UK Statutory Instrument SI 2023/800 United Kingdom

The Hornsea Four Offshore Wind Farm Order 2023

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker5 Licence Holder4

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Licence Holder — also bound by 225 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

sch. 11 para. 5 Vessels under the undertaker’s control Regulated
  • Issue vessel code of conduct and coordinate vessels to protect marine mammals and other vesselsStatutory Undertaker
sch. 11 para. 7 Notifications and inspections Regulated
  • Comply with all notification, inspection and licence-distribution requirementsStatutory Undertaker
sch. 12 para. 7 Notifications and inspections Regulated
  • Manage marine licence notification and inspection programmeStatutory Undertaker
sch. 9 para. 4 sch. 9 para. 4 Regulated
  • Pay for damage to telecoms equipment or service interruptions caused by worksStatutory Undertaker
sch. 9 para. 5 Provision of information Regulated
  • Keep each other informed of relevant activities to allow co-existenceLicence Holder
sch. 9 para. 6 Line of orientation Regulated
  • Do not carry out works that prevent wind turbine layoutLicence Holder
sch. 9 para. 7 Crossing and proximity Regulated
  • Use reasonable efforts to agree crossing/proximity terms with licenseeLicence Holder
s.art017 Authority to survey and investigate the land onshore Regulated
  • Notify landowners and obtain consents before surveying landStatutory Undertaker
73 other provisions — procedural and definitional
sch. 11 para. 8 General provisions
sch. 9 para. 9 Arbitration
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent etc. granted by this Order
s.art004 Power to maintain the authorised project
s.art005 Benefit of the Order
s.art006 Application and modification of legislative provisions
s.art007 Defence to proceedings in respect of statutory nuisance
s.art008 Street works
s.art009 Application of the 1991 Act
s.art010 Temporary closure and restriction of streets and public rights of way
s.art011 Closure and diversion of public rights of way and access land
s.art012 Access to works
s.art013 Agreements with street authorities
s.art014 Power to alter layout etc. of streets
s.art015 Discharge of water
s.art016 Protective work to buildings
s.art018 Compulsory acquisition of land
s.art019 Compulsory acquisition of land: minerals
s.art020 Time limit for exercise of authority to acquire land compulsorily
s.art021 Compulsory acquisition of rights etc.
s.art022 Private Rights
s.art023 Application of the 1981 Act
s.art024 Statutory authority to override easements and other rights
s.art025 Acquisition of subsoil only
s.art026 Modification of Part 1 of the 1965 Act
s.art027 Rights under or over streets
s.art028 Temporary use of land for carrying out the authorised project
s.art029 Temporary use of land for maintaining the authorised project
s.art030 Statutory undertakers
s.art031 Recovery of costs of new connections
s.art032 Operation of generating station
s.art033 Deemed marine licences under the 2009 Act
s.art034 Application of landlord and tenant law
s.art035 Operational land for purposes of the 1990 Act
s.art036 Felling or lopping of trees and removal of hedgerows
s.art037 Trees subject to tree preservation orders
s.art038 Certification of plans and documents, etc.
s.art039 Arbitration
s.art040 Requirements, appeals, etc.
s.art041 Abatement of works abandoned or decayed
s.art042 Saving provisions for Trinity House
s.art043 Crown rights
s.art044 Protective provisions
s.art045 Funding
s.art046 Amendment and modification of statutory provisions
s.art047 Service of notices
s.art048 Modification of Section 106 agreements relating to land
s.art049 Compensation provisions
Schedules

Schedules

1 of 105 shown
s.sch012 Stages of construction Regulated
  • Submit construction stage scheme to MMO and obtain approval before startingLicence Holder
104 other schedules
s.sch001 Ecological management plan
s.sch001 Highway accesses
s.sch001 Fencing and other means of permanent enclosure
s.sch001 Temporary fencing and other temporary means of enclosure
s.sch001 Surface and foul water drainage
s.sch001 Contaminated land and groundwater scheme
s.sch001 Surface water
s.sch001 Onshore archaeology
s.sch001 Code of construction practice
s.sch001 Construction traffic management plan
s.sch001 European protected species onshore
s.sch001 Restoration of land used temporarily for construction
s.sch001 Control of noise during operational phase
s.sch001 Enhancement strategy
s.sch001 Ministry of Defence radar mitigation
s.sch001 Onshore decommissioning
s.sch001 Employment and skills plan
s.sch001 Energy balancing infrastructure safety management
s.sch001 Stages of authorised development
s.sch001 Claxby Radar Mitigation
s.sch001 Requirement for written approval
s.sch001 Amendments to approved details
s.sch001 (1) The number of cable circuits must not exceed six....
s.sch001 Biodiversity net gain
s.sch001 Detailed design approval onshore
s.sch001 Provision of landscaping
s.sch001 Implementation and maintenance of landscaping
s.sch007 The enactments for the time being in force with respect...
s.sch007 For Schedule 2A to the 1965 Act substitute— SCHEDULE 2A...
s.sch007 (1) Without limitation on the scope of paragraph 1, the...
s.sch007 (1) Without limitation to the scope of paragraph 1, the...
s.sch007 Application of Part 1 of the 1965 Act
s.sch007 For section 7 (measure of compensation in the case of...
s.sch007 The following provisions of the 1965 Act (which state the...
s.sch007 Section 11 (powers of entry) of the 1965 Act is...
s.sch007 Section 20 (tenants at will, etc.) of the 1965 Act...
s.sch007 Section 22 (interest omitted from purchase) of the 1965 Act...
s.sch009 Facilities and rights for alternative apparatus
s.sch009 Retained apparatus: protection of National Grid as Gas Undertaker
s.sch009 Expenses
s.sch009 Indemnity
s.sch009 Enactments and agreements
s.sch009 Co-operation
s.sch009 Access
s.sch009 Arbitration
s.sch009 Notices
s.sch011 Aviation safety
s.sch011 Chemicals, drilling and debris
s.sch011 Force majeure
s.sch011 Pre-construction plans and documentation
s.sch011 (1) Except where otherwise stated or agreed in writing with...
s.sch011 Offshore safety management
s.sch011 Reporting of engaged agents, contractors and vessels
s.sch011 Pre-construction monitoring and surveys
s.sch011 Construction monitoring
s.sch011 Post-construction monitoring
s.sch011 Timing of monitoring report
s.sch011 Reporting of impact pile driving
s.sch011 Maintenance reporting
s.sch011 Stages of construction
s.sch011 Completion of construction
s.sch011 The undertaker must submit a close out report to the...
s.sch011 Deployment of cable protection
s.sch011 Southern North Sea Special Area of Conservation Site Integrity Plan
s.sch012 Aviation safety
s.sch012 Chemicals, drilling and debris
s.sch012 Force majeure
s.sch012 Pre-construction plans and documentation
s.sch012 (1) Except where otherwise stated or agreed in writing with...
s.sch012 Offshore safety management
s.sch012 Reporting of engaged agents, contractors and vessels
s.sch012 Pre-construction monitoring and surveys
s.sch012 Construction monitoring
s.sch012 Post-construction monitoring
s.sch012 Timing of monitoring report
s.sch012 Reporting of impact pile driving
s.sch012 HVAC booster station lighting plan
s.sch012 Piling restriction
s.sch012 Maintenance reporting
s.sch012 Completion of construction
s.sch012 Deployment of cable protection
s.sch012 Southern North Sea Special Area of Conservation Site Integrity Plan
s.sch013 Schedule 12 to the Dogger Bank Creyke Beck Offshore Wind Farm Order 2015
s.sch014 Primary objective
s.sch014 Time periods
s.sch014 Timetable
s.sch014 Procedure
s.sch014 Arbitrator’s powers
s.sch014 Costs
s.sch014 Confidentiality
s.sch016 In this Schedule— “the FFC” means the site designated as...
s.sch016 Following consultation with the H4 OOEG, the GCIMP must be...
s.sch016 The undertaker must carry out the predator eradication method as...
s.sch016 The undertaker must notify the Secretary of State of completion...
s.sch016 The GCIMP approved under this Schedule includes any amendments that...
s.sch016 In the event of any conflict between the terms of...
s.sch016 Work Nos. 1, 2, 3, 4 and 5 together with...
s.sch016 Following consultation with the H4 OOEG, the KCIMP must be...
s.sch016 The undertaker must implement the measures set out in the...
s.sch016 The undertaker must notify the Secretary of State of completion...
s.sch016 Results from the monitoring scheme must be submitted at least...
s.sch016 The artificial nesting structure must not be decommissioned without prior...
s.sch016 The KCIMP approved under this Schedule includes any amendments that...
s.sch016 In the event of any conflict between the terms of...