The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
At a glance
What's here
4 compliance obligations
Who this Act binds
Business-side actors with duties under this Act, ranked by how often they appear.
- Statutory Undertaker 3
- Trader 1
Other Acts binding the same actors
For each actor bound by this Act, the other UK Acts that bind them most often. Useful for understanding the full compliance landscape facing each role.
Statutory Undertakers also bound by 169 other Acts (top 5 shown)
- The Cory Decarbonisation Project Order 2025 2025 116 duties
- The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 2022 112 duties
- Water Industry Act 1991 1991 52 duties
- Water and Sewerage Services (Northern Ireland) Order 2006 2006 44 duties
- The A47 North Tuddenham to Easton Development Consent Order 2022 2022 28 duties
Traders also bound by 826 other Acts (top 5 shown)
- Value Added Tax Regulations 1995 1995 413 duties
- Companies Act 2006 2006 243 duties
- The Large and Medium-sized Companies and Groups (Accounts and Reports) Regulations 2008 2008 114 duties
- Insolvency (England and Wales) Rules 2016 2016 62 duties
- Building Societies Act 1986 1986 56 duties
What this Act requires
Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.
Schedules
Browse 172 other Schedules — structural / supplementary
(1) Within Work No. 1A, the HVAC cable crossings must...
(1) Within Work Nos. 1A and 2A, the HVDC cable...
Layout rules
Aviation lighting
Offshore decommissioning
Offshore safety management
Restricted work area
Stages of authorised development onshore
Detailed design approval onshore
(1) Except where a stage of the onshore works (or...
Provision of landscaping
Implementation and maintenance of landscaping
Fencing and other means of enclosure
Highway accesses
Surface and foul water drainage
Archaeology
Code of construction practice
Construction environmental management plan
Construction hours
Control of noise during operational phase
Control of artificial light emissions
Construction traffic routing and management plans
Drilling works under highways
Port access and transport plans
European protected species: onshore
Restoration of land used temporarily for construction
Interference with telecommunications
Onshore decommissioning
Approval, etc. to be given in writing
(1) No meteorological station lattice tower may exceed a height...
Amendments to plans, etc.
Southern North Sea Special Area of Conservation
(1) The total number of offshore platforms within Work No....
(1) Within Work No. 1A, wind turbine generator foundation structures...
(1) Within Work No. 1(B), wind turbine generator foundation structures...
(1) Within Work No. 1A, the wind turbine generator foundations...
(1) The total seabed footprint of foundation structures (excluding mooring...
Within Work No. 1B, the total number of monopole foundations...
(1) Within Work Nos. 1A, 2A and 3A, the HVDC...
Compensation enactments modified
Land Compensation Act 1973 modified
Compulsory Purchase Act 1965 modified
Interpretation
Within Work No. 1A, the HVAC cable crossings must not,...
Within Work Nos. 1A and 2A, the HVDC cable crossings...
Layout rules
Notifications and inspections
Chemicals, drilling and debris
Force majeure
Pre-construction plans and documentation
(1) Each programme, statement, plan, protocol, scheme or details required...
Offshore safety management
Reporting of engaged agents, contractors and vessels
Details of licensed activities
Equipment and operation of vessels engaged in licensed activities
Pre-construction monitoring
Construction monitoring
Post-construction surveys
Offshore maintenance plan
Aids to navigation
The undertaker must submit reports quarterly to Trinity House detailing...
The undertaker must notify Trinity House and the MMO of...
Following notification of a failure of aids to navigation, the...
The undertaker must paint all structures that are part of...
Detailed offshore design parameters
In case of damage to, or destruction or decay of,...
The undertaker must lay down such buoys, exhibit such lights...
Progress of authorised scheme
Amendments to plans, etc.
(1) No meteorological station lattice tower may exceed a height...
(1) The total number of offshore platforms within Work No....
(1) Wind turbine generator foundation structures must be of 1...
Within Work No. 1A, the wind turbine generator foundations must...
(1) The total seabed footprint of foundation structures (excluding mooring...
Within Work No. 1A, the HVAC cables must not, in...
Interpretation
Within Work No. 1B, the HVAC cable crossings must not,...
Within Work Nos. 1B and 2B, the HVDC cable crossings...
Layout rules
Notifications and inspections
Chemicals, drilling and debris
Force majeure
Pre-construction plans and documentation
(1) Each programme, statement, plan, protocol, scheme or details required...
Offshore safety management
Reporting of engaged agents, contractors and vessels
Details of licensed activities
Equipment and operation of vessels engaged in licensed activities
Pre-construction monitoring
Construction monitoring
Post-construction surveys
Offshore maintenance plan
Aids to navigation
The undertaker must submit reports quarterly to Trinity House detailing...
The undertaker must notify Trinity House and the MMO of...
Following notification of a failure of aids to navigation, the...
The undertaker must paint all structures that are part of...
Detailed offshore design parameters
In case of damage to, or destruction or decay of,...
The undertaker must lay down such buoys, exhibit such lights...
Progress of authorised scheme
Amendments to plans, etc.
(1) No meteorological station lattice tower may exceed a height...
(1) The total number of offshore platforms within Work No....
(1) Wind turbine generator foundation structures must be of 1...
Within Work No. 1B, the wind turbine generator foundations must...
(1) The total seabed footprint of foundation structures (excluding mooring...
Within Work No. 1B, the HVAC cables must not, in...
Interpretation
Notifications and inspections
Chemicals, drilling and debris
Force majeure
Pre-construction plans and documentation
(1) Each programme, statement, plan, protocol, scheme or details required...
Offshore safety management
Reporting of engaged agents, contractors and vessels
Equipment and operation of vessels engaged in licensed activities
Pre-construction monitoring
Construction monitoring
Details of licensed activities
Post-construction surveys
Offshore maintenance plan
Aids to navigation
The undertaker must submit reports quarterly to Trinity House detailing...
The undertaker must notify Trinity House and the MMO of...
Following notification of a failure of aids to navigation, the...
The undertaker must paint all structures that are part of...
In case of damage to, or destruction or decay of,...
The undertaker must lay down such buoys, exhibit such lights...
Progress of authorised scheme
Detailed offshore design parameters
Amendments to plans, etc.
(1) The total number of offshore platforms within Work No...
(1) The total seabed footprint of foundation structures (excluding mooring...
(1) Within Work Nos. 1A, 2A and 3A, the HVDC...
Within Work No. 1A, the HVAC cables must not, in...
Within Work No. 1A, the HVAC cable crossings must not,...
Within Work Nos. 1A and 2A, the HVDC cable crossings...
Interpretation
Notifications and inspections
Chemicals, drilling and debris
Force majeure
Pre-construction plans and documentation
(1) Each programme, statement, plan, protocol or scheme required to...
Offshore safety management
Reporting of engaged agents, contractors and vessels
Equipment and operation of vessels engaged in licensed activities
Pre-construction monitoring
Construction monitoring
Details of licensed activities
Post-construction surveys
Offshore maintenance plan
Aids to navigation
The undertaker must submit reports quarterly to Trinity House detailing...
The undertaker must notify Trinity House and the MMO of...
Following notification of a failure of aids to navigation, the...
The undertaker must paint all structures that are part of...
In case of damage to, or destruction or decay of,...
The undertaker must lay down such buoys, exhibit such lights...
Progress of authorised scheme
Detailed offshore design parameters
Amendments to plans, etc.
(1) The total number of offshore platforms within Work No....
(1) The total seabed footprint of foundation structures (excluding mooring...
(1) Within Work Nos. 1B, 2B and 3B, the HVDC...
Within Work No. 1B, the HVAC cables must not, in...
Within Work No. 1B, the HVAC cable crossings must not,...
Within Work Nos. 1B and 2B, the HVDC cable crossings...
Before undertaking any construction works on the Wilton Land or...
The undertaker must co-operate with the owners and operators in...
Expert
sch. 12 para. 12
- Pay costs and compensation for damage or interruption caused by construction Statutory Undertaker
sch. 12 para. 3
- Pay for damage to telecoms equipment and restore service if caused by your project Statutory Undertaker
sch. 12 para. 7
- Provide up-to-date drawings of protected property on notice Trader
Apparatus
- Ensure alternative apparatus is operational before removing existing apparatus Statutory Undertaker
Browse 67 other sections — procedural / definitional / commencement
sch. 12 para. 5
A nationally significant infrastructure project as defined in sections 14...
Associated development within the meaning of section 115(2) of the...
Associated development within the meaning of section 115(2) of the...
Despite any provision of this Order or anything shown on...
(1) If, in the exercise of the powers conferred by...
(1) Where, in accordance with this Part, the undertaker affords...
(1) Not less than 28 days before executing any works...
(1) Subject to the provisions of this paragraph, the undertaker...
(1) Subject to sub-paragraphs (2) and (3), if by reason...
Nothing in this Part affects the provisions of any enactment...
In relation to any dispute arising under this Part, the...
If at any time after the completion of a specified...
The undertaker must not provide any illumination or illuminated sign...
Any additional expenses that Network Rail may reasonably incur in...
(1) The undertaker must— (a) pay to Network Rail all...
Network Rail must, on receipt of a request from the...
In the assessment of any sums payable to Network Rail...
The undertaker and Network Rail may, subject in the case...
Nothing in this Order, or in any enactment incorporated with...
The undertaker must give written notice to Network Rail if...
The undertaker must, no later than 28 days after the...
Citation and commencement
Interpretation
Development consent granted by Order
Maintenance of authorised project
Operation of generating station
Procedure in relation to approvals, etc. under Requirements
Benefit of Order
Consent to transfer benefit of Order
Guarantees in respect of payment
Bizco 2 and Bizo 3 may enter on certain land for purposes of construction
Disapplication and modification of legislative provisions
Project A Offshore works: abandonment, decay or removal
Project B Offshore works: abandonment, decay or removal
Defence to proceedings in respect of statutory nuisance
Street works
Temporary stopping up of streets
Access to works
Agreements with street authorities
Discharge of water
Protective work to buildings
Authority to survey and investigate land
Removal of human remains
Compulsory acquisition of land
Compulsory acquisition of land: minerals
Time limit for exercise of authority to acquire land compulsorily,
Compulsory acquisition of rights
Private rights of way
Application of Compulsory Purchase (Vesting Declarations) Act 1981
Rights under or over streets
Temporary use of land for carrying out authorised project
Temporary use of land for maintaining authorised project
Statutory undertakers
Recovery of costs of new connections
Application of landlord and tenant law
Special category land
Railway and navigation undertakings
Trees subject to tree preservation orders
Operational land for purposes of Town and Country Planning Act 1990
Felling or lopping of trees and removal of hedgerows
Deemed licences under Marine and Coastal Access Act 2009
Saving for
Crown rights
Certification of plans and documents, etc.
Protective provisions
Arbitration