Does it bind you?
Business-side roles with duties under this instrument.
Data Controller50
Any Person11
Operator2
Client1
Contractor1
Occupier1
Plus 1 duty on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Data Controller — also bound by 35 other Acts
Any Person — also bound by 2340 other Acts
Human Medicines Regulations 2012
184 duties
Merchant Shipping Act 1995
144 duties
Insolvency (England and Wales) Rules 2016
104 duties
Communications Act 2003
92 duties
Road Traffic Act 1988
92 duties
Operator — also bound by 746 other Acts
Regulation (EU) No 965/2012 (Air Operations)
203 duties
Space Industry Regulations 2021
76 duties
Client — also bound by 62 other Acts
Building Regulations 2010
12 duties
Contractor — also bound by 173 other Acts
Occupier — also bound by 235 other Acts
Highways Act 1980
23 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
s.art006
Endorsement of submission documents
Regulated
- Notify Secretary of State of submission documents and provide requested informationData Controller
s.art007
Modification of reference documents, controlling documents and endorsement conditions
Regulated
- Get Secretary of State approval before modifying plans or conditionsData Controller
6 other provisions — procedural and definitional
s.art001
Citation, commencement, extent, application and revocation
s.art002
Interpretation
s.art003
Other planning permissions
s.art004
Grant of planning permission
s.art005
Conditions and limitations
s.art008
Publication of documents
Schedules
Schedules
65 of 99 shown
s.sch003
Dark corridors for bats
Regulated
- Obtain Secretary of State approval for bat dark corridor plans before construction in specified zonesData Controller
s.sch003
Time when development must be begun
Regulated
- Start development within 3 years and notify Secretary of State of start dateData Controller
s.sch003
Construction environmental management plan
Regulated
- Submit and obtain approval of a Construction Environmental Management Plan before construction work beginsData Controller
s.sch003
Mass grading
Regulated
- Submit grading plan and get Secretary of State approval before mass gradingData Controller
s.sch003
Land remediation
Regulated
- Prepare land remediation strategy before construction work on contaminated landData Controller
s.sch003
Construction traffic management scheme
Regulated
- Monitor and record construction traffic movements until traffic management scheme approvedData Controller
s.sch003
Broadmead Road level crossing
Regulated
- Get approval for level crossing safety scheme before using it for construction trafficData Controller
s.sch003
Accommodation monitoring reports
Regulated
- Monitor and report construction workforce numbers to the Secretary of StateData Controller
s.sch003
Exceedances and accommodation management plans
Regulated
- Prepare and submit accommodation management plan when exceedance likelyData Controller
s.sch003
Construction worker accommodation
Regulated
- Provide accommodation for construction workers when monitoring shows likely exceedancesData Controller
s.sch003
Height controls: general
Regulated
- Comply with maximum height limits for authorised worksAny Person
s.sch003
Height controls to secure an articulated skyline
Regulated
- Design and construct authorised works within specified height limitsAny Person
s.sch003
Masterplans
Regulated
- Provide compliant masterplan and compliance statement to Secretary of StateData Controller
s.sch003
Detailed designs: class 3 and class 6 authorised works
Regulated
- Submit detailed designs for class 3 and class 6 works with supporting documents and approvalsData Controller
s.sch003
Detailed designs: other classes of authorised works
Regulated
- Submit detailed designs with required documents and compliance statementData Controller
s.sch003
Designation of site controller and appointment of principal representative
Regulated
- Designate a site controller and appoint a principal representative before starting developmentClient
s.sch003
Lake Zone (proximity to liquefied natural gas facility)
Regulated
- Get HSE safety advice before building near the LNG facilityData Controller
s.sch003
Entertainment resort complex
Regulated
- Locate authorised works only within the permitted areasAny Person
s.sch003
Transport related development
Regulated
- Build transport hub and roads only in permitted zonesAny Person
s.sch003
Camp sites
Regulated
- Locate camp sites only within the Lake ZoneAny Person
s.sch003
Core controls
Regulated
- Control and land ownership requirements for the entertainment resort complexData Controller
s.sch003
Conference and convention facilities
Regulated
- Conference facilities must be in the Lake Zone and under 55,000 sqmAny Person
s.sch003
Sports venues with outdoor playing fields
Regulated
- Locate sports facilities with outdoor playing fields only in the Lake ZoneAny Person
s.sch003
Class 4 authorised works
Regulated
- Site controller must submit utility compound plan for Secretary of State approvalData Controller
s.sch003
Impact of authorised works on natural light in certain dwellings
Regulated
- Get expert light report before building tall structures near certain homesData Controller
s.sch003
Kempston Hardwick moated site
Regulated
- Protect the Kempston Hardwick moated site from development and vibrationData Controller
s.sch003
ERC expansion areas
Regulated
- Do not start construction in ERC expansion areas without Secretary of State endorsement and material change of useAny Person
s.sch003
Means of enclosure with a height of more than 5.4 metres AGL
Regulated
- Obtain Secretary of State approval before building fences or walls over 5.4 metresData Controller
s.sch003
Battery energy storage system
Regulated
- Comply with design, location, safety, and notification requirements for BESSData Controller
s.sch003
Experience and capability
Regulated
- Ensure an accountable individual with relevant experience is in place for the ERCData Controller
s.sch003
Vehicle parking
Regulated
- Provide minimum vehicle parking before Grand Opening and maintain sustainable spacesData Controller
s.sch003
Leadership in Energy and Environmental Design
Regulated
- Submit LEED-based environmental scheme before building resort complexData Controller
s.sch003
Carbon management
Regulated
- Follow carbon management plan and report compliance after Grand OpeningData Controller
s.sch003
Riparian protection zone
Regulated
- Design and construct riparian protection zones along watercoursesContractor
s.sch003
Flood risk
Regulated
- Prepare and submit flood resilience scheme for approval before constructionData Controller
s.sch003
Storage capacity
Regulated
- Maintain flood storage capacity on the Order landAny Person
s.sch003
Water conservation and supplies of non-potable water
Regulated
- Conserve and reuse water, and supply non-potable water as plannedData Controller
s.sch003
Specified habitats: general
Regulated
- Create or enhance specified habitats before Grand OpeningOperator
s.sch003
Culverts
Regulated
- Get approval for new culverts unless they're in agreed designsData Controller
s.sch003
Outfalls
Regulated
- Obtain Secretary of State approval before constructing certain outfallsData Controller
s.sch003
Runoff
Regulated
- Control surface water runoff and monitor complianceData Controller
s.sch003
Sustainable drainage systems: management and maintenance
Regulated
- Submit and maintain sustainable drainage maintenance plan for approvalData Controller
s.sch003
Foul drainage
Regulated
- Get Secretary of State approval before connecting new drainage to public sewersData Controller
s.sch003
Water supplies
Regulated
- Do not connect works to public water supply without satisfying criteriaData Controller
s.sch003
Core capacity and features of ERC
Regulated
- Do not open the Entertainment Resort Complex until capacity and security conditions are metData Controller
s.sch003
Habitat location plan
Regulated
- Obtain approved habitat location plan and keep habitat records until Grand OpeningData Controller
s.sch003
Soft Opening Period and security and emergency management
Regulated
- Obtain Secretary of State approval for security and emergency plan before soft openingData Controller
s.sch003
Public access
Regulated
- Ensure public roads are complete or arrange alternative temporary access before Grand OpeningData Controller
s.sch003
Manor Road level crossing
Regulated
Other duties (1) — Crown / regulator
- Get Secretary of State approval for level crossing improvements before openingCrown / Minister / Government department
s.sch003
Public rights of way
Regulated
- Grand Opening must not happen until footpaths are permanently stopped upOperator
s.sch003
Wixams station (bus replacement service)
Regulated
- Do not hold Grand Opening without open Wixams station or approved bus schemeData Controller
s.sch003
Travel plan
Regulated
- Submit and implement a travel plan before Grand OpeningData Controller
s.sch003
Restrictions on occupation before Grand Opening
Regulated
- Do not occupy class 1 works before Grand Opening without approvalData Controller
s.sch003
Public roads in Lake Zone
Regulated
- Do not occupy Lake Zone work until road/cycleway complete or temporary access approved and in placeData Controller
s.sch003
Traffic monitoring and management
Regulated
- Set up and operate a traffic monitoring scheme for the Entertainment Resort ComplexData Controller
s.sch003
Habitat creation and enhancement plans
Regulated
- Submit habitat creation and enhancement plans before construction in habitat areasData Controller
s.sch003
Milton Keynes shuttle bus
Regulated
- Ensure shuttle bus service meets minimum standards before Grand Opening and monitor usage post-openingData Controller
s.sch003
Wixams shuttle bus
Regulated
- Provide Wixams shuttle bus service and report to Secretary of StateData Controller
s.sch003
Drone shows
Regulated
- Do not operate drone displays outside Core Zone or near protected habitatsAny Person
s.sch003
Pyrotechnic and laser effects
Regulated
- Restrict outdoor pyrotechnic and laser displays to the Core Zone and brief burstsAny Person
s.sch003
Noise and vibration
Regulated
- Operate within noise limits and comply with noise monitoring requirementsData Controller
s.sch003
Seasonal events and special events
Regulated
- Control amplified music after late-night events to avoid disturbing neighboursData Controller
s.sch003
Opening hours
Regulated
- Comply with ticketed area opening hours after Grand OpeningOccupier
s.sch003
Landscape and ecology management plans
Regulated
- Submit landscape and ecology management plan before Grand Opening and manage habitats accordinglyData Controller
s.sch003
Employment and skills
Regulated
- Implement employment and skills commitments from the environmental controls documentData Controller
34 other schedules
s.sch002
Visitor entertainment and hospitality facilities
s.sch002
Support for provision and operation of visitor entertainment and hospitality facilities
s.sch002
Rail-related development
s.sch002
Utilities and services
s.sch002
Walking, wheeling and cycling routes
s.sch002
Roads and associated infrastructure
s.sch002
Vehicle-related facilities
s.sch002
Security and reception
s.sch002
Landscaping and environmental measures, miscellaneous features, facilities and amenities
s.sch003
Interpretation of Schedule
s.sch003
Archaeological mitigation
s.sch003
Broadmead Road
s.sch003
Interpretation of Part 5
s.sch003
Modification of zonal boundaries; ticketed area plan
s.sch003
Interpretation of Part 7
s.sch003
Requirement for masterplan or detailed design approval
s.sch003
Reference design standards applicable to all parts of the Order land
s.sch003
Reference design standards applicable only to the Core Zone
s.sch003
Reference design standards applicable only to the East Gateway Zone
s.sch003
Reference design standards applicable only to the Lake Zone
s.sch003
Primary access points
s.sch003
Petrol filling or service station
s.sch003
Veteran tree
s.sch003
Limits on extent of highway works
s.sch003
Limits on extent of railway development
s.sch003
Limits on capacity, extent or use of certain energy and water infrastructure
s.sch003
Floorspace
s.sch003
Road crossing over Elstow Brook
s.sch003
Sustainable drainage
s.sch003
Kempston Hardwick Clay Pits (North)
s.sch003
Active travel
s.sch003
Firework displays
s.sch003
Hotels
s.sch003
1 and 2 Vine Cottages
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.