UK Statutory Instrument 2025 United Kingdom

The Town and Country Planning (Entertainment Resort Complex, Bedford) Special Development (No. 2) Order 2025

At a glance

Enforced by

APHA

What's here

67 compliance obligations

Who this Act binds

Business-side actors with duties under this Act, ranked by how often they appear.

  • Data Controller 50
  • Any Person 11
  • Operator 2
  • Client 1
  • Contractor 1
  • Occupier 1

Plus 1 non-business duty on Crown ministers, regulators, local authorities or tribunals — shown collapsed under each section below.

Other Acts binding the same actors

For each actor bound by this Act, the other UK Acts that bind them most often. Useful for understanding the full compliance landscape facing each role.

Data Controllers also bound by 38 other Acts (top 5 shown)
Any Person also bound by 2338 other Acts (top 5 shown)
Operators also bound by 730 other Acts (top 5 shown)
Clients also bound by 65 other Acts (top 5 shown)
Contractors also bound by 178 other Acts (top 5 shown)
Occupiers also bound by 259 other Acts (top 5 shown)

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

s.sch003

Dark corridors for bats

  • Obtain Secretary of State approval for bat dark corridor plans before construction in specified zones Data Controller
s.sch003

Time when development must be begun

  • Start development within 3 years and notify Secretary of State of start date Data Controller
s.sch003

Construction environmental management plan

  • Submit and obtain approval of a Construction Environmental Management Plan before construction work begins Data Controller
s.sch003

Mass grading

  • Submit grading plan and get Secretary of State approval before mass grading Data Controller
s.sch003

Land remediation

  • Prepare land remediation strategy before construction work on contaminated land Data Controller
s.sch003

Construction traffic management scheme

  • Monitor and record construction traffic movements until traffic management scheme approved Data Controller
s.sch003

Broadmead Road level crossing

  • Get approval for level crossing safety scheme before using it for construction traffic Data Controller
s.sch003

Accommodation monitoring reports

  • Monitor and report construction workforce numbers to the Secretary of State Data Controller
s.sch003

Exceedances and accommodation management plans

  • Prepare and submit accommodation management plan when exceedance likely Data Controller
s.sch003

Construction worker accommodation

  • Provide accommodation for construction workers when monitoring shows likely exceedances Data Controller
s.sch003

Height controls: general

  • Comply with maximum height limits for authorised works Any Person
s.sch003

Height controls to secure an articulated skyline

  • Design and construct authorised works within specified height limits Any Person
s.sch003

Masterplans

  • Provide compliant masterplan and compliance statement to Secretary of State Data Controller
s.sch003

Detailed designs: class 3 and class 6 authorised works

  • Submit detailed designs for class 3 and class 6 works with supporting documents and approvals Data Controller
s.sch003

Detailed designs: other classes of authorised works

  • Submit detailed designs with required documents and compliance statement Data Controller
s.sch003

Designation of site controller and appointment of principal representative

  • Designate a site controller and appoint a principal representative before starting development Client
s.sch003

Lake Zone (proximity to liquefied natural gas facility)

  • Get HSE safety advice before building near the LNG facility Data Controller
s.sch003

Entertainment resort complex

  • Locate authorised works only within the permitted areas Any Person
s.sch003

Transport related development

  • Build transport hub and roads only in permitted zones Any Person
s.sch003

Camp sites

  • Locate camp sites only within the Lake Zone Any Person
s.sch003

Core controls

  • Control and land ownership requirements for the entertainment resort complex Data Controller
s.sch003

Conference and convention facilities

  • Conference facilities must be in the Lake Zone and under 55,000 sqm Any Person
s.sch003

Sports venues with outdoor playing fields

  • Locate sports facilities with outdoor playing fields only in the Lake Zone Any Person
s.sch003

Class 4 authorised works

  • Site controller must submit utility compound plan for Secretary of State approval Data Controller
s.sch003

Impact of authorised works on natural light in certain dwellings

  • Get expert light report before building tall structures near certain homes Data Controller
s.sch003

Kempston Hardwick moated site

  • Protect the Kempston Hardwick moated site from development and vibration Data Controller
s.sch003

ERC expansion areas

  • Do not start construction in ERC expansion areas without Secretary of State endorsement and material change of use Any Person
s.sch003

Means of enclosure with a height of more than 5.4 metres AGL

  • Obtain Secretary of State approval before building fences or walls over 5.4 metres Data Controller
s.sch003

Battery energy storage system

  • Comply with design, location, safety, and notification requirements for BESS Data Controller
s.sch003

Experience and capability

  • Ensure an accountable individual with relevant experience is in place for the ERC Data Controller
s.sch003

Vehicle parking

  • Provide minimum vehicle parking before Grand Opening and maintain sustainable spaces Data Controller
s.sch003

Leadership in Energy and Environmental Design

  • Submit LEED-based environmental scheme before building resort complex Data Controller
s.sch003

Carbon management

  • Follow carbon management plan and report compliance after Grand Opening Data Controller
s.sch003

Riparian protection zone

  • Design and construct riparian protection zones along watercourses Contractor
s.sch003

Flood risk

  • Prepare and submit flood resilience scheme for approval before construction Data Controller
s.sch003

Storage capacity

  • Maintain flood storage capacity on the Order land Any Person
s.sch003

Water conservation and supplies of non-potable water

  • Conserve and reuse water, and supply non-potable water as planned Data Controller
s.sch003

Specified habitats: general

  • Create or enhance specified habitats before Grand Opening Operator
s.sch003

Culverts

  • Get approval for new culverts unless they're in agreed designs Data Controller
s.sch003

Outfalls

  • Obtain Secretary of State approval before constructing certain outfalls Data Controller
s.sch003

Runoff

  • Control surface water runoff and monitor compliance Data Controller
s.sch003

Sustainable drainage systems: management and maintenance

  • Submit and maintain sustainable drainage maintenance plan for approval Data Controller
s.sch003

Foul drainage

  • Get Secretary of State approval before connecting new drainage to public sewers Data Controller
s.sch003

Water supplies

  • Do not connect works to public water supply without satisfying criteria Data Controller
s.sch003

Core capacity and features of ERC

  • Do not open the Entertainment Resort Complex until capacity and security conditions are met Data Controller
s.sch003

Habitat location plan

  • Obtain approved habitat location plan and keep habitat records until Grand Opening Data Controller
s.sch003

Soft Opening Period and security and emergency management

  • Obtain Secretary of State approval for security and emergency plan before soft opening Data Controller
s.sch003

Public access

  • Ensure public roads are complete or arrange alternative temporary access before Grand Opening Data Controller
s.sch003

Manor Road level crossing

Other duties (1) — Crown / regulator
  • Get Secretary of State approval for level crossing improvements before opening Crown / Minister / Government department
s.sch003

Public rights of way

  • Grand Opening must not happen until footpaths are permanently stopped up Operator
s.sch003

Wixams station (bus replacement service)

  • Do not hold Grand Opening without open Wixams station or approved bus scheme Data Controller
s.sch003

Travel plan

  • Submit and implement a travel plan before Grand Opening Data Controller
s.sch003

Restrictions on occupation before Grand Opening

  • Do not occupy class 1 works before Grand Opening without approval Data Controller
s.sch003

Public roads in Lake Zone

  • Do not occupy Lake Zone work until road/cycleway complete or temporary access approved and in place Data Controller
s.sch003

Traffic monitoring and management

  • Set up and operate a traffic monitoring scheme for the Entertainment Resort Complex Data Controller
s.sch003

Habitat creation and enhancement plans

  • Submit habitat creation and enhancement plans before construction in habitat areas Data Controller
s.sch003

Milton Keynes shuttle bus

  • Ensure shuttle bus service meets minimum standards before Grand Opening and monitor usage post-opening Data Controller
s.sch003

Wixams shuttle bus

  • Provide Wixams shuttle bus service and report to Secretary of State Data Controller
s.sch003

Drone shows

  • Do not operate drone displays outside Core Zone or near protected habitats Any Person
s.sch003

Pyrotechnic and laser effects

  • Restrict outdoor pyrotechnic and laser displays to the Core Zone and brief bursts Any Person
s.sch003

Noise and vibration

  • Operate within noise limits and comply with noise monitoring requirements Data Controller
s.sch003

Seasonal events and special events

  • Control amplified music after late-night events to avoid disturbing neighbours Data Controller
s.sch003

Opening hours

  • Comply with ticketed area opening hours after Grand Opening Occupier
s.sch003

Landscape and ecology management plans

  • Submit landscape and ecology management plan before Grand Opening and manage habitats accordingly Data Controller
s.sch003

Employment and skills

  • Implement employment and skills commitments from the environmental controls document Data Controller
Browse 34 other Schedules — structural / supplementary
s.sch002

Visitor entertainment and hospitality facilities

s.sch002

Support for provision and operation of visitor entertainment and hospitality facilities

s.sch002

Rail-related development

s.sch002

Utilities and services

s.sch002

Walking, wheeling and cycling routes

s.sch002

Roads and associated infrastructure

s.sch002

Vehicle-related facilities

s.sch002

Security and reception

s.sch002

Landscaping and environmental measures, miscellaneous features, facilities and amenities

s.sch003

Interpretation of Schedule

s.sch003

Archaeological mitigation

s.sch003

Broadmead Road

s.sch003

Interpretation of Part 5

s.sch003

Modification of zonal boundaries; ticketed area plan

s.sch003

Interpretation of Part 7

s.sch003

Requirement for masterplan or detailed design approval

s.sch003

Reference design standards applicable to all parts of the Order land

s.sch003

Reference design standards applicable only to the Core Zone

s.sch003

Reference design standards applicable only to the East Gateway Zone

s.sch003

Reference design standards applicable only to the Lake Zone

s.sch003

Primary access points

s.sch003

Petrol filling or service station

s.sch003

Veteran tree

s.sch003

Limits on extent of highway works

s.sch003

Limits on extent of railway development

s.sch003

Limits on capacity, extent or use of certain energy and water infrastructure

s.sch003

Floorspace

s.sch003

Road crossing over Elstow Brook

s.sch003

Sustainable drainage

s.sch003

Kempston Hardwick Clay Pits (North)

s.sch003

Active travel

s.sch003

Firework displays

s.sch003

Hotels

s.sch003

1 and 2 Vine Cottages

s.art006

Endorsement of submission documents

  • Notify Secretary of State of submission documents and provide requested information Data Controller
s.art007

Modification of reference documents, controlling documents and endorsement conditions

  • Get Secretary of State approval before modifying plans or conditions Data Controller
Browse 6 other sections — procedural / definitional / commencement
s.art001

Citation, commencement, extent, application and revocation

s.art002

Interpretation

s.art003

Other planning permissions

s.art004

Grant of planning permission

s.art005

Conditions and limitations

s.art008

Publication of documents

Enforcement and responsible bodies

The regulators that administer or enforce this legislation.

Animal and Plant Health Agency

Safeguards animal and plant health for the benefit of people, environment and economy. Issues export health certificates, manages disease outbreaks, operates veterinary …

Explore more

Browse legislation

Find other UK business legislation with related guidance.

Regulators

Learn more about the bodies that enforce this legislation.