UK Statutory Instrument SI 2017/826 United Kingdom

The East Anglia THREE Offshore Wind Farm Order 2017

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Licence Holder1 Statutory Undertaker1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Licence Holder — also bound by 225 other Acts
Statutory Undertaker — also bound by 179 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

115 other provisions — procedural and definitional
sch. 14 para. 5 Force majeure
sch. 15 para. 5 Force majeure
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent etc. granted by the Order
s.art004 Power to maintain authorised project
s.art005 Benefit of the Order
s.art006 Application and modification of legislative provisions
s.art007 Defence to proceedings in respect of statutory nuisance
s.art008 Street works
s.art009 Temporary stopping up of public rights of way
s.art010 Temporary stopping up of streets
s.art011 Access to works
s.art012 Agreements with street authorities
s.art013 Discharge of water
s.art014 Authority to survey and investigate the land onshore
s.art015 Compulsory acquisition of land
s.art016 Time limit for exercise of authority to acquire land compulsorily
s.art017 Compulsory acquisition of rights
s.art018 Private rights
s.art019 Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art020 Acquisition of subsoil only
s.art021 Acquisition of part of certain properties
s.art022 Rights under or over streets
s.art023 Temporary use of land for carrying out the authorised project
s.art024 Temporary use of land for maintaining authorised project
s.art025 Statutory undertakers
s.art026 Recovery of costs of new connections
s.art027 Operation of generating station
s.art028 Deemed marine licences under the 2009 Act
s.art029 Application of landlord and tenant law
s.art030 Operational land for purposes of the 1990 Act
s.art031 Felling or lopping of trees and removal of hedgerows
s.art032 Certification of plans etc.
s.art033 Arbitration
s.art034 Requirements, appeals, etc.
s.art035 Abatement of works abandoned or decayed
s.art036 Saving provisions for Trinity House
s.art037 Crown rights
s.art038 Protective provisions
s.para.100 Work No. 63 – Onshore connection works consisting of up...
s.para.101 Work No. 64 – Onshore connection works consisting of up...
s.para.102 Work No. 65 – A new temporary lay down area...
s.para.103 Work No. 66 – Onshore connection works consisting of up...
s.para.104 Work No. 67 – Works comprising onshore substations;
s.para.105 Work No. 68 – Landscaping works including bunding and planting;...
s.para.106 Work No. 69 – Landscaping works including bunding and planting;...
s.para.41 Work No. 6 – A new temporary vehicular access track...
s.para.42 Work No. 7 – Onshore connection works consisting of up...
s.para.43 Work No. 8 – Onshore connection works consisting of up...
s.para.44 Work No. 9 – Temporary widening and upgrade of an...
s.para.45 Work No. 10 – Temporary widening and upgrade of an...
s.para.46 Work No. 11 – Temporary widening and upgrade of an...
s.para.47 Work No. 12 – Onshore connection works consisting of up...
s.para.48 Work No. 13 – Onshore connection works consisting of up...
s.para.49 Work No. 14 – A new temporary vehicular access track...
s.para.50 Work No. 15 – Temporary widening and upgrade of an...
s.para.51 Work No. 16 – Temporary widening and upgrade of two...
s.para.52 Work No. 17 – Onshore connection works consisting of up...
s.para.53 Work No. 18 – A new temporary secondary construction consolidation...
s.para.54 Work No. 19 – Onshore connection works consisting of up...
s.para.55 Work No. 20 – Onshore connection works consisting of up...
s.para.56 Work No. 21 – Onshore connection works consisting of up...
s.para.57 Work No. 22 – A new temporary secondary construction consolidation...
s.para.58 Work No. 23 – Temporary widening and upgrade of an...
s.para.59 Work No. 24 – A new temporary access track running...
s.para.60 Work No. 25 – Onshore connection works consisting of up...
s.para.61 Work No. 26 – Temporary widening and upgrade of an...
s.para.62 Work No. 27 – Temporary widening and upgrade of an...
s.para.63 Work No. 28 – Onshore connection works consisting of up...
s.para.64 Work No. 29 – Onshore connection works consisting of up...
s.para.65 Work No. 30 – Onshore connection works consisting of up...
s.para.66 Work No. 31 – A new temporary primary construction consolidation...
s.para.67 Work No. 32 – Onshore connection works consisting of up...
s.para.68 Work No. 33 – Temporary widening and upgrade of an...
s.para.69 Work No. 34 – Onshore connection works consisting of up...
s.para.70 Work No. 35 – Onshore connection works consisting of up...
s.para.71 Work No. 36 – Temporary widening and upgrade of an...
s.para.72 Work No. 37 – A new temporary access track from...
s.para.73 Work No. 38 – Onshore connection works consisting of up...
s.para.74 Work No. 39 – Onshore connection works consisting of up...
s.para.75 Work No. 40 – A new temporary secondary construction consolidation...
s.para.76 Work No. 41 – Onshore connection works consisting of up...
s.para.77 Work No. 42 – A new temporary vehicular access track...
s.para.78 Work No. 43 – Temporary widening and upgrade of an...
s.para.79 Work No. 44 – Temporary widening and upgrade of an...
s.para.80 Work No. 45 – Onshore connection works consisting of up...
s.para.81 Work No. 46 – A new temporary secondary construction consolidation...
s.para.82 Work No. 47 – Onshore connection works consisting of up...
s.para.83 In the county of Suffolk, district of Mid Suffolk
s.para.84 Work No. 48 – Onshore connection works consisting of up...
s.para.85 Work No. 49 – Onshore connection works consisting of up...
s.para.86 Work No. 50 – Onshore connection works consisting of up...
s.para.87 Work No. 51 – A new temporary primary construction consolidation...
s.para.88 Work No. 52 – Onshore connection works consisting of up...
s.para.89 Work No. 53 – A new temporary vehicular access track...
s.para.90 Work No. 54 – A new temporary vehicular access track...
s.para.91 Work No. 55 – Onshore connection works consisting of up...
s.para.92 Work No. 56 – Temporary widening and upgrade of an...
s.para.93 Work No. 57 – Temporary widening and upgrade of an...
s.para.94 Work No. 58 – Onshore connection works consisting of up...
s.para.95 Work No. 59 – A new temporary vehicular access track...
s.para.96 Work No. 60 – A new temporary vehicular access track...
s.para.97 Work No. 61 – A new temporary secondary construction consolidation...
s.para.98 Work No. 61A – Temporary widening and upgrade of Bullen...
s.para.99 Work No. 62 – Onshore connection works consisting of up...
Schedules

Schedules

2 of 183 shown
s.sch008 (1) Subject to sub-paragraphs (2) to (4), if as the... Regulated
  • Pay for damage to or interruption of electronic communications servicesStatutory Undertaker
s.sch008 In response to the notice the Licensee shall produce a... Regulated
  • Produce a plan of works within 28 days of receiving a noticeLicence Holder
181 other schedules
s.sch001 Offshore decommissioning
s.sch001 Stages and phasing of authorised development onshore
s.sch001 Detailed design parameters onshore
s.sch001 Landfall method statement
s.sch001 Provision of landscaping
s.sch001 Implementation and maintenance of landscaping
s.sch001 Highway accesses and improvements
s.sch001 Fencing and other means of enclosure
s.sch001 Surface and foul water drainage
s.sch001 Contaminated land and groundwater
s.sch001 Archaeology
s.sch001 Ecological management plan
s.sch001 Code of construction practice
s.sch001 External lighting and control of artificial light emissions
s.sch001 Control of noise during construction
s.sch001 Construction hours
s.sch001 Control of noise during operational phase
s.sch001 Traffic
s.sch001 Port travel plan
s.sch001 European protected species onshore
s.sch001 (1) The total number of offshore electrical stations forming part...
s.sch001 Restoration of land used temporarily for construction
s.sch001 Onshore decommissioning
s.sch001 Aviation Safety
s.sch001 Ministry of Defence surveillance operations
s.sch001 Requirement for written approval
s.sch001 Amendments to approved details
s.sch001 Reuse of temporary works
s.sch001 Notification of site clearance and archaeological investigations
s.sch001 Cromer Primary Surveillance Radar
s.sch001 (1) The total length of the cables and the volume...
s.sch001 (1) In relation to a wind turbine generator, each gravity...
s.sch001 (1) In relation to a meteorological mast, each gravity base...
s.sch001 (1) In relation to an offshore electrical station, each gravity...
s.sch001 (1) In relation to any accommodation platform, each gravity base...
s.sch001 The total amount of scour protection for the wind turbine...
s.sch006 Compensation enactments
s.sch006 (1) Without prejudice to the generality of paragraph 1, the...
s.sch006 (1) The 1965 Act has effect with the modifications necessary...
s.sch006 For section 7 of the 1965 Act (measure of compensation)...
s.sch006 For section 8 of the 1965 Act (other provisions as...
s.sch006 The following provisions of the 1965 Act (which state the...
s.sch006 Section 11 of the 1965 Act (powers of entry) is...
s.sch006 Section 20 of the 1965 Act (protection for interests of...
s.sch006 Section 22 of the 1965 Act (protection of acquiring authority’s...
s.sch008 For the protection of the affected undertakers referred to in...
s.sch008 Nothing in this part of this Schedule affects the provisions...
s.sch008 (1) For the protection of any operator, the following provisions,...
s.sch008 The exercise of the powers of article 25 (statutory undertakers)...
s.sch008 This part of this Schedule does not apply to—
s.sch008 Nothing in this part of this Schedule affects the provisions...
s.sch008 The following provisions of this Part of this Schedule have...
s.sch008 In this part of this Schedule— “construction” includes execution, placing,...
s.sch008 (1) Where under this part of this Schedule Network Rail...
s.sch008 (1) The undertaker must not exercise the powers conferred by...
s.sch008 In this part of this Schedule— “affected undertaker” means any...
s.sch008 (1) The undertaker must before commencing construction of any specified...
s.sch008 (1) Any specified work and any protective works to be...
s.sch008 The undertaker must— (a) at all times afford reasonable facilities...
s.sch008 Network Rail must at all times afford reasonable facilities to...
s.sch008 (1) If any permanent or temporary alterations or additions to...
s.sch008 The undertaker must repay to Network Rail all reasonable fees,...
s.sch008 (1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...
s.sch008 If at any time after the completion of a specified...
s.sch008 The undertaker must not provide any illumination or illuminated sign...
s.sch008 Any additional expenses which Network Rail may reasonably incur in...
s.sch008 This part of this Schedule does not apply to apparatus...
s.sch008 (1) The undertaker must pay to Network Rail all reasonable...
s.sch008 Network Rail must, on receipt of a request from the...
s.sch008 In the assessment of any sums payable to Network Rail...
s.sch008 The undertaker and Network Rail may, subject in the case...
s.sch008 Nothing in this Order, or in any enactment incorporated with...
s.sch008 The undertaker must give written notice to Network Rail where...
s.sch008 The undertaker must no later than 28 days from the...
s.sch008 For the protection of Anglian Water, the following provisions of...
s.sch008 In this part of this schedule— “Anglian Water” means Anglian...
s.sch008 The undertaker must not interfere with, build over or near...
s.sch008 Regardless of any provision in this Order or anything shown...
s.sch008 The alteration, extension, removal or re-location of any Apparatus may...
s.sch008 In the situation, where in exercise of the powers conferred...
s.sch008 Regardless of any provision in this Order or anything shown...
s.sch008 If in consequence of the exercise of the powers conferred...
s.sch008 If in consequence of the exercise of the powers conferred...
s.sch008 If for any reason or in consequence of the construction...
s.sch008 Nothing in paragraph 45 above imposes any liability on the...
s.sch008 Any difference or dispute arising between the undertaker and Anglian...
s.sch008 Application
s.sch008 Interpretation
s.sch008 (1) If, in the exercise of the powers conferred by...
s.sch008 Apparatus of statutory undertakers in stopped up streets
s.sch008 Acquisition of land
s.sch008 Removal of apparatus
s.sch008 Facilities and rights for alternative apparatus
s.sch008 Retained apparatus protection: Gas Undertakers
s.sch008 Retained apparatus protection: Electricity Undertakers
s.sch008 Expenses
s.sch008 Indemnity
s.sch008 Enactments and agreements
s.sch008 Co-operation
s.sch008 (1) Where, in accordance with the provisions of this part...
s.sch008 Access
s.sch008 Arbitration
s.sch008 Application
s.sch008 Interpretation
s.sch008 Apparatus of undertakers in stopped up streets
s.sch008 Acquisition of land
s.sch008 Removal of apparatus
s.sch008 Facilities and rights for alternative apparatus
s.sch008 Retained apparatus: protection: electricity undertakers
s.sch008 Expenses
s.sch008 (1) Not less than 28 days before starting the execution...
s.sch008 Compensation
s.sch008 Enactments and agreements
s.sch008 Co-operation
s.sch008 Access
s.sch008 Arbitration
s.sch008 Application
s.sch008 Interpretation
s.sch008 Proximity Agreement
s.sch008 Preparation of a Proximity Agreement must commence when the Undertaker...
s.sch008 Any such notice must be served within no less than...
s.sch008 (1) Subject to the following provisions of this paragraph, the...
s.sch008 Preparation of a Proximity Agreement must be concluded within 3...
s.sch008 If the Undertaker considers that the Plan of the Licensees’...
s.sch008 Paragraph 77 shall not apply if the plan of the...
s.sch008 The Proximity Agreement must be based on the Plan of...
s.sch008 Arbitration
s.sch008 Provision of information
s.sch008 Compensation
s.sch008 (1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch010 Aviation safety
s.sch010 Chemicals, drilling and debris
s.sch010 Force majeure
s.sch010 Pre-construction plans and documentation
s.sch010 (1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...
s.sch010 Reporting of engaged agents, contractors and vessels
s.sch010 Foundation restrictions
s.sch010 Pre-construction monitoring and surveys
s.sch010 Construction monitoring
s.sch010 Post construction
s.sch010 Reporting of impact pile driving/detonation of explosives
s.sch011 Aviation safety
s.sch011 Chemicals, drilling and debris
s.sch011 Force majeure
s.sch011 Pre-construction plans and documentation
s.sch011 (1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...
s.sch011 Reporting of engaged agents, contractors and vessels
s.sch011 Foundation restrictions
s.sch011 Pre-construction monitoring and surveys
s.sch011 Construction monitoring
s.sch011 Post construction
s.sch011 Reporting of impact pile driving/detonation of explosives
s.sch012 Aviation safety
s.sch012 Chemicals, drilling and debris
s.sch012 Force majeure
s.sch012 Pre-construction plans and documentation
s.sch012 (1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...
s.sch012 Reporting of engaged agents, contractors and vessels
s.sch012 Foundation restrictions
s.sch012 Pre-construction monitoring and surveys
s.sch012 Construction monitoring
s.sch012 Post construction
s.sch012 Reporting of impact pile driving/detonation of explosives
s.sch013 Aviation safety
s.sch013 Chemicals, drilling and debris
s.sch013 Force majeure
s.sch013 Pre-construction plans and documentation
s.sch013 (1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...
s.sch013 Reporting of engaged agents, contractors and vessels
s.sch013 Foundation restrictions
s.sch013 Pre-construction monitoring and surveys
s.sch013 Construction monitoring
s.sch013 Post construction
s.sch013 Reporting of impact pile driving/detonation of explosives
s.sch014 Construction monitoring
s.sch014 Post construction
s.sch014 Coordination with East Anglia ONE Offshore Wind Farm
s.sch015 Construction monitoring
s.sch015 Post construction
s.sch015 Coordination with East Anglia ONE Offshore Wind Farm
s.schedule/1/part/1/paragraph/1n2 In the county of Suffolk, district of Suffolk Coastal

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.