- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Statutory Undertaker6
Trader1
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Statutory Undertaker — also bound by 179 other Acts
The Cory Decarbonisation Project Order 2025
120 duties
Water Industry Act 1991
53 duties
Trader — also bound by 825 other Acts
Value Added Tax Regulations 1995
416 duties
Companies Act 2006
243 duties
Companies Act 1985
85 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
sch. 12 para. 12
sch. 12 para. 12
Regulated
- Pay costs and compensation for damage or interruption caused by constructionStatutory Undertaker
sch. 12 para. 3
sch. 12 para. 3
Regulated
- Pay for damage to telecoms equipment and restore service if caused by your projectStatutory Undertaker
sch. 12 para. 7
sch. 12 para. 7
Regulated
- Provide up-to-date drawings of protected property on noticeTrader
sch. 12 para. 8
Apparatus
Regulated
- Ensure alternative apparatus is operational before removing existing apparatusStatutory Undertaker
67 other provisions — procedural and definitional
sch. 12 para. 5
sch. 12 para. 5
s.001
A nationally significant infrastructure project as defined in sections 14... (opens in a new tab)
s.art001
Citation and commencement
s.art002
Interpretation
s.art003
Development consent granted by Order
s.art004
Maintenance of authorised project
s.art005
Operation of generating station
s.art006
Procedure in relation to approvals, etc. under Requirements
s.art007
Benefit of Order
s.art008
Consent to transfer benefit of Order
s.art009
Guarantees in respect of payment
s.art010
Bizco 2 and Bizo 3 may enter on certain land for purposes of construction
s.art011
Disapplication and modification of legislative provisions
s.art012
Project A Offshore works: abandonment, decay or removal
s.art012
Project B Offshore works: abandonment, decay or removal
s.art013
Defence to proceedings in respect of statutory nuisance
s.art014
Street works
s.art015
Temporary stopping up of streets
s.art016
Access to works
s.art017
Agreements with street authorities
s.art018
Discharge of water
s.art019
Protective work to buildings
s.art020
Authority to survey and investigate land
s.art021
Removal of human remains
s.art022
Compulsory acquisition of land
s.art023
Compulsory acquisition of land: minerals
s.art024
Time limit for exercise of authority to acquire land compulsorily,
s.art025
Compulsory acquisition of rights
s.art026
Private rights of way
s.art027
Application of Compulsory Purchase (Vesting Declarations) Act 1981
s.art028
Rights under or over streets
s.art029
Temporary use of land for carrying out authorised project
s.art030
Temporary use of land for maintaining authorised project
s.art031
Statutory undertakers
s.art032
Recovery of costs of new connections
s.art033
Application of landlord and tenant law
s.art034
Special category land
s.art035
Railway and navigation undertakings
s.art036
Trees subject to tree preservation orders
s.art037
Operational land for purposes of Town and Country Planning Act 1990
s.art038
Felling or lopping of trees and removal of hedgerows
s.art039
Deemed licences under Marine and Coastal Access Act 2009
s.art040
Saving for
s.art041
Crown rights
s.art042
Certification of plans and documents, etc.
s.art043
Protective provisions
s.art044
Arbitration
Schedules
Schedules
3 of 172 shown
s.sch008
(1) Each programme, statement, plan, protocol, scheme or details required...
Regulated
- Submit pre-construction plans early and comply with approved versionsStatutory Undertaker
s.sch009
(1) Each programme, statement, plan, protocol, scheme or details required...
Regulated
- Submit pre-construction plans 4 months before building and comply with themStatutory Undertaker
s.sch011
(1) Each programme, statement, plan, protocol or scheme required to...
Regulated
- Submit pre-construction plans for MMO approval before starting constructionStatutory Undertaker
169 other schedules
s.sch001
(1) Within Work No. 1A, the HVAC cables must not,...
s.sch001
(1) Within Work No. 1A, the HVAC cable crossings must...
s.sch001
(1) Within Work Nos. 1A and 2A, the HVDC cable...
s.sch001
Layout rules
s.sch001
Aviation lighting
s.sch001
Offshore decommissioning
s.sch001
Offshore safety management
s.sch001
Restricted work area
s.sch001
Stages of authorised development onshore
s.sch001
Detailed design approval onshore
s.sch001
(1) Except where a stage of the onshore works (or...
s.sch001
Provision of landscaping
s.sch001
Implementation and maintenance of landscaping
s.sch001
Fencing and other means of enclosure
s.sch001
Highway accesses
s.sch001
Surface and foul water drainage
s.sch001
Archaeology
s.sch001
Code of construction practice
s.sch001
Construction environmental management plan
s.sch001
Construction hours
s.sch001
Control of noise during operational phase
s.sch001
Control of artificial light emissions
s.sch001
Construction traffic routing and management plans
s.sch001
Drilling works under highways
s.sch001
Port access and transport plans
s.sch001
European protected species: onshore
s.sch001
Restoration of land used temporarily for construction
s.sch001
Interference with telecommunications
s.sch001
Onshore decommissioning
s.sch001
Approval, etc. to be given in writing
s.sch001
(1) No meteorological station lattice tower may exceed a height...
s.sch001
Amendments to plans, etc.
s.sch001
Southern North Sea Special Area of Conservation
s.sch001
(1) The total number of offshore platforms within Work No....
s.sch001
(1) Within Work No. 1A, wind turbine generator foundation structures...
s.sch001
(1) Within Work No. 1(B), wind turbine generator foundation structures...
s.sch001
(1) Within Work No. 1A, the wind turbine generator foundations...
s.sch001
(1) The total seabed footprint of foundation structures (excluding mooring...
s.sch001
Within Work No. 1B, the total number of monopole foundations...
s.sch001
(1) Within Work Nos. 1A, 2A and 3A, the HVDC...
s.sch006
Compensation enactments modified
s.sch006
Land Compensation Act 1973 modified
s.sch006
Compulsory Purchase Act 1965 modified
s.sch008
Interpretation
s.sch008
Within Work No. 1A, the HVAC cable crossings must not,...
s.sch008
Within Work Nos. 1A and 2A, the HVDC cable crossings...
s.sch008
Layout rules
s.sch008
Notifications and inspections
s.sch008
Chemicals, drilling and debris
s.sch008
Force majeure
s.sch008
Pre-construction plans and documentation
s.sch008
Offshore safety management
s.sch008
Reporting of engaged agents, contractors and vessels
s.sch008
Details of licensed activities
s.sch008
Equipment and operation of vessels engaged in licensed activities
s.sch008
Pre-construction monitoring
s.sch008
Construction monitoring
s.sch008
Post-construction surveys
s.sch008
Offshore maintenance plan
s.sch008
Aids to navigation
s.sch008
The undertaker must submit reports quarterly to Trinity House detailing...
s.sch008
The undertaker must notify Trinity House and the MMO of...
s.sch008
Following notification of a failure of aids to navigation, the...
s.sch008
The undertaker must paint all structures that are part of...
s.sch008
Detailed offshore design parameters
s.sch008
In case of damage to, or destruction or decay of,...
s.sch008
The undertaker must lay down such buoys, exhibit such lights...
s.sch008
Progress of authorised scheme
s.sch008
Amendments to plans, etc.
s.sch008
(1) No meteorological station lattice tower may exceed a height...
s.sch008
(1) The total number of offshore platforms within Work No....
s.sch008
(1) Wind turbine generator foundation structures must be of 1...
s.sch008
Within Work No. 1A, the wind turbine generator foundations must...
s.sch008
(1) The total seabed footprint of foundation structures (excluding mooring...
s.sch008
Within Work No. 1A, the HVAC cables must not, in...
s.sch009
Interpretation
s.sch009
Within Work No. 1B, the HVAC cable crossings must not,...
s.sch009
Within Work Nos. 1B and 2B, the HVDC cable crossings...
s.sch009
Layout rules
s.sch009
Notifications and inspections
s.sch009
Chemicals, drilling and debris
s.sch009
Force majeure
s.sch009
Pre-construction plans and documentation
s.sch009
Offshore safety management
s.sch009
Reporting of engaged agents, contractors and vessels
s.sch009
Details of licensed activities
s.sch009
Equipment and operation of vessels engaged in licensed activities
s.sch009
Pre-construction monitoring
s.sch009
Construction monitoring
s.sch009
Post-construction surveys
s.sch009
Offshore maintenance plan
s.sch009
Aids to navigation
s.sch009
The undertaker must submit reports quarterly to Trinity House detailing...
s.sch009
The undertaker must notify Trinity House and the MMO of...
s.sch009
Following notification of a failure of aids to navigation, the...
s.sch009
The undertaker must paint all structures that are part of...
s.sch009
Detailed offshore design parameters
s.sch009
In case of damage to, or destruction or decay of,...
s.sch009
The undertaker must lay down such buoys, exhibit such lights...
s.sch009
Progress of authorised scheme
s.sch009
Amendments to plans, etc.
s.sch009
(1) No meteorological station lattice tower may exceed a height...
s.sch009
(1) The total number of offshore platforms within Work No....
s.sch009
(1) Wind turbine generator foundation structures must be of 1...
s.sch009
Within Work No. 1B, the wind turbine generator foundations must...
s.sch009
(1) The total seabed footprint of foundation structures (excluding mooring...
s.sch009
Within Work No. 1B, the HVAC cables must not, in...
s.sch010
Interpretation
s.sch010
Notifications and inspections
s.sch010
Chemicals, drilling and debris
s.sch010
Force majeure
s.sch010
Pre-construction plans and documentation
s.sch010
(1) Each programme, statement, plan, protocol, scheme or details required...
s.sch010
Offshore safety management
s.sch010
Reporting of engaged agents, contractors and vessels
s.sch010
Equipment and operation of vessels engaged in licensed activities
s.sch010
Pre-construction monitoring
s.sch010
Construction monitoring
s.sch010
Details of licensed activities
s.sch010
Post-construction surveys
s.sch010
Offshore maintenance plan
s.sch010
Aids to navigation
s.sch010
The undertaker must submit reports quarterly to Trinity House detailing...
s.sch010
The undertaker must notify Trinity House and the MMO of...
s.sch010
Following notification of a failure of aids to navigation, the...
s.sch010
The undertaker must paint all structures that are part of...
s.sch010
In case of damage to, or destruction or decay of,...
s.sch010
The undertaker must lay down such buoys, exhibit such lights...
s.sch010
Progress of authorised scheme
s.sch010
Detailed offshore design parameters
s.sch010
Amendments to plans, etc.
s.sch010
(1) The total number of offshore platforms within Work No...
s.sch010
(1) The total seabed footprint of foundation structures (excluding mooring...
s.sch010
(1) Within Work Nos. 1A, 2A and 3A, the HVDC...
s.sch010
Within Work No. 1A, the HVAC cables must not, in...
s.sch010
Within Work No. 1A, the HVAC cable crossings must not,...
s.sch010
Within Work Nos. 1A and 2A, the HVDC cable crossings...
s.sch011
Interpretation
s.sch011
Notifications and inspections
s.sch011
Chemicals, drilling and debris
s.sch011
Force majeure
s.sch011
Pre-construction plans and documentation
s.sch011
Offshore safety management
s.sch011
Reporting of engaged agents, contractors and vessels
s.sch011
Equipment and operation of vessels engaged in licensed activities
s.sch011
Pre-construction monitoring
s.sch011
Construction monitoring
s.sch011
Details of licensed activities
s.sch011
Post-construction surveys
s.sch011
Offshore maintenance plan
s.sch011
Aids to navigation
s.sch011
The undertaker must submit reports quarterly to Trinity House detailing...
s.sch011
The undertaker must notify Trinity House and the MMO of...
s.sch011
Following notification of a failure of aids to navigation, the...
s.sch011
The undertaker must paint all structures that are part of...
s.sch011
In case of damage to, or destruction or decay of,...
s.sch011
The undertaker must lay down such buoys, exhibit such lights...
s.sch011
Progress of authorised scheme
s.sch011
Detailed offshore design parameters
s.sch011
Amendments to plans, etc.
s.sch011
(1) The total number of offshore platforms within Work No....
s.sch011
(1) The total seabed footprint of foundation structures (excluding mooring...
s.sch011
(1) Within Work Nos. 1B, 2B and 3B, the HVDC...
s.sch011
Within Work No. 1B, the HVAC cables must not, in...
s.sch011
Within Work No. 1B, the HVAC cable crossings must not,...
s.sch011
Within Work Nos. 1B and 2B, the HVDC cable crossings...
s.sch012
Before undertaking any construction works on the Wilton Land or...
s.sch012
The undertaker must co-operate with the owners and operators in...
s.sch012
Expert
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.