UK Statutory Instrument SI 2014/2950 United Kingdom

The Walney Extension Offshore Wind Farm Order 2014

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker3 Contractor1 Licence Holder1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Contractor — also bound by 173 other Acts
Licence Holder — also bound by 225 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

sch. 10 para. 3 Notifications and inspections Regulated
  • Distribute, inspect, and notify for licensed offshore wind farm activitiesStatutory Undertaker
sch. 12 para. 3 sch. 12 para. 3 Regulated
  • Pay costs and compensate for damage to electronic communications apparatusStatutory Undertaker
s.art017 Authority to survey and investigate the land Regulated
  • Compensate landowners for survey and investigation damageStatutory Undertaker
52 other provisions — procedural and definitional
sch. 10 para. 2 Design parameters for other deposits
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent
s.art004 Maintenance of authorised project
s.art005 Benefit of the Order
s.art006 Operation of generating station
s.art007 Application of the Hedgerows Regulations 1997
s.art008 Defence to proceedings in respect of statutory nuisance
s.art009 Requirements, appeals etc.
s.art010 Street works
s.art011 Temporary stopping up of streets
s.art012 Temporary stopping up of public rights of way
s.art013 Access to works
s.art014 Agreements with street authorities
s.art015 Discharge of water
s.art016 Protective work to buildings
s.art018 Removal of human remains
s.art019 Compulsory acquisition of land
s.art020 Time limit for exercise of authority to acquire land compulsorily
s.art021 Compulsory acquisition of rights
s.art022 Private rights
s.art023 Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art024 Acquisition of subsoil only
s.art025 Acquisition of part of certain properties
s.art026 Rights under or over streets
s.art027 Temporary use of land for carrying out the authorised project
s.art028 Temporary use of land for maintaining the authorised project
s.art029 Statutory
s.art030 Recovery of costs of new connections
s.art031 Application of landlord and tenant law
s.art032 Operational land for the purposes of the
s.art033 Felling or lopping of trees and the removal of hedgerows
s.art034 Trees subject to tree preservation orders
s.art035 Public rights of navigation
s.art036 Abatement of works abandoned or decayed
s.art037 Deemed licences under the Marine and Coastal Access Act 2009
s.art038 Saving for
s.art039 Crown rights
s.art040 Certification of plans etc.
s.art041 Protective provisions
s.art042 Arbitration
Schedules

Schedules

2 of 81 shown
s.sch009 Equipment and operation of vessels engaged in licensed activities Regulated
  • Equip and operate vessels properly for licensed offshore wind activitiesContractor
s.sch010 Equipment and operation of vessels engaged in licensed activities Regulated
  • Equip and operate vessels to comply with licence conditionsLicence Holder
79 other schedules
s.sch001 The total volume of cable protection (excluding cable crossings) for...
s.sch001 The total volume of cable protection associated with cable crossings...
s.sch001 Air traffic services at Warton Aerodrome
s.sch001 Primary surveillance radars at St Annes and Lowther Hill
s.sch001 Offshore decommissioning
s.sch001 Stages of authorised development onshore
s.sch001 Detailed design approval onshore
s.sch001 The connection works must be carried out in accordance with...
s.sch001 Provision of landscaping
s.sch001 Implementation and maintenance of landscaping
s.sch001 Highway accesses
s.sch001 Public Access Strategy
s.sch001 Public rights of way
s.sch001 Fencing and other means of enclosure
s.sch001 Surface and foul water drainage
s.sch001 Contaminated land and contaminated groundwater
s.sch001 Archaeology onshore
s.sch001 Code of Construction Practice (CoCP)
s.sch001 Construction and environmental management plan
s.sch001 Emergency response plan
s.sch001 (1) The total number of offshore substations forming part of...
s.sch001 European protected species
s.sch001 Construction Traffic Management Plan
s.sch001 Port Construction Traffic Management Plan (Port CTMP)
s.sch001 Construction hours
s.sch001 Control of noise during construction
s.sch001 Control of noise during operational phase
s.sch001 Control of air quality
s.sch001 Control of artificial light emissions
s.sch001 Flood risk
s.sch001 Restoration of land used temporarily for construction
s.sch001 (1) The number of cable systems forming part of the...
s.sch001 Onshore decommissioning
s.sch001 Requirement for written approval
s.sch001 Amendments to approved details
s.sch001 (1) The total number of monopile foundations forming part of...
s.sch001 The total volume of scour protection for use with WTGs...
s.sch001 The total volume of scour protection for use with the...
s.sch001 The total volume of cable protection (excluding cable crossings) included...
s.sch001 The total volume of cable protection associated with cable crossings...
s.sch007 Compensation enactments
s.sch007 (1) Without prejudice to the generality of paragraph 1, the...
s.sch007 Application of the
s.sch007 For section 7 of the 1965 Act (measure of compensation)...
s.sch007 For section 8 of the 1965 Act (provisions as to...
s.sch007 The following provisions of the 1965 Act (which state the...
s.sch007 Section 11 of the 1965 Act (powers of entry) shall...
s.sch007 Section 20 of the 1965 Act (protection for interests of...
s.sch007 Section 22 of the 1965 Act (protection of acquiring authority’s...
s.sch009 Seasonal restrictions in respect of fish spawning
s.sch009 Pre-construction plans and documentation
s.sch009 Pre-construction surveying and monitoring
s.sch009 Construction monitoring
s.sch009 Post construction monitoring
s.sch009 Offshore Decommissioning
s.sch009 Offshore Safety Management
s.sch009 Aids to navigation
s.sch009 Provision against danger to navigation
s.sch009 Requirement for written approval
s.sch009 Amendments to approved details
s.sch009 Notifications and inspections
s.sch009 Reporting of engaged agents, contractors and
s.sch009 Chemicals, drilling and debris
s.sch009 Force majeure
s.sch010 Pre-construction plans and documentation
s.sch010 Pre-construction surveying and monitoring
s.sch010 Construction monitoring
s.sch010 Post construction monitoring
s.sch010 Offshore Decommissioning
s.sch010 Offshore Safety Management
s.sch010 Aids to navigation
s.sch010 Provision against danger to navigation
s.sch010 Requirement for written approval
s.sch010 Amendments to approved details
s.sch010 Chemicals, drilling and debris
s.sch010 Force majeure
s.sch010 Restrictions on works in the Inter-tidal Area
s.sch010 Seasonal restrictions in respect of fish spawning
s.sch012 Nothing in this Part of this Schedule shall affect the...

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.