- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Statutory Undertaker10
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Statutory Undertaker — also bound by 179 other Acts
The Cory Decarbonisation Project Order 2025
120 duties
Water Industry Act 1991
53 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
sch. 10 para. 3
sch. 10 para. 3
Regulated
- Pay for damage or interruption to telecoms apparatus caused by your worksStatutory Undertaker
sch. 13 para. 4
Design parameters
Regulated
- Limit number and dimensions of offshore electrical platformsStatutory Undertaker
sch. 13 para. 5
Design parameters
Regulated
- Keep cables and cable protection within specified design limitsStatutory Undertaker
sch. 14 para. 2
Design parameters
Regulated
- Do not exceed offshore platform number and dimension limitsStatutory Undertaker
sch. 14 para. 6
Notifications and inspections
Regulated
- Comply with notification and inspection requirements for offshore wind farmStatutory Undertaker
s.art017
Authority to survey and investigate the land onshore
Regulated
- Survey and investigate land for offshore wind projectStatutory Undertaker
60 other provisions — procedural and definitional
sch. 13 para. 8
Details of licensed marine activities
s.001
A nationally significant infrastructure project as defined in sections 14... (opens in a new tab)
s.002
A nationally significant infrastructure project as defined in sections 14... (opens in a new tab)
s.art001
Citation and commencement
s.art002
Interpretation
s.art003
Development consent etc. granted by the Order
s.art004
Power to maintain authorised project
s.art005
Benefit of the Order
s.art006
Application and modification of legislative provisions
s.art007
Defence to proceedings in respect of statutory nuisance
s.art008
Street works
s.art009
Application of the 1991 Act
s.art010
Public rights of way
s.art011
Temporary stopping up of public rights of way
s.art012
Temporary stopping up of streets
s.art013
Access to works
s.art014
Agreements with street authorities
s.art015
Highway alterations
s.art016
Discharge of water
s.art018
Compulsory acquisition of land
s.art019
Time limit for exercise of authority to acquire land compulsorily
s.art020
Compulsory acquisition of rights
s.art021
Private rights
s.art022
Application of the 1981 Act
s.art023
Modification of Part 1 of the Compulsory Purchase Act 1965
s.art024
Acquisition of subsoil or airspace only
s.art025
Rights under or over streets
s.art026
Temporary use of land for carrying out the authorised project
s.art027
Temporary use of land for maintaining authorised project
s.art028
Statutory undertakers
s.art029
Recovery of costs of new connections
s.art030
Operation of generating station
s.art031
Deemed marine licences under the 2009 Act
s.art032
Application of landlord and tenant law
s.art033
Operational land for purposes of the 1990 Act
s.art034
Felling or lopping of trees and removal of hedgerows
s.art035
Trees subject to tree preservation orders
s.art036
Certification of plans etc.
s.art037
Arbitration
s.art038
Requirements, appeals, etc.
s.art039
Abatement of works abandoned or decayed
s.art040
Saving provisions for Trinity House
s.art041
Crown rights
s.art042
Protective provisions
s.art043
Funding
s.art044
Offshore ornithology compensation provisions
s.art045
Service of notices
Schedules
Schedules
4 of 105 shown
s.sch013
Notifications and inspections
Regulated
- Distribute the licence, confirm receipt, and give inspection accessStatutory Undertaker
s.sch013
Force majeure
Regulated
- Notify MMO of emergency deposits within 48 hoursStatutory Undertaker
s.sch013
Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
Regulated
- Submit and obtain approval for Site Integrity Plan before pilingStatutory Undertaker
s.sch014
Force majeure
Regulated
- Notify MMO of emergency deposits and remove unauthorised depositsStatutory Undertaker
101 other schedules
s.sch001
Offshore decommissioning
s.sch001
Stages of authorised development onshore
s.sch001
Detailed design parameters onshore
s.sch001
Landfall construction method statement and monitoring plan
s.sch001
Provision of landscaping
s.sch001
Implementation and maintenance of landscaping
s.sch001
Highway accesses
s.sch001
Fencing and other means of enclosure
s.sch001
Contaminated land and groundwater
s.sch001
Pre-commencement archaeology execution plan
s.sch001
Archaeology
s.sch001
Ecological management plan
s.sch001
Code of construction practice
s.sch001
Construction hours for the transmission works
s.sch001
Construction hours for the grid connection works
s.sch001
Control of artificial light emissions during operational phase
s.sch001
Onshore preparation works management plan
s.sch001
Control of noise during operational phase
s.sch001
Traffic
s.sch001
Restoration of land used temporarily for construction
s.sch001
Onshore decommissioning
s.sch001
Aviation Lighting
s.sch001
Public rights of way
s.sch001
Emergency planning arrangements
s.sch001
Ministry of Defence surveillance operations
s.sch001
Cromer Primary Surveillance Radar
s.sch001
Port traffic
s.sch001
Decommissioning of relevant landfall works
s.sch001
Restriction on carrying out grid connection works where consented in another order
s.sch001
Requirement for written approval
s.sch001
(1) The total length of the inter-array cables comprised within...
s.sch001
Amendments to approved details
s.sch001
Operational drainage management plan
s.sch001
Installation of cable ducts
s.sch001
Restriction on carrying out grid connection works
s.sch001
Control of development during operational phase
s.sch001
(1) In relation to a wind turbine generator, each gravity...
s.sch001
(1) In relation to a meteorological mast, each gravity base...
s.sch001
(1) In relation to each offshore electrical platform, the gravity...
s.sch001
(1) In relation to a construction, operation and maintenance platform,...
s.sch001
The total amount of scour protection for the wind turbine...
s.sch008
Compensation enactments
s.sch008
For Schedule 2A to the 1965 Act substitute— SCHEDULE 2A...
s.sch008
(1) Without prejudice to the generality of paragraph 1, the...
s.sch008
(1) Without limitation on the scope of paragraph 1, the...
s.sch008
Application of the 1965 Act
s.sch008
For section 7 of the 1965 Act (measure of compensation...
s.sch008
The following provisions of the 1965 Act (which state the...
s.sch008
Section 11 of the 1965 Act (powers of entry) is...
s.sch008
Section 20 of the 1965 Act (tenants at will, etc.)...
s.sch008
Section 22 of the 1965 Act (interests omitted from purchase)...
s.sch010
Access
s.sch010
Arbitration
s.sch013
Aids to navigation
s.sch013
(1) The undertaker must colour all structures yellow (colour code...
s.sch013
Aviation safety
s.sch013
Chemicals, drilling and debris
s.sch013
UXO clearance
s.sch013
Pre-construction plans and documentation
s.sch013
(1) Any archaeological reports produced in accordance with condition 17(1)(g)(iii)...
s.sch013
Reporting of engaged agents, contractors and vessels
s.sch013
Pre-construction monitoring and surveys
s.sch013
Construction monitoring
s.sch013
Post construction
s.sch013
Reporting of impact pile driving/detonation of explosives
s.sch013
Scour protection and cable protection during operation
s.sch013
Co-operation
s.sch013
Southern North Sea Special Area of Conservation Site Integrity Plan (UXO clearance)
s.sch013
Control of piling and UXO detonations
s.sch013
Herring spawning
s.sch013
Sediment sampling
s.sch013
Completion of construction
s.sch014
Chemicals, drilling and debris
s.sch014
UXO clearance
s.sch014
Pre-construction plans and documentation
s.sch014
(1) Any archaeological reports produced in accordance with condition 13(1)(g)(iii)...
s.sch014
Reporting of engaged agents, contractors and vessels
s.sch014
Pre-construction monitoring and surveys
s.sch014
Construction monitoring
s.sch014
Post construction
s.sch014
Reporting of impact pile driving/detonation of explosives
s.sch014
Scour protection and cable protection during operation
s.sch014
Co-operation
s.sch014
Southern North Sea Special Area of Conservation Site Integrity Plan (Piling)
s.sch014
Southern North Sea Special Area of Conservation Site Integrity Plan (UXO clearance)
s.sch014
Control of piling and UXO detonations
s.sch014
Herring spawning
s.sch014
Sediment sampling
s.sch014
Completion of construction
s.sch015
Primary objective
s.sch015
Time periods
s.sch015
Timetable
s.sch015
Procedure
s.sch015
Arbitrator’s powers
s.sch015
Costs
s.sch015
Confidentiality
s.sch015
Conservatory and Interim Measures
s.sch016
Applications made for certain approvals
s.sch016
Further information
s.sch016
Appeals
s.sch016
Interpretation of Schedule 16
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.