UK Statutory Instrument 2017 United Kingdom

The East Anglia THREE Offshore Wind Farm Order 2017

At a glance

What's here

2 compliance obligations

What this Act requires

Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.

Schedules

s.sch008

(1) Subject to sub-paragraphs (2) to (4), if as the...

  • Pay for damage to or interruption of electronic communications services
s.sch008

In response to the notice the Licensee shall produce a...

  • Produce a plan of works within 28 days of receiving a notice
Browse 181 other Schedules — structural / supplementary
s.sch001

Offshore decommissioning

s.sch001

Stages and phasing of authorised development onshore

s.sch001

Detailed design parameters onshore

s.sch001

Landfall method statement

s.sch001

Provision of landscaping

s.sch001

Implementation and maintenance of landscaping

s.sch001

Highway accesses and improvements

s.sch001

Fencing and other means of enclosure

s.sch001

Surface and foul water drainage

s.sch001

Contaminated land and groundwater

s.sch001

Archaeology

s.sch001

Ecological management plan

s.sch001

Code of construction practice

s.sch001

External lighting and control of artificial light emissions

s.sch001

Control of noise during construction

s.sch001

Construction hours

s.sch001

Control of noise during operational phase

s.sch001

Traffic

s.sch001

Port travel plan

s.sch001

European protected species onshore

s.sch001

(1) The total number of offshore electrical stations forming part...

s.sch001

Restoration of land used temporarily for construction

s.sch001

Onshore decommissioning

s.sch001

Aviation Safety

s.sch001

Ministry of Defence surveillance operations

s.sch001

Requirement for written approval

s.sch001

Amendments to approved details

s.sch001

Reuse of temporary works

s.sch001

Notification of site clearance and archaeological investigations

s.sch001

Cromer Primary Surveillance Radar

s.sch001

(1) The total length of the cables and the volume...

s.sch001

(1) In relation to a wind turbine generator, each gravity...

s.sch001

(1) In relation to a meteorological mast, each gravity base...

s.sch001

(1) In relation to an offshore electrical station, each gravity...

s.sch001

(1) In relation to any accommodation platform, each gravity base...

s.sch001

The total amount of scour protection for the wind turbine...

s.sch006

Compensation enactments

s.sch006

(1) Without prejudice to the generality of paragraph 1, the...

s.sch006

(1) The 1965 Act has effect with the modifications necessary...

s.sch006

For section 7 of the 1965 Act (measure of compensation)...

s.sch006

For section 8 of the 1965 Act (other provisions as...

s.sch006

The following provisions of the 1965 Act (which state the...

s.sch006

Section 11 of the 1965 Act (powers of entry) is...

s.sch006

Section 20 of the 1965 Act (protection for interests of...

s.sch006

Section 22 of the 1965 Act (protection of acquiring authority’s...

s.sch008

For the protection of the affected undertakers referred to in...

s.sch008

Nothing in this part of this Schedule affects the provisions...

s.sch008

(1) For the protection of any operator, the following provisions,...

s.sch008

The exercise of the powers of article 25 (statutory undertakers)...

s.sch008

This part of this Schedule does not apply to—

s.sch008

Nothing in this part of this Schedule affects the provisions...

s.sch008

The following provisions of this Part of this Schedule have...

s.sch008

In this part of this Schedule— “construction” includes execution, placing,...

s.sch008

(1) Where under this part of this Schedule Network Rail...

s.sch008

(1) The undertaker must not exercise the powers conferred by...

s.sch008

In this part of this Schedule— “affected undertaker” means any...

s.sch008

(1) The undertaker must before commencing construction of any specified...

s.sch008

(1) Any specified work and any protective works to be...

s.sch008

The undertaker must— (a) at all times afford reasonable facilities...

s.sch008

Network Rail must at all times afford reasonable facilities to...

s.sch008

(1) If any permanent or temporary alterations or additions to...

s.sch008

The undertaker must repay to Network Rail all reasonable fees,...

s.sch008

(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...

s.sch008

If at any time after the completion of a specified...

s.sch008

The undertaker must not provide any illumination or illuminated sign...

s.sch008

Any additional expenses which Network Rail may reasonably incur in...

s.sch008

This part of this Schedule does not apply to apparatus...

s.sch008

(1) The undertaker must pay to Network Rail all reasonable...

s.sch008

Network Rail must, on receipt of a request from the...

s.sch008

In the assessment of any sums payable to Network Rail...

s.sch008

The undertaker and Network Rail may, subject in the case...

s.sch008

Nothing in this Order, or in any enactment incorporated with...

s.sch008

The undertaker must give written notice to Network Rail where...

s.sch008

The undertaker must no later than 28 days from the...

s.sch008

For the protection of Anglian Water, the following provisions of...

s.sch008

In this part of this schedule— “Anglian Water” means Anglian...

s.sch008

The undertaker must not interfere with, build over or near...

s.sch008

Regardless of any provision in this Order or anything shown...

s.sch008

The alteration, extension, removal or re-location of any Apparatus may...

s.sch008

In the situation, where in exercise of the powers conferred...

s.sch008

Regardless of any provision in this Order or anything shown...

s.sch008

If in consequence of the exercise of the powers conferred...

s.sch008

If in consequence of the exercise of the powers conferred...

s.sch008

If for any reason or in consequence of the construction...

s.sch008

Nothing in paragraph 45 above imposes any liability on the...

s.sch008

Any difference or dispute arising between the undertaker and Anglian...

s.sch008

Application

s.sch008

Interpretation

s.sch008

(1) If, in the exercise of the powers conferred by...

s.sch008

Apparatus of statutory undertakers in stopped up streets

s.sch008

Acquisition of land

s.sch008

Removal of apparatus

s.sch008

Facilities and rights for alternative apparatus

s.sch008

Retained apparatus protection: Gas Undertakers

s.sch008

Retained apparatus protection: Electricity Undertakers

s.sch008

Expenses

s.sch008

Indemnity

s.sch008

Enactments and agreements

s.sch008

Co-operation

s.sch008

(1) Where, in accordance with the provisions of this part...

s.sch008

Access

s.sch008

Arbitration

s.sch008

Application

s.sch008

Interpretation

s.sch008

Apparatus of undertakers in stopped up streets

s.sch008

Acquisition of land

s.sch008

Removal of apparatus

s.sch008

Facilities and rights for alternative apparatus

s.sch008

Retained apparatus: protection: electricity undertakers

s.sch008

Expenses

s.sch008

(1) Not less than 28 days before starting the execution...

s.sch008

Compensation

s.sch008

Enactments and agreements

s.sch008

Co-operation

s.sch008

Access

s.sch008

Arbitration

s.sch008

Application

s.sch008

Interpretation

s.sch008

Proximity Agreement

s.sch008

Preparation of a Proximity Agreement must commence when the Undertaker...

s.sch008

Any such notice must be served within no less than...

s.sch008

(1) Subject to the following provisions of this paragraph, the...

s.sch008

Preparation of a Proximity Agreement must be concluded within 3...

s.sch008

If the Undertaker considers that the Plan of the Licensees’...

s.sch008

Paragraph 77 shall not apply if the plan of the...

s.sch008

The Proximity Agreement must be based on the Plan of...

s.sch008

Arbitration

s.sch008

Provision of information

s.sch008

Compensation

s.sch008

(1) Subject to sub-paragraphs (2) and (3), if by reason...

s.sch010

Aviation safety

s.sch010

Chemicals, drilling and debris

s.sch010

Force majeure

s.sch010

Pre-construction plans and documentation

s.sch010

(1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...

s.sch010

Reporting of engaged agents, contractors and vessels

s.sch010

Foundation restrictions

s.sch010

Pre-construction monitoring and surveys

s.sch010

Construction monitoring

s.sch010

Post construction

s.sch010

Reporting of impact pile driving/detonation of explosives

s.sch011

Aviation safety

s.sch011

Chemicals, drilling and debris

s.sch011

Force majeure

s.sch011

Pre-construction plans and documentation

s.sch011

(1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...

s.sch011

Reporting of engaged agents, contractors and vessels

s.sch011

Foundation restrictions

s.sch011

Pre-construction monitoring and surveys

s.sch011

Construction monitoring

s.sch011

Post construction

s.sch011

Reporting of impact pile driving/detonation of explosives

s.sch012

Aviation safety

s.sch012

Chemicals, drilling and debris

s.sch012

Force majeure

s.sch012

Pre-construction plans and documentation

s.sch012

(1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...

s.sch012

Reporting of engaged agents, contractors and vessels

s.sch012

Foundation restrictions

s.sch012

Pre-construction monitoring and surveys

s.sch012

Construction monitoring

s.sch012

Post construction

s.sch012

Reporting of impact pile driving/detonation of explosives

s.sch013

Aviation safety

s.sch013

Chemicals, drilling and debris

s.sch013

Force majeure

s.sch013

Pre-construction plans and documentation

s.sch013

(1) Any archaeological reports produced in accordance with condition 13(1)(h)(iii)...

s.sch013

Reporting of engaged agents, contractors and vessels

s.sch013

Foundation restrictions

s.sch013

Pre-construction monitoring and surveys

s.sch013

Construction monitoring

s.sch013

Post construction

s.sch013

Reporting of impact pile driving/detonation of explosives

s.sch014

Construction monitoring

s.sch014

Post construction

s.sch014

Coordination with East Anglia ONE Offshore Wind Farm

s.sch015

Construction monitoring

s.sch015

Post construction

s.sch015

Coordination with East Anglia ONE Offshore Wind Farm

s.schedule/1/part/1/paragraph/1n2

In the county of Suffolk, district of Suffolk Coastal

Browse 115 other sections — procedural / definitional / commencement
sch. 14 para. 5

Force majeure

sch. 15 para. 5

Force majeure

s.art001

Citation and commencement

s.art002

Interpretation

s.art003

Development consent etc. granted by the Order

s.art004

Power to maintain authorised project

s.art005

Benefit of the Order

s.art006

Application and modification of legislative provisions

s.art007

Defence to proceedings in respect of statutory nuisance

s.art008

Street works

s.art009

Temporary stopping up of public rights of way

s.art010

Temporary stopping up of streets

s.art011

Access to works

s.art012

Agreements with street authorities

s.art013

Discharge of water

s.art014

Authority to survey and investigate the land onshore

s.art015

Compulsory acquisition of land

s.art016

Time limit for exercise of authority to acquire land compulsorily

s.art017

Compulsory acquisition of rights

s.art018

Private rights

s.art019

Application of the Compulsory Purchase (Vesting Declarations) Act 1981

s.art020

Acquisition of subsoil only

s.art021

Acquisition of part of certain properties

s.art022

Rights under or over streets

s.art023

Temporary use of land for carrying out the authorised project

s.art024

Temporary use of land for maintaining authorised project

s.art025

Statutory undertakers

s.art026

Recovery of costs of new connections

s.art027

Operation of generating station

s.art028

Deemed marine licences under the 2009 Act

s.art029

Application of landlord and tenant law

s.art030

Operational land for purposes of the 1990 Act

s.art031

Felling or lopping of trees and removal of hedgerows

s.art032

Certification of plans etc.

s.art033

Arbitration

s.art034

Requirements, appeals, etc.

s.art035

Abatement of works abandoned or decayed

s.art036

Saving provisions for Trinity House

s.art037

Crown rights

s.art038

Protective provisions

s.para.100

Work No. 63 – Onshore connection works consisting of up...

s.para.101

Work No. 64 – Onshore connection works consisting of up...

s.para.102

Work No. 65 – A new temporary lay down area...

s.para.103

Work No. 66 – Onshore connection works consisting of up...

s.para.104

Work No. 67 – Works comprising onshore substations;

s.para.105

Work No. 68 – Landscaping works including bunding and planting;...

s.para.106

Work No. 69 – Landscaping works including bunding and planting;...

s.para.41

Work No. 6 – A new temporary vehicular access track...

s.para.42

Work No. 7 – Onshore connection works consisting of up...

s.para.43

Work No. 8 – Onshore connection works consisting of up...

s.para.44

Work No. 9 – Temporary widening and upgrade of an...

s.para.45

Work No. 10 – Temporary widening and upgrade of an...

s.para.46

Work No. 11 – Temporary widening and upgrade of an...

s.para.47

Work No. 12 – Onshore connection works consisting of up...

s.para.48

Work No. 13 – Onshore connection works consisting of up...

s.para.49

Work No. 14 – A new temporary vehicular access track...

s.para.50

Work No. 15 – Temporary widening and upgrade of an...

s.para.51

Work No. 16 – Temporary widening and upgrade of two...

s.para.52

Work No. 17 – Onshore connection works consisting of up...

s.para.53

Work No. 18 – A new temporary secondary construction consolidation...

s.para.54

Work No. 19 – Onshore connection works consisting of up...

s.para.55

Work No. 20 – Onshore connection works consisting of up...

s.para.56

Work No. 21 – Onshore connection works consisting of up...

s.para.57

Work No. 22 – A new temporary secondary construction consolidation...

s.para.58

Work No. 23 – Temporary widening and upgrade of an...

s.para.59

Work No. 24 – A new temporary access track running...

s.para.60

Work No. 25 – Onshore connection works consisting of up...

s.para.61

Work No. 26 – Temporary widening and upgrade of an...

s.para.62

Work No. 27 – Temporary widening and upgrade of an...

s.para.63

Work No. 28 – Onshore connection works consisting of up...

s.para.64

Work No. 29 – Onshore connection works consisting of up...

s.para.65

Work No. 30 – Onshore connection works consisting of up...

s.para.66

Work No. 31 – A new temporary primary construction consolidation...

s.para.67

Work No. 32 – Onshore connection works consisting of up...

s.para.68

Work No. 33 – Temporary widening and upgrade of an...

s.para.69

Work No. 34 – Onshore connection works consisting of up...

s.para.70

Work No. 35 – Onshore connection works consisting of up...

s.para.71

Work No. 36 – Temporary widening and upgrade of an...

s.para.72

Work No. 37 – A new temporary access track from...

s.para.73

Work No. 38 – Onshore connection works consisting of up...

s.para.74

Work No. 39 – Onshore connection works consisting of up...

s.para.75

Work No. 40 – A new temporary secondary construction consolidation...

s.para.76

Work No. 41 – Onshore connection works consisting of up...

s.para.77

Work No. 42 – A new temporary vehicular access track...

s.para.78

Work No. 43 – Temporary widening and upgrade of an...

s.para.79

Work No. 44 – Temporary widening and upgrade of an...

s.para.80

Work No. 45 – Onshore connection works consisting of up...

s.para.81

Work No. 46 – A new temporary secondary construction consolidation...

s.para.82

Work No. 47 – Onshore connection works consisting of up...

s.para.83

In the county of Suffolk, district of Mid Suffolk

s.para.84

Work No. 48 – Onshore connection works consisting of up...

s.para.85

Work No. 49 – Onshore connection works consisting of up...

s.para.86

Work No. 50 – Onshore connection works consisting of up...

s.para.87

Work No. 51 – A new temporary primary construction consolidation...

s.para.88

Work No. 52 – Onshore connection works consisting of up...

s.para.89

Work No. 53 – A new temporary vehicular access track...

s.para.90

Work No. 54 – A new temporary vehicular access track...

s.para.91

Work No. 55 – Onshore connection works consisting of up...

s.para.92

Work No. 56 – Temporary widening and upgrade of an...

s.para.93

Work No. 57 – Temporary widening and upgrade of an...

s.para.94

Work No. 58 – Onshore connection works consisting of up...

s.para.95

Work No. 59 – A new temporary vehicular access track...

s.para.96

Work No. 60 – A new temporary vehicular access track...

s.para.97

Work No. 61 – A new temporary secondary construction consolidation...

s.para.98

Work No. 61A – Temporary widening and upgrade of Bullen...

s.para.99

Work No. 62 – Onshore connection works consisting of up...