- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Statutory Undertaker3
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Statutory Undertaker — also bound by 179 other Acts
The Cory Decarbonisation Project Order 2025
120 duties
Water Industry Act 1991
53 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
sch. 11 para. 5
Notifications and inspection
Regulated
- Comply with all notification, inspection and reporting requirements for the offshore wind farmStatutory Undertaker
sch. 12 para. 5
Notifications and inspections
Regulated
- Distribute licence, collect confirmations, provide access, and issue maritime notificationsStatutory Undertaker
s.art019
Authority to survey and investigate the land onshore
Regulated
- Give 14 days' notice before surveying land and obtain consents for trial pitsStatutory Undertaker
103 other provisions — procedural and definitional
s.001
A nationally significant infrastructure project as defined in sections 14... (opens in a new tab)
s.art001
Citation and commencement
s.art002
Interpretation
s.art003
Development consent etc. granted by the Order
s.art004
Power to maintain the authorised project
s.art005
Benefit of the Order
s.art006
Application and modification of legislative provisions
s.art007
Interaction with the Rampion Offshore Wind Farm Order 2014
s.art008
Defence to proceedings in respect of statutory nuisance
s.art009
Street works
s.art010
Application of the 1991 Act
s.art011
Temporary closure of streets
s.art012
Public rights of way
s.art013
Access to works
s.art014
Agreements with street authorities
s.art015
Power to alter layout etc. of streets
s.art016
Temporary speed limits
s.art017
Discharge of water
s.art018
Protective work to buildings
s.art020
Public rights of navigation
s.art021
Temporary suspension of public access to access land
s.art022
Compulsory acquisition of land
s.art023
Time limit for exercise of authority to acquire land compulsorily or to take land temporarily
s.art024
Compulsory acquisition of rights and imposition of restrictive covenants
s.art025
Private rights over land
s.art026
Power to override easements and other rights
s.art027
Application of the 1981 Act
s.art028
Modification of Part 1 of the 1965 Act
s.art029
Acquisition of subsoil or airspace only
s.art030
Rights under or over streets
s.art031
Temporary use of land for carrying out the authorised project
s.art032
Temporary use of land for maintaining the authorised project
s.art033
Compulsory acquisition of land – incorporation of the mineral code
s.art034
Statutory undertakers
s.art035
Apparatus and rights of statutory undertakers in closed streets
s.art036
Recovery of costs of new connections
s.art037
Special Category Land
s.art038
Operation of generating station
s.art039
Deemed marine licences under the 2009 Act
s.art040
Application of landlord and tenant law
s.art041
Operational land for purposes of the 1990 Act
s.art042
Felling or lopping of trees and removal of hedgerows
s.art043
Trees subject to tree preservation orders
s.art044
Abatement of works abandoned or decayed
s.art045
Procedure in relation to certain approvals etc.
s.art046
Arbitration
s.art047
Saving provisions for Trinity House
s.art048
Crown rights
s.art049
Certification of plans and documents, etc.
s.art050
Protective provisions
s.art051
Funding
s.art052
No double recovery
s.art053
Disregard of certain improvements, etc
s.art054
Set-off for enhancement in value of retained land
s.art055
Service of notices
s.art056
Compensation measures
s.para.59
landfall connection works comprising up to four cable circuits and...
s.para.61
onshore connection works consisting of up to four cable circuits...
s.para.62
Work No. 8—
s.para.63
onshore connection works at landfall consisting of—
s.para.65
onshore connection works consisting of— (a) up to four cable...
s.para.66
Work No. 10—
s.para.67
temporary construction compounds.
s.para.68
Work No. 11—
s.para.69
temporary soil storage area.
s.para.70
Work No. 12—
s.para.71
non-intrusive works for duct and cable installation preparation and stringing...
s.para.72
Work No. 13—
s.para.73
temporary construction accesses including creation of visibility splays and vegetation...
s.para.74
Work No. 14—
s.para.75
construction and operational accesses including creation of visibility splays and...
s.para.76
Work No.15— operational accesses including creation of visibility splays and...
s.para.78
onshore substation and associated construction works including—
s.para.79
Work No. 17—
s.para.80
environmental works to mitigate the impact of the substations comprising...
s.para.81
Work No. 18—
s.para.82
construction and operational access including drainage connecting Work No. 16...
s.para.84
onshore cable installation and associated works connecting Work No. 16...
s.para.85
Work No. 20—
s.para.86
an extension to the existing National Grid substation at Bolney...
s.para.88
In connection with such Work Nos. 1 to 6 and...
s.para.89
Onshore
s.para.90
In connection with such Work Nos. 6 to 20 and...
s.para.91
and in each case such other works, apparatus, plant and...
Schedules
Schedules
0 of 129 shown129 other schedules
s.sch001
Stages of onshore works
s.sch001
Offshore Decommissioning
s.sch001
Provision of landscaping
s.sch001
Implementation and maintenance of landscaping
s.sch001
Biodiversity net gain
s.sch001
Highway accesses outside the South Downs National Park
s.sch001
Highway accesses in the South Downs National Park
s.sch001
Operational drainage management
s.sch001
(1) No works to construct the extension of the National...
s.sch001
Onshore Archaeology
s.sch001
Detailed offshore design parameters
s.sch001
Public rights of way
s.sch001
Open access land
s.sch001
Code of construction practice
s.sch001
Onshore construction method statement
s.sch001
Construction traffic management plan
s.sch001
Contamination risk
s.sch001
Coastal erosion
s.sch001
Operation phase maintenance
s.sch001
(1) The authorised development must not be brought into commercial...
s.sch001
Control of noise during operational phase
s.sch001
(1) There must be no more than 3 offshore substations....
s.sch001
Control of artificial light emissions during operational phase
s.sch001
(1) Work No. 20 must not commence, excluding onshore site...
s.sch001
Operational Travel Plan
s.sch001
Skills and Employment Strategy
s.sch001
Construction Communication Plan
s.sch001
Onshore decommissioning
s.sch001
Primary Surveillance Radar Mitigation
s.sch001
Instrument flight procedures
s.sch001
Vegetation retention and removal
s.sch001
Horsham District mitigation and enhancement
s.sch001
The total volume of scour protection comprising development associated with...
s.sch001
Public rights of way and landscape enhancement
s.sch001
National Park enhancement and furtherance
s.sch001
European protected species licence
s.sch001
Site-specific plan for the detailed design approval of the temporary construction compounds at Washington and Climping
s.sch001
Crossing Schedule
s.sch001
Requirement for written approval
s.sch001
Amendments to approved details
s.sch001
(1) The total number of cable circuits must be no...
s.sch001
Cable parameters
s.sch001
Onshore substation parameters
s.sch001
Site-specific plan for the detailed design approval of the onshore substation at Oakendene
s.sch001
Detailed design approval – extension to National Grid substation
s.sch008
The enactments for the time being in force with respect...
s.sch008
(1) Without limitation on the scope of paragraph 1, the...
s.sch008
(1) Without limitation on the scope of paragraph 1, the...
s.sch008
Application of Part 1 of the 1965 Act
s.sch008
(1) The modifications referred to in paragraph 4(a) are as...
s.sch010
The undertaker must give written notice to Network Rail if...
s.sch010
The undertaker must no later than 28 days from the...
s.sch010
In relation to any dispute arising under this part of...
s.sch011
Force majeure
s.sch011
Pre-construction plans and documentation
s.sch011
(1) Each programme, statement, plan, protocol or scheme required to...
s.sch011
Safety Zones
s.sch011
Offshore safety management
s.sch011
Reporting of engaged agents, contractors and vessels
s.sch011
Pre-construction monitoring and surveys
s.sch011
Construction monitoring
s.sch011
Post-construction monitoring
s.sch011
Monitoring of underwater noise from piling
s.sch011
Timing of monitoring report
s.sch011
Updating of cable monitoring plan
s.sch011
Piling
s.sch011
Reporting of cable protection
s.sch011
Decommissioning
s.sch011
Completion of construction
s.sch011
Herring piling restriction
s.sch011
Reporting of impact pile driving
s.sch011
Piling restriction
s.sch012
Force majeure
s.sch012
Pre-construction plans and documentation
s.sch012
(1) Each programme, statement, plan, protocol or scheme required to...
s.sch012
Safety Zones
s.sch012
Offshore safety management
s.sch012
Reporting of engaged agents, contractors and vessels
s.sch012
Pre-construction monitoring and surveys
s.sch012
Construction monitoring
s.sch012
Post-construction monitoring
s.sch012
Monitoring of underwater noise from piling
s.sch012
Timing of monitoring report
s.sch012
Updating of cable monitoring plan
s.sch012
Piling
s.sch012
Reporting of cable protection
s.sch012
Decommissioning
s.sch012
Completion of construction
s.sch012
Herring piling restriction
s.sch012
Reporting of impact pile driving
s.sch012
Piling restriction
s.sch014
Applications made for certain approvals
s.sch014
Further information
s.sch014
Fees
s.sch014
Appeals
s.sch014
Interpretation of Schedule 14
s.sch015
Primary objective
s.sch015
Time periods
s.sch015
Timetable
s.sch015
Procedure
s.sch015
Arbitrator’s powers
s.sch015
Costs
s.sch015
Confidentiality
s.sch017
In this Part 1 of Schedule 17— “the FFC SPA”...
s.sch017
Results from the monitoring and reporting scheme referred to in...
s.sch017
The Final KIMP approved under this Part 1 of Schedule...
s.sch017
In this Part 2 of Schedule 17— “the Farne Islands...
s.sch017
(1) No offshore works may commence until the undertaker has...
s.sch017
Where the undertaker elects to submit a Final GCIMP no...
s.sch017
Following consultation with OGEG, the Final GCIMP must be submitted...
s.sch017
The Final GCIMP (if required) must be based on the...
s.sch017
The undertaker must implement the measures set out in the...
s.sch017
Where the undertaker has confirmed that it intends to make...
s.sch017
Results from the monitoring and reporting scheme referred to in...
s.sch017
(1) No offshore works may commence until the undertaker has...
s.sch017
The Final GCIMP approved under this Part 2 of Schedule...
s.sch017
Where the undertaker elects to submit a Final KIMP no...
s.sch017
Following consultation with OKEG, the Final KIMP must be submitted...
s.sch017
The Final KIMP (if required) must be based on the...
s.sch017
Where the Final KIMP identifies the provision of artificial nesting...
s.sch017
The undertaker must implement the measures set out in the...
s.sch017
No operation of any wind turbine generator forming part of...
s.sch017
Where the undertaker has confirmed that it intends to make...
s.schedule/1/part/1/paragraph/1n2
In the intertidal area
s.schedule/1/part/1/paragraph/1n3
In the district of Arun, in the county of West Sussex
s.schedule/1/part/1/paragraph/1n4
In the districts of Arun, Horsham and Mid Sussex in the county of West Sussex, and within the South Downs National Park
s.schedule/1/part/1/paragraph/1n5
>In the district of Horsham, in the county of West Sussex
s.schedule/1/part/1/paragraph/1n6
In the districts of Mid Sussex and Horsham, in the county of West Sussex
s.schedule/1/part/1/paragraph/1n7
Further Works
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.