UK Statutory Instrument SI 2020/474 United Kingdom

The Lake Lothing (Lowestoft) Third Crossing Order 2020

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker3 Licence Holder1 Any Person1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Licence Holder — also bound by 225 other Acts
Any Person — also bound by 2340 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art017 Authority to survey and investigate land Regulated
  • Notify landowners before surveying or investigating landStatutory Undertaker
s.art020 Temporary suspension of navigation within Lake Lothing in connection with the authorised development Regulated
  • Notify stakeholders before closing or restricting navigation on Lake LothingStatutory Undertaker
s.art042 Extinguishment of right of navigation within Lake Lothing in connection with authorised development Regulated
  • Vessel masters must obtain consent before entering restricted areas near Lake Lothing bridgeAny Person
60 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Disapplication of legislation, etc.
s.art004 Development consent, etc., granted by the Order
s.art005 Limits of deviation
s.art006 Street works
s.art007 Application of the 1991 Act
s.art008 Construction and maintenance of new, altered or diverted streets and other structures
s.art009 Classification of roads, etc.
s.art010 Permanent stopping up of streets and private means of access
s.art011 Temporary stopping up and restriction of use of streets
s.art012 Access to works
s.art013 Agreements with street authorities
s.art014 Use of private roads for construction
s.art015 Discharge of water
s.art016 Protective works to buildings
s.art018 Felling or lopping of trees
s.art019 Trees subject to tree preservation orders
s.art021 Removal of vessels
s.art022 Compulsory acquisition of land
s.art023 Crown land
s.art024 Compulsory acquisition of land – incorporation of the mineral code
s.art025 Time limit for exercise of powers to possess land temporarily or to acquire land compulsorily
s.art026 Compulsory acquisition of rights, etc.
s.art027 Acquisition of subsoil and airspace only
s.art028 Private rights over land
s.art029 Power to override easements and other rights
s.art030 Rights over or under streets
s.art031 Application of the 1981 Act
s.art032 Modification of the 1965 Act
s.art033 Temporary use of land for carrying out the authorised development
s.art034 Temporary use of land for maintaining the authorised development
s.art035 Statutory undertakers and utilities
s.art036 Apparatus and rights of statutory undertakers and utilities in stopped up streets
s.art037 Recovery of costs of new connection
s.art038 Disregard of certain interests and improvements
s.art039 Set-off for enhancement in value of retained land
s.art040 No double recovery
s.art041 Operation of the new bridge
s.art043 Maintenance of authorised development
s.art044 Subsidiary works and operations in Lake Lothing
s.art045 Protection against dredging by the harbour authority
s.art046 Byelaws
s.art047 Fixed penalty notices
s.art048 Benefit of Order
s.art049 Transfer of benefit of Order, etc.
s.art050 Planning permission
s.art051 Saving for undertaker's highway and planning functions
s.art052 Application of landlord and tenant law
s.art053 Traffic regulation measures
s.art054 Clearways
s.art055 Deemed marine licence
s.art056 Defence to proceedings in respect of statutory nuisance
s.art057 Crown rights
s.art058 Protective provisions
s.art059 Saving for Trinity House
s.art060 Certification of documents
s.art061 Service of notices
s.art062 Arbitration
s.art063 Consents, agreements, certifications and approvals
Schedules

Schedules

2 of 190 shown
s.sch012 Vessels Regulated
  • Notify MMO of vessels used for construction and keep licence on boardLicence Holder
s.sch013 (1) Subject to sub-paragraphs (2) to (3), if as the... Regulated
  • Pay costs and compensation for damage to telecoms equipment or service interruptionStatutory Undertaker
188 other schedules
s.sch001 works within highways, including— (a) alteration of the layout of...
s.sch001 works within Lake Lothing (to the extent they are situated...
s.sch001 other works and development— (m) for the strengthening, alteration or...
s.sch001 In the administrative area of East Suffolk Council
s.sch001 Work No. 1 – as shown on sheets 1 and...
s.sch001 Work No. 2 – as shown on sheet 2 of...
s.sch001 Work No. 3 – as shown on sheet 1 of...
s.sch001 Work No. 4 – as shown on sheet 2 of...
s.sch001 Work No. 5 – as shown on sheet 2 of...
s.sch001 Work No. 6 – as shown on sheet 2 of...
s.sch001 Work No. 7 – as shown on sheet 2 of...
s.sch001 And for the purposes of or in connection with the...
s.sch002 Interpretation
s.sch002 Written schemes of investigation
s.sch002 Navigation risk assessment
s.sch002 Traffic mitigation
s.sch002 Piling works risk assessment
s.sch002 New bridge operating signals
s.sch002 Amendment to approved details
s.sch002 Interpretation
s.sch002 Applications made under requirements
s.sch002 Further information regarding requirements
s.sch002 Appeals
s.sch002 Time limit for commencement of the authorised development
s.sch002 Publication of requirements
s.sch002 Anticipatory steps towards compliance with any requirement
s.sch002 Design of the authorised development
s.sch002 Code of construction practice
s.sch002 Landscaping scheme
s.sch002 Surface water drainage
s.sch002 Highways lighting
s.sch002 Contaminated land and groundwater
s.sch002 Mooring
s.sch003 A12 Waveney Drive
s.sch003 A12 Peto Way
s.sch003 A12 Roundabout (existing junction of Peto Way (C970) and Peto Way (A1117) with Normanston Drive (A1117) and Normanston Drive (A1144))
s.sch003 A12 Peto Way
s.sch003 A12 Roundabout (existing junction of Oulton Road, Millennium Way and Peto Way)
s.sch003 A12 Millennium Way
s.sch003 A12 Roundabout (existing junction of Millennium Way, Bentley Drive and Park Meadows)
s.sch003 A12 Millennium Way
s.sch003 A146 Bridge Road
s.sch003 A146 Roundabout (existing junction of Saltwater Way (A1117), Bridge Road (A1117) and Victoria Road (B1531)
s.sch003 A146 Saltwater Way
s.sch003 A12 Lake Lothing Third Crossing Southern Roundabout
s.sch003 A146 Bridge Road
s.sch003 A146 Roundabout (existing junction of Bridge Road (A1117) and Commodore Road)
s.sch003 A146 Bridge Road
s.sch003 A146 Roundabout (existing junction of Bridge Road (A1117), Gorleston Road (B1375) and Normanston Drive (A1117))
s.sch003 A146 Normanston Drive
s.sch003 C970 Lake Lothing Third Crossing Northern Roundabout northern arm (to/from Denmark Road)
s.sch003 Canning Road
s.sch003 New Access Road
s.sch003 A12 Riverside Road
s.sch003 A12 Lake Lothing Third Crossing
s.sch003 A12 Lake Lothing Third Crossing Northern Roundabout
s.sch003 A12 Lake Lothing Third Crossing Northern Roundabout western arm (to and from Peto Way)
s.sch003 A12 Roundabout (existing junction of Peto Way (C970), Barnards Way and North Quay Retail Park)
s.sch003 A12 Peto Way
s.sch003 A12 Roundabout (existing junction of Peto Way (C970), Barnards Way and North Quay Retail Park)
s.sch007 Compensation enactments
s.sch007 (1) Without limitation on the scope of paragraph 1, the...
s.sch007 (1) Without limitation on the scope of paragraph 1, the...
s.sch007 Application of the 1965 Act
s.sch007 (1) The modifications referred to in paragraph 4(a) are as...
s.sch010 Citation and commencement
s.sch010 Interpretation
s.sch010 Smoking etc.
s.sch010 Unacceptable behaviour
s.sch010 Unauthorised access and loitering
s.sch010 Traffic regulation
s.sch010 Saving for appointed persons
s.sch012 Interpretation
s.sch012 Concrete and cement
s.sch012 Coatings and treatments
s.sch012 Spills, etc.
s.sch012 Scheme-wide written scheme of investigation
s.sch012 Dropped objects
s.sch012 Disposal at sea
s.sch012 The licence holder must not dispose of any dredged materials...
s.sch012 The licence holder must inform the MMO of the location...
s.sch012 The material to be disposed of within the disposal site...
s.sch012 During the course of disposal at sea, material must be...
s.sch012 (1) Except where otherwise indicated, the main point of contact...
s.sch012 Meaning of “application”
s.sch012 Further information regarding application
s.sch012 Determination of application
s.sch012 Notice of determination
s.sch012 Details of licensed marine activities
s.sch012 Construction method statement
s.sch012 Post construction
s.sch012 Maintenance dredging method statement
s.sch012 Notification of commencement and completion of construction activities only
s.sch012 Marine pollution contingency plan
s.sch013 The provisions of this Part of this Schedule have effect...
s.sch013 (1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch013 If in consequence of the exercise of the powers conferred...
s.sch013 (1) For the protection of any operator, the following provisions...
s.sch013 The exercise of the powers of article 35 (statutory undertakers...
s.sch013 Any difference arising between the undertaker and the operator under...
s.sch013 This Part of this Schedule does not apply to—
s.sch013 The following provisions of this Part of this Schedule apply...
s.sch013 In this Part of this Schedule— “the Agency” means the...
s.sch013 (1) Before beginning to construct any specified work, the undertaker...
s.sch013 In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch013 The undertaker must give to the Agency notice in writing...
s.sch013 (1) If any part of a specified work or any...
s.sch013 (1) Subject to sub-paragraph (6) the undertaker must from the...
s.sch013 Subject to paragraph 26, if by reason of the construction...
s.sch013 If by reason of construction of the specified work the...
s.sch013 (1) The undertaker must take all such measures as may...
s.sch013 (1) The undertaker must indemnify the Agency in respect of...
s.sch013 (1) The undertaker is responsible for and must indemnify the...
s.sch013 The Agency must give to the undertaker reasonable notice of...
s.sch013 The fact that any work or thing has been executed...
s.sch013 This Part of this Schedule does not apply to apparatus...
s.sch013 Any difference or dispute arising between the Agency and the...
s.sch013 The provisions of this Part of this Schedule have effect,...
s.sch013 In this Part of this Schedule— “construction” includes execution, placing,...
s.sch013 (1) Where under this Part of this Schedule Network Rail...
s.sch013 (1) The undertaker must not exercise the powers conferred by...
s.sch013 (1) The undertaker must before commencing construction of any specified...
s.sch013 (1) Any specified work and any protective works to be...
s.sch013 The undertaker must— (a) at all times afford reasonable facilities...
s.sch013 Network Rail must at all times afford reasonable facilities to...
s.sch013 (1) If any permanent or temporary alterations or additions to...
s.sch013 (1) Regardless of the temporary stopping up, alteration or diversion...
s.sch013 The undertaker must repay to Network Rail all reasonable fees,...
s.sch013 (1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...
s.sch013 If at any time after the completion of a specified...
s.sch013 The undertaker must not provide any illumination or illuminated sign...
s.sch013 Any additional expenses which Network Rail may reasonably incur in...
s.sch013 (1) The undertaker must pay to Network Rail all reasonable...
s.sch013 Network Rail must, on receipt of a request from the...
s.sch013 In the assessment of any sums payable to Network Rail...
s.sch013 The undertaker and Network Rail may, subject in the case...
s.sch013 Nothing in this Order, or in any enactment incorporated with...
s.sch013 Despite any provision in this Order or anything shown on...
s.sch013 The undertaker must give written notice to Network Rail if...
s.sch013 The undertaker must no later than 28 days from the...
s.sch013 In relation to any dispute arising under this Part of...
s.sch013 For the protection of the harbour authority the provisions of...
s.sch013 In this Part of this Schedule— “accumulation” means any accumulation...
s.sch013 (1) The undertaker must not, under the powers conferred by...
s.sch013 (1) At least 56 days before commencing the construction or...
s.sch013 The undertaker must at all reasonable times during construction of...
s.sch013 (1) After the purpose of any temporary works has been...
s.sch013 (1) If during the construction of a tidal work or...
s.sch013 (1) If, in the exercise of the powers conferred by...
s.sch013 The undertaker must pay to the harbour authority the reasonable...
s.sch013 The undertaker must, at or near a specified work, exhibit...
s.sch013 The undertaker must comply with any reasonable directions issued from...
s.sch013 (1) If any tidal work of which the undertaker is...
s.sch013 (1) Without limiting the other provisions of this Part, the...
s.sch013 The fact that any work or thing has been executed...
s.sch013 Save to the extent expressly provided for nothing in this...
s.sch013 With the exception of any duty owed by the harbour...
s.sch013 Any difference or dispute arising under this Part must, unless...
s.sch013 The following provisions of this Part of this Schedule have...
s.sch013 (1) Where, in accordance with the provisions of this Part...
s.sch013 In this Part of this Schedule— “alternative apparatus” means alternative...
s.sch013 The undertaker must not interfere with, build over or near...
s.sch013 The alteration, extension, removal or re-location of any apparatus must...
s.sch013 In the situation, where in exercise of the powers conferred...
s.sch013 Regardless of any provision in this Order or anything shown...
s.sch013 If in consequence of the exercise of the powers conferred...
s.sch013 If in consequence of the exercise of the powers conferred...
s.sch013 If for any reason or in consequence of the construction...
s.sch013 Application
s.sch013 Interpretation
s.sch013 (1) Not less than 28 days before starting the carrying...
s.sch013 On Street Apparatus
s.sch013 Apparatus of Cadent in stopped up streets
s.sch013 Protective works to buildings
s.sch013 Acquisition of land
s.sch013 Removal of apparatus
s.sch013 Facilities and rights for alternative apparatus
s.sch013 Retained apparatus: protection
s.sch013 Expenses
s.sch013 Indemnity
s.sch013 Enactments and agreements
s.sch013 (1) Subject to the following provisions of this paragraph, the...
s.sch013 Co-operation
s.sch013 Access
s.sch013 Arbitration
s.schedule/11/part/1/paragraph/wrapper14n2 Note 1: Where roads are to become restricted roads as...
s.schedule/11/part/1/paragraph/wrapper15n2 Note 2: Where existing speed limits (to be retained) are...
s.schedule/3/part/1/paragraph/wrapper13n2 In the administrative area of East Suffolk Council—