UK Statutory Instrument SI 2014/2594 United Kingdom

The Burbo Bank Extension Offshore Wind Farm Order 2014

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker3 Licence Holder1 Contractor1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Licence Holder — also bound by 225 other Acts
Contractor — also bound by 173 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

sch. 2 para. 4 sch. 2 para. 4 Regulated
  • Provide licence copies to agents, contractors, and vessel operators and get confirmation forms returned within 28 daysStatutory Undertaker
sch. 3 para. 4 sch. 3 para. 4 Regulated
  • Distribute, display and comply with licence; notify MMO before work startsStatutory Undertaker
19 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent
s.art004 Power to maintain authorised project
s.art005 Operation of electricity generating station
s.art006 Benefit of the Order
s.art007 Public rights of navigation
s.art008 Abatement of works abandoned or decayed
s.art009 Deemed marine licences under the Marine and Coastal Access Act 2009
s.art010 Saving for
s.art011 Crown rights
s.art012 Certification of plans etc
s.art013 Arbitration
Schedules

Schedules

3 of 33 shown
s.sch002 Equipment and operation of vessels engaged in licensed activities Regulated
  • Equip and operate vessels properly for licensed activitiesLicence Holder
s.sch002 Force majeure Regulated
  • Notify MMO of emergency deposits within 48 hoursStatutory Undertaker
s.sch003 Equipment and operation of vessels engaged in licensed activities Regulated
  • Equip and operate vessels properly for licensed offshore wind farm activitiesContractor
30 other schedules
s.sch001 Air traffic services at Warton Aerodrome
s.sch001 Primary surveillance radars at Lytham St Annes and Great Dun Fell
s.sch001 Air traffic services at Liverpool John Lennon Airport
s.sch001 Community liaison
s.sch001 (1) Subject to sub-paragraph (2), no wind turbine generator forming...
s.sch001 (1) The total number of offshore substations forming part of...
s.sch001 The total length of the cables comprising Work No. 1(b)...
s.sch001 (1) Each steel monopile foundation forming part of the authorised...
s.sch001 Lighting
s.sch001 Decommissioning
s.sch001 Navigational radar scheme at the Port of Liverpool
s.sch002 Pre-construction plans and documentation
s.sch002 (1) Each programme, statement, plan, protocol or scheme required to...
s.sch002 Reporting of engaged agents, contractors and
s.sch002 Pre-construction monitoring
s.sch002 Construction monitoring
s.sch002 Post construction surveys
s.sch002 Piling restrictions
s.sch002 (1) The undertaker must colour all structures yellow from at...
s.sch002 Chemicals, drilling and debris
s.sch003 Pre-construction plans and documentation
s.sch003 (1) Each programme, statement, plan, protocol or scheme required to...
s.sch003 Reporting of engaged agents, contractors and vessels
s.sch003 Pre-construction monitoring
s.sch003 Construction monitoring
s.sch003 Post construction surveys
s.sch003 Piling restrictions
s.sch003 The undertaker must colour all structures yellow from at least...
s.sch003 Chemicals, drilling and debris
s.sch003 Force majeure

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.