UK Statutory Instrument SI 2018/1020 United Kingdom

The Eggborough Gas Fired Generating Station Order 2018

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker1 Licence Holder1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Licence Holder — also bound by 225 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art015 Authority to survey and investigate the land Regulated
  • Give 14 days' notice before surveying land and compensate for damageStatutory Undertaker
42 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent etc. granted by the Order
s.art004 Maintenance of authorised development
s.art005 Operation of authorised development
s.art006 Benefit of the Order
s.art007 Consent to transfer benefit of the Order
s.art008 Street works
s.art009 Power to alter layout, etc., of streets
s.art010 Construction and maintenance of new or altered means of access
s.art011 Temporary stopping up of streets, public rights of way and public rights of navigation
s.art012 Access to works
s.art013 Agreements with street authorities
s.art014 Discharge of water
s.art016 Removal of human remains
s.art017 Compulsory acquisition of land
s.art018 Statutory authority to override easements and other rights
s.art019 Time limit for exercise of authority to acquire land compulsorily
s.art020 Compulsory acquisition of rights
s.art021 Private rights
s.art022 Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art023 Acquisition of subsoil only
s.art024 Application of Part 1 of the Compulsory Purchase Act 1965
s.art025 Rights under or over streets
s.art026 Temporary use of land for carrying out the authorised development
s.art027 Temporary use of land for maintaining the authorised development
s.art028 Statutory undertakers
s.art029 Apparatus and rights of statutory undertakers in stopped up streets
s.art030 Recovery of costs of new connections
s.art031 Felling or lopping of trees
s.art032 Protective works to buildings
s.art033 Protective provisions
s.art034 Deemed marine licence
s.art035 Application of landlord and tenant law
s.art036 Operational land for purposes of the 1990 Act
s.art037 Defence to proceedings in respect of statutory nuisance
s.art038 Certification of plans etc
s.art039 Service of notices
s.art040 Procedure in relation to certain approvals etc
s.art041 Arbitration
s.art042 Crown rights
s.art043 Guarantees in respect of payment of compensation
Schedules

Schedules

1 of 128 shown
s.sch013 (1) The licence holder must notify the MMO in writing... Regulated
  • Notify MMO of vessels used for licensed activities and keep licence onboardLicence Holder
127 other schedules
s.sch001 Work No. 8 – retained landscaping comprising—
s.sch001 Work No. 9 – surface water drainage connection to Hensall...
s.sch001 Work No. 10 – vehicular, pedestrian and cycle access works...
s.sch001 In connection with and in addition to Works Nos. 1...
s.sch001 In the County of North Yorkshire and the District of...
s.sch001 Work No. 1 – an electricity generating station located on...
s.sch001 and further associated development in connection with the nationally significant...
s.sch001 Work No. 2 comprising— (e) Work No. 2A – temporary...
s.sch001 Work No. 3 – electrical connection works comprising—
s.sch001 Work No. 4 – cooling water connection works, comprising works...
s.sch001 Work No. 5 – groundwater and towns water supply connection...
s.sch001 Work No. 6 – gas supply pipeline connection works for...
s.sch001 Work No. 7 – an above ground installation west of...
s.sch002 Interpretation
s.sch002 Means of enclosure
s.sch002 Site security - above ground installation (Work No. 7)
s.sch002 Fire prevention
s.sch002 Surface and foul water drainage
s.sch002 Flood risk mitigation
s.sch002 Contaminated land and groundwater
s.sch002 Archaeology
s.sch002 Protected species
s.sch002 Construction environmental management plan
s.sch002 Protection of highway surfaces
s.sch002 Commencement of the authorised development
s.sch002 Construction traffic management plan
s.sch002 Construction workers travel plan
s.sch002 Construction hours
s.sch002 Control of noise and vibration - construction
s.sch002 Control of noise - operation
s.sch002 Piling and penetrative foundation design
s.sch002 Waste management on site - construction wastes
s.sch002 Restoration of land used temporarily for construction
s.sch002 Combined heat and power
s.sch002 Aviation warning lighting
s.sch002 Notice of commencement and completion of commissioning
s.sch002 Air safety
s.sch002 Carbon capture readiness reserve space
s.sch002 Carbon capture readiness monitoring report
s.sch002 Local liaison committee
s.sch002 Employment, skills and training plan
s.sch002 Ambient air monitoring
s.sch002 Decommissioning
s.sch002 Requirement for written approval
s.sch002 Approved details and amendments to them
s.sch002 Amendments agreed by the relevant planning authority
s.sch002 Notice of commencement of commercial use and requirement for cessation of existing coal-fired power station electricity generation
s.sch002 Ground subsidence
s.sch002 Detailed design
s.sch002 Landscaping and biodiversity protection management and enhancement
s.sch002 Public rights of way diversions
s.sch002 External lighting
s.sch002 Highway accesses
s.sch008 Interpretation
s.sch009 Compensation enactments
s.sch009 For Schedule 2A to the 1965 Act substitute— SCHEDULE 2A COUNTER-NOTICE...
s.sch009 (1) Without limitation on the scope of paragraph 1, the...
s.sch009 (1) Without limitation on the scope of paragraph 1, the...
s.sch009 Application of the 1965 Act
s.sch009 For section 7 of the 1965 Act (measure of compensation...
s.sch009 The following provisions of the 1965 Act (which state the...
s.sch009 Section 11 of the 1965 Ac (powers of entry) is...
s.sch009 Section 20 of the 1965 Act (tenants at will, etc.)...
s.sch009 Section 22 (interests omitted from purchase) of the 1965 Act...
s.sch011 Applications made under requirements
s.sch011 Further information and consultation
s.sch011 Fees
s.sch011 Appeals
s.sch011 Interpretation of Schedule 11
s.sch012 For the protection of the utility undertakers referred to in...
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch012 Nothing in this Part affects the provisions of any enactment...
s.sch012 (1) For the protection of any operator, the following provisions...
s.sch012 The exercise of the powers of article 28 (statutory undertakers)...
s.sch012 (1) Subject to sub-paragraphs (2) to (4), if as the...
s.sch012 This part of this Schedule does not apply to—
s.sch012 Nothing in this Part affects the provisions of any enactment...
s.sch012 Interpretation
s.sch012 Powers requiring CRT's consent
s.sch012 Fencing
s.sch012 In this Part— “alternative apparatus” means alternative apparatus adequate to...
s.sch012 Survey of waterway
s.sch012 Approval of plans, protective works etc.
s.sch012 Design of works
s.sch012 Notice of works
s.sch012 Lighting
s.sch012 Construction of specified works
s.sch012 Prevention of pollution
s.sch012 Access to work – provision of information
s.sch012 Alterations to the waterway
s.sch012 Maintenance of works
s.sch012 This Part does not apply to apparatus in respect of...
s.sch012 Repayment of CRT's fees, etc.
s.sch012 Costs of alterations, etc.
s.sch012 Making good of detriment; compensation and indemnity, etc.
s.sch012 Arbitration
s.sch012 Capitalised sums
s.sch012 Regardless of the temporary prohibition or restriction of use of...
s.sch012 Regardless of any provision in this Order or anything shown...
s.sch012 (1) If, in the exercise of the powers conferred by...
s.sch012 (1) Where, in accordance with the provisions of this Part,...
s.sch012 (1) Not less than twenty-eight days before starting the execution...
s.sch012 (1) Subject to the following provisions of this paragraph, the...
s.sch013 (1) In this licence— “the 2008 Act” means the Planning...
s.sch013 (1) The licence holder must notify the MMO in writing...
s.sch013 The licence holder must ensure that any coatings and treatments...
s.sch013 The storage, handling, transport and use of fuels, lubricants, chemicals...
s.sch013 The licence holder must not discharge waste concrete slurry or...
s.sch013 (1) Vibro piling must be used as standard, with percussive...
s.sch013 If concrete is to be sprayed suitable protective sheeting must...
s.sch013 During licensed activities all wastes must be stored in designated...
s.sch013 The licence holder must ensure that any equipment, temporary structures,...
s.sch013 The licence holder must ensure that the MMO local Marine...
s.sch013 Addresses
s.sch013 (1) Subject to the licence conditions in Part 3 of...
s.sch013 Should the licence holder become aware that any of the...
s.sch013 Any oil, fuel or chemical spill within the marine environment...
s.sch013 (1) Where the licensed activities are to be carried out...
s.sch013 (1) The licence holder must submit a method statement to...
s.sch013 The licence holder must inform the MMO in writing of...
s.sch013 A notice to mariners must be issued prior to activities...
s.sch014 The maximum parameters for the buildings and structures for the...
s.sch014 The maximum parameters and grid reference location of the combined...
s.sch014 The finished ground level in respect of Work No. 1...
s.sch014 The maximum parameters for the buildings and structures for the...
s.sch014 The maximum parameters and grid reference location of the combined...
s.sch014 The finished ground level in respect of Work No. 1...