facilities...
s.sch012 Network Rail must at all times afford reasonable facilities to...
s.sch012 (1) If any permanent or temporary alterations or additions to...
s.sch012 (1) For the protection of any operator, the following provisions...
s.sch012 The undertaker must repay to Network Rail all reasonable fees,...
s.sch012 (1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...
s.sch012 (1) If at any time after the completion of a...
s.sch012 The undertaker must not provide any illumination or illuminated sign...
s.sch012 Any additional expenses which Network Rail may reasonably incur in...
s.sch012 (1) The undertaker must pay to Network Rail all reasonable...
s.sch012 Network Rail must, on receipt of a request from the...
s.sch012 In the assessment of any sums payable to Network Rail...
s.sch012 The undertaker and Network Rail may, subject in the case...
s.sch012 Nothing in this Order, or in any enactment incorporated with...
s.sch012 The exercise of the powers of article 33 (statutory undertakers)...
s.sch012 The undertaker must give written notice to Network Rail if...
s.sch012 The undertaker must no later than 28 days from the...
s.sch012 For the protection of Northern Powergrid (Northeast) Plc the following...
s.sch012 In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch012 This Part of this Schedule does not apply to apparatus...
s.sch012 Regardless of the temporary prohibition or restriction of use of...
s.sch012 Regardless of any provision in this Order or anything shown...
s.sch012 (1) If, in the exercise of the powers conferred by...
s.sch012 (1) Where, in accordance with the provisions of this Part...
s.sch012 (1) Not less than ninety days before starting the execution...
s.sch012 (1) Subject to the following provisions of this paragraph, the...
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch012 Nothing in this Part of this Schedule affects the provisions...
s.sch012 Without prejudice to the generality of the protective provisions in...
s.sch012 Northern Powergrid and the undertaker must use their reasonable endeavours...
s.sch012 Work in relation to which an estimate is submitted must...
s.sch012 If Northern Powergrid at any time becomes aware that an...
s.sch012 Northern Powergrid may from time to time and at least...
s.sch012 The undertaker is not responsible for meeting costs or expenses...
s.sch012 Any difference under the provisions of this Part of this...
s.sch012 This Part of this Schedule does not apply to—
s.sch012 Prior to carrying out any works within the Order limits...
s.sch012 For the protection of NPL, the following provisions have effect,...
s.sch012 In this Part of this Schedule— “NPL” means NPL Waste...
s.sch012 Consent under this Part
s.sch012 No works comprising any part of the authorised development which...
s.sch012 Any approval of NPL required under paragraph 153 must not...
s.sch012 (1) The authorised development must be carried out in accordance...
s.sch012 Indemnity
s.sch012 Arbitration
s.sch012 For the protection of PD Teesport, the following provisions have...
s.sch012 Nothing in this Part affects the provisions of any enactment...
s.sch012 In this Part of this Schedule— “PD Teesport” means PD...
s.sch012 Regulation of powers
s.sch012 Any approval of PD Teesport required under paragraph 160 must...
s.sch012 Regulation of powers in relation to Seal Sands Road
s.sch012 Regulation of powers in relation to South Gare Road
s.sch012 Consent under this Part
s.sch012 No works comprising any part of the authorised development which...
s.sch012 Any approval of PD Teesport required under paragraph 165 must...
s.sch012 The authorised development must be carried out in accordance with...
s.sch012 Where there has been a reference to an arbitrator in...
s.sch012 Application
s.sch012 Indemnity
s.sch012 Arbitration
s.sch012 For the protection of RBT, the following provisions have effect,...
s.sch012 In this Part of this Schedule— “apparatus” means any mains,...
s.sch012 Regulation of powers
s.sch012 Any approval of RBT required under paragraph 173 must not...
s.sch012 Without limiting paragraph 174, it is not reasonable for RBT...
s.sch012 Interference with Apparatus and Access
s.sch012 Consent under this Part
s.sch012 No— (a) works comprising any part of the authorised development...
s.sch012 Interpretation
s.sch012 Any approval of RBT required under paragraph 178 must not...
s.sch012 Without limiting paragraph 179, it is not reasonable for RBT...
s.sch012 (1) The authorised development and activities on the wharf and...
s.sch012 Co-operation
s.sch012 The undertaker must pay to RBT— (a) a cost agreed...
s.sch012 Indemnity
s.sch012 Arbitration
s.sch012 Benefit of protective provisions
s.sch012 Interpretation
s.sch012 Pipeline survey
s.sch012 On Street Apparatus
s.sch012 Authorisation of works details affecting pipelines or protected crossing
s.sch012 No part of a relevant work is to be commenced...
s.sch012 (1) Any authorisation by SABIC required under paragraph 190(a) must...
s.sch012 (1) In the event that— (a) no response has been...
s.sch012 Notice of works
s.sch012 Further provisions about works
s.sch012 (1) All piling within 1.5 metres of the centreline of...
s.sch012 (1) Where excavation of trenches (including excavation by dredging) adjacent...
s.sch012 (1) Where a trench is excavated across or parallel to...
s.sch012 (1) A minimum clearance of 1500 millimetres must be maintained...
s.sch012 In this Part— “alternative apparatus” means alternative apparatus adequate to...
s.sch012 Apparatus of National Grid in streets subject to temporary stopping up
s.sch012 Monitoring for damage to pipelines
s.sch012 (1) If any damage occurs to a pipeline causing a...
s.sch012 Compliance with requirements, etc. applying to the protected land
s.sch012 Access for construction and maintenance
s.sch012 (1) In preparing a construction access plan under paragraph 202...
s.sch012 (1) No works affecting access rights over the access roads...
s.sch012 (1) If SABIC has a dispute about the proposed insurance...
s.sch012 Costs
s.sch012 Further protection in relation to the exercise of powers under the Order
s.sch012 Protective works to buildings
s.sch012 The undertaker, must when requested to do so by SABIC,...
s.sch012 Prior to the commencement of the authorised development the undertaker...
s.sch012 Arbitration
s.sch012 Extent of this Part
s.sch012 Interpretation of this Part
s.sch012 Separate approvals by third party owners or operators
s.sch012 Alternative apparatus
s.sch012 Consent under this Part in connection with Sembcorp operations
s.sch012 The works referred to in paragraph 217 must not be...
s.sch012 Removal of apparatus
s.sch012 Any approval of Sembcorp required under paragraph 218 must not...
s.sch012 (1) The authorised development must be carried out in accordance...
s.sch012 Indemnity
s.sch012 Participation in community groups
s.sch012 Notice of start and completion of commissioning
s.sch012 Arbitration
s.sch012 Additional Agreement
s.sch012 Interpretation
s.sch012 Facilities and rights for alternative apparatus
s.sch012 The following definitions apply in this Part of this Schedule—...
s.sch012 Consent to works in the shared area
s.sch012 Co-operation
s.sch012 Regulation of works within the shared area
s.sch012 Regulation of powers over the shared area
s.sch012 Constructability Principles
s.sch012 Interface Design Process
s.sch012 Design Principles
s.sch012 Maintenance and Operational Principles
s.sch012 Miscellaneous provisions
s.sch012 Retained apparatus
s.sch012 Indemnity
s.sch012 Dispute Resolution
s.sch012 Any difference in relation to the provisions in this Part...
s.sch012 The fees of the expert appointed pursuant to paragraph 241(b)...
s.sch012 Where appointed pursuant to paragraph 241(b), the expert must—
s.sch012 The expert must consider where relevant— (a) the development outcomes...
s.sch012 Any determination by the expert is final and binding which...
s.sch012 For the protection of Suez, the following provisions have effect,...
s.sch012 In this Part of this Schedule— “the respective authorised developments”...
s.sch012 Consent under this Part
s.sch012 Expenses
s.sch012 Before commencing any part of the authorised development which would...
s.sch012 No works comprising any part of the authorised development which...
s.sch012 Any approval of Suez required under paragraph 250 must not...
s.sch012 (1) The authorised development must be carried out in accordance...
s.sch012 Co-operation
s.sch012 Indemnity
s.sch012 Arbitration
s.sch012 For the protection of South Tees Development Corporation, Teesworks Limited...
s.sch012 (1) In this Part of this Schedule— “AIL access route...
s.sch012 Consent for works
s.sch012 Indemnity
s.sch012 No works comprising any part of the authorised development including...
s.sch012 Any approval of the Teesworks entity required under paragraph 260...
s.sch012 The authorised development must be carried out in accordance with...
s.sch012 The undertaker must not exercise the powers under Article 14...
s.sch012 Co-operation
s.sch012 The undertaker must provide the Teesworks entity with information the...
s.sch012 (1) This paragraph applies insofar as— (a) the construction of...
s.sch012 Expenses
s.sch012 Indemnity
s.sch012 Provision for diversion works
s.sch012 Enactments and agreements
s.sch012 If the undertaker intends to change the timing of the...
s.sch012 The Teesworks entity may issue a notice (a “diversion notice”)...
s.sch012 A diversion notice must set out— (a) the diversion work...
s.sch012 If a diversion notice is issued to the undertaker before...
s.sch012 In making the decision under paragraph 272 the undertaker must...
s.sch012 Where the undertaker gives an information notice to the Teesworks...
s.sch012 Where the undertaker notifies the Teesworks entity under paragraph 272(b)...
s.sch012 If the undertaker issues an information notice to the Teesworks...
s.sch012 If the Teesworks entity submits further information to the undertaker...
s.sch012 If the undertaker issues notice to the Teesworks entity under...
s.sch012 Co-operation
s.sch012 If the undertaker issues a notice under paragraph 272(a) the...
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if a diversion...
s.sch012 If a reference is made to arbitration under paragraph 285...
s.sch012 Where the arbitrator determines that the terms of the diversion...
s.sch012 If— (a) a diversion works agreement is entered into within...
s.sch012 (1) If— (a) no diversion notice is issued by the...
s.sch012 Arbitration
s.sch012 Interpretation
s.sch012 Where a notice or information is provided by the undertaker...
s.sch012 For the protection of the Breagh Pipeline Owners, the following...
s.sch012 Access
s.sch012 In this Part of this Schedule— “Breagh Pipeline” means the...
s.sch012 Consent under this Part
s.sch012 No works comprising any part of the authorised development which...
s.sch012 (1) Any approval of the Breagh Pipeline Owners required under...
s.sch012 Compliance with requirements, etc. applying to the Breagh Pipeline and the Breagh Pipeline Operations
s.sch012 Indemnity
s.sch012 Arbitration
s.sch012 For the protection of Teesside Windfarm, the following provisions have...
s.sch012 In this Part of this Schedule— “restricted works” means works...
s.sch012 Consent under this Part
s.sch012 Precedence of the 1991 Act in respect of apparatus in the streets
s.sch012 Arbitration
s.sch012 Particularly in respect of the restricted works, the undertaker must...
s.sch012 No works comprising any part of the authorised development which...
s.sch012 Any approval of Teesside Windfarm required under paragraph 300 must...
s.sch012 (1) The authorised development must be carried out in accordance...
s.sch012 Indemnity
s.sch012 Arbitration
s.sch012 Benefit of protective provisions
s.sch012 Interpretation
s.sch012 Pipeline survey
s.sch012 Authorisation of works details affecting pipelines or protected crossing
s.sch012 Notices
s.sch012 No part of a relevant work is to be commenced...
s.sch012 (1) Any authorisation by HPU required under paragraph 309(a) must...
s.sch012 (1) In the event that— (a) no response has been...
s.sch012 Notice of works
s.sch012 Further provisions about works
s.sch012 (1) All piling within 1.5 metres of the centreline of...
s.sch012 (1) Where excavation of trenches (including excavation by dredging) adjacent...
s.sch012 (1) Where a trench is excavated across or parallel to...
s.sch012 (1) A minimum clearance of 1500 millimetres must be maintained...
s.sch012 Monitoring for damage to pipelines
s.sch012 Application
s.sch012 (1) If any damage occurs to a pipeline causing a...
s.sch012 Compliance with requirements, etc. applying to the protected land
s.sch012 Access for construction and maintenance
s.sch012 (1) In preparing a construction access plan under paragraph 321...
s.sch012 (1) No works affecting access rights over the access roads...
s.sch012 If HPU has a dispute about the proposed insurance (including...
s.sch012 Costs
s.sch012 Further protection in relation to the exercise of powers under the Order
s.sch012 The undertaker, must when requested to do so by HPU,...
s.sch012 Interpretation
s.sch012 Prior to the commencement of the authorised development the undertaker...
s.sch012 Arbitration
s.sch012 For the protection of Navigator Terminals, the following provisions have...
s.sch012 In this Part of this Schedule— “Navigator Terminals” means Navigator...
s.sch012 Consent under this Part
s.sch012 No works comprising any part of the authorised development which...
s.sch012 Any approval of Navigator Terminals required under paragraph 334 must...
s.sch012 (1) The authorised development must be carried out with good...
s.sch012 Indemnity
s.sch012 Arbitration
s.sch012 On Street Apparatus
s.sch012 For the protection of NW, the following provisions, unless otherwise...
s.sch012 In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch012 The undertaker must not within the standard protection strips interfere...
s.sch012 The alteration, extension, removal or re-location of any apparatus shall...
s.sch012 In the situation, where in exercise of the powers conferred...
s.sch012 Regardless of any provision in this Order or anything shown...
s.sch012 If in consequence of the exercise of the powers conferred...
s.sch012 If in consequence of the exercise of the powers conferred...
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if for any...
s.sch012 Any dispute arising between the undertaker and NW under this...
s.sch012 Apparatus of National Gas in streets subject to temporary stopping up
s.sch012 (1) Where in consequence of the proposed construction of any...
s.sch012 Prior to carrying out any works within the Order Limits...
s.sch012 Application
s.sch012 Interpretation
s.sch012 Except for paragraphs 354 (apparatus of statutory undertaker in stopped...
s.sch012 Apparatus of statutory undertaker in stopped up streets
s.sch012 Acquisition of land
s.sch012 Removal or diversion of apparatus
s.sch012 Facilities and rights for alternative apparatus
s.sch012 Retained apparatus: protection
s.sch012 Protective works to buildings
s.sch012 Expenses
s.sch012 Indemnity
s.sch012 Enactments and agreements
s.sch012 Co-operation
s.sch012 Access
s.sch012 Arbitration
s.sch012 Works falling outside of development authorised by the Order
s.sch012 Cathodic protection testing
s.sch012 For the protection of the NT Group (as defined below),...
s.sch012 In this Part of this Schedule— “NTL” means North Tees...
s.sch012 Removal of apparatus
s.sch012 Consent under this Part
s.sch012 Indemnity
s.sch012 Arbitration
s.sch012 Apparatus
s.sch012 For the protection of TGLP, TGPP and NGPL, the following...
s.sch012 In this Part of this Schedule— “alternate access agreement” means...
s.sch012 No relevant works are to be commenced until the design...
s.sch012 Following approval or deemed approval of the design package, the...
s.sch012 The undertaker will design and carry out or will procure...
s.sch012 Facilities and rights for alternative apparatus
s.sch012 Retained apparatus
s.sch012 Approval Principles: Relevant Works Package A
s.sch012 Subject to paragraph 393, below, it shall be reasonable for...
s.sch012 It will be unreasonable for the NSMP entity to withhold...
s.sch012 The undertaker and the NSMP entity must, in carrying out...
s.sch012 Approval Principles: Relevant Works Package B
s.sch012 The undertaker and the NSMP entity must, in carrying out...
s.sch012 Compliance with requirements, etc. applying to the NSMP operations
s.sch012 In undertaking any works in relation to the NSMP operations...
s.sch012 For the benefit of NSMP, the undertaker must not exercise...
s.sch012 Regardless of the temporary prohibition or restriction of use of...
s.sch012 Expenses
s.sch012 Indemnity
s.sch012 Arbitration
s.sch012 Access to plots 110, 112, 113 or 114
s.sch012 The undertaker must not use plots 103 or 108 to...
s.sch012 Where an alternate access agreement has been concluded, reference to...
s.sch012 Indemnity
s.sch012 Enactments and agreements
s.sch012 Co-operation
s.sch012 Access
s.sch012 Arbitration
s.sch012 Notices
s.sch012 For the protection of Air Products the following provisions have...
s.sch012 In this Part— “Air Products” means Air Products Public Limited...
s.sch012 Precedence of the 1991 Act in respect of apparatus in streets
s.sch012 No acquisition etc. except by agreement
s.sch012 Regardless of the temporary prohibition or restriction of use of...
s.sch012 No acquisition etc. except by agreement
s.sch012 Removal of apparatus
s.sch012 Facilities and rights for alternative apparatus
s.sch012 Retained Apparatus
s.sch012 Expenses and costs
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch012 Enactments and agreements
s.sch012 For the protection of CATS, the following provisions have effect,...
s.sch012 In this Part of this Schedule— “CATS” means CATS North...
s.sch012 Removal of apparatus
s.sch012 Consent under this Part
s.sch012 No works comprising any part of the authorised development within...
s.sch012 (1) Any approval of CATS required under paragraph 61 must...
s.sch012 Where formal consent is required under the CATS requirements for...
s.sch012 Compliance with the CATS requirements
s.sch012 No explosives for blasting are to be used within 400...
s.sch012 Monitoring for damage to pipelines
s.sch012 (1) If any damage occurs to a CATS pipeline causing...
s.sch012 Indemnity
s.sch012 Costs
s.sch012 Facilities and rights for alternative apparatus
s.sch012 Arbitration
s.sch012 For the protection of CF Fertilisers, the following provisions have...
s.sch012 In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch012 Precedence of the 1991 Act in respect of apparatus in streets
s.sch012 Regardless of the temporary prohibition or restriction of use of...
s.sch012 Removal of apparatus/access
s.sch012 Facilities and rights for alternative apparatus
s.sch012 Retained Apparatus
s.sch012 Consent under this Part
s.sch012 Before commencing any part of the authorised development which would...
s.sch012 Retained Apparatus
s.sch012 No works comprising any part of the authorised development which...
s.sch012 Any approval of CF Fertilisers required under paragraph 80 must...
s.sch012 (1) The authorised development must be carried out in accordance...
s.sch012 Notices
s.sch012 Co-operation
s.sch012 Expenses and costs
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch012 Arbitration
s.sch012 For the protection of Exolum, the following provisions have effect,...
s.sch012 In this Part of this Schedule— “Exolum” means Exolum Seal...
s.sch012 Expenses and costs
s.sch012 Consent of restricted works under this Part
s.sch012 Prohibition of acquisition and interference
s.sch012 Cathodic protection testing
s.sch012 Expenses
s.sch012 Indemnity
s.sch012 Arbitration
s.sch012 For the protection of INEOS, the following provisions have effect,...
s.sch012 In this Part of this Schedule— “INEOS” means INEOS Nitriles...
s.sch012 Consent under this Part
s.sch012 No works comprising any part of the authorised development which...
s.sch012 This Part A sets out the approval process to be...
s.sch012 The undertaker shall submit the design package to the NSMP...
s.sch012 Following submission of the design package to the NSMP entity,...
s.sch012 In the event the NSMP entity does not provide any...
s.sch012 Once approved, the undertaker shall issue one paper copy and...
s.sch012 With respect to the relevant works package A, the undertaker...
s.sch012 This Part B sets out the approval process to be...
s.sch012 The undertaker shall submit any such change required to the...
s.sch012 Following submission of the change request to the NSMP entity,...
s.sch012 In the event the NSMP entity does not provide a...
s.sch012 Once approved, the undertaker shall issue one (1) paper copy...
s.sch012 Any approval of the NSMP entity required under Part A...
s.sch013 In this Schedule— “requirement consultee” means any body named in...
s.sch013 Applications made under a Requirement
s.sch013 Further information and consultation
s.sch013 Fees
s.sch013 Appeals
s.schedule/12/part/28/paragraph/1 Approval Process

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.