UK Statutory Instrument 2026 United Kingdom

The Outer Dowsing Offshore Wind Farm Order 2026

At a glance

What's here

1 compliance obligation

Who this Act binds

Business-side actors with duties under this Act, ranked by how often they appear.

  • Statutory Undertaker 1

Other Acts binding the same actors

For each actor bound by this Act, the other UK Acts that bind them most often. Useful for understanding the full compliance landscape facing each role.

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

s.sch018

(1) Subject to sub-paragraphs (2) to (4), if as the...

  • Compensate telecoms operators for damage or service interruption caused by the wind farm works Statutory Undertaker
Browse 433 other Schedules — structural / supplementary
s.sch001

A nationally significant infrastructure project as defined in sections 14...

s.sch001

Offshore decommissioning

s.sch001

Stages of authorised project onshore

s.sch001

Detailed onshore design parameters

s.sch001

Provision of landscaping

s.sch001

Implementation and maintenance of landscaping

s.sch001

Ecological management plan

s.sch001

Fencing and other means of permanent enclosure

s.sch001

Temporary fencing and other temporary means of enclosure

s.sch001

Operational drainage management and emergency flood response

s.sch001

Contaminated land and groundwater

s.sch001

The grid coordinates for that part of the authorised project...

s.sch001

Onshore archaeology

s.sch001

Code of construction practice

s.sch001

Construction hours

s.sch001

Highway accesses

s.sch001

Traffic

s.sch001

Public rights of way

s.sch001

Restoration of land used temporarily for construction

s.sch001

Onshore decommissioning

s.sch001

Control of noise during operational phase

s.sch001

Control of artificial light emissions during operational phase

s.sch001

Works within the Order limits which have been subject to...

s.sch001

Aviation Lighting

s.sch001

Requirement for written approval

s.sch001

Amendments to approved details

s.sch001

Skills, supply chain and employment

s.sch001

Cromer and Claxby Radar Mitigation

s.sch001

Ministry of Defence Surveillance Operation

s.sch001

Biodiversity Net Gain

s.sch001

Wake Effects

s.sch001

Time limits

s.sch001

Detailed offshore design parameters

s.sch001

(1) The total number of offshore electrical installations and offshore...

s.sch001

(1) The maximum number of gravity base structure foundations must...

s.sch001

The total volume of scour protection for wind turbine generators,...

s.sch001

(1) In respect of the offshore export cables comprised within...

s.sch008

Compensation enactments

s.sch008

For Schedule 2A to the 1965 Act substitute— SCHEDULE2A Counter-notice...

s.sch008

(1) Without prejudice to the generality of paragraph 1, the...

s.sch008

(1) Without limitation on the scope of paragraph 1, the...

s.sch008

Application of the 1965 Act

s.sch008

For section 7 of the 1965 Act (measure of compensation...

s.sch008

The following provisions of the 1965 Act (which state the...

s.sch008

are so modified as to secure that, as against persons...

s.sch008

Section 20 of the 1965 Act (tenants at will, etc.)...

s.sch008

Section 22 of the 1965 Act (interests omitted from purchase)...

s.sch010

(1) In this licence— “the 2004 Act” means the Energy...

s.sch010

Design parameters

s.sch010

(1) The total number of offshore accommodation platforms forming part...

s.sch010

(1) The total length of the cables forming part of...

s.sch010

Maintenance of the authorised scheme

s.sch010

Vessels under the undertaker’s control

s.sch010

Extension of time periods

s.sch010

Notification and Inspection

s.sch010

Aids to navigation

s.sch010

Colouring of structures

s.sch010

Aviation safety

s.sch010

Subject to the licence conditions at Part 2, this licence...

s.sch010

Chemicals, drilling and debris

s.sch010

Notification of unauthorised deposits

s.sch010

Pre-construction plans and documentation

s.sch010

(1) Any archaeological reports produced in accordance with condition 22(1)(g)(iii)...

s.sch010

Offshore safety management

s.sch010

Reporting of engaged agents, contractors and vessels

s.sch010

Pre-construction monitoring and surveys

s.sch010

Construction monitoring

s.sch010

Post construction

s.sch010

Reporting of impact pile driving

s.sch010

Such activities are authorised in relation to the construction, maintenance...

s.sch010

Deployment of cable protection

s.sch010

Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)

s.sch010

Completion of construction

s.sch010

Maintenance reporting

s.sch010

Piling restriction for spawning herring

s.sch010

The substances or articles authorised for deposit at sea are—...

s.sch010

The grid coordinates for the authorised scheme are specified below—...

s.sch010

This licence remains in force until the authorised scheme has...

s.sch010

The provisions of section 72 (variation, suspension, revocation and transfer)...

s.sch010

With respect to any condition which requires the licensed activities...

s.sch010

Any amendments to the details, plan or scheme must be...

s.sch011

(1) In this licence— “the 2004 Act” means the Energy...

s.sch011

Design parameters

s.sch011

(1) Offshore accommodation platform foundation structures forming part of the...

s.sch011

(1) The total length of the cables forming part of...

s.sch011

Maintenance of the authorised scheme

s.sch011

Vessels under the undertaker’s control

s.sch011

Extension of time periods

s.sch011

Notification and Inspection

s.sch011

Aids to navigation

s.sch011

Colouring of structures

s.sch011

Aviation safety

s.sch011

Subject to the licence conditions at Part 2, this licence...

s.sch011

Chemicals, drilling and debris

s.sch011

Notification of unauthorised deposits

s.sch011

Pre-construction plans and documentation

s.sch011

(1) Any archaeological reports produced in accordance with condition 22(1)(g)(iii)...

s.sch011

Offshore safety management

s.sch011

Reporting of engaged agents, contractors and vessels

s.sch011

Pre-construction monitoring and surveys

s.sch011

Construction monitoring

s.sch011

Post construction

s.sch011

Reporting of impact pile driving

s.sch011

Such activities are authorised in relation to the construction, maintenance...

s.sch011

Deployment of cable protection

s.sch011

Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)

s.sch011

Completion of construction

s.sch011

Maintenance reporting

s.sch011

Seasonal restriction

s.sch011

The substances or articles authorised for deposit at sea are—...

s.sch011

The grid coordinates for the authorised scheme are specified below—...

s.sch011

This licence remains in force until the authorised scheme has...

s.sch011

The provisions of section 72 (variation, suspension, revocation and transfer)...

s.sch011

With respect to any condition which requires the licensed activities...

s.sch011

Any amendments to the details, plan or scheme must be...

s.sch012

(1) In this licence— “the 2008 Act” means the Planning...

s.sch012

Design parameters

s.sch012

Maintenance of the authorised scheme

s.sch012

Vessels under the undertaker’s control

s.sch012

Extension of time periods

s.sch012

Notification and Inspection

s.sch012

Aids to navigation

s.sch012

Colouring of structures

s.sch012

Chemicals, drilling and debris

s.sch012

Notification of unauthorised deposits

s.sch012

Aviation safety

s.sch012

Subject to the licence conditions at Part 2, this licence...

s.sch012

Pre-construction plans and documents

s.sch012

(1) Each programme, statement, plan, protocol or scheme required to...

s.sch012

Reporting of engaged agents, contractors and vessels

s.sch012

Reporting of impact pile driving

s.sch012

Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)

s.sch012

Maintenance reporting

s.sch012

Piling restriction for spawning herring

s.sch012

Such activities are authorised in relation to the construction, maintenance...

s.sch012

The substances or articles authorised for deposit at sea are—...

s.sch012

The grid coordinates for the authorised scheme are specified below—...

s.sch012

This licence remains in force until the authorised scheme has...

s.sch012

The provisions of section 72 (variation, suspension, revocation and transfer)...

s.sch012

With respect to any condition which requires the licensed activities...

s.sch012

Any amendments to the details, plan or scheme must be...

s.sch013

(1) In this licence— “the 2008 Act” means the Planning...

s.sch013

Design parameters

s.sch013

Maintenance of the authorised scheme

s.sch013

Vessels under the undertaker’s control

s.sch013

Extension of time periods

s.sch013

Notification and Inspection

s.sch013

Aids to navigation

s.sch013

Colouring of structures

s.sch013

Chemicals, drilling and debris

s.sch013

Notification of unauthorised deposits

s.sch013

Aviation safety

s.sch013

Subject to the licence conditions at Part 2, this licence...

s.sch013

Pre-construction plans and documents

s.sch013

(1) Each programme, statement, plan, protocol or scheme required to...

s.sch013

Reporting of engaged agents, contractors and vessels

s.sch013

Reporting of impact pile driving

s.sch013

Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)

s.sch013

Maintenance reporting

s.sch013

Piling restriction for spawning herring

s.sch013

Such activities are authorised in relation to the construction, maintenance...

s.sch013

The substances or articles authorised for deposit at sea are—...

s.sch013

The grid coordinates for the authorised scheme are specified below—...

s.sch013

This licence remains in force until the authorised scheme has...

s.sch013

The provisions of section 72 (variation, suspension, revocation and transfer)...

s.sch013

With respect to any condition which requires the licensed activities...

s.sch013

Any amendments to the details, plan or scheme must be...

s.sch014

(1) In this licence— “the 2008 Act” means the Planning...

s.sch014

Design parameters

s.sch014

Maintenance of the authorised scheme

s.sch014

Vessels under the undertaker’s control

s.sch014

Extension of time periods

s.sch014

Notification and Inspection

s.sch014

Aids to navigation

s.sch014

Colouring of structures

s.sch014

Chemicals, drilling and debris

s.sch014

Notification of unauthorised deposits

s.sch014

Aviation safety

s.sch014

Subject to the licence conditions at Part 2, this licence...

s.sch014

Pre-construction plans and documents

s.sch014

(1) Each programme, statement, plan, protocol or scheme required to...

s.sch014

Reporting of engaged agents, contractors and vessels

s.sch014

Reporting of impact pile driving

s.sch014

Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)

s.sch014

Maintenance reporting

s.sch014

Such activities are authorised in relation to the construction, maintenance...

s.sch014

The substances or articles authorised for deposit at sea are—...

s.sch014

The grid coordinates for the authorised scheme are specified below—...

s.sch014

This licence remains in force until the authorised scheme has...

s.sch014

The provisions of section 72 (variation, suspension, revocation and transfer)...

s.sch014

With respect to any condition which requires the licensed activities...

s.sch014

Any amendments to the details, plan or scheme must be...

s.sch015

(1) In this licence— “the 2008 Act” means the Planning...

s.sch015

Design parameters

s.sch015

Maintenance of the authorised scheme

s.sch015

Vessels under the undertaker’s control

s.sch015

Extension of time periods

s.sch015

Notification and Inspection

s.sch015

Aids to navigation

s.sch015

Colouring of structures

s.sch015

Chemicals, drilling and debris

s.sch015

Notification of unauthorised deposits

s.sch015

Aviation safety

s.sch015

Subject to the licence conditions at Part 2, this licence...

s.sch015

Pre-construction plans and documents

s.sch015

(1) Each programme, statement, plan, protocol or scheme required to...

s.sch015

Reporting of engaged agents, contractors and vessels

s.sch015

Reporting of impact pile driving

s.sch015

Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)

s.sch015

Maintenance reporting

s.sch015

Such activities are authorised in relation to the construction, maintenance...

s.sch015

The substances or articles authorised for deposit at sea are—...

s.sch015

The grid coordinates for the authorised scheme are specified below—...

s.sch015

This licence remains in force until the authorised scheme has...

s.sch015

The provisions of section 72 (variation, suspension, revocation and transfer)...

s.sch015

With respect to any condition which requires the licensed activities...

s.sch015

Any amendments to the details, plan or scheme must be...

s.sch016

Not used.

s.sch018

Application

s.sch018

Miscellaneous

s.sch018

Acquisition of land

s.sch018

Removal of apparatus

s.sch018

Facilities and rights for alternative apparatus

s.sch018

Retained apparatus: protection of Cadent

s.sch018

Expenses

s.sch018

Indemnity

s.sch018

Enactments and agreements

s.sch018

Co-operation

s.sch018

Access

s.sch018

Arbitration

s.sch018

Any difference or dispute arising between the undertaker and the...

s.sch018

Notices

s.sch018

The provisions of this Part of this Schedule have effect,...

s.sch018

In this Part of this Schedule— “asset protection agreement” means...

s.sch018

(1) Where under this Part of this Schedule Network Rail...

s.sch018

(1) The undertaker must not exercise the powers conferred by—...

s.sch018

(1) The undertaker must before commencing construction of any specified...

s.sch018

(1) Any specified work and any protective works to be...

s.sch018

The undertaker must— (a) at all times afford reasonable facilities...

s.sch018

Network Rail must at all times afford reasonable facilities to...

s.sch018

(1) If any permanent or temporary alterations or additions to...

s.sch018

For the protection of any operator, the following provisions, unless...

s.sch018

The undertaker must repay to Network Rail all reasonable fees,...

s.sch018

(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...

s.sch018

If at any time after the completion of a specified...

s.sch018

The undertaker must not provide any illumination or illuminated sign...

s.sch018

Any additional expenses which Network Rail may reasonably incur in...

s.sch018

(1) The undertaker must pay to Network Rail all reasonable...

s.sch018

Network Rail must, on receipt of a request from the...

s.sch018

In the assessment of any sums payable to Network Rail...

s.sch018

The undertaker and Network Rail may, subject in the case...

s.sch018

Nothing in this Order, or in any enactment incorporated with...

s.sch018

In this Part— “electronic communications apparatus” has the same meaning...

s.sch018

The undertaker must give written notice to Network Rail if...

s.sch018

The undertaker must no later than 28 days from the...

s.sch018

In relation to any dispute arising under this part of...

s.sch018

Application

s.sch018

Interpretation

s.sch018

Restriction on authorised development

s.sch018

Submission and approval of plans

s.sch018

Co-existence and proximity agreement

s.sch018

Provision of information

s.sch018

Arbitration

s.sch018

The exercise of the powers of article 28 (statutory undertakers)...

s.sch018

Application

s.sch018

Interpretation

s.sch018

Restriction on authorised development

s.sch018

Coexistence and proximity agreement

s.sch018

Provision of information

s.sch018

Arbitration

s.sch018

Application

s.sch018

Interpretation

s.sch018

Control of works within the Lincs control area

s.sch018

Arbitration

s.sch018

Application

s.sch018

Interpretation

s.sch018

Control of works within the Race Bank control area

s.sch018

Arbitration

s.sch018

Application

s.sch018

Interpretation

s.sch018

Control of works within the DEP control area

s.sch018

Arbitration

s.sch018

Application

s.sch018

In this Part of this Schedule— “acceptable credit provider” means...

s.sch018

This Part of this Schedule does not apply to—

s.sch018

On Street Apparatus

s.sch018

Apparatus of Spalding Energy in closed streets

s.sch018

Acquisition of land

s.sch018

Removal of apparatus

s.sch018

Facilities and rights for alternative apparatus

s.sch018

Retained apparatus: protection

s.sch018

Expenses

s.sch018

Indemnity

s.sch018

Enactments and agreements

s.sch018

Co-operation

s.sch018

Nothing in this part of this Schedule affects the provisions...

s.sch018

Access

s.sch018

Arbitration

s.sch018

Notices

s.sch018

Application

s.sch018

Interpretation

s.sch018

In this Part of this Schedule— “affected undertaker” means— any...

s.sch018

On street apparatus

s.sch018

Apparatus in closed streets

s.sch018

Acquisition of land

s.sch018

Removal of apparatus

s.sch018

Facilities and rights for alternative apparatus

s.sch018

Retained apparatus

s.sch018

Expenses and costs

s.sch018

(1) Subject to sub-paragraphs (2) and (3), if by reason...

s.sch018

Cooperation

s.sch018

Where the undertaker identifies any apparatus which may belong to...

s.sch018

Precedence of the 1991 Act in respect of apparatus in the street

s.sch018

Nothing in this Part of this Schedule affects the provisions...

s.sch018

The undertaker and Anglian Water may by written agreement substitute...

s.sch018

For the avoidance of doubt whenever Anglian Water’s consent, agreement...

s.sch018

Any difference or dispute arising between the undertaker and Anglian...

s.sch018

(1) The following provisions apply for the protection of the...

s.sch018

Submission and approval of plans

s.sch018

Construction of protective works

s.sch018

Timing of works and service of notices

s.sch018

Works not in accordance with this Part of Schedule 18

s.sch018

Maintenance of works

s.sch018

No acquisition etc. except by agreement

s.sch018

Remediating impaired drainage work

s.sch018

Agency access

s.sch018

Free passage of fish

s.sch018

Indemnity

s.sch018

(1) The undertaker is responsible for and indemnifies the Agency...

s.sch018

Disputes

s.sch018

The provisions of this Part of this Schedule have effect...

s.sch018

In this Part of this Schedule— “construction” includes execution, placing,...

s.sch018

(1) Before beginning to construct any specified work, the undertaker...

s.sch018

Without limiting paragraph 3, the requirements which the relevant drainage...

s.sch018

Removal of apparatus

s.sch018

(1) Subject to sub–paragraph (2), any specified work, and all...

s.sch018

(1) Subject to sub-paragraph (5) the undertaker must from the...

s.sch018

If by reason of the construction of any specified work...

s.sch018

If by reason of construction of the specified work the...

s.sch018

The undertaker must indemnify the relevant drainage authority in respect...

s.sch018

(1) Without limiting the other provisions of this Part of...

s.sch018

Any dispute arising between the undertaker and the relevant drainage...

s.sch018

For the protection of the Harbour Authority as referred to...

s.sch018

Interpretation

s.sch018

Submission and approval of plans

s.sch018

Facilities and rights for alternative apparatus

s.sch018

Construction of specified works and service of notices

s.sch018

The undertaker must give to the Harbour Authority not less...

s.sch018

Harbour legislation

s.sch018

The undertaker shall not require any further approval or licence...

s.sch018

Application

s.sch018

Interpretation

s.sch018

Interaction with the Proposed NGET Projects

s.sch018

On Street Apparatus

s.sch018

Apparatus of National Grid Electricity Transmission Plc in closed streets

s.sch018

Acquisition of land

s.sch018

Retained apparatus

s.sch018

Removal of apparatus

s.sch018

Facilities and rights for alternative apparatus

s.sch018

Retained apparatus: protection

s.sch018

Expenses

s.sch018

Indemnity

s.sch018

Enactments and agreements

s.sch018

Co-operation

s.sch018

Access

s.sch018

Arbitration

s.sch018

Notices

s.sch018

Expenses and costs

s.sch018

Restriction on authorised development

s.sch018

Application

s.sch018

Interpretation

s.sch018

On Street Apparatus

s.sch018

Apparatus of National Gas in closed streets

s.sch018

Acquisition of land

s.sch018

Removal of apparatus

s.sch018

Facilities and rights for alternative apparatus

s.sch018

Retained apparatus: protection

s.sch018

Expenses

s.sch018

(1) Subject to sub-paragraphs (2) and (3), if by reason...

s.sch018

Indemnity

s.sch018

Enactments and agreements

s.sch018

Co-operation

s.sch018

Access

s.sch018

Arbitration

s.sch018

Notices

s.sch018

Application

s.sch018

Interpretation

s.sch018

On street apparatus

s.sch018

Apparatus of Cadent in closed streets

s.sch019

Primary objective

s.sch019

Time periods

s.sch019

Timetable

s.sch019

Procedure

s.sch019

Arbitrator’s powers

s.sch019

Costs

s.sch019

Confidentiality

s.sch019

Conservatory and Interim Measures

s.sch020

Applications made for certain approvals

s.sch020

Further information

s.sch020

Appeals

s.sch020

Fees

s.sch020

Interpretation of this Schedule

s.sch022

In this Part— “the artificial nesting measure” means up to...

s.sch022

The artificial nesting measure must not be decommissioned without written...

s.sch022

Results from the monitoring and reporting scheme referred to in...

s.sch022

The Kittiwake CIMP approved under this Schedule includes any amendments...

s.sch022

In this Part— “the artificial nesting measure” means up to...

s.sch022

(1) No offshore works are to commence until the undertaker has confirmed...

s.sch022

Marine Recovery Fund

s.sch022

Guillemot CIMP

s.sch022

Following consultation with the GCSG, the Guillemot CIMP must be...

s.sch022

The Guillemot CIMP (if required) must be based on the...

s.sch022

The undertaker must implement the measures set out in the...

s.sch022

(1) No offshore works are to commence until the undertaker has confirmed...

s.sch022

In the event that one or more of the guillemot...

s.sch022

No operation of any turbine forming part of the authorised...

s.sch022

The undertaker must notify the Secretary of State of—

s.sch022

The artificial nesting measure must not be decommissioned without written...

s.sch022

Results from the monitoring and reporting scheme referred to in...

s.sch022

The Guillemot CIMP approved under this Schedule includes any amendments...

s.sch022

In this Part— “Marine Recovery Fund” means the fund established...

s.sch022

No offshore works within the IDRBNR SAC are to commence...

s.sch022

Following receipt of the approvals under paragraph 2 the undertaker...

s.sch022

In this Part— “Marine Recovery Fund” means the fund established...

s.sch022

Marine Recovery Fund

s.sch022

No offshore works within the IDRBNR SAC are to commence...

s.sch022

Following receipt of the approvals under paragraph 2 the undertaker...

s.sch022

Kittiwake CIMP

s.sch022

Following consultation with the KCSG, the Kittiwake CIMP must be...

s.sch022

The Kittiwake CIMP (if required) must be based on the...

s.sch022

The undertaker must implement the measures set out in the...

s.sch022

No operation of any turbine forming part of the authorised...

s.sch022

The undertaker must notify the Secretary of State of—

Browse 48 other sections — procedural / definitional / commencement
s.art001

Citation and commencement

s.art002

Interpretation

s.art003

Development consent etc. granted by the Order

s.art004

Power to maintain the authorised project

s.art005

Benefit of the Order

s.art006

Application and modification of legislative provisions

s.art007

Defence to proceedings in respect of statutory nuisance

s.art008

Street works

s.art009

Application of the 1991 Act

s.art010

Temporary closure of public rights of way

s.art011

Temporary closure of streets

s.art012

Access to works

s.art013

Agreements with street authorities

s.art014

Power to alter layout etc. of streets

s.art015

Traffic Regulation

s.art016

Discharge of water

s.art017

Authority to survey and investigate the land onshore

s.art018

Compulsory acquisition of land

s.art019

Time limit for exercise of authority to acquire land compulsorily

s.art020

Compulsory acquisition of rights

s.art021

Private rights

s.art022

Application of the Compulsory Purchase (Vesting Declarations) Act 1981

s.art023

Modification of Part 1 of the Compulsory Purchase Act 1965

s.art024

Acquisition of subsoil or airspace only

s.art025

Rights under or over streets

s.art026

Temporary use of land for carrying out the authorised project

s.art027

Temporary use of land for maintaining authorised project

s.art028

Statutory undertakers

s.art029

Recovery of costs of new connections

s.art030

Operation of generating station

s.art031

Deemed marine licences under the 2009 Act

s.art032

Application of landlord and tenant law

s.art033

Amendment of local legislation

s.art034

Operational land for purposes of the 1990 Act

s.art035

Felling or lopping of trees and removal of hedgerows

s.art036

Trees subject to tree preservation orders

s.art037

Protective provisions

s.art038

Arbitration

s.art039

Requirements, appeals, etc.

s.art040

Certification of plans etc.

s.art041

Abatement of works abandoned or decayed

s.art042

Saving provisions for Trinity House

s.art043

Crown rights

s.art044

Funding

s.art045

Compensation provisions

s.art046

Service of notices

s.art047

Transfer of functions of the relevant local planning authority

s.art048

No double recovery

Explore more

Browse legislation

Find other UK business legislation with related guidance.