UK Statutory Instrument SI 2022/433 United Kingdom

The East Anglia TWO Offshore Wind Farm Order 2022

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker10

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

sch. 10 para. 3 sch. 10 para. 3 Regulated
  • Pay for damage or interruption to telecoms apparatus caused by your worksStatutory Undertaker
sch. 13 para. 4 Design parameters Regulated
  • Limit number and dimensions of offshore electrical platformsStatutory Undertaker
sch. 13 para. 5 Design parameters Regulated
  • Keep cables and cable protection within specified design limitsStatutory Undertaker
sch. 14 para. 2 Design parameters Regulated
  • Do not exceed offshore platform number and dimension limitsStatutory Undertaker
sch. 14 para. 6 Notifications and inspections Regulated
  • Comply with notification and inspection requirements for offshore wind farmStatutory Undertaker
s.art017 Authority to survey and investigate the land onshore Regulated
  • Survey and investigate land for offshore wind projectStatutory Undertaker
60 other provisions — procedural and definitional
sch. 13 para. 8 Details of licensed marine activities
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent etc. granted by the Order
s.art004 Power to maintain authorised project
s.art005 Benefit of the Order
s.art006 Application and modification of legislative provisions
s.art007 Defence to proceedings in respect of statutory nuisance
s.art008 Street works
s.art009 Application of the 1991 Act
s.art010 Public rights of way
s.art011 Temporary stopping up of public rights of way
s.art012 Temporary stopping up of streets
s.art013 Access to works
s.art014 Agreements with street authorities
s.art015 Highway alterations
s.art016 Discharge of water
s.art018 Compulsory acquisition of land
s.art019 Time limit for exercise of authority to acquire land compulsorily
s.art020 Compulsory acquisition of rights
s.art021 Private rights
s.art022 Application of the 1981 Act
s.art023 Modification of Part 1 of the Compulsory Purchase Act 1965
s.art024 Acquisition of subsoil or airspace only
s.art025 Rights under or over streets
s.art026 Temporary use of land for carrying out the authorised project
s.art027 Temporary use of land for maintaining authorised project
s.art028 Statutory undertakers
s.art029 Recovery of costs of new connections
s.art030 Operation of generating station
s.art031 Deemed marine licences under the 2009 Act
s.art032 Application of landlord and tenant law
s.art033 Operational land for purposes of the 1990 Act
s.art034 Felling or lopping of trees and removal of hedgerows
s.art035 Trees subject to tree preservation orders
s.art036 Certification of plans etc.
s.art037 Arbitration
s.art038 Requirements, appeals, etc.
s.art039 Abatement of works abandoned or decayed
s.art040 Saving provisions for Trinity House
s.art041 Crown rights
s.art042 Protective provisions
s.art043 Funding
s.art044 Offshore ornithology compensation provisions
s.art045 Service of notices
Schedules

Schedules

4 of 105 shown
s.sch013 Notifications and inspections Regulated
  • Distribute the licence, confirm receipt, and give inspection accessStatutory Undertaker
s.sch013 Force majeure Regulated
  • Notify MMO of emergency deposits within 48 hoursStatutory Undertaker
s.sch013 Southern North Sea Special Area of Conservation Site Integrity Plan (Piling) Regulated
  • Submit and obtain approval for Site Integrity Plan before pilingStatutory Undertaker
s.sch014 Force majeure Regulated
  • Notify MMO of emergency deposits and remove unauthorised depositsStatutory Undertaker
101 other schedules
s.sch001 Offshore decommissioning
s.sch001 Stages of authorised development onshore
s.sch001 Detailed design parameters onshore
s.sch001 Landfall construction method statement and monitoring plan
s.sch001 Provision of landscaping
s.sch001 Implementation and maintenance of landscaping
s.sch001 Highway accesses
s.sch001 Fencing and other means of enclosure
s.sch001 Contaminated land and groundwater
s.sch001 Pre-commencement archaeology execution plan
s.sch001 Archaeology
s.sch001 Ecological management plan
s.sch001 Code of construction practice
s.sch001 Construction hours for the transmission works
s.sch001 Construction hours for the grid connection works
s.sch001 Control of artificial light emissions during operational phase
s.sch001 Onshore preparation works management plan
s.sch001 Control of noise during operational phase
s.sch001 Traffic
s.sch001 Restoration of land used temporarily for construction
s.sch001 Onshore decommissioning
s.sch001 Aviation Lighting
s.sch001 Public rights of way
s.sch001 Emergency planning arrangements
s.sch001 Ministry of Defence surveillance operations
s.sch001 Cromer Primary Surveillance Radar
s.sch001 Port traffic
s.sch001 Decommissioning of relevant landfall works
s.sch001 Restriction on carrying out grid connection works where consented in another order
s.sch001 Requirement for written approval
s.sch001 (1) The total length of the inter-array cables comprised within...
s.sch001 Amendments to approved details
s.sch001 Operational drainage management plan
s.sch001 Installation of cable ducts
s.sch001 Restriction on carrying out grid connection works
s.sch001 Control of development during operational phase
s.sch001 (1) In relation to a wind turbine generator, each gravity...
s.sch001 (1) In relation to a meteorological mast, each gravity base...
s.sch001 (1) In relation to each offshore electrical platform, the gravity...
s.sch001 (1) In relation to a construction, operation and maintenance platform,...
s.sch001 The total amount of scour protection for the wind turbine...
s.sch008 Compensation enactments
s.sch008 For Schedule 2A to the 1965 Act substitute— SCHEDULE 2A...
s.sch008 (1) Without prejudice to the generality of paragraph 1, the...
s.sch008 (1) Without limitation on the scope of paragraph 1, the...
s.sch008 Application of the 1965 Act
s.sch008 For section 7 of the 1965 Act (measure of compensation...
s.sch008 The following provisions of the 1965 Act (which state the...
s.sch008 Section 11 of the 1965 Act (powers of entry) is...
s.sch008 Section 20 of the 1965 Act (tenants at will, etc.)...
s.sch008 Section 22 of the 1965 Act (interests omitted from purchase)...
s.sch010 Access
s.sch010 Arbitration
s.sch013 Aids to navigation
s.sch013 (1) The undertaker must colour all structures yellow (colour code...
s.sch013 Aviation safety
s.sch013 Chemicals, drilling and debris
s.sch013 UXO clearance
s.sch013 Pre-construction plans and documentation
s.sch013 (1) Any archaeological reports produced in accordance with condition 17(1)(g)(iii)...
s.sch013 Reporting of engaged agents, contractors and vessels
s.sch013 Pre-construction monitoring and surveys
s.sch013 Construction monitoring
s.sch013 Post construction
s.sch013 Reporting of impact pile driving/detonation of explosives
s.sch013 Scour protection and cable protection during operation
s.sch013 Co-operation
s.sch013 Southern North Sea Special Area of Conservation Site Integrity Plan (UXO clearance)
s.sch013 Control of piling and UXO detonations
s.sch013 Herring spawning
s.sch013 Sediment sampling
s.sch013 Completion of construction
s.sch014 Chemicals, drilling and debris
s.sch014 UXO clearance
s.sch014 Pre-construction plans and documentation
s.sch014 (1) Any archaeological reports produced in accordance with condition 13(1)(g)(iii)...
s.sch014 Reporting of engaged agents, contractors and vessels
s.sch014 Pre-construction monitoring and surveys
s.sch014 Construction monitoring
s.sch014 Post construction
s.sch014 Reporting of impact pile driving/detonation of explosives
s.sch014 Scour protection and cable protection during operation
s.sch014 Co-operation
s.sch014 Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
s.sch014 Southern North Sea Special Area of Conservation Site Integrity Plan (UXO clearance)
s.sch014 Control of piling and UXO detonations
s.sch014 Herring spawning
s.sch014 Sediment sampling
s.sch014 Completion of construction
s.sch015 Primary objective
s.sch015 Time periods
s.sch015 Timetable
s.sch015 Procedure
s.sch015 Arbitrator’s powers
s.sch015 Costs
s.sch015 Confidentiality
s.sch015 Conservatory and Interim Measures
s.sch016 Applications made for certain approvals
s.sch016 Further information
s.sch016 Appeals
s.sch016 Interpretation of Schedule 16

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.