UK Statutory Instrument 2024 United Kingdom

The A66 Northern Trans-Pennine Development Consent Order 2024

At a glance

What's here

1 compliance obligation

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

s.sch009

(1) Subject to sub-paragraphs (2) to (4), if as the...

  • Pay costs and compensation for damage to telecoms apparatus or service interruption
Browse 201 other Schedules — structural / supplementary
s.sch005

Compensation enactments

s.sch005

(1) Without limitation on the scope of paragraph 1, the...

s.sch005

(1) Without limitation on the scope of paragraph 1, the...

s.sch005

Application of Part 1 of the 1965 Act

s.sch005

(1) The modifications referred to in paragraph 4(a) are as...

s.sch007

A 2.8 km length of new and improved A66 trunk road

s.sch007

A66 westbound merge slip road

s.sch007

Kemplay Bank Roundabout

s.sch007

A 90 metre length of improved A6 (southbound approach to Kemplay Bank Roundabout)

s.sch007

A 155 metre length of improved A6 (northbound approach to Kemplay Bank Roundabout)

s.sch007

A 242 metre length of improved A686

s.sch007

A length of approximately 416 metres of the existing A66,...

s.sch007

A 2.9 kilometre length of improved A66 trunk road

s.sch007

A 2.4 kilometre length of new A66 trunk road

s.sch007

A 116 metre length of new road (Northbound Approach)

s.sch007

A 493 metre length of new road (Connector Loop)

s.sch007

M6 northbound diverge slip road

s.sch007

B6262 (Realigned)

s.sch007

A 144 metre length of new road (unclassified U3192)

s.sch007

A 247 metre length of new road (unclassified westbound approach) (unclassified U3193)

s.sch007

A length of approximately 451 metres of the existing A66,...

s.sch007

An 8.6 kilometre length of new road

s.sch007

Temple Sowerby connector road

s.sch007

Kirkby Thore Junction (access to British Gypsum) eastbound connector road

s.sch007

Kirkby Thore Junction (access to British Gypsum) westbound connector road

s.sch007

Long Marton Junction eastbound connector road

s.sch007

Long Marton Junction westbound connector road

s.sch007

M6 northbound merge slip road

s.sch007

Local road linking C3057 to A66

s.sch007

An 8.5 km length of new and existing road

s.sch007

Proposed Roundabout

s.sch007

C3057 South

s.sch007

C3057 North

s.sch007

C3065 Road – Fell Lane

s.sch007

C3065 Road – Realigned Main Street

s.sch007

An 87 metre length of existing road to be classified...

s.sch007

A 1.15 km length of new road

s.sch007

Roman Road (unclassified U3199)

s.sch007

M6 southbound diverge slip road

s.sch007

New Cross Street (unclassified C3030)

s.sch007

A 33 metre length of existing link road, commencing at...

s.sch007

A 32 metre length of existing link road, commencing at...

s.sch007

A 207 metre length of existing road, commencing at point...

s.sch007

Main Street (unclassified U3772)

s.sch007

New Sleastonhow Lane (unclassified U3202)

s.sch007

Improved Long Marton (unclassified U3773)

s.sch007

Existing Fell Lane (unclassified C3065)

s.sch007

Priest Lane (unclassified U3199)

s.sch007

A 7.2 km length of the existing A66 trunk road...

s.sch007

M6 southbound merge slip road

s.sch007

An 8.2 kilometre length of new road

s.sch007

New B6259 Sandford Junction

s.sch007

New Warcop Eastbound Junction

s.sch007

New Warcop Westbound Junction

s.sch007

A 220m length of new road (new B6259)

s.sch007

A 1.1 kilometre length of existing A66 trunk road

s.sch007

A 3.5 kilometre length of new road (realigned old A66)

s.sch007

A 126 metre length of new road (Flitholme Road)

s.sch007

A 666 metre length of new road (Flitholme to Langrigg Link)

s.sch007

A 890 metre length of the existing A66 at Warcop (Moorhouse Link)

s.sch007

A 205 metre length of improved A592

s.sch007

A 1.2 kilometre length of existing A66 Trunk Road

s.sch007

A 1.4 kilometre length of existing A66 Trunk Road

s.sch007

A66 all-purpose dual carriageway

s.sch007

A66 eastbound diverge slip road

s.sch007

A66 eastbound merge slip road

s.sch007

A66 westbound diverge slip road

s.sch007

A66 westbound merge slip road

s.sch007

A67

s.sch007

The Street

s.sch007

The new Clint Lane Overbridge

s.sch007

A66 eastbound diverge slip road

s.sch007

Unnamed Side Road

s.sch007

A66 Junction with The Street

s.sch007

A66 all-purpose dual carriageway

s.sch007

Eastbound A66 / B6277 compact connector road

s.sch007

Westbound A66 / B6277 compact connector road

s.sch007

New B6277 Moorhouse Lane link road

s.sch007

Realigned Moorhouse Lane (north)

s.sch007

Realigned Rutherford Lane

s.sch007

Realigned Moorhouse Lane (south)

s.sch007

A66 Eastbound Diverge connector road

s.sch007

A66 eastbound merge slip road

s.sch007

Westbound A66 / C165 compact connector road

s.sch007

Rokeby Junction compact grade separated junction

s.sch007

Existing A66

s.sch007

A66 Eastbound Merge Slip Road

s.sch007

A66 Junction with Rutherford Lane

s.sch007

A66 Trunk Road

s.sch007

A66 Junction with Moorhouse Lane (South)

s.sch007

A66 Trunk Road

s.sch007

A66 all-purpose dual carriageway

s.sch007

A66 westbound merge slip road

s.sch007

A66 westbound diverge slip road

s.sch007

C108 Warrener Lane

s.sch007

Realigned C12 Collier Lane

s.sch007

Eastbound A66 compact connector road

s.sch007

Westbound A66 compact connector road

s.sch007

Moor Lane link road

s.sch007

A66 Trunk Road (west)

s.sch007

A66 Trunk Road (east)

s.sch009

(1) The provisions of this Part of this Schedule have...

s.sch009

Expenses and costs

s.sch009

(1) Subject to sub-paragraphs (2) and (3), if by reason...

s.sch009

Cooperation

s.sch009

Nothing in this Part of this Schedule affects the provisions...

s.sch009

(1) For the protection of any operator, the following provisions...

s.sch009

The exercise of the powers of article 31 (statutory undertakers)...

s.sch009

This Part of this Schedule does not apply to—

s.sch009

Nothing in this Part of this Schedule affects the provisions...

s.sch009

Application

s.sch009

In this Part of this Schedule— “alternative apparatus” means alternative...

s.sch009

Interpretation

s.sch009

Except for paragraphs 22 (apparatus of National Grid in stopped...

s.sch009

Apparatus of National Grid in closed streets

s.sch009

Protective works to buildings

s.sch009

Acquisition of land

s.sch009

Removal of apparatus

s.sch009

Facilities and rights for alternative apparatus

s.sch009

Retained apparatus: protection of electricity undertaker

s.sch009

Expenses

s.sch009

Indemnity

s.sch009

On street apparatus

s.sch009

Enactments and agreements

s.sch009

Co-operation

s.sch009

Access

s.sch009

Arbitration

s.sch009

Notices

s.sch009

Application

s.sch009

Interpretation

s.sch009

Except for paragraphs 38 (apparatus of National Grid in closed...

s.sch009

Apparatus of National Grid in closed streets

s.sch009

Protective works to buildings

s.sch009

Apparatus in closed streets

s.sch009

Acquisition of land

s.sch009

Removal of apparatus

s.sch009

Facilities and rights for alternative apparatus

s.sch009

Retained apparatus: protection of gas undertaker

s.sch009

Expenses

s.sch009

Indemnity

s.sch009

Enactments and agreements

s.sch009

Co-operation

s.sch009

Access

s.sch009

Arbitration

s.sch009

Protective works to buildings

s.sch009

Notices

s.sch009

(1) The following provisions of this Part of this Schedule...

s.sch009

Submission and approval of plans

s.sch009

Construction of protective works

s.sch009

Timing of works and service of notices

s.sch009

Works not in accordance with this Schedule

s.sch009

Maintenance of works

s.sch009

Remediating impaired drainage work

s.sch009

Agency access

s.sch009

Free passage of fish

s.sch009

Acquisition of land

s.sch009

Indemnity

s.sch009

(1) The undertaker is responsible for and indemnifies the Agency...

s.sch009

Disputes

s.sch009

The following provisions of this Part of this Schedule have...

s.sch009

In this Part of this Schedule— “asset protection agreement” means...

s.sch009

(1) Where under this Part of this Schedule Network Rail...

s.sch009

(1) The undertaker must not exercise the powers conferred by—...

s.sch009

(1) The undertaker must before commencing construction of any specified...

s.sch009

(1) Any specified work and any protective works to be...

s.sch009

The undertaker must— (a) at all times afford reasonable facilities...

s.sch009

Removal of apparatus

s.sch009

Network Rail must at all times afford reasonable facilities to...

s.sch009

(1) If any permanent or temporary alterations or additions to...

s.sch009

The undertaker must repay to Network Rail all reasonable fees,...

s.sch009

(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...

s.sch009

If at any time after the completion of a specified...

s.sch009

The undertaker must not provide any illumination or illuminated sign...

s.sch009

Any additional expenses which Network Rail may reasonably incur in...

s.sch009

(1) The undertaker must pay to Network Rail all reasonable...

s.sch009

Network Rail must, on receipt of a request from the...

s.sch009

In the assessment of any sums payable to Network Rail...

s.sch009

Facilities and rights for alternative apparatus

s.sch009

The undertaker and Network Rail may, subject in the case...

s.sch009

Nothing in this Order, or in any enactment incorporated with...

s.sch009

The undertaker must give written notice to Network Rail if...

s.sch009

The undertaker must no later than 28 days from the...

s.sch009

The provisions of this Part of this Schedule apply for...

s.sch009

In this Part of this Schedule— “construction” includes execution, placing,...

s.sch009

(1) Before beginning to construct any specified work, the undertaker...

s.sch009

The requirements or conditions which the drainage authority may make...

s.sch009

(1) Any specified work in relation to an ordinary watercourse,...

s.sch009

(1) From the commencement of the construction of any specified...

s.sch009

Retained apparatus

s.sch009

Subject to paragraph 89(5)(b), if by reason of the construction...

s.sch009

(1) The undertaker must make reasonable compensation for costs, charges...

s.sch009

Any dispute arising between the undertaker and the drainage authority...

s.schedule/1/part/1/paragraph/1

In the administrative area of Westmorland and Furness Council

s.schedule/1/part/2/paragraph/1

In the administrative area of Westmorland and Furness Council

s.schedule/1/part/3/paragraph/1

In the administrative area of Westmorland and Furness Council

s.schedule/1/part/4/paragraph/1

In the administrative area of Westmorland and Furness Council

s.schedule/1/part/5/paragraph/1

In the administrative area of Durham County Council

s.schedule/1/part/6/paragraph/1

In the administrative area of Durham County Council

s.schedule/1/part/7/paragraph/1

In the administrative area of the North Yorkshire Council

s.schedule/1/part/8/paragraph/1n8

In the administrative area of the North Yorkshire Council

s.schedule/1/part/8/paragraph/1n9

Ancillary Works

Browse 97 other sections — procedural / definitional / commencement
s.art001

Citation and commencement

s.art002

Interpretation

s.art003

Disapplication of legislative provisions

s.art004

Development consent, etc. granted by the Order

s.art005

Maintenance of the authorised development

s.art006

Planning permission

s.art007

Limits of deviation

s.art008

Application of the 1991 Act

s.art009

Construction and maintenance of new, altered or diverted streets and other structures

s.art010

Permanent stopping up of streets and private means of access

s.art011

Temporary prohibition, restriction or regulation of use or alteration or diversion of streets

s.art012

Access to works

s.art013

Discharge of water

s.art014

Protective works to buildings

s.art015

Authority to survey and investigate land

s.art016

Removal of human remains

s.art017

Felling or lopping of trees and hedgerows

s.art018

Maintenance of drainage works

s.art019

Compulsory acquisition of land

s.art020

Compulsory acquisition of land – incorporation of the minerals code

s.art021

Time limit for exercise of powers to possess land temporarily or to acquire land compulsorily

s.art022

Compulsory acquisition of rights and restrictive covenants

s.art023

Private rights over land

s.art024

Power to override easements and other rights

s.art025

Modification of Part 1 of the 1965 Act

s.art026

Application of the 1981 Act

s.art027

Acquisition of subsoil, etc., only

s.art028

Rights over or under streets

s.art029

Temporary use of land for constructing the authorised development

s.art030

Temporary use of land for maintaining the authorised development

s.art031

Statutory undertakers

s.art032

Apparatus and rights of statutory undertakers in stopped up streets

s.art033

Recovery of costs of new connection

s.art034

Special category land

s.art035

Crown rights

s.art036

Relocation of Brough Hill Fair

s.art037

Disregard of certain interests and improvements

s.art038

Set-off for enhancement in value of retained land

s.art039

No double recovery

s.art040

Classification of roads, etc.

s.art041

Clearways

s.art042

Traffic regulation measures

s.art043

Benefit of the Order

s.art044

Consent to transfer benefit of Order

s.art045

Application of landlord and tenant law

s.art046

Operational land for the purposes of the 1990 Act

s.art047

Defence to proceedings in respect of statutory nuisance

s.art048

Protective provisions

s.art049

Certification of plans, etc.

s.art050

Service of notices

s.art051

Arbitration

s.art052

Consents, agreements and approvals

s.art053

Environmental Management Plans

s.art054

Detailed design

s.art055

Time limit for when development must begin

s.para.100

Work No. 0405-21— as shown on sheet 7 of the...

s.para.57

A nationally significant infrastructure project as defined in sections 14...

s.para.58

Work No. 0102-1— as shown on sheets 1 to 2...

s.para.59

Work No. 0102-2— as shown on sheet 1 of the...

s.para.60

Work No. 0102-3— as shown on sheet 1 of the...

s.para.61

Work No. 0102-4— as shown on sheet 1 of the...

s.para.62

Work No. 0102-5— as shown on sheet 1 of the...

s.para.63

Work No. 0102-6— as shown on sheet 1 of the...

s.para.64

Work No. 0102-7— as shown on sheet 2 of the...

s.para.65

Work No. 0102-8— as shown on sheet 2 of the...

s.para.67

A nationally significant infrastructure project as defined in sections 14...

s.para.68

Work No. 03-1— as shown on sheets 1 to 4...

s.para.69

Work No. 03-2— as shown on sheet 1 of the...

s.para.70

Work No. 03-3— as shown on sheet 2 of the...

s.para.71

Work No. 03-4— as shown on sheet 3 of the...

s.para.72

Work No. 03-5— as shown on sheet 3 of the...

s.para.73

Work No. 03-6— as shown on sheet 3 of the...

s.para.74

Work No. 03-7— as shown on sheets 1 to 3...

s.para.75

Work No. 03-8— as shown on sheets 3 and 4...

s.para.76

Work No. 03-9— as shown on sheet 1 of the...

s.para.78

A nationally significant infrastructure project as defined in sections 14...

s.para.79

Work No. 0405-1— as shown on sheets 1 to 7...

s.para.80

Work No. 0405-2— as shown on sheets 1 to 7...

s.para.81

Work No. 0405-3— as shown on sheet 1 of the...

s.para.82

Work No. 0405-4A— as shown on sheet 1 of the...

s.para.83

Work No. 0405-4B— as shown on sheets 1, 2, 4...

s.para.84

Work No. 0405-5— as shown on sheets 1 and 2...

s.para.85

Work No. 0405-6— as shown on sheets 1 and 2...

s.para.86

Work No. 0405-7— as shown on sheet 2 of the...

s.para.87

Work No. 0405-8— as shown on sheet 2 of the...

s.para.88

Work No. 0405-9— as shown on sheets 2 and 3...

s.para.89

Work No. 0405-10— as shown on sheet 3 of the...

s.para.90

Work No. 0405-11— as shown on sheet 3 of the...

s.para.91

Work No. 0405-12— as shown on sheet 3 of the...

s.para.92

Work No. 0405-13— as shown on sheets 3 and 4...

s.para.93

Work No. 0405-14— as shown on sheets 4 and 5...

s.para.94

Work No. 0405-15— as shown on sheet 5 of the...

s.para.95

Work No. 0405-16— as shown on sheet 5 of the...

s.para.96

Work No. 0405-17— as shown on sheet 5 of the...

s.para.97

Work No. 0405-18— as shown on sheet 5 of the...

s.para.98

Work No. 0405-19— as shown on sheets 5 to 7...

s.para.99

Work No. 0405-20— as shown on sheet 6 of the...

Explore more

Browse legislation

Find other UK business legislation with related guidance.