UK Statutory Instrument SI 2015/1592 United Kingdom

The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker6 Trader1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Trader — also bound by 825 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

sch. 12 para. 12 sch. 12 para. 12 Regulated
  • Pay costs and compensation for damage or interruption caused by constructionStatutory Undertaker
sch. 12 para. 3 sch. 12 para. 3 Regulated
  • Pay for damage to telecoms equipment and restore service if caused by your projectStatutory Undertaker
sch. 12 para. 7 sch. 12 para. 7 Regulated
  • Provide up-to-date drawings of protected property on noticeTrader
sch. 12 para. 8 Apparatus Regulated
  • Ensure alternative apparatus is operational before removing existing apparatusStatutory Undertaker
67 other provisions — procedural and definitional
sch. 12 para. 5 sch. 12 para. 5
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent granted by Order
s.art004 Maintenance of authorised project
s.art005 Operation of generating station
s.art006 Procedure in relation to approvals, etc. under Requirements
s.art007 Benefit of Order
s.art008 Consent to transfer benefit of Order
s.art009 Guarantees in respect of payment
s.art010 Bizco 2 and Bizo 3 may enter on certain land for purposes of construction
s.art011 Disapplication and modification of legislative provisions
s.art012 Project A Offshore works: abandonment, decay or removal
s.art012 Project B Offshore works: abandonment, decay or removal
s.art013 Defence to proceedings in respect of statutory nuisance
s.art014 Street works
s.art015 Temporary stopping up of streets
s.art016 Access to works
s.art017 Agreements with street authorities
s.art018 Discharge of water
s.art019 Protective work to buildings
s.art020 Authority to survey and investigate land
s.art021 Removal of human remains
s.art022 Compulsory acquisition of land
s.art023 Compulsory acquisition of land: minerals
s.art024 Time limit for exercise of authority to acquire land compulsorily,
s.art025 Compulsory acquisition of rights
s.art026 Private rights of way
s.art027 Application of Compulsory Purchase (Vesting Declarations) Act 1981
s.art028 Rights under or over streets
s.art029 Temporary use of land for carrying out authorised project
s.art030 Temporary use of land for maintaining authorised project
s.art031 Statutory undertakers
s.art032 Recovery of costs of new connections
s.art033 Application of landlord and tenant law
s.art034 Special category land
s.art035 Railway and navigation undertakings
s.art036 Trees subject to tree preservation orders
s.art037 Operational land for purposes of Town and Country Planning Act 1990
s.art038 Felling or lopping of trees and removal of hedgerows
s.art039 Deemed licences under Marine and Coastal Access Act 2009
s.art040 Saving for
s.art041 Crown rights
s.art042 Certification of plans and documents, etc.
s.art043 Protective provisions
s.art044 Arbitration
Schedules

Schedules

3 of 172 shown
s.sch008 (1) Each programme, statement, plan, protocol, scheme or details required... Regulated
  • Submit pre-construction plans early and comply with approved versionsStatutory Undertaker
s.sch009 (1) Each programme, statement, plan, protocol, scheme or details required... Regulated
  • Submit pre-construction plans 4 months before building and comply with themStatutory Undertaker
s.sch011 (1) Each programme, statement, plan, protocol or scheme required to... Regulated
  • Submit pre-construction plans for MMO approval before starting constructionStatutory Undertaker
169 other schedules
s.sch001 (1) Within Work No. 1A, the HVAC cables must not,...
s.sch001 (1) Within Work No. 1A, the HVAC cable crossings must...
s.sch001 (1) Within Work Nos. 1A and 2A, the HVDC cable...
s.sch001 Layout rules
s.sch001 Aviation lighting
s.sch001 Offshore decommissioning
s.sch001 Offshore safety management
s.sch001 Restricted work area
s.sch001 Stages of authorised development onshore
s.sch001 Detailed design approval onshore
s.sch001 (1) Except where a stage of the onshore works (or...
s.sch001 Provision of landscaping
s.sch001 Implementation and maintenance of landscaping
s.sch001 Fencing and other means of enclosure
s.sch001 Highway accesses
s.sch001 Surface and foul water drainage
s.sch001 Archaeology
s.sch001 Code of construction practice
s.sch001 Construction environmental management plan
s.sch001 Construction hours
s.sch001 Control of noise during operational phase
s.sch001 Control of artificial light emissions
s.sch001 Construction traffic routing and management plans
s.sch001 Drilling works under highways
s.sch001 Port access and transport plans
s.sch001 European protected species: onshore
s.sch001 Restoration of land used temporarily for construction
s.sch001 Interference with telecommunications
s.sch001 Onshore decommissioning
s.sch001 Approval, etc. to be given in writing
s.sch001 (1) No meteorological station lattice tower may exceed a height...
s.sch001 Amendments to plans, etc.
s.sch001 Southern North Sea Special Area of Conservation
s.sch001 (1) The total number of offshore platforms within Work No....
s.sch001 (1) Within Work No. 1A, wind turbine generator foundation structures...
s.sch001 (1) Within Work No. 1(B), wind turbine generator foundation structures...
s.sch001 (1) Within Work No. 1A, the wind turbine generator foundations...
s.sch001 (1) The total seabed footprint of foundation structures (excluding mooring...
s.sch001 Within Work No. 1B, the total number of monopole foundations...
s.sch001 (1) Within Work Nos. 1A, 2A and 3A, the HVDC...
s.sch006 Compensation enactments modified
s.sch006 Land Compensation Act 1973 modified
s.sch006 Compulsory Purchase Act 1965 modified
s.sch008 Interpretation
s.sch008 Within Work No. 1A, the HVAC cable crossings must not,...
s.sch008 Within Work Nos. 1A and 2A, the HVDC cable crossings...
s.sch008 Layout rules
s.sch008 Notifications and inspections
s.sch008 Chemicals, drilling and debris
s.sch008 Force majeure
s.sch008 Pre-construction plans and documentation
s.sch008 Offshore safety management
s.sch008 Reporting of engaged agents, contractors and vessels
s.sch008 Details of licensed activities
s.sch008 Equipment and operation of vessels engaged in licensed activities
s.sch008 Pre-construction monitoring
s.sch008 Construction monitoring
s.sch008 Post-construction surveys
s.sch008 Offshore maintenance plan
s.sch008 Aids to navigation
s.sch008 The undertaker must submit reports quarterly to Trinity House detailing...
s.sch008 The undertaker must notify Trinity House and the MMO of...
s.sch008 Following notification of a failure of aids to navigation, the...
s.sch008 The undertaker must paint all structures that are part of...
s.sch008 Detailed offshore design parameters
s.sch008 In case of damage to, or destruction or decay of,...
s.sch008 The undertaker must lay down such buoys, exhibit such lights...
s.sch008 Progress of authorised scheme
s.sch008 Amendments to plans, etc.
s.sch008 (1) No meteorological station lattice tower may exceed a height...
s.sch008 (1) The total number of offshore platforms within Work No....
s.sch008 (1) Wind turbine generator foundation structures must be of 1...
s.sch008 Within Work No. 1A, the wind turbine generator foundations must...
s.sch008 (1) The total seabed footprint of foundation structures (excluding mooring...
s.sch008 Within Work No. 1A, the HVAC cables must not, in...
s.sch009 Interpretation
s.sch009 Within Work No. 1B, the HVAC cable crossings must not,...
s.sch009 Within Work Nos. 1B and 2B, the HVDC cable crossings...
s.sch009 Layout rules
s.sch009 Notifications and inspections
s.sch009 Chemicals, drilling and debris
s.sch009 Force majeure
s.sch009 Pre-construction plans and documentation
s.sch009 Offshore safety management
s.sch009 Reporting of engaged agents, contractors and vessels
s.sch009 Details of licensed activities
s.sch009 Equipment and operation of vessels engaged in licensed activities
s.sch009 Pre-construction monitoring
s.sch009 Construction monitoring
s.sch009 Post-construction surveys
s.sch009 Offshore maintenance plan
s.sch009 Aids to navigation
s.sch009 The undertaker must submit reports quarterly to Trinity House detailing...
s.sch009 The undertaker must notify Trinity House and the MMO of...
s.sch009 Following notification of a failure of aids to navigation, the...
s.sch009 The undertaker must paint all structures that are part of...
s.sch009 Detailed offshore design parameters
s.sch009 In case of damage to, or destruction or decay of,...
s.sch009 The undertaker must lay down such buoys, exhibit such lights...
s.sch009 Progress of authorised scheme
s.sch009 Amendments to plans, etc.
s.sch009 (1) No meteorological station lattice tower may exceed a height...
s.sch009 (1) The total number of offshore platforms within Work No....
s.sch009 (1) Wind turbine generator foundation structures must be of 1...
s.sch009 Within Work No. 1B, the wind turbine generator foundations must...
s.sch009 (1) The total seabed footprint of foundation structures (excluding mooring...
s.sch009 Within Work No. 1B, the HVAC cables must not, in...
s.sch010 Interpretation
s.sch010 Notifications and inspections
s.sch010 Chemicals, drilling and debris
s.sch010 Force majeure
s.sch010 Pre-construction plans and documentation
s.sch010 (1) Each programme, statement, plan, protocol, scheme or details required...
s.sch010 Offshore safety management
s.sch010 Reporting of engaged agents, contractors and vessels
s.sch010 Equipment and operation of vessels engaged in licensed activities
s.sch010 Pre-construction monitoring
s.sch010 Construction monitoring
s.sch010 Details of licensed activities
s.sch010 Post-construction surveys
s.sch010 Offshore maintenance plan
s.sch010 Aids to navigation
s.sch010 The undertaker must submit reports quarterly to Trinity House detailing...
s.sch010 The undertaker must notify Trinity House and the MMO of...
s.sch010 Following notification of a failure of aids to navigation, the...
s.sch010 The undertaker must paint all structures that are part of...
s.sch010 In case of damage to, or destruction or decay of,...
s.sch010 The undertaker must lay down such buoys, exhibit such lights...
s.sch010 Progress of authorised scheme
s.sch010 Detailed offshore design parameters
s.sch010 Amendments to plans, etc.
s.sch010 (1) The total number of offshore platforms within Work No...
s.sch010 (1) The total seabed footprint of foundation structures (excluding mooring...
s.sch010 (1) Within Work Nos. 1A, 2A and 3A, the HVDC...
s.sch010 Within Work No. 1A, the HVAC cables must not, in...
s.sch010 Within Work No. 1A, the HVAC cable crossings must not,...
s.sch010 Within Work Nos. 1A and 2A, the HVDC cable crossings...
s.sch011 Interpretation
s.sch011 Notifications and inspections
s.sch011 Chemicals, drilling and debris
s.sch011 Force majeure
s.sch011 Pre-construction plans and documentation
s.sch011 Offshore safety management
s.sch011 Reporting of engaged agents, contractors and vessels
s.sch011 Equipment and operation of vessels engaged in licensed activities
s.sch011 Pre-construction monitoring
s.sch011 Construction monitoring
s.sch011 Details of licensed activities
s.sch011 Post-construction surveys
s.sch011 Offshore maintenance plan
s.sch011 Aids to navigation
s.sch011 The undertaker must submit reports quarterly to Trinity House detailing...
s.sch011 The undertaker must notify Trinity House and the MMO of...
s.sch011 Following notification of a failure of aids to navigation, the...
s.sch011 The undertaker must paint all structures that are part of...
s.sch011 In case of damage to, or destruction or decay of,...
s.sch011 The undertaker must lay down such buoys, exhibit such lights...
s.sch011 Progress of authorised scheme
s.sch011 Detailed offshore design parameters
s.sch011 Amendments to plans, etc.
s.sch011 (1) The total number of offshore platforms within Work No....
s.sch011 (1) The total seabed footprint of foundation structures (excluding mooring...
s.sch011 (1) Within Work Nos. 1B, 2B and 3B, the HVDC...
s.sch011 Within Work No. 1B, the HVAC cables must not, in...
s.sch011 Within Work No. 1B, the HVAC cable crossings must not,...
s.sch011 Within Work Nos. 1B and 2B, the HVDC cable crossings...
s.sch012 Before undertaking any construction works on the Wilton Land or...
s.sch012 The undertaker must co-operate with the owners and operators in...
s.sch012 Expert