Retained EU Law SI 2016/424 United Kingdom

Regulation (EU) 2016/424 of the European Parliament and of the Council of 9 March 2016 on cableway installations and repealing Directive 2000/9/EC (Text with EEA relevance)

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Manufacturer33 Conformity Assessment Body6 Any Person3 Operator3 Distributor1

Plus 12 duties on the regulator, Crown ministers and public bodies — folded into the section list below.

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Manufacturer — also bound by 502 other Acts
Conformity Assessment Body — also bound by 47 other Acts
Any Person — also bound by 2340 other Acts
Operator — also bound by 746 other Acts
Distributor — also bound by 182 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

uri:annex/iii/division/4 uri:annex/iii/division/4 Regulated
  • Notified body must examine technical documentation and test specimensConformity Assessment Body
uri:annex/iii/division/5 uri:annex/iii/division/5 Regulated
Other duties (1) — Crown / regulator
  • Approved body must keep evaluation report confidential without manufacturer's agreementStatutory regulator
uri:annex/iii/division/6 uri:annex/iii/division/6 Regulated
Other duties (1) — Crown / regulator
  • Approved bodies must issue proper type examination certificates and refuse non-compliant types with reasonsStatutory regulator
uri:annex/iii/division/7 uri:annex/iii/division/7 Regulated
  • Notify your approved body of any modification to an approved typeManufacturer
uri:annex/iii/division/8 uri:annex/iii/division/8 Regulated
Other duties (1) — Crown / regulator
  • Approved bodies must share certificate decisions and keep recordsStatutory regulator
uri:annex/iii/division/9 uri:annex/iii/division/9 Regulated
  • Keep type examination records for 30 years after placing on marketManufacturer
uri:annex/iv/division/2 uri:annex/iv/division/2 Regulated
  • Operate an approved quality system for cableway subsystems and safety componentsManufacturer
uri:annex/iv/division/3/division/3.1 uri:annex/iv/division/3/division/3.1 Regulated
  • Submit complete application for cableway subsystem approvalManufacturer
uri:annex/iv/division/3/division/3.3 uri:annex/iv/division/3/division/3.3 Regulated
Other duties (1) — Crown / regulator
  • Notified body must conduct qualified audits and notify manufacturerStatutory regulator
uri:annex/iv/division/3/division/3.4 uri:annex/iv/division/3/division/3.4 Regulated
  • Maintain your approved quality system for cableway installationsManufacturer
uri:annex/iv/division/3/division/3.5 uri:annex/iv/division/3/division/3.5 Regulated
Other duties (1) — Crown / regulator
  • Approved body must assess quality-system changes and notify manufacturerStatutory regulator
uri:annex/iv/division/4/division/4.2 uri:annex/iv/division/4/division/4.2 Regulated
  • Maintain quality system documentation and quality recordsManufacturer
uri:annex/iv/division/4/division/4.3 uri:annex/iv/division/4/division/4.3 Regulated
Other duties (1) — Crown / regulator
  • Approved body must audit your quality system every two yearsStatutory regulator
uri:annex/iv/division/4/division/4.4 uri:annex/iv/division/4/division/4.4 Regulated
Other duties (1) — Crown / regulator
  • Approved body may make unannounced visits and product testsStatutory regulator
uri:annex/iv/division/5/division/5.1 uri:annex/iv/division/5/division/5.1 Regulated
  • Affix UKCA marking and approved body number to cableway subsystems and safety componentsManufacturer
uri:annex/iv/division/5/division/5.2 uri:annex/iv/division/5/division/5.2 Regulated
  • Make declaration of conformity available to authorities on requestManufacturer
uri:annex/iv/division/6 uri:annex/iv/division/6 Regulated
  • Keep documentation accessible for 30 years after placing safety component on marketManufacturer
uri:annex/iv/division/7 uri:annex/iv/division/7 Regulated
  • Report and record quality system approvals decisionsConformity Assessment Body
uri:annex/v/division/2 uri:annex/v/division/2 Regulated
  • Ensure manufacturing processes and monitoring conform to approved type and regulationManufacturer
uri:annex/v/division/4/division/4.2 uri:annex/v/division/4/division/4.2 Regulated
  • Keep certificates of conformity for 30 years for inspectionManufacturer
uri:annex/v/division/5/division/5.1 uri:annex/v/division/5/division/5.1 Regulated
  • Ensure homogeneity of each lot and present for verificationManufacturer
uri:annex/v/division/5/division/5.2 uri:annex/v/division/5/division/5.2 Regulated
  • Sample and test each lot of cableway safety components for conformityManufacturer
uri:annex/v/division/5/division/5.3 uri:annex/v/division/5/division/5.3 Regulated
  • Keep certificates of conformity for 30 years after placing subsystems or safety components on the marketManufacturer
uri:annex/v/division/5/division/5.4 uri:annex/v/division/5/division/5.4 Regulated
Other duties (1) — Crown / regulator
  • Approved body must block rejected cableway lots from marketStatutory regulator
uri:annex/v/division/6/division/6.1 uri:annex/v/division/6/division/6.1 Regulated
  • Affix UK marking and approved body identification number to cableway subsystems and safety componentsManufacturer
uri:annex/v/division/8 uri:annex/v/division/8 Regulated
  • Authorised representative must not fulfil certain manufacturer obligationsAny Person
uri:annex/vi/division/3/division/3.1 uri:annex/vi/division/3/division/3.1 Regulated
  • Include required details in conformity assessment applicationManufacturer
uri:annex/vi/division/3/division/3.2 uri:annex/vi/division/3/division/3.2 Regulated
  • Keep technical documentation and certificate of conformity for 30 years after placing on the marketManufacturer
uri:annex/vi/division/4/division/4.1 uri:annex/vi/division/4/division/4.1 Regulated
  • Affix UK marking and approved body's ID to compliant cableway subsystemsManufacturer
uri:annex/vii/division/3/division/3.1 uri:annex/vii/division/3/division/3.1 Regulated
  • Apply for quality system assessment before manufacturing cableway componentsManufacturer
uri:annex/vii/division/3/division/3.2 uri:annex/vii/division/3/division/3.2 Regulated
  • Establish and maintain a documented quality system for cableway subsystems or safety componentsManufacturer
uri:annex/vii/division/3/division/3.3 uri:annex/vii/division/3/division/3.3 Regulated
Other duties (1) — Crown / regulator
  • Approved body must audit quality systems and inspect cableway installationsStatutory regulator
uri:annex/vii/division/3/division/3.4 uri:annex/vii/division/3/division/3.4 Regulated
  • Maintain your approved quality system and keep it adequate and efficientManufacturer
uri:annex/vii/division/3/division/3.5 uri:annex/vii/division/3/division/3.5 Regulated
  • Inform the approved body of any planned changes to your quality systemManufacturer
uri:annex/vii/division/3/division/3.6/division/3.6.1 uri:annex/vii/division/3/division/3.6/division/3.6.1 Regulated
  • Lodge application for design examination with approved bodyManufacturer
uri:annex/vii/division/3/division/3.6/division/3.6.4 uri:annex/vii/division/3/division/3.6/division/3.6.4 Regulated
  • Notify approved body of design changes that affect safetyManufacturer
uri:annex/vii/division/3/division/3.6/division/3.6.5 uri:annex/vii/division/3/division/3.6/division/3.6.5 Regulated
Other duties (1) — Crown / regulator
  • Approved bodies must share and retain design examination certificate informationStatutory regulator
uri:annex/vii/division/3/division/3.6/division/3.6.6 uri:annex/vii/division/3/division/3.6/division/3.6.6 Regulated
  • Keep cableway design certificate and technical docs for 30 yearsManufacturer
uri:annex/vii/division/4 uri:annex/vii/division/4 Regulated
  • Allow approved body access to sites and provide quality system documentationManufacturer
uri:annex/vii/division/5 uri:annex/vii/division/5 Regulated
  • Affix UK marking and keep declaration of conformity for cableway productsManufacturer
uri:annex/vii/division/6 uri:annex/vii/division/6 Regulated
  • Keep technical and quality documentation for 30 yearsManufacturer
uri:annex/vii/division/7 uri:annex/vii/division/7 Regulated
  • Inform Secretary of State and other approved bodies of quality system approvals and keep records for 30 yearsConformity Assessment Body
s.art011 Obligations of manufacturers Regulated
  • Ensure cableway subsystems and safety components meet all regulatory requirementsManufacturer
s.art012 Authorised representatives Regulated
  • Perform duties as an authorised representative including document retention, information provision, and cooperation with the Secretary of StateAny Person
s.art013 Obligations of importers Regulated
  • Ensure imported cableway subsystems and safety components are fully compliantManufacturer
s.art014 Obligations of distributors Regulated
  • Distributors must verify cableway subsystems and safety components before saleDistributor
s.art016 Identification of economic operators Regulated
  • Maintain supply chain records for 30 years and identify on requestOperator
s.art018 Conformity assessment procedures Regulated
  • Test cableway subsystems and safety components before saleManufacturer
s.art019 Declaration of conformity Regulated
  • Draw up and maintain a declaration of conformity for cableway subsystems and safety componentsManufacturer
s.art021 Rules and conditions for affixing the UK marking Regulated
  • Affix UK marking visibly, legibly and indelibly to cableway subsystems or safety componentsManufacturer
s.art026 Requirements relating to approved bodies Regulated
  • Conformity assessment bodies must meet independence, competence, and impartiality requirementsConformity Assessment Body
s.art028 Subsidiaries of and subcontracting by approved bodies Regulated
  • Approved bodies must take full responsibility for subcontractor and subsidiary workConformity Assessment Body
s.art029 Application for approval Regulated
  • Apply for approval as a conformity assessment body for cableway installationsConformity Assessment Body
s.art034 Operational obligations of approved bodies Regulated
Other duties (1) — Crown / regulator
  • Approved bodies must assess conformity and enforce corrective measures on manufacturersStatutory regulator
s.art035 Appeal against decisions of approved bodies Regulated
  • Approved bodies must provide an appeal procedure against their decisionsAny Person
s.art036 Information obligation on approved bodies Regulated
Other duties (1) — Crown / regulator
  • Approved bodies must inform the Secretary of State of certain decisions and activitiesStatutory regulator
s.art040 Procedure ... for dealing with subsystems or safety components presenting a risk Regulated
  • Cooperate with the Executive when they investigate a safety riskOperator
s.art042 Compliant subsystems or safety components which present a risk Regulated
  • Take corrective action for compliant but risky cableway subsystems or safety componentsOperator
44 other provisions — procedural and definitional
uri:annex/ii/division/5 uri:annex/ii/division/5
uri:annex/ii/division/7/division/7.3/division/7.3.1 uri:annex/ii/division/7/division/7.3/division/7.3.1
uri:annex/iii/division/3 uri:annex/iii/division/3
uri:annex/v/division/1 uri:annex/v/division/1
uri:annex/v/division/3/division/3.1 uri:annex/v/division/3/division/3.1
uri:annex/v/division/6/division/6.2 uri:annex/v/division/6/division/6.2
uri:annex/v/division/7 uri:annex/v/division/7
uri:annex/vii/division/3/division/3.6/division/3.6.3 uri:annex/vii/division/3/division/3.6/division/3.6.3
s.annex i para.1 A cableway installation is divided up into infrastructure and the...
s.annex i para.2 Cables and cable connections. Drives and brakes. Mechanical equipment: Cable...
s.annex x para.1 Directive 2000/9/EC This Regulation — Article 1 Article 1(1) Article...
s.art001 Subject matter
s.art002 Scope
s.art003 Definitions
s.art003 Designated Standards
s.art004 Making available on the market of subsystems and safety components
s.art005 Presumption of conformity of cableway installations
s.art006 Essential requirements
s.art007 Free movement of subsystems and safety components
s.art008 Safety analysis and safety report for planned cableway installations
s.art009 Authorisation of cableway installations
s.art010 Operation of cableway installations
s.art015 Cases in which obligations of manufacturers apply to importers and distributors
s.art017 Presumption of conformity of subsystems and safety components
s.art020 Requirements of the UK marking
s.art022 Approval
s.art023 Notifying authorities
s.art024 Requirements relating to notifying authorities
s.art025 Information obligation on notifying authorities
s.art027 Presumption of conformity of notified bodies
s.art030 Notification procedure
s.art031 Identification numbers and lists of notified bodies
s.art032 Changes to approvals
s.art033 Challenge of the competence of notified bodies
s.art037 Exchange of experience
s.art038 Coordination of notified bodies
s.art041 Union safeguard procedure
s.art043 Formal non-compliance
s.art044 Committee procedure
s.art045 Penalties
s.art046 Transitional provisions
s.art046 Post-withdrawal continuity provision
s.art047 Repeal
s.art048 Entry into force and application

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.