UK Statutory Instrument SI 2025/463 United Kingdom

The London Luton Airport Expansion Development Consent Order 2025

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker2

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art021 Authority to survey and investigate the land Regulated
  • The undertaker must give 14 days' notice before surveying or investigating landStatutory Undertaker
57 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent etc. granted by the Order
s.art004 Maintenance of authorised development
s.art005 Maintenance of drainage works
s.art006 Limits of works
s.art007 Benefit of Order
s.art008 Consent to transfer benefit of Order
s.art009 Application of the 1991 Act
s.art010 Street works
s.art011 Power to alter layout, etc., of streets
s.art012 Construction and maintenance of new, altered or diverted streets
s.art013 Temporary stopping up and restriction of use of streets
s.art014 Permanent stopping up of public rights of way
s.art015 Access to works
s.art016 Traffic regulation
s.art017 Agreements with street authorities
s.art018 Designation of highways
s.art019 Discharge of water
s.art020 Protective work to buildings
s.art022 Felling, lopping and removal of trees, shrubs and hedgerows
s.art023 Removal of human remains
s.art024 Compulsory acquisition of land
s.art025 Compulsory acquisition of land – incorporation of the mineral code
s.art026 Time limit for exercise of authority to acquire land compulsorily
s.art027 Compulsory acquisition of rights and imposition of restrictive covenants
s.art028 Private rights over land
s.art029 Modification of Part 1 of the 1965 Act
s.art030 Application of the 1981 Act
s.art031 Acquisition of subsoil or airspace only
s.art032 Rights under or over streets
s.art033 Temporary use of land for carrying out the authorised development
s.art034 Temporary use of land for maintaining the authorised development
s.art035 Special category land
s.art036 Statutory undertakers
s.art037 Apparatus and rights of statutory undertakers in stopped-up streets
s.art038 Recovery of costs of new connections
s.art039 Crown rights
s.art040 Disregard of certain improvements, etc.
s.art041 Set off for enhancement in value of retained land
s.art042 Power to operate the authorised development
s.art043 Disapplication of legislative provisions
s.art044 Interaction with LLAOL planning permission
s.art045 Application of the 1990 Act
s.art046 Application of landlord and tenant law
s.art047 Defence to proceedings in respect of statutory nuisance
s.art048 No double recovery
s.art049 Protection of interests
s.art050 Certification of documents, etc.
s.art051 Service of notices
s.art052 Arbitration
s.art053 Guarantees in respect of payment of compensation
s.art054 Enhancement and conservation of the Chilterns National Landscape
s.para.62 Airport Access Road Work No. 6a(01) — Airport Access Road....
s.para.63 Airport Public Roads Work No. 6b(01) — Within the area...
s.para.64 Airport Operational Roads Work No. 6c(01) —Within the area of...
s.para.65 Offsite Highway Works Work No. 6e — Within the area...
Schedules

Schedules

1 of 149 shown
s.sch008 (1) Subject to sub-paragraphs (2) to (4), if as the... Regulated
  • Pay for damage to electronic communications apparatus caused by the developmentStatutory Undertaker
148 other schedules
s.sch001 In the administrative area of Luton Borough Council, Central Bedfordshire Council, North Hertfordshire District Council, Hertfordshire County Council and Dacorum Borough Council
s.sch001 Sitewide works to enable development
s.sch001 Airfield works
s.sch001 Terminal and associated works
s.sch001 Airport support facilities
s.sch001 Landscaping and mitigation
s.sch001 Airport Access Road and Offsite Highway Works
s.sch001 Ancillary works
s.sch002 Interpretation
s.sch002 Landscape and biodiversity management plan
s.sch002 Protected species
s.sch002 Previously unidentified land contamination and contaminated groundwater
s.sch002 Surface and foul water drainage
s.sch002 Water resources and flood risk assessment
s.sch002 Construction traffic management
s.sch002 Construction workers
s.sch002 Archaeological remains
s.sch002 Remediation of Former Eaton Green Landfill
s.sch002 Interpretation
s.sch002 Amendments to approved details
s.sch002 Exceedance of air quality Level 2 Threshold or Limit
s.sch002 Environmental Scrutiny Group
s.sch002 Monitoring of permitted operations
s.sch002 Exceedance of a Level 1 Threshold
s.sch002 Exceedance of a Level 2 Threshold
s.sch002 Exceedance of a Limit
s.sch002 Review of implementation of this Part
s.sch002 Passenger cap for the authorised development
s.sch002 Night quota period scheduled movements cap
s.sch002 Annual air traffic movement cap for the authorised development
s.sch002 Anticipatory steps towards compliance with any requirement
s.sch002 Air noise management plan
s.sch002 Fixed plant noise management plan
s.sch002 Ground noise management plan
s.sch002 Noise contour limits and quota count point limits
s.sch002 Noise insulation plan and programme
s.sch002 Offsite highways works
s.sch002 Off-site highway works, Work Nos. 6e(d), (e), (f), (j) and (q)
s.sch002 Travel plans
s.sch002 Sustainable transport fund
s.sch002 Operational air quality plan
s.sch002 Time limits
s.sch002 Greenhouse gas action plan
s.sch002 Operational waste management plan
s.sch002 Water consumption
s.sch002 Interpretation
s.sch002 Applications made under requirements
s.sch002 Further information
s.sch002 Register of requirements
s.sch002 Phasing of authorised development
s.sch002 Detailed design
s.sch002 Parameters of authorised development
s.sch002 Code of Construction Practice
s.sch002 Landscaping design
s.sch006 The enactments for the time being in force with respect...
s.sch006 (1) Without limiting paragraph 1, the Land Compensation Act 1973...
s.sch006 (1) Without limiting paragraph 1, the 1961 Act has effect...
s.sch006 Part 1 of the 1965 Act, as applied by section...
s.sch006 (1) The modifications referred to in paragraph 4(a) are as...
s.sch008 For the protection of the utility undertakers referred to in...
s.sch008 (1) Subject to the following provisions of this paragraph, the...
s.sch008 (1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch008 Where in consequence of the proposed construction of any of...
s.sch008 Where, under this Part, the utility undertaker is required to...
s.sch008 Nothing in this Part of this Schedule affects the provisions...
s.sch008 For the protection of any operator, the following provisions have...
s.sch008 In this Part of this Schedule— “the 2003 Act” means...
s.sch008 The exercise of the powers conferred by article 36 (statutory...
s.sch008 (1) The provisions of this Part of this Schedule—
s.sch008 In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch008 For the protection of Cadent the following provisions will, unless...
s.sch008 In this Part of this Schedule— “alternative apparatus” means appropriate...
s.sch008 (1) This Part of this Schedule does not apply to...
s.sch008 (1) Where any public right of way is stopped up...
s.sch008 The undertaker must exercise the powers conferred by article 20...
s.sch008 (1) Regardless of any provision in this Order or anything...
s.sch008 (1) If, in the exercise of the powers conferred by...
s.sch008 (1) Where, in accordance with the provisions of this Part...
s.sch008 (1) Not less than 56 days before the commencement of...
s.sch008 (1) Subject to the following provisions of this paragraph, the...
s.sch008 This Part of this Schedule does not apply to apparatus...
s.sch008 (1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch008 Except where this Part of this Schedule provides otherwise, nothing...
s.sch008 (1) Where in consequence of the proposed construction of any...
s.sch008 If in consequence of any agreement reached in accordance with...
s.sch008 Save for differences or disputes arising under sub-paragraphs 26(2) (removal...
s.sch008 Notwithstanding article 51 (service of notices) any plans submitted to...
s.sch008 (1) The provisions of this Part of this Schedule apply...
s.sch008 (1) Where the terms defined in article 2 (interpretation) of...
s.sch008 The undertaker acknowledges that parts of the works authorised by...
s.sch008 (1) The specified works must not commence until—
s.sch008 (1) Where any public right of way is stopped up...
s.sch008 (1) The undertaker must— (a) as soon as reasonably practicable...
s.sch008 (1) The undertaker must pay to National Highways a sum...
s.sch008 (1) Following any closure or partial closure of any of...
s.sch008 The undertaker must notify National Highways not less than 56...
s.sch008 (1) The undertaker must, as soon as reasonably practicable after...
s.sch008 (1) The undertaker must at its own expense remedy any...
s.sch008 (1) The undertaker must apply to National Highways for the...
s.sch008 The specified works must not commence until—
s.sch008 (1) National Highways must provide to the undertaker an estimate...
s.sch008 Prior to the commencement of the specified works the undertaker...
s.sch008 The undertaker, in the case of the powers conferred by...
s.sch008 (1) Subject to sub-paragraphs (2) and (3) the undertaker fully...
s.sch008 (1) The undertaker must, prior to the commencement of any...
s.sch008 (1) Article 52 (arbitration) of the Order does not apply...
s.sch008 (1) The provisions of this Part of this Schedule apply...
s.sch008 (1) In this Part of this Schedule— “bond sum” means...
s.sch008 Before commencing any specified works, the undertaker must—
s.sch008 The specified works must not commence until—
s.sch008 (1) Road safety audits required to be carried out by...
s.sch008 The specified works must be carried out by the undertaker...
s.sch008 (1) The undertaker must allow and facilitate an appropriately qualified...
s.sch008 Regardless of any provision in this Order or anything shown...
s.sch008 (1) Until such time as a final certificate has been...
s.sch008 (1) The undertaker must pay to the relevant highway authority...
s.sch008 (1) Subject to sub-paragraph (2), when the undertaker considers that...
s.sch008 (1) Notwithstanding article 12 (construction and maintenance of new, altered...
s.sch008 (1) No sooner than 12 months from the date of...
s.sch008 Nothing in this Part of this Schedule prevents a relevant...
s.sch008 Following the issuing of the final certificate under paragraph 63...
s.sch008 (1) The relevant highway authority must provide to the undertaker...
s.sch008 Prior to the commencement of specified works the undertaker must...
s.sch008 (1) Subject to sub-paragraphs (2) and (3) the undertaker fully...
s.sch008 (1) If, in the exercise of the powers conferred by...
s.sch008 The provisions of this Part of this Schedule have effect...
s.sch008 In this Part of this Schedule— “construction” includes execution, placing,...
s.sch008 (1) Where under this Part of this Schedule Network Rail...
s.sch008 (1) The undertaker must before commencing construction of any specified...
s.sch008 (1) Any specified work and any protective works to be...
s.sch008 The undertaker must— (a) at all times afford reasonable facilities...
s.sch008 Network Rail must at all times afford reasonable facilities to...
s.sch008 (1) If any permanent or temporary alterations or additions to...
s.sch008 The undertaker must repay to Network Rail all reasonable fees,...
s.sch008 (1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...
s.sch008 (1) Where, in accordance with the provisions of this Part...
s.sch008 If at any time after the completion of a specified...
s.sch008 The undertaker must not provide any illumination or illuminated sign...
s.sch008 Any additional expenses which Network Rail may reasonably incur in...
s.sch008 (1) The undertaker must pay to Network Rail all reasonable...
s.sch008 Network Rail must, on receipt of a request from the...
s.sch008 In the assessment of any sums payable to Network Rail...
s.sch008 The undertaker and Network Rail may, subject in the case...
s.sch008 Nothing in this Order, or in any enactment incorporated with...
s.sch008 The undertaker must give written notice to Network Rail if...
s.sch008 The undertaker must no later than 28 days from the...
s.sch008 (1) Not less than 28 days before starting the execution...
s.sch008 In relation to any dispute arising under this Part of...

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.