- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Statutory Undertaker1
Licence Holder1
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Statutory Undertaker — also bound by 179 other Acts
The Cory Decarbonisation Project Order 2025
120 duties
Water Industry Act 1991
53 duties
Licence Holder — also bound by 225 other Acts
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
s.art015
Authority to survey and investigate the land
Regulated
- Give 14 days' notice before surveying land and compensate for damageStatutory Undertaker
42 other provisions — procedural and definitional
s.art001
Citation and commencement
s.art002
Interpretation
s.art003
Development consent etc. granted by the Order
s.art004
Maintenance of authorised development
s.art005
Operation of authorised development
s.art006
Benefit of the Order
s.art007
Consent to transfer benefit of the Order
s.art008
Street works
s.art009
Power to alter layout, etc., of streets
s.art010
Construction and maintenance of new or altered means of access
s.art011
Temporary stopping up of streets, public rights of way and public rights of navigation
s.art012
Access to works
s.art013
Agreements with street authorities
s.art014
Discharge of water
s.art016
Removal of human remains
s.art017
Compulsory acquisition of land
s.art018
Statutory authority to override easements and other rights
s.art019
Time limit for exercise of authority to acquire land compulsorily
s.art020
Compulsory acquisition of rights
s.art021
Private rights
s.art022
Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art023
Acquisition of subsoil only
s.art024
Application of Part 1 of the Compulsory Purchase Act 1965
s.art025
Rights under or over streets
s.art026
Temporary use of land for carrying out the authorised development
s.art027
Temporary use of land for maintaining the authorised development
s.art028
Statutory undertakers
s.art029
Apparatus and rights of statutory undertakers in stopped up streets
s.art030
Recovery of costs of new connections
s.art031
Felling or lopping of trees
s.art032
Protective works to buildings
s.art033
Protective provisions
s.art034
Deemed marine licence
s.art035
Application of landlord and tenant law
s.art036
Operational land for purposes of the 1990 Act
s.art037
Defence to proceedings in respect of statutory nuisance
s.art038
Certification of plans etc
s.art039
Service of notices
s.art040
Procedure in relation to certain approvals etc
s.art041
Arbitration
s.art042
Crown rights
s.art043
Guarantees in respect of payment of compensation
Schedules
Schedules
1 of 128 shown
s.sch013
(1) The licence holder must notify the MMO in writing...
Regulated
- Notify MMO of vessels used for licensed activities and keep licence onboardLicence Holder
127 other schedules
s.sch001
Work No. 8 – retained landscaping comprising—
s.sch001
Work No. 9 – surface water drainage connection to Hensall...
s.sch001
Work No. 10 – vehicular, pedestrian and cycle access works...
s.sch001
In connection with and in addition to Works Nos. 1...
s.sch001
In the County of North Yorkshire and the District of...
s.sch001
Work No. 1 – an electricity generating station located on...
s.sch001
and further associated development in connection with the nationally significant...
s.sch001
Work No. 2 comprising— (e) Work No. 2A – temporary...
s.sch001
Work No. 3 – electrical connection works comprising—
s.sch001
Work No. 4 – cooling water connection works, comprising works...
s.sch001
Work No. 5 – groundwater and towns water supply connection...
s.sch001
Work No. 6 – gas supply pipeline connection works for...
s.sch001
Work No. 7 – an above ground installation west of...
s.sch002
Interpretation
s.sch002
Means of enclosure
s.sch002
Site security - above ground installation (Work No. 7)
s.sch002
Fire prevention
s.sch002
Surface and foul water drainage
s.sch002
Flood risk mitigation
s.sch002
Contaminated land and groundwater
s.sch002
Archaeology
s.sch002
Protected species
s.sch002
Construction environmental management plan
s.sch002
Protection of highway surfaces
s.sch002
Commencement of the authorised development
s.sch002
Construction traffic management plan
s.sch002
Construction workers travel plan
s.sch002
Construction hours
s.sch002
Control of noise and vibration - construction
s.sch002
Control of noise - operation
s.sch002
Piling and penetrative foundation design
s.sch002
Waste management on site - construction wastes
s.sch002
Restoration of land used temporarily for construction
s.sch002
Combined heat and power
s.sch002
Aviation warning lighting
s.sch002
Notice of commencement and completion of commissioning
s.sch002
Air safety
s.sch002
Carbon capture readiness reserve space
s.sch002
Carbon capture readiness monitoring report
s.sch002
Local liaison committee
s.sch002
Employment, skills and training plan
s.sch002
Ambient air monitoring
s.sch002
Decommissioning
s.sch002
Requirement for written approval
s.sch002
Approved details and amendments to them
s.sch002
Amendments agreed by the relevant planning authority
s.sch002
Notice of commencement of commercial use and requirement for cessation of existing coal-fired power station electricity generation
s.sch002
Ground subsidence
s.sch002
Detailed design
s.sch002
Landscaping and biodiversity protection management and enhancement
s.sch002
Public rights of way diversions
s.sch002
External lighting
s.sch002
Highway accesses
s.sch008
Interpretation
s.sch009
Compensation enactments
s.sch009
For Schedule 2A to the 1965 Act substitute— SCHEDULE 2A COUNTER-NOTICE...
s.sch009
(1) Without limitation on the scope of paragraph 1, the...
s.sch009
(1) Without limitation on the scope of paragraph 1, the...
s.sch009
Application of the 1965 Act
s.sch009
For section 7 of the 1965 Act (measure of compensation...
s.sch009
The following provisions of the 1965 Act (which state the...
s.sch009
Section 11 of the 1965 Ac (powers of entry) is...
s.sch009
Section 20 of the 1965 Act (tenants at will, etc.)...
s.sch009
Section 22 (interests omitted from purchase) of the 1965 Act...
s.sch011
Applications made under requirements
s.sch011
Further information and consultation
s.sch011
Fees
s.sch011
Appeals
s.sch011
Interpretation of Schedule 11
s.sch012
For the protection of the utility undertakers referred to in...
s.sch012
(1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch012
Nothing in this Part affects the provisions of any enactment...
s.sch012
(1) For the protection of any operator, the following provisions...
s.sch012
The exercise of the powers of article 28 (statutory undertakers)...
s.sch012
(1) Subject to sub-paragraphs (2) to (4), if as the...
s.sch012
This part of this Schedule does not apply to—
s.sch012
Nothing in this Part affects the provisions of any enactment...
s.sch012
Interpretation
s.sch012
Powers requiring CRT's consent
s.sch012
Fencing
s.sch012
In this Part— “alternative apparatus” means alternative apparatus adequate to...
s.sch012
Survey of waterway
s.sch012
Approval of plans, protective works etc.
s.sch012
Design of works
s.sch012
Notice of works
s.sch012
Lighting
s.sch012
Construction of specified works
s.sch012
Prevention of pollution
s.sch012
Access to work – provision of information
s.sch012
Alterations to the waterway
s.sch012
Maintenance of works
s.sch012
This Part does not apply to apparatus in respect of...
s.sch012
Repayment of CRT's fees, etc.
s.sch012
Costs of alterations, etc.
s.sch012
Making good of detriment; compensation and indemnity, etc.
s.sch012
Arbitration
s.sch012
Capitalised sums
s.sch012
Regardless of the temporary prohibition or restriction of use of...
s.sch012
Regardless of any provision in this Order or anything shown...
s.sch012
(1) If, in the exercise of the powers conferred by...
s.sch012
(1) Where, in accordance with the provisions of this Part,...
s.sch012
(1) Not less than twenty-eight days before starting the execution...
s.sch012
(1) Subject to the following provisions of this paragraph, the...
s.sch013
(1) In this licence— “the 2008 Act” means the Planning...
s.sch013
(1) The licence holder must notify the MMO in writing...
s.sch013
The licence holder must ensure that any coatings and treatments...
s.sch013
The storage, handling, transport and use of fuels, lubricants, chemicals...
s.sch013
The licence holder must not discharge waste concrete slurry or...
s.sch013
(1) Vibro piling must be used as standard, with percussive...
s.sch013
If concrete is to be sprayed suitable protective sheeting must...
s.sch013
During licensed activities all wastes must be stored in designated...
s.sch013
The licence holder must ensure that any equipment, temporary structures,...
s.sch013
The licence holder must ensure that the MMO local Marine...
s.sch013
Addresses
s.sch013
(1) Subject to the licence conditions in Part 3 of...
s.sch013
Should the licence holder become aware that any of the...
s.sch013
Any oil, fuel or chemical spill within the marine environment...
s.sch013
(1) Where the licensed activities are to be carried out...
s.sch013
(1) The licence holder must submit a method statement to...
s.sch013
The licence holder must inform the MMO in writing of...
s.sch013
A notice to mariners must be issued prior to activities...
s.sch014
The maximum parameters for the buildings and structures for the...
s.sch014
The maximum parameters and grid reference location of the combined...
s.sch014
The finished ground level in respect of Work No. 1...
s.sch014
The maximum parameters for the buildings and structures for the...
s.sch014
The maximum parameters and grid reference location of the combined...
s.sch014
The finished ground level in respect of Work No. 1...
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.