UK Statutory Instrument SI 2012/2679 United Kingdom

The Chiltern Railways (Bicester to Oxford Improvements) Order 2012

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Trader33 Any Person1 Statutory Undertaker1

Plus 4 duties on the regulator, Crown ministers and public bodies — folded into the section list below.

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Trader — also bound by 825 other Acts
Any Person — also bound by 2340 other Acts
Statutory Undertaker — also bound by 179 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art010 Temporary stopping up of streets Regulated
  • Consult street authority and provide pedestrian access before closing streetsTrader
s.art012 Construction and maintenance of new or altered streets Regulated
  • Construct and maintain new or altered streets to authority's satisfactionTrader
s.art016 Replacement and closure of footpath level crossings Regulated
  • Chiltern Railways must replace footpath crossings before closing themTrader
s.art020 Protective works to buildings, roads or apparatus of a statutory undertaker Regulated
  • Give notice before protective works and compensate for damageTrader
s.art030 Temporary use of land for maintenance of works Regulated
  • Notify landowners before temporarily using land for railway maintenanceTrader
s.art034 Acquisition of part of certain properties Regulated
  • Sell only part of your property if Chiltern Railways serves a notice and you don't objectAny Person
s.art037 Traffic regulation Regulated
  • Give notice and consult before imposing traffic restrictions during constructionTrader
s.art054 Certification of plans etc. Regulated
  • Submit certified copies of plans and book of reference to Secretary of StateTrader
49 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Incorporation of Railways Clauses Acts
s.art004 Application of the
s.art005 Power to construct and maintain works
s.art006 Power to deviate
s.art007 Power to keep apparatus in streets
s.art008 Power to execute street works
s.art009 Stopping up of streets
s.art011 Access to works
s.art013 Construction of bridges and tunnels
s.art014 Agreements with street authorities
s.art015 Replacement and closure of road level crossings
s.art017 Accommodation crossings
s.art018 Temporary closure of part of Rewley Abbey Stream and Castle Mill Stream
s.art019 Discharge of water
s.art021 Power to survey and investigate land
s.art022 Power to acquire land
s.art023 Application of Part 1 of the
s.art024 Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art025 Power to acquire new rights
s.art026 Power to acquire airspace only
s.art027 Cases where powers of acquisition limited to ground anchor rights
s.art028 Rights under or over streets
s.art029 Temporary use of land for construction of works
s.art031 Limitation of powers
s.art032 Disregard of certain interests and improvements
s.art033 Set-off for enhancement in value of retained land
s.art035 Extinction or suspension of private rights of way
s.art036 Time limit for exercise of powers of acquisition
s.art038 Defence to proceedings in respect of statutory nuisance
s.art039 Planning permission
s.art040 Power to lop trees overhanging the authorised works
s.art041 Open Space at Tubbs Lane
s.art042 Power to operate and use railway
s.art043 Power to transfer undertaking
s.art044 Agreements with
s.art045 Application of landlord and tenant law
s.art046 Obstruction of construction of authorised works
s.art047 Trespass
s.art048 Disclosure of confidential information
s.art049 Statutory undertakers
s.art050 For the protection of specified undertakers
s.art051 For the protection of the Environment Agency
s.art052 For the protection of Network Rail
s.art053 For the protection of the Canal & River Trust
s.art055 Service of notices
s.art056 No double recovery
s.art057 Arbitration
Schedules

Schedules

31 of 75 shown
s.sch013 (1) Where a street is stopped up under this Order... Regulated
Other duties (1) — Crown / regulator
  • Pay the utility's relocation costs when a street is stopped upCrown / Minister / Government department
s.sch014 (1) Subject to sub-paragraphs (2) and (3), if by reason... Regulated
  • Pay for damage to and interruption of utility apparatusTrader
s.sch014 Regardless of any provision in this Order or anything shown... Regulated
  • Chiltern Railways must only acquire apparatus by agreementTrader
s.sch014 (1) If, in the exercise of the powers conferred by... Regulated
  • Utility undertakers must construct replacement apparatus without unnecessary delayStatutory Undertaker
s.sch014 (1) Where, in accordance with the provisions of this Schedule,... Regulated
Other duties (1) — Crown / regulator
  • Arbitrator must settle alternative apparatus terms and compensationTribunal / Court
s.sch014 (1) Not less than 28 days before starting the execution... Regulated
  • Submit plans and follow undertaker requirements before affecting apparatusTrader
s.sch014 (1) If in consequence of the exercise of the powers... Regulated
  • Provide alternative access to obstructed apparatusTrader
s.sch015 (1) Without prejudice to the other provisions of this Schedule,... Regulated
  • Indemnify the Agency against damage caused by your construction workTrader
s.sch015 (1) Before beginning to construct any specified work, the Company... Regulated
  • Submit plans for specified works and obtain Agency approval before constructionTrader
s.sch015 (1) Subject to sub-paragraph (2), any specified work, and all... Regulated
  • Construct specified works to approved plans and notify Agency of start and completionTrader
s.sch015 (1) Subject to the provisions of this Schedule and except... Regulated
  • Maintain drainage works in good repair and clear of obstructionTrader
s.sch015 Subject to paragraph 8, if by reason of the construction... Regulated
  • Repair any flood defence drainage damage caused by constructionTrader
s.sch015 (1) The Company must take all such measures as may... Regulated
  • Protect fish passage during railway constructionTrader
s.sch015 The Company must indemnify the Agency in respect of all... Regulated
  • Indemnify the Agency for costs of plan examination and inspectionTrader
s.sch016 (1) The Company must pay to Network Rail all costs,... Regulated
  • Pay Network Rail for all costs and losses from your construction workTrader
s.sch016 (1) Where under this Schedule Network Rail is required to... Regulated
Other duties (1) — Crown / regulator
  • Network Rail must not unreasonably withhold or delay consent or approvalStatutory regulator
s.sch016 (1) The Company must before commencing construction of any specified... Regulated
  • Supply plans for approval before constructing specified worksTrader
s.sch016 The Company must— (a) at all times afford reasonable facilities... Regulated
  • Provide access and information to engineer during constructionTrader
s.sch016 (1) If any permanent or temporary alterations or additions to... Regulated
  • Pay Network Rail’s costs for protective railway alterations during constructionTrader
s.sch017 The Company must not exercise the maintenance powers conferred by... Regulated
  • Obtain consent from Canal & River Trust before maintenance works on canalTrader
s.sch017 The Company must bear the reasonable costs of the carrying... Regulated
  • Pay for surveys of canal affected by your construction worksTrader
s.sch017 For the purposes of the surveys the Company— Regulated
  • Provide access and information for canal surveysTrader
s.sch017 Where, in the reasonable opinion of the Trust, the surveys... Regulated
  • Remedy any canal detriment shown by surveys when Trust requestsTrader
s.sch017 The Company must not deposit any polluting material on, in... Regulated
  • Do not deposit polluting material in the canalTrader
s.sch017 Any consent of the Trust required under paragraph 15 must... Regulated
Other duties (1) — Crown / regulator
  • Trust must not unreasonably withhold consent for deposits or dischargesStatutory regulator
s.sch017 The Company must not under the powers conferred by article... Regulated
  • Do not acquire Trust land without consentTrader
s.sch017 The Company must indemnify the Trust from all claims, demands,... Regulated
  • Indemnify the Trust for canal damage caused by your worksTrader
s.sch017 (1) Subject to sub-paragraph (2), the Company must not under... Regulated
  • Do not acquire easements that would impede canal navigationTrader
s.sch017 Before beginning to construct any specified work, the Company must... Regulated
  • Submit plans of specified work to the Trust before construction beginsTrader
s.sch017 The Company must give to the Trust not less than... Regulated
  • Notify the Trust at least 56 days before starting specified worksTrader
s.sch017 The Company must not— (a) temporarily close the canal; or... Regulated
  • Do not close or obstruct the canal outside the stoppage seasonTrader
44 other schedules
s.sch010 The enactments for the time being in force with respect...
s.sch010 (1) Without limitation on the scope of paragraph 1, the...
s.sch010 (1) The 1965 Act has effect with the modifications necessary...
s.sch010 For section 7 of the 1965 Act (measure of compensation...
s.sch010 For section 8 of the 1965 Act (other provisions as...
s.sch010 The following provisions of the 1965 Act (which state the...
s.sch010 Section 11 of the 1965 Act (powers of entry) is...
s.sch010 Section 20 of the 1965 Act (protection for interests of...
s.sch010 Section 22 of the 1965 Act (interest omitted from purchase)...
s.sch013 (1) Sections 271 to 274 of the 1990 Act (power...
s.sch013 (1) Subject to the following provisions of this paragraph, the...
s.sch014 (1) For the protection of the undertakers referred to in...
s.sch014 In this Schedule— “alternative apparatus” means alternative apparatus adequate to...
s.sch014 This Schedule does not apply to apparatus in respect of...
s.sch014 (1) Where any street is stopped up under article 9...
s.sch015 (1) For the protection of the Agency, the following provisions...
s.sch015 The fact that any work or thing has been executed...
s.sch015 For the purposes of Chapter 2 of Part 2 of...
s.sch015 Any dispute arising between the Company and the Agency under...
s.sch015 Without limitation on the scope of paragraph 2, the requirements...
s.sch015 Nothing in paragraphs 4(4), 5(3), 6, 7(3) and (4) authorises...
s.sch016 For the protection of Network Rail, the following provisions have...
s.sch016 The Company must repay to Network Rail all fees, costs,...
s.sch016 If at any time after the completion of a specified...
s.sch016 Any additional expenses which Network Rail may reasonably incur in...
s.sch016 Network Rail must, on receipt of a request from the...
s.sch016 In the assessment of any sums payable to Network Rail...
s.sch016 The Company must no later than 28 days from the...
s.sch016 In this Schedule— “construction” includes execution, placing, alteration and reconstruction...
s.sch016 (1) The Company must not exercise the powers conferred by...
s.sch016 (1) Any specified work and any protective works to be...
s.sch016 Network Rail must at all times afford reasonable facilities to...
s.sch017 (1) For the protection of the Canal & River Trust,...
s.sch017 The surveyor must provide copies of a report of the...
s.sch017 In its application to the discharge of water into the...
s.sch017 If any canal work is abandoned, the Trust may by...
s.sch017 If any canal work is in such condition that it...
s.sch017 If— (a) a work which consists of a canal work...
s.sch017 If after such reasonable period as may be specified in...
s.sch017 The Trust must give to the Company reasonable notice of...
s.sch017 Nothing in paragraph 22 imposes any liability on the Company...
s.sch017 Any specified work must not be constructed except in accordance...
s.sch017 Any approval of the Trust required under paragraph 5 must...
s.sch017 Any specified work, and any protective works required by the...

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.