UK Statutory Instrument SI 2017/215 United Kingdom

The North London Heat and Power Generating Station Order 2017

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker3 Operator1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Operator — also bound by 746 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

sch. 13 para. 3 (1) Subject to sub-paragraphs (2) and (3), if, as the... Regulated
  • Pay for damage to or interruption of electronic communications servicesStatutory Undertaker
sch. 13 para. 6 Any difference or dispute arsing between the operator and the... Regulated
  • Refer disputes to arbitration unless agreed otherwiseStatutory Undertaker
sch. 13 para. 7 (1) Where, under this Part or anywhere else under this... Regulated
  • Act reasonably on consents and cooperate with undertakerOperator
s.art018 Authority to survey and investigate Regulated
  • Notify landowners and occupiers 14 days before entering or surveying their landStatutory Undertaker
44 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent etc. granted by Order
s.art004 Limits of deviation
s.art005 Maintenance of authorised development
s.art006 Operation of authorised development
s.art007 Benefit of Order
s.art008 Consent to transfer benefit of Order
s.art009 Defence to proceedings in respect of statutory nuisance
s.art010 Street works
s.art011 Alteration of street layout
s.art012 Public rights of way
s.art013 Temporary stopping up of streets
s.art014 Access to works
s.art015 Agreements with street authorities
s.art016 Discharge of water
s.art017 Protective work to buildings
s.art019 Compulsory acquisition of land
s.art020 Time limit for exercise of authority to acquire land compulsorily or use land temporarily
s.art021 Power to override easements and other rights
s.art022 Compulsory acquisition of rights
s.art023 Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art024 Rights under or over streets
s.art025 Rights over land
s.art026 Temporary use of land for construction of authorised development
s.art027 Temporary use of land for maintaining authorised development
s.art028 Statutory undertakers
s.art029 Recovery of costs of new connections
s.art030 Application of landlord and tenant law
s.art031 Operational land for purposes of the 1990 Act
s.art032 Felling or lopping of trees
s.art033 Certification of documents and plans
s.art034 Arbitration
s.art035 No double recovery
s.art036 Protective provisions for specified undertakers
s.art037 Approvals, consents and appeals
Schedules

Schedules

0 of 39 shown
39 other schedules
s.sch001 The construction and operation of a nationally significant infrastructure project...
s.sch001 Associated development within the meaning of section 115(2) of the...
s.sch001 In connection with Works No. 1 to 7, to the...
s.sch002 Interpretation
s.sch002 Provision of landscaping
s.sch002 Maintenance of landscaping
s.sch002 Access and roads
s.sch002 Operational surface and foul water drainage
s.sch002 Contaminated land and groundwater
s.sch002 Ecology
s.sch002 Code of construction practice
s.sch002 Control of noise during operational stage
s.sch002 Combined heat and power
s.sch002 Transitional period
s.sch002 Time limits
s.sch002 Decommissioning and demolition of the energy from waste facility
s.sch002 Decommissioning and demolition of the electricity and heat generating station
s.sch002 Stages of the authorised development
s.sch002 Detailed design approval
s.sch002 Parameters
s.sch002 Environmental commitments and mitigation schedule
s.sch002 Type of waste to be managed
s.sch002 Notices
s.sch002 BREEAM rating
s.sch003 Applications made for approvals and consents required by this Order
s.sch003 Further information
s.sch003 Fees further to Requirements
s.sch003 Appeals
s.sch011 Compensation enactments
s.sch011 (1) Without limiting paragraph 1, the Land Compensation Act 1973...
s.sch011 Application of 1965 Act
s.sch011 Section 11 of the 1965 Act (powers of entry) is...
s.sch011 Sections 12 (unauthorised entry) and 13 (refusal to give possession...
s.sch013 Indemnity
s.sch013 Enactments and agreements
s.sch013 Co-operation
s.sch013 Access
s.sch013 Arbitration
s.sch013 Approval Process

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.