- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Licence Holder1
Statutory Undertaker1
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Licence Holder — also bound by 225 other Acts
Statutory Undertaker — also bound by 179 other Acts
The Cory Decarbonisation Project Order 2025
120 duties
Water Industry Act 1991
53 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
115 other provisions — procedural and definitional
sch. 14 para. 5
Force majeure
sch. 15 para. 5
Force majeure
s.001
A nationally significant infrastructure project as defined in sections 14... (opens in a new tab)
s.003
Such activities are authorised in relation to the construction, maintenance... (opens in a new tab)
s.art001
Citation and commencement
s.art002
Interpretation
s.art003
Development consent etc. granted by the Order
s.art004
Power to maintain authorised project
s.art005
Benefit of the Order
s.art006
Application and modification of legislative provisions
s.art007
Defence to proceedings in respect of statutory nuisance
s.art008
Street works
s.art009
Temporary stopping up of public rights of way
s.art010
Temporary stopping up of streets
s.art011
Access to works
s.art012
Agreements with street authorities
s.art013
Discharge of water
s.art014
Authority to survey and investigate the land onshore
s.art015
Compulsory acquisition of land
s.art016
Time limit for exercise of authority to acquire land compulsorily
s.art017
Compulsory acquisition of rights
s.art018
Private rights
s.art019
Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art020
Acquisition of subsoil only
s.art021
Acquisition of part of certain properties
s.art022
Rights under or over streets
s.art023
Temporary use of land for carrying out the authorised project
s.art024
Temporary use of land for maintaining authorised project
s.art025
Statutory undertakers
s.art026
Recovery of costs of new connections
s.art027
Operation of generating station
s.art028
Deemed marine licences under the 2009 Act
s.art029
Application of landlord and tenant law
s.art030
Operational land for purposes of the 1990 Act
s.art031
Felling or lopping of trees and removal of hedgerows
s.art032
Certification of plans etc.
s.art033
Arbitration
s.art034
Requirements, appeals, etc.
s.art035
Abatement of works abandoned or decayed
s.art036
Saving provisions for Trinity House
s.art037
Crown rights
s.art038
Protective provisions
s.para.100
Work No. 63 – Onshore connection works consisting of up...
s.para.101
Work No. 64 – Onshore connection works consisting of up...
s.para.102
Work No. 65 – A new temporary lay down area...
s.para.103
Work No. 66 – Onshore connection works consisting of up...
s.para.104
Work No. 67 – Works comprising onshore substations;
s.para.105
Work No. 68 – Landscaping works including bunding and planting;...
s.para.106
Work No. 69 – Landscaping works including bunding and planting;...
s.para.41
Work No. 6 – A new temporary vehicular access track...
s.para.42
Work No. 7 – Onshore connection works consisting of up...
s.para.43
Work No. 8 – Onshore connection works consisting of up...
s.para.44
Work No. 9 – Temporary widening and upgrade of an...
s.para.45
Work No. 10 – Temporary widening and upgrade of an...
s.para.46
Work No. 11 – Temporary widening and upgrade of an...
s.para.47
Work No. 12 – Onshore connection works consisting of up...
s.para.48
Work No. 13 – Onshore connection works consisting of up...
s.para.49
Work No. 14 – A new temporary vehicular access track...
s.para.50
Work No. 15 – Temporary widening and upgrade of an...
s.para.51
Work No. 16 – Temporary widening and upgrade of two...
s.para.52
Work No. 17 – Onshore connection works consisting of up...
s.para.53
Work No. 18 – A new temporary secondary construction consolidation...
s.para.54
Work No. 19 – Onshore connection works consisting of up...
s.para.55
Work No. 20 – Onshore connection works consisting of up...
s.para.56
Work No. 21 – Onshore connection works consisting of up...
s.para.57
Work No. 22 – A new temporary secondary construction consolidation...
s.para.58
Work No. 23 – Temporary widening and upgrade of an...
s.para.59
Work No. 24 – A new temporary access track running...
s.para.60
Work No. 25 – Onshore connection works consisting of up...
s.para.61
Work No. 26 – Temporary widening and upgrade of an...
s.para.62
Work No. 27 – Temporary widening and upgrade of an...
s.para.63
Work No. 28 – Onshore connection works consisting of up...
s.para.64
Work No. 29 – Onshore connection works consisting of up...
s.para.65
Work No. 30 – Onshore connection works consisting of up...
s.para.66
Work No. 31 – A new temporary primary construction consolidation...
s.para.67
Work No. 32 – Onshore connection works consisting of up...
s.para.68
Work No. 33 – Temporary widening and upgrade of an...
s.para.69
Work No. 34 – Onshore connection works consisting of up...
s.para.70
Work No. 35 – Onshore connection works consisting of up...
s.para.71
Work No. 36 – Temporary widening and upgrade of an...
s.para.72
Work No. 37 – A new temporary access track from...
s.para.73
Work No. 38 – Onshore connection works consisting of up...
s.para.74
Work No. 39 – Onshore connection works consisting of up...
s.para.75
Work No. 40 – A new temporary secondary construction consolidation...
s.para.76
Work No. 41 – Onshore connection works consisting of up...
s.para.77
Work No. 42 – A new temporary vehicular access track...
s.para.78
Work No. 43 – Temporary widening and upgrade of an...
s.para.79
Work No. 44 – Temporary widening and upgrade of an...
s.para.80
Work No. 45 – Onshore connection works consisting of up...
s.para.81
Work No. 46 – A new temporary secondary construction consolidation...
s.para.82
Work No. 47 – Onshore connection works consisting of up...
s.para.83
In the county of Suffolk, district of Mid Suffolk
s.para.84
Work No. 48 – Onshore connection works consisting of up...
s.para.85
Work No. 49 – Onshore connection works consisting of up...
s.para.86
Work No. 50 – Onshore connection works consisting of up...
s.para.87
Work No. 51 – A new temporary primary construction consolidation...
s.para.88
Work No. 52 – Onshore connection works consisting of up...
s.para.89
Work No. 53 – A new temporary vehicular access track...
s.para.90
Work No. 54 – A new temporary vehicular access track...
s.para.91
Work No. 55 – Onshore connection works consisting of up...
s.para.92
Work No. 56 – Temporary widening and upgrade of an...
s.para.93
Work No. 57 – Temporary widening and upgrade of an...
s.para.94
Work No. 58 – Onshore connection works consisting of up...
s.para.95
Work No. 59 – A new temporary vehicular access track...
s.para.96
Work No. 60 – A new temporary vehicular access track...
s.para.97
Work No. 61 – A new temporary secondary construction consolidation...
s.para.98
Work No. 61A – Temporary widening and upgrade of Bullen...
s.para.99
Work No. 62 – Onshore connection works consisting of up...
Schedules
Schedules
2 of 183 shown
s.sch008
(1) Subject to sub-paragraphs (2) to (4), if as the...
Regulated
- Pay for damage to or interruption of electronic communications servicesStatutory Undertaker
s.sch008
In response to the notice the Licensee shall produce a...
Regulated
- Produce a plan of works within 28 days of receiving a noticeLicence Holder
181 other schedules
s.sch001
Offshore decommissioning
s.sch001
Stages and phasing of authorised development onshore
s.sch001
Detailed design parameters onshore
s.sch001
Landfall method statement
s.sch001
Provision of landscaping
s.sch001
Implementation and maintenance of landscaping
s.sch001
Highway accesses and improvements
s.sch001
Fencing and other means of enclosure
s.sch001
Surface and foul water drainage
s.sch001
Contaminated land and groundwater
s.sch001
Archaeology
s.sch001
Ecological management plan
s.sch001
Code of construction practice
s.sch001
External lighting and control of artificial light emissions
s.sch001
Control of noise during construction
s.sch001
Construction hours
s.sch001
Control of noise during operational phase
s.sch001
Traffic
s.sch001
Port travel plan
s.sch001
European protected species onshore
s.sch001
(1) The total number of offshore electrical stations forming part...
s.sch001
Restoration of land used temporarily for construction
s.sch001
Onshore decommissioning
s.sch001
Aviation Safety
s.sch001
Ministry of Defence surveillance operations
s.sch001
Requirement for written approval
s.sch001
Amendments to approved details
s.sch001
Reuse of temporary works
s.sch001
Notification of site clearance and archaeological investigations
s.sch001
Cromer Primary Surveillance Radar
s.sch001
(1) The total length of the cables and the volume...
s.sch001
(1) In relation to a wind turbine generator, each gravity...
s.sch001
(1) In relation to a meteorological mast, each gravity base...
s.sch001
(1) In relation to an offshore electrical station, each gravity...
s.sch001
(1) In relation to any accommodation platform, each gravity base...
s.sch001
The total amount of scour protection for the wind turbine...
s.sch006
Compensation enactments
s.sch006
(1) Without prejudice to the generality of paragraph 1, the...
s.sch006
(1) The 1965 Act has effect with the modifications necessary...
s.sch006
For section 7 of the 1965 Act (measure of compensation)...
s.sch006
For section 8 of the 1965 Act (other provisions as...
s.sch006
The following provisions of the 1965 Act (which state the...
s.sch006
Section 11 of the 1965 Act (powers of entry) is...
s.sch006
Section 20 of the 1965 Act (protection for interests of...
s.sch006
Section 22 of the 1965 Act (protection of acquiring authority’s...
s.sch008
For the protection of the affected undertakers referred to in...
s.sch008
Nothing in this part of this Schedule affects the provisions...
s.sch008
(1) For the protection of any operator, the following provisions,...
s.sch008
The exercise of the powers of article 25 (statutory undertakers)...
s.sch008
This part of this Schedule does not apply to—
s.sch008
Nothing in this part of this Schedule affects the provisions...
s.sch008
The following provisions of this Part of this Schedule have...
s.sch008
In this part of this Schedule— “construction” includes execution, placing,...
s.sch008
(1) Where under this part of this Schedule Network Rail...
s.sch008
(1) The undertaker must not exercise the powers conferred by...
s.sch008
In this part of this Schedule— “affected undertaker” means any...
s.sch008
(1) The undertaker must before commencing construction of any specified...
s.sch008
(1) Any specified work and any protective works to be...
s.sch008
The undertaker must— (a) at all times afford reasonable facilities...
s.sch008
Network Rail must at all times afford reasonable facilities to...
s.sch008
(1) If any permanent or temporary alterations or additions to...
s.sch008
The undertaker must repay to Network Rail all reasonable fees,...
s.sch008
(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...
s.sch008
If at any time after the completion of a specified...
s.sch008
The undertaker must not provide any illumination or illuminated sign...
s.sch008
Any additional expenses which Network Rail may reasonably incur in...
s.sch008
This part of this Schedule does not apply to apparatus...
s.sch008
(1) The undertaker must pay to Network Rail all reasonable...
s.sch008
Network Rail must, on receipt of a request from the...
s.sch008
In the assessment of any sums payable to Network Rail...
s.sch008
The undertaker and Network Rail may, subject in the case...
s.sch008
Nothing in this Order, or in any enactment incorporated with...
s.sch008
The undertaker must give written notice to Network Rail where...
s.sch008
The undertaker must no later than 28 days from the...
s.sch008
For the protection of Anglian Water, the following provisions of...
s.sch008
In this part of this schedule— “Anglian Water” means Anglian...
s.sch008
The undertaker must not interfere with, build over or near...
s.sch008
Regardless of any provision in this Order or anything shown...
s.sch008
The alteration, extension, removal or re-location of any Apparatus may...
s.sch008
In the situation, where in exercise of the powers conferred...
s.sch008
Regardless of any provision in this Order or anything shown...
s.sch008
If in consequence of the exercise of the powers conferred...
s.sch008
If in consequence of the exercise of the powers conferred...
s.sch008
If for any reason or in consequence of the construction...
s.sch008
Nothing in paragraph 45 above imposes any liability on the...
s.sch008
Any difference or dispute arising between the undertaker and Anglian...
s.sch008
Application
s.sch008
Interpretation
s.sch008
(1) If, in the exercise of the powers conferred by...
s.sch008
Apparatus of statutory undertakers in stopped up streets
s.sch008
Acquisition of land
s.sch008
Removal of apparatus
s.sch008
Facilities and rights for alternative apparatus
s.sch008
Retained apparatus protection: Gas Undertakers
s.sch008
Retained apparatus protection: Electricity Undertakers
s.sch008
Expenses
s.sch008
Indemnity
s.sch008
Enactments and agreements
s.sch008
Co-operation
s.sch008
(1) Where, in accordance with the provisions of this part...
s.sch008
Access
s.sch008
Arbitration
s.sch008
Application
s.sch008
Interpretation
s.sch008
Apparatus of undertakers in stopped up streets
s.sch008
Acquisition of land
s.sch008
Removal of apparatus
s.sch008
Facilities and rights for alternative apparatus
s.sch008
Retained apparatus: protection: electricity undertakers
s.sch008
Expenses
s.sch008
(1) Not less than 28 days before starting the execution...
s.sch008
Compensation
s.sch008
Enactments and agreements
s.sch008
Co-operation
s.sch008
Access
s.sch008
Arbitration
s.sch008
Application
s.sch008
Interpretation
s.sch008
Proximity Agreement
s.sch008
Preparation of a Proximity Agreement must commence when the Undertaker...
s.sch008
Any such notice must be served within no less than...
s.sch008
(1) Subject to the following provisions of this paragraph, the...
s.sch008
Preparation of a Proximity Agreement must be concluded within 3...
s.sch008
If the Undertaker considers that the Plan of the Licensees’...
s.sch008
Paragraph 77 shall not apply if the plan of the...
s.sch008
The Proximity Agreement must be based on the Plan of...
s.sch008
Arbitration
s.sch008
Provision of information
s.sch008
Compensation
s.sch008
(1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch010
Aviation safety
s.sch010
Chemicals, drilling and debris
s.sch010
Force majeure
s.sch010
Pre-construction plans and documentation
s.sch010
(1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...
s.sch010
Reporting of engaged agents, contractors and vessels
s.sch010
Foundation restrictions
s.sch010
Pre-construction monitoring and surveys
s.sch010
Construction monitoring
s.sch010
Post construction
s.sch010
Reporting of impact pile driving/detonation of explosives
s.sch011
Aviation safety
s.sch011
Chemicals, drilling and debris
s.sch011
Force majeure
s.sch011
Pre-construction plans and documentation
s.sch011
(1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...
s.sch011
Reporting of engaged agents, contractors and vessels
s.sch011
Foundation restrictions
s.sch011
Pre-construction monitoring and surveys
s.sch011
Construction monitoring
s.sch011
Post construction
s.sch011
Reporting of impact pile driving/detonation of explosives
s.sch012
Aviation safety
s.sch012
Chemicals, drilling and debris
s.sch012
Force majeure
s.sch012
Pre-construction plans and documentation
s.sch012
(1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...
s.sch012
Reporting of engaged agents, contractors and vessels
s.sch012
Foundation restrictions
s.sch012
Pre-construction monitoring and surveys
s.sch012
Construction monitoring
s.sch012
Post construction
s.sch012
Reporting of impact pile driving/detonation of explosives
s.sch013
Aviation safety
s.sch013
Chemicals, drilling and debris
s.sch013
Force majeure
s.sch013
Pre-construction plans and documentation
s.sch013
(1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...
s.sch013
Reporting of engaged agents, contractors and vessels
s.sch013
Foundation restrictions
s.sch013
Pre-construction monitoring and surveys
s.sch013
Construction monitoring
s.sch013
Post construction
s.sch013
Reporting of impact pile driving/detonation of explosives
s.sch014
Construction monitoring
s.sch014
Post construction
s.sch014
Coordination with East Anglia ONE Offshore Wind Farm
s.sch015
Construction monitoring
s.sch015
Post construction
s.sch015
Coordination with East Anglia ONE Offshore Wind Farm
s.schedule/1/part/1/paragraph/1n2
In the county of Suffolk, district of Suffolk Coastal
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.