UK Statutory Instrument 2024 United Kingdom

The Net Zero Teesside Order 2024

At a glance

What's here

6 compliance obligations

Who this Act binds

Business-side actors with duties under this Act, ranked by how often they appear.

  • Statutory Undertaker 4
  • Contractor 2

Other Acts binding the same actors

For each actor bound by this Act, the other UK Acts that bind them most often. Useful for understanding the full compliance landscape facing each role.

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

s.sch012

(1) Subject to sub-paragraphs (2) to (4), if as the...

  • Pay costs and compensation for damage to operator's electronic communications apparatus Statutory Undertaker
s.sch012

Insurance

  • Obtain and maintain insurance for works affecting SABIC Contractor
s.sch012

Removal of apparatus

  • Do not remove existing apparatus until alternative is operational (Net Zero Teesside) Statutory Undertaker
s.sch012

Insurance

  • Obtain and maintain insurance for works on the Sembcorp Protection Corridor Contractor
s.sch012

Expenses

  • Pay reasonable expenses incurred by apparatus owners and Sembcorp Statutory Undertaker
s.sch012

Insurance

  • Obtain and maintain insurance for works affecting HPU Statutory Undertaker
Browse 514 other Schedules — structural / supplementary
s.sch002

Commencement of the authorised development

s.sch002

Fire prevention

s.sch002

Surface and foul water drainage

s.sch002

Flood risk mitigation

s.sch002

Contaminated land and groundwater

s.sch002

Archaeology

s.sch002

Protected species

s.sch002

Construction environmental management plan

s.sch002

Protection of highway surfaces

s.sch002

Construction traffic management plan

s.sch002

Construction workers travel plan

s.sch002

Notice of start and completion of commissioning

s.sch002

Construction hours

s.sch002

Control of noise - construction

s.sch002

Control of noise - operation

s.sch002

Piling and penetrative foundation design

s.sch002

Waste management on site - construction wastes

s.sch002

Restoration of land used temporarily for construction

s.sch002

Combined heat and power

s.sch002

Aviation warning lighting

s.sch002

Air safety

s.sch002

Local liaison group

s.sch002

Detailed design

s.sch002

Employment, skills and training plan

s.sch002

Carbon dioxide capture transfer and storage

s.sch002

Decommissioning

s.sch002

Requirement for written approval

s.sch002

Approved details and amendments to them

s.sch002

Amendments agreed by the relevant planning authority

s.sch002

Consultation with South Tees Development Corporation

s.sch002

Effluent nutrient nitrogen safeguarding scheme

s.sch002

Consultation with Sembcorp and TG entities

s.sch002

Landscape and biodiversity protection management and enhancement

s.sch002

Public rights of way and access land management

s.sch002

External lighting

s.sch002

Highway accesses

s.sch002

Means of enclosure

s.sch002

Site security

s.sch003

The York Potash Harbour Facilities Order 2016 is amended as...

s.sch003

In article 34 (protection of interests), for “11” substitute “12”....

s.sch003

After Schedule 11 insert new Schedule 12— SCHEDULE 12 FOR...

s.sch007

Interpretation

s.sch008

The enactments for the time being in force with respect...

s.sch008

(1) Without limitation to the scope of paragraph 1, the...

s.sch008

(1) Without limitation on the scope of paragraph 1, the...

s.sch008

Part 1 (compulsory purchase under Acquisition of Land Act 1946)...

s.sch008

(1) The modifications referred to in paragraph 4(a) are as...

s.sch010

(1) In this licence— “the 2004 Act” means the Energy...

s.sch010

Notifications and Inspections

s.sch010

Pre-construction

s.sch010

(1) The relevant undertaker must submit a CEMP covering the...

s.sch010

(1) A marine method statement must be submitted to the...

s.sch010

Reporting of engaged agents, contractors and vessels

s.sch010

Written scheme of archaeological investigation

s.sch010

Construction, Operation and Maintenance

s.sch010

The storage, handling, transport and use of fuels, lubricants, chemicals...

s.sch010

The relevant undertaker must— (a) not discharge waste concrete slurry...

s.sch010

During licensed activities all wastes must be stored in designated...

s.sch010

Details of licensed activities

s.sch010

(1) Vibratory or drilled “pin” piling must be used as...

s.sch010

(1) In the event that any rock material is misplaced...

s.sch010

UXO Clearance

s.sch010

Post Construction

s.sch010

Disposal

s.sch010

The relevant undertaker must ensure dredge arisings are disposed of...

s.sch010

The material to be disposed of within the disposal site...

s.sch010

The combined total volume of material for disposal at each...

s.sch010

Provision of Information

s.sch010

Amendments to plans etc.

s.sch010

The relevant undertaker may engage in the licensed activities related...

s.sch010

Maximum parameters

s.sch010

Safety Management

s.sch010

Provision of Information

s.sch010

The coordinates for the disposal sites notified to the MMO...

s.sch010

The coordinates in Table 9 and Table 10 are defined...

s.sch010

This licence remains in force until the authorised development has...

s.sch010

The provisions of section 72 (variation, suspension, revocation and transfer)...

s.sch010

With respect to any condition which requires the licensed activities...

s.sch010

General

s.sch011

(1) In this licence— “the 2004 Act” means the Energy...

s.sch011

Notifications and Inspections

s.sch011

Pre-construction

s.sch011

(1) The relevant undertaker must submit a CEMP covering the...

s.sch011

(1) A marine method statement must be submitted to the...

s.sch011

Reporting of engaged agents, contractors and vessels

s.sch011

Written scheme of archaeological investigation

s.sch011

Construction, Operation and Maintenance

s.sch011

The storage, handling, transport and use of fuels, lubricants, chemicals...

s.sch011

The relevant undertaker must— (a) not discharge waste concrete slurry...

s.sch011

During licensed activities all wastes must be stored in designated...

s.sch011

Details of licensed activities

s.sch011

(1) Vibratory or drilled “pin” piling must be used as...

s.sch011

(1) In the event that any rock material is misplaced...

s.sch011

UXO Clearance

s.sch011

Post Construction

s.sch011

Disposal

s.sch011

The relevant undertaker must ensure that only inert material of...

s.sch011

The material to be disposed of within the disposal site...

s.sch011

The volume of material for disposal at each of the...

s.sch011

Provision of Information

s.sch011

Amendments to plans etc.

s.sch011

The relevant undertaker may engage in the licensed activities related...

s.sch011

Maximum parameters

s.sch011

Safety Management

s.sch011

Provision of Information

s.sch011

The coordinates for the disposal sites notified to the MMO...

s.sch011

The coordinates in Table 11 and Table 12 are defined...

s.sch011

This licence remains in force until the authorised development has...

s.sch011

The provisions of section 72 (variation, suspension, revocation and transfer)...

s.sch011

With respect to any condition which requires the licensed activities...

s.sch011

General

s.sch012

(1) Subject to sub-paragraphs (2) and (3), if by reason...

s.sch012

(1) Any approval of INEOS required under paragraph 99 must...

s.sch012

Compliance with requirements, etc. applying to the INEOS operations

s.sch012

Indemnity

s.sch012

Arbitration

s.sch012

For the protection of Marlow Foods, the following provisions have...

s.sch012

In this Part of this Schedule— “Marlow Foods” means Marlow...

s.sch012

Regulation of powers

s.sch012

The undertaker must give to Marlow Foods not less than...

s.sch012

Co-operation

s.sch012

Indemnity

s.sch012

Enactments and agreements

s.sch012

Arbitration

s.sch012

The provisions of this Part of this Schedule have effect,...

s.sch012

(1) In this Part of this Schedule— “construction” includes execution,...

s.sch012

(1) Where under this Part of this Schedule Network Rail...

s.sch012

The undertaker must not under the powers of this Order...

s.sch012

(1) The undertaker must before commencing construction of any specified...

s.sch012

(1) Any specified work and any protective works to be...

s.sch012

The undertaker must— (a) at all times afford reasonable facilities...

s.sch012

Network Rail must at all times afford reasonable facilities to...

s.sch012

(1) If any permanent or temporary alterations or additions to...

s.sch012

(1) For the protection of any operator, the following provisions...

s.sch012

The undertaker must repay to Network Rail all reasonable fees,...

s.sch012

(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...

s.sch012

(1) If at any time after the completion of a...

s.sch012

The undertaker must not provide any illumination or illuminated sign...

s.sch012

Any additional expenses which Network Rail may reasonably incur in...

s.sch012

(1) The undertaker must pay to Network Rail all reasonable...

s.sch012

Network Rail must, on receipt of a request from the...

s.sch012

In the assessment of any sums payable to Network Rail...

s.sch012

The undertaker and Network Rail may, subject in the case...

s.sch012

Nothing in this Order, or in any enactment incorporated with...

s.sch012

The exercise of the powers of article 33 (statutory undertakers)...

s.sch012

The undertaker must give written notice to Network Rail if...

s.sch012

The undertaker must no later than 28 days from the...

s.sch012

For the protection of Northern Powergrid (Northeast) Plc the following...

s.sch012

In this Part of this Schedule— “alternative apparatus” means alternative...

s.sch012

This Part of this Schedule does not apply to apparatus...

s.sch012

Regardless of the temporary prohibition or restriction of use of...

s.sch012

Regardless of any provision in this Order or anything shown...

s.sch012

(1) If, in the exercise of the powers conferred by...

s.sch012

(1) Where, in accordance with the provisions of this Part...

s.sch012

(1) Not less than ninety days before starting the execution...

s.sch012

(1) Subject to the following provisions of this paragraph, the...

s.sch012

(1) Subject to sub-paragraphs (2) and (3), if by reason...

s.sch012

Nothing in this Part of this Schedule affects the provisions...

s.sch012

Without prejudice to the generality of the protective provisions in...

s.sch012

Northern Powergrid and the undertaker must use their reasonable endeavours...

s.sch012

Work in relation to which an estimate is submitted must...

s.sch012

If Northern Powergrid at any time becomes aware that an...

s.sch012

Northern Powergrid may from time to time and at least...

s.sch012

The undertaker is not responsible for meeting costs or expenses...

s.sch012

Any difference under the provisions of this Part of this...

s.sch012

This Part of this Schedule does not apply to—

s.sch012

Prior to carrying out any works within the Order limits...

s.sch012

For the protection of NPL, the following provisions have effect,...

s.sch012

In this Part of this Schedule— “NPL” means NPL Waste...

s.sch012

Consent under this Part

s.sch012

No works comprising any part of the authorised development which...

s.sch012

Any approval of NPL required under paragraph 153 must not...

s.sch012

(1) The authorised development must be carried out in accordance...

s.sch012

Indemnity

s.sch012

Arbitration

s.sch012

For the protection of PD Teesport, the following provisions have...

s.sch012

Nothing in this Part affects the provisions of any enactment...

s.sch012

In this Part of this Schedule— “PD Teesport” means PD...

s.sch012

Regulation of powers

s.sch012

Any approval of PD Teesport required under paragraph 160 must...

s.sch012

Regulation of powers in relation to Seal Sands Road

s.sch012

Regulation of powers in relation to South Gare Road

s.sch012

Consent under this Part

s.sch012

No works comprising any part of the authorised development which...

s.sch012

Any approval of PD Teesport required under paragraph 165 must...

s.sch012

The authorised development must be carried out in accordance with...

s.sch012

Where there has been a reference to an arbitrator in...

s.sch012

Application

s.sch012

Indemnity

s.sch012

Arbitration

s.sch012

For the protection of RBT, the following provisions have effect,...

s.sch012

In this Part of this Schedule— “apparatus” means any mains,...

s.sch012

Regulation of powers

s.sch012

Any approval of RBT required under paragraph 173 must not...

s.sch012

Without limiting paragraph 174, it is not reasonable for RBT...

s.sch012

Interference with Apparatus and Access

s.sch012

Consent under this Part

s.sch012

No— (a) works comprising any part of the authorised development...

s.sch012

Interpretation

s.sch012

Any approval of RBT required under paragraph 178 must not...

s.sch012

Without limiting paragraph 179, it is not reasonable for RBT...

s.sch012

(1) The authorised development and activities on the wharf and...

s.sch012

Co-operation

s.sch012

The undertaker must pay to RBT— (a) a cost agreed...

s.sch012

Indemnity

s.sch012

Arbitration

s.sch012

Benefit of protective provisions

s.sch012

Interpretation

s.sch012

Pipeline survey

s.sch012

On Street Apparatus

s.sch012

Authorisation of works details affecting pipelines or protected crossing

s.sch012

No part of a relevant work is to be commenced...

s.sch012

(1) Any authorisation by SABIC required under paragraph 190(a) must...

s.sch012

(1) In the event that— (a) no response has been...

s.sch012

Notice of works

s.sch012

Further provisions about works

s.sch012

(1) All piling within 1.5 metres of the centreline of...

s.sch012

(1) Where excavation of trenches (including excavation by dredging) adjacent...

s.sch012

(1) Where a trench is excavated across or parallel to...

s.sch012

(1) A minimum clearance of 1500 millimetres must be maintained...

s.sch012

In this Part— “alternative apparatus” means alternative apparatus adequate to...

s.sch012

Apparatus of National Grid in streets subject to temporary stopping up

s.sch012

Monitoring for damage to pipelines

s.sch012

(1) If any damage occurs to a pipeline causing a...

s.sch012

Compliance with requirements, etc. applying to the protected land

s.sch012

Access for construction and maintenance

s.sch012

(1) In preparing a construction access plan under paragraph 202...

s.sch012

(1) No works affecting access rights over the access roads...

s.sch012

(1) If SABIC has a dispute about the proposed insurance...

s.sch012

Costs

s.sch012

Further protection in relation to the exercise of powers under the Order

s.sch012

Protective works to buildings

s.sch012

The undertaker, must when requested to do so by SABIC,...

s.sch012

Prior to the commencement of the authorised development the undertaker...

s.sch012

Arbitration

s.sch012

Extent of this Part

s.sch012

Interpretation of this Part

s.sch012

Separate approvals by third party owners or operators

s.sch012

Alternative apparatus

s.sch012

Consent under this Part in connection with Sembcorp operations

s.sch012

The works referred to in paragraph 217 must not be...

s.sch012

Removal of apparatus

s.sch012

Any approval of Sembcorp required under paragraph 218 must not...

s.sch012

(1) The authorised development must be carried out in accordance...

s.sch012

Indemnity

s.sch012

Participation in community groups

s.sch012

Notice of start and completion of commissioning

s.sch012

Arbitration

s.sch012

Additional Agreement

s.sch012

Interpretation

s.sch012

Facilities and rights for alternative apparatus

s.sch012

The following definitions apply in this Part of this Schedule—...

s.sch012

Consent to works in the shared area

s.sch012

Co-operation

s.sch012

Regulation of works within the shared area

s.sch012

Regulation of powers over the shared area

s.sch012

Constructability Principles

s.sch012

Interface Design Process

s.sch012

Design Principles

s.sch012

Maintenance and Operational Principles

s.sch012

Miscellaneous provisions

s.sch012

Retained apparatus

s.sch012

Indemnity

s.sch012

Dispute Resolution

s.sch012

Any difference in relation to the provisions in this Part...

s.sch012

The fees of the expert appointed pursuant to paragraph 241(b)...

s.sch012

Where appointed pursuant to paragraph 241(b), the expert must—

s.sch012

The expert must consider where relevant— (a) the development outcomes...

s.sch012

Any determination by the expert is final and binding which...

s.sch012

For the protection of Suez, the following provisions have effect,...

s.sch012

In this Part of this Schedule— “the respective authorised developments”...

s.sch012

Consent under this Part

s.sch012

Expenses

s.sch012

Before commencing any part of the authorised development which would...

s.sch012

No works comprising any part of the authorised development which...

s.sch012

Any approval of Suez required under paragraph 250 must not...

s.sch012

(1) The authorised development must be carried out in accordance...

s.sch012

Co-operation

s.sch012

Indemnity

s.sch012

Arbitration

s.sch012

For the protection of South Tees Development Corporation, Teesworks Limited...

s.sch012

(1) In this Part of this Schedule— “AIL access route...

s.sch012

Consent for works

s.sch012

Indemnity

s.sch012

No works comprising any part of the authorised development including...

s.sch012

Any approval of the Teesworks entity required under paragraph 260...

s.sch012

The authorised development must be carried out in accordance with...

s.sch012

The undertaker must not exercise the powers under Article 14...

s.sch012

Co-operation

s.sch012

The undertaker must provide the Teesworks entity with information the...

s.sch012

(1) This paragraph applies insofar as— (a) the construction of...

s.sch012

Expenses

s.sch012

Indemnity

s.sch012

Provision for diversion works

s.sch012

Enactments and agreements

s.sch012

If the undertaker intends to change the timing of the...

s.sch012

The Teesworks entity may issue a notice (a “diversion notice”)...

s.sch012

A diversion notice must set out— (a) the diversion work...

s.sch012

If a diversion notice is issued to the undertaker before...

s.sch012

In making the decision under paragraph 272 the undertaker must...

s.sch012

Where the undertaker gives an information notice to the Teesworks...

s.sch012

Where the undertaker notifies the Teesworks entity under paragraph 272(b)...

s.sch012

If the undertaker issues an information notice to the Teesworks...

s.sch012

If the Teesworks entity submits further information to the undertaker...

s.sch012

If the undertaker issues notice to the Teesworks entity under...

s.sch012

Co-operation

s.sch012

If the undertaker issues a notice under paragraph 272(a) the...

s.sch012

(1) Subject to sub-paragraphs (2) and (3), if a diversion...

s.sch012

If a reference is made to arbitration under paragraph 285...

s.sch012

Where the arbitrator determines that the terms of the diversion...

s.sch012

If— (a) a diversion works agreement is entered into within...

s.sch012

(1) If— (a) no diversion notice is issued by the...

s.sch012

Arbitration

s.sch012

Interpretation

s.sch012

Where a notice or information is provided by the undertaker...

s.sch012

For the protection of the Breagh Pipeline Owners, the following...

s.sch012

Access

s.sch012

In this Part of this Schedule— “Breagh Pipeline” means the...

s.sch012

Consent under this Part

s.sch012

No works comprising any part of the authorised development which...

s.sch012

(1) Any approval of the Breagh Pipeline Owners required under...

s.sch012

Compliance with requirements, etc. applying to the Breagh Pipeline and the Breagh Pipeline Operations

s.sch012

Indemnity

s.sch012

Arbitration

s.sch012

For the protection of Teesside Windfarm, the following provisions have...

s.sch012

In this Part of this Schedule— “restricted works” means works...

s.sch012

Consent under this Part

s.sch012

Precedence of the 1991 Act in respect of apparatus in the streets

s.sch012

Arbitration

s.sch012

Particularly in respect of the restricted works, the undertaker must...

s.sch012

No works comprising any part of the authorised development which...

s.sch012

Any approval of Teesside Windfarm required under paragraph 300 must...

s.sch012

(1) The authorised development must be carried out in accordance...

s.sch012

Indemnity

s.sch012

Arbitration

s.sch012

Benefit of protective provisions

s.sch012

Interpretation

s.sch012

Pipeline survey

s.sch012

Authorisation of works details affecting pipelines or protected crossing

s.sch012

Notices

s.sch012

No part of a relevant work is to be commenced...

s.sch012

(1) Any authorisation by HPU required under paragraph 309(a) must...

s.sch012

(1) In the event that— (a) no response has been...

s.sch012

Notice of works

s.sch012

Further provisions about works

s.sch012

(1) All piling within 1.5 metres of the centreline of...

s.sch012

(1) Where excavation of trenches (including excavation by dredging) adjacent...

s.sch012

(1) Where a trench is excavated across or parallel to...

s.sch012

(1) A minimum clearance of 1500 millimetres must be maintained...

s.sch012

Monitoring for damage to pipelines

s.sch012

Application

s.sch012

(1) If any damage occurs to a pipeline causing a...

s.sch012

Compliance with requirements, etc. applying to the protected land

s.sch012

Access for construction and maintenance

s.sch012

(1) In preparing a construction access plan under paragraph 321...

s.sch012

(1) No works affecting access rights over the access roads...

s.sch012

If HPU has a dispute about the proposed insurance (including...

s.sch012

Costs

s.sch012

Further protection in relation to the exercise of powers under the Order

s.sch012

The undertaker, must when requested to do so by HPU,...

s.sch012

Interpretation

s.sch012

Prior to the commencement of the authorised development the undertaker...

s.sch012

Arbitration

s.sch012

For the protection of Navigator Terminals, the following provisions have...

s.sch012

In this Part of this Schedule— “Navigator Terminals” means Navigator...

s.sch012

Consent under this Part

s.sch012

No works comprising any part of the authorised development which...

s.sch012

Any approval of Navigator Terminals required under paragraph 334 must...

s.sch012

(1) The authorised development must be carried out with good...

s.sch012

Indemnity

s.sch012

Arbitration

s.sch012

On Street Apparatus

s.sch012

For the protection of NW, the following provisions, unless otherwise...

s.sch012

In this Part of this Schedule— “alternative apparatus” means alternative...

s.sch012

The undertaker must not within the standard protection strips interfere...

s.sch012

The alteration, extension, removal or re-location of any apparatus shall...

s.sch012

In the situation, where in exercise of the powers conferred...

s.sch012

Regardless of any provision in this Order or anything shown...

s.sch012

If in consequence of the exercise of the powers conferred...

s.sch012

If in consequence of the exercise of the powers conferred...

s.sch012

(1) Subject to sub-paragraphs (2) and (3), if for any...

s.sch012

Any dispute arising between the undertaker and NW under this...

s.sch012

Apparatus of National Gas in streets subject to temporary stopping up

s.sch012

(1) Where in consequence of the proposed construction of any...

s.sch012

Prior to carrying out any works within the Order Limits...

s.sch012

Application

s.sch012

Interpretation

s.sch012

Except for paragraphs 354 (apparatus of statutory undertaker in stopped...

s.sch012

Apparatus of statutory undertaker in stopped up streets

s.sch012

Acquisition of land

s.sch012

Removal or diversion of apparatus

s.sch012

Facilities and rights for alternative apparatus

s.sch012

Retained apparatus: protection

s.sch012

Protective works to buildings

s.sch012

Expenses

s.sch012

Indemnity

s.sch012

Enactments and agreements

s.sch012

Co-operation

s.sch012

Access

s.sch012

Arbitration

s.sch012

Works falling outside of development authorised by the Order

s.sch012

Cathodic protection testing

s.sch012

For the protection of the NT Group (as defined below),...

s.sch012

In this Part of this Schedule— “NTL” means North Tees...

s.sch012

Removal of apparatus

s.sch012

Consent under this Part

s.sch012

Indemnity

s.sch012

Arbitration

s.sch012

Apparatus

s.sch012

For the protection of TGLP, TGPP and NGPL, the following...

s.sch012

In this Part of this Schedule— “alternate access agreement” means...

s.sch012

No relevant works are to be commenced until the design...

s.sch012

Following approval or deemed approval of the design package, the...

s.sch012

The undertaker will design and carry out or will procure...

s.sch012

Facilities and rights for alternative apparatus

s.sch012

Retained apparatus

s.sch012

Approval Principles: Relevant Works Package A

s.sch012

Subject to paragraph 393, below, it shall be reasonable for...

s.sch012

It will be unreasonable for the NSMP entity to withhold...

s.sch012

The undertaker and the NSMP entity must, in carrying out...

s.sch012

Approval Principles: Relevant Works Package B

s.sch012

The undertaker and the NSMP entity must, in carrying out...

s.sch012

Compliance with requirements, etc. applying to the NSMP operations

s.sch012

In undertaking any works in relation to the NSMP operations...

s.sch012

For the benefit of NSMP, the undertaker must not exercise...

s.sch012

Regardless of the temporary prohibition or restriction of use of...

s.sch012

Expenses

s.sch012

Indemnity

s.sch012

Arbitration

s.sch012

Access to plots 110, 112, 113 or 114

s.sch012

The undertaker must not use plots 103 or 108 to...

s.sch012

Where an alternate access agreement has been concluded, reference to...

s.sch012

Indemnity

s.sch012

Enactments and agreements

s.sch012

Co-operation

s.sch012

Access

s.sch012

Arbitration

s.sch012

Notices

s.sch012

For the protection of Air Products the following provisions have...

s.sch012

In this Part— “Air Products” means Air Products Public Limited...

s.sch012

Precedence of the 1991 Act in respect of apparatus in streets

s.sch012

No acquisition etc. except by agreement

s.sch012

Regardless of the temporary prohibition or restriction of use of...

s.sch012

No acquisition etc. except by agreement

s.sch012

Removal of apparatus

s.sch012

Facilities and rights for alternative apparatus

s.sch012

Retained Apparatus

s.sch012

Expenses and costs

s.sch012

(1) Subject to sub-paragraphs (2) and (3), if by reason...

s.sch012

Enactments and agreements

s.sch012

For the protection of CATS, the following provisions have effect,...

s.sch012

In this Part of this Schedule— “CATS” means CATS North...

s.sch012

Removal of apparatus

s.sch012

Consent under this Part

s.sch012

No works comprising any part of the authorised development within...

s.sch012

(1) Any approval of CATS required under paragraph 61 must...

s.sch012

Where formal consent is required under the CATS requirements for...

s.sch012

Compliance with the CATS requirements

s.sch012

No explosives for blasting are to be used within 400...

s.sch012

Monitoring for damage to pipelines

s.sch012

(1) If any damage occurs to a CATS pipeline causing...

s.sch012

Indemnity

s.sch012

Costs

s.sch012

Facilities and rights for alternative apparatus

s.sch012

Arbitration

s.sch012

For the protection of CF Fertilisers, the following provisions have...

s.sch012

In this Part of this Schedule— “alternative apparatus” means alternative...

s.sch012

Precedence of the 1991 Act in respect of apparatus in streets

s.sch012

Regardless of the temporary prohibition or restriction of use of...

s.sch012

Removal of apparatus/access

s.sch012

Facilities and rights for alternative apparatus

s.sch012

Retained Apparatus

s.sch012

Consent under this Part

s.sch012

Before commencing any part of the authorised development which would...

s.sch012

Retained Apparatus

s.sch012

No works comprising any part of the authorised development which...

s.sch012

Any approval of CF Fertilisers required under paragraph 80 must...

s.sch012

(1) The authorised development must be carried out in accordance...

s.sch012

Notices

s.sch012

Co-operation

s.sch012

Expenses and costs

s.sch012

(1) Subject to sub-paragraphs (2) and (3), if by reason...

s.sch012

Arbitration

s.sch012

For the protection of Exolum, the following provisions have effect,...

s.sch012

In this Part of this Schedule— “Exolum” means Exolum Seal...

s.sch012

Expenses and costs

s.sch012

Consent of restricted works under this Part

s.sch012

Prohibition of acquisition and interference

s.sch012

Cathodic protection testing

s.sch012

Expenses

s.sch012

Indemnity

s.sch012

Arbitration

s.sch012

For the protection of INEOS, the following provisions have effect,...

s.sch012

In this Part of this Schedule— “INEOS” means INEOS Nitriles...

s.sch012

Consent under this Part

s.sch012

No works comprising any part of the authorised development which...

s.sch012

This Part A sets out the approval process to be...

s.sch012

The undertaker shall submit the design package to the NSMP...

s.sch012

Following submission of the design package to the NSMP entity,...

s.sch012

In the event the NSMP entity does not provide any...

s.sch012

Once approved, the undertaker shall issue one paper copy and...

s.sch012

With respect to the relevant works package A, the undertaker...

s.sch012

This Part B sets out the approval process to be...

s.sch012

The undertaker shall submit any such change required to the...

s.sch012

Following submission of the change request to the NSMP entity,...

s.sch012

In the event the NSMP entity does not provide a...

s.sch012

Once approved, the undertaker shall issue one (1) paper copy...

s.sch012

Any approval of the NSMP entity required under Part A...

s.sch013

In this Schedule— “requirement consultee” means any body named in...

s.sch013

Applications made under a Requirement

s.sch013

Further information and consultation

s.sch013

Fees

s.sch013

Appeals

s.schedule/12/part/28/paragraph/1

Approval Process

Browse 50 other sections — procedural / definitional / commencement
s.art001

Citation and commencement

s.art002

Interpretation

s.art003

Electronic communications

s.art004

Development consent etc. granted by this Order

s.art005

Maintenance of authorised development

s.art006

Operation of authorised development

s.art007

Benefit of this Order

s.art008

Consent to transfer benefit of this Order

s.art009

Amendment and modification of statutory provisions

s.art010

Power to alter layout etc. of streets

s.art011

Street works

s.art012

Construction and maintenance of new or altered means of access

s.art013

Temporary stopping up of streets, public rights of way and access land

s.art014

Access to works

s.art015

Agreements with streets authorities

s.art016

Traffic regulation

s.art017

Discharge of water

s.art018

Felling or lopping of trees and removal of hedgerows

s.art019

Protective works to buildings

s.art020

Authority to survey and investigate the land

s.art021

Removal of human remains

s.art021

Supplemental land

s.art022

Compulsory acquisition of land

s.art023

Power to override easements and other rights

s.art024

Time limit for exercise of authority to acquire land compulsorily

s.art025

Compulsory acquisition of rights etc.

s.art026

Private rights

s.art027

Application of the 1981 Act

s.art028

Acquisition of subsoil and airspace only

s.art029

Modification of Part 1 of the 1965 Act

s.art030

Rights under or over streets

s.art031

Temporary use of land for carrying out the authorised development

s.art032

Temporary use of land for maintaining the authorised development

s.art033

Statutory undertakers

s.art034

Apparatus and rights of statutory undertakers in streets

s.art035

Recovery of costs of new connections

s.art036

Compulsory acquisition of land – incorporation of the mineral code

s.art037

Deemed marine licence

s.art038

Application of landlord and tenant law

s.art039

Operational land for purposes of the 1990 Act

s.art040

Defence to proceedings in respect of statutory nuisance

s.art041

Protection of interests

s.art042

Saving for Trinity House

s.art043

Crown Rights

s.art044

Procedure in relation to certain approvals

s.art045

Certification of plans etc.

s.art046

Service of notices

s.art047

Arbitration

s.art048

Funding for compulsory acquisition compensation

Explore more