UK Statutory Instrument SI 2014/1873 United Kingdom

The Rampion Offshore Wind Farm Order 2014

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker3 Contractor2 Any Person1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Contractor — also bound by 173 other Acts
Any Person — also bound by 2340 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

sch. 13 para. 5 Notifications and inspections Regulated
  • Provide licence copies and collect confirmation forms from agents and contractorsStatutory Undertaker
sch. 14 para. 2 Notifications and inspections Regulated
  • Distribute licence, manage confirmations, enable inspections and maritime safety notificationsStatutory Undertaker
s.art021 Authority to survey and investigate the land Regulated
  • Complying with conditions when surveying land for the wind farm projectStatutory Undertaker
60 other provisions — procedural and definitional
sch. 13 para. 2 Design parameters
sch. 14 para. 6 Force majeure
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent etc granted by the Order
s.art004 Power to maintain authorised project
s.art005 Operation of electricity generating station
s.art006 Requirements, appeals
s.art007 Benefit of
s.art008 Application and modification of legislative provisions
s.art009 Public rights of navigation
s.art010 Abatement of works abandoned or decayed
s.art011 Deemed marine licences under the Marine and Coastal Access Act 2009
s.art012 Saving for
s.art013 Crown rights
s.art014 Defence to proceedings in respect of statutory nuisance
s.art015 Street works
s.art016 Temporary stopping up of streets
s.art017 Public rights of way
s.art018 Access to works
s.art019 Agreements with street authorities
s.art020 Discharge of water
s.art022 Temporary suspension of public access to access land
s.art023 Compulsory acquisition of land
s.art024 Time limit for exercise of authority to acquire land compulsorily
s.art025 Compulsory acquisition of rights
s.art026 Private rights
s.art027 Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art028 Acquisition of subsoil only
s.art029 Acquisition of part of certain properties
s.art030 Rights under or over streets
s.art031 Temporary use of land for carrying out the authorised project
s.art032 Temporary use of land for maintaining the authorised project
s.art033 Statutory
s.art034 Recovery of costs of new connections
s.art035 Application of landlord and tenant law
s.art036 Operational land for purposes of the
s.art037 Felling or lopping of trees and removal of hedgerows
s.art038 Trees subject to tree preservation orders
s.art039 Procedure in relation to further approvals, etc
s.art040 Certification of plans etc
s.art041 Protective provisions
s.art042 Arbitration
Schedules

Schedules

3 of 79 shown
s.sch013 Force majeure Regulated
  • Deposits outside Order limits – notify MMO within 48 hours in emergencyAny Person
s.sch013 Equipment and operation of vessels engaged in licensed activities Regulated
  • Equip and operate vessels for licensed offshore wind farm activitiesContractor
s.sch014 Equipment and operation of vessels engaged in licensed activities Regulated
  • Ensure vessels are properly equipped and operated for licensed activitiesContractor
76 other schedules
s.sch001 Design approval onshore
s.sch001 Provision of landscaping
s.sch001 Implementation and maintenance of landscaping
s.sch001 Highway accesses
s.sch001 Permanent highway accesses in the South Downs National Park
s.sch001 Public rights of way
s.sch001 National Trail in the South Downs National Park
s.sch001 Fencing and means of enclosure
s.sch001 Temporary fencing in the South Downs National Park
s.sch001 Surface and foul water drainage
s.sch001 Contaminated land and groundwater
s.sch001 Landfill site
s.sch001 Flood risk
s.sch001 Archaeology
s.sch001 Archaeology in the South Downs National Park
s.sch001 Scheduled monument at Tottington Mount
s.sch001 Construction environmental management plan
s.sch001 Watercourse crossings
s.sch001 Ecological and landscape management plan
s.sch001 Ecological and landscape management plan for the South Downs National Park
s.sch001 (1) The total number of offshore substations forming part of...
s.sch001 Construction health, safety and environmental plan
s.sch001 Construction traffic management plan
s.sch001 Construction hours
s.sch001 External lighting and control of artificial light emissions
s.sch001 External lighting in the South Downs National Park
s.sch001 Control of noise during construction
s.sch001 Control of noise during operational phase
s.sch001 European protected species onshore
s.sch001 European protected species within the South Downs National Park
s.sch001 Restoration of land used temporarily for construction
s.sch001 (1) The total length of the cables comprising Work No....
s.sch001 Restoration of land within the South Downs National Park used temporarily for construction
s.sch001 Onshore decommissioning
s.sch001 Amendments to approved details
s.sch001 Consultation with local planning authority
s.sch001 (1) Each monopile foundation forming part of the authorised development...
s.sch001 Base port travel plan
s.sch001 Lighting
s.sch001 Offshore decommissioning
s.sch001 Stages of authorised development onshore
s.sch008 The enactments for the time being in force with respect...
s.sch008 (1) Without prejudice to the generality of paragraph 1, the...
s.sch008 (1) The 1965 Act shall have effect with the modifications...
s.sch008 For section 7 of the 1965 Act (measure of compensation)...
s.sch008 For section 8 of the 1965 Act (provisions as to...
s.sch008 The following provisions of the 1965 Act (which state the...
s.sch008 Section 11 of the 1965 Act (powers of entry) shall...
s.sch008 Section 20 of the 1965 Act (protection for interests of...
s.sch008 Section 22 of the 1965 Act (protection of acquiring authority’s...
s.sch012 The undertaker and Network Rail may, subject in the case...
s.sch012 Nothing in this Order, or in any enactment incorporated with...
s.sch012 The undertaker shall give written notice to Network Rail if...
s.sch012 The undertaker shall no later than 28 days from the...
s.sch013 Pre-construction plans and documentation
s.sch013 (1) Any archaeological reports produced in accordance with condition 11(1)(h)(iii)...
s.sch013 Reporting of engaged agents, contractors and vessels
s.sch013 Pre-construction monitoring and surveys
s.sch013 Construction monitoring
s.sch013 Post construction surveys
s.sch013 Black bream spawning
s.sch013 Herring spawning
s.sch013 Restrictions on monopile foundations
s.sch013 Monitoring of shoreline sediment morphology
s.sch013 Decommissioning
s.sch013 Aids to navigation
s.sch013 (1) The undertaker shall colour all structures yellow from at...
s.sch013 Chemicals, drilling and debris
s.sch014 Pre-construction monitoring and surveys
s.sch014 Construction monitoring
s.sch014 Post construction surveys
s.sch014 Decommissioning
s.sch014 Monitoring of shoreline sediment morphology
s.sch014 Pre-construction plans and documentation
s.sch014 (1) Any archaeological reports produced in accordance with condition 7(1)(g)(iii)...
s.sch014 Reporting of engaged agents, contractors and vessels

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.