The East Anglia ONE Offshore Wind Farm Order 2014
At a glance
What's here
1 compliance obligation
Who this Act binds
Business-side actors with duties under this Act, ranked by how often they appear.
- Statutory Undertaker 1
Other Acts binding the same actors
For each actor bound by this Act, the other UK Acts that bind them most often. Useful for understanding the full compliance landscape facing each role.
Statutory Undertakers also bound by 169 other Acts (top 5 shown)
- The Cory Decarbonisation Project Order 2025 2025 116 duties
- The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order 2022 2022 112 duties
- Water Industry Act 1991 1991 52 duties
- Water and Sewerage Services (Northern Ireland) Order 2006 2006 44 duties
- The A47 North Tuddenham to Easton Development Consent Order 2022 2022 28 duties
What this Act requires
Sections that create concrete duties on businesses or carry penalties. Procedural and definitional sections are folded into the “Browse other sections” expander at the bottom of each group. Click any section title to read the source text on legislation.gov.uk.
Schedules
Browse 74 other Schedules — structural / supplementary
Landfall method statement
Provision of landscaping
Implementation and maintenance of landscaping
Highway accesses and improvements
Fencing and other means of enclosure
Surface and foul water drainage
Contaminated land and ground water
Archaeology
Ecological management plan
Code of construction practice
External lighting and control of artificial light emissions
Control of noise during construction
Construction hours
Control of noise during operational phase
Traffic
Port travel plan
European protected species
Restoration of land used temporarily for construction
Installation of cable ducts
Skills strategy
Onshore decommissioning
Decommissioning of Work No. 3B and Work No. 4
Requirement for written approval
Amendments to approved details
Transmission system
Marine mammal mitigation protocol
No meteorological mast, wind turbine generator or offshore substation forming...
(1) The total number of offshore substations forming part of...
(1) The total length of the cables comprising Work No....
(1) In relation to a WTG, each gravity base foundation...
As built offshore parameters
Aviation safety
Offshore decommissioning
Compensation enactments
(1) Without prejudice to the generality of paragraph 1, the...
Application of the 1965 Act
For section 7 of the 1965 Act (measure of compensation)...
For section 8 of the 1965 Act (provisions as to...
The following provisions of the 1965 Act (which state the...
Section 11 of the 1965 Act (powers of entry) shall...
Section 20 of the 1965 Act (protection for interests of...
Section 22 of the 1965 Act (protection of acquiring authority’s...
Network Rail must, on receipt of a request from the...
In the assessment of any sums payable to Network Rail...
The undertakers and Network Rail may, subject in the case...
Nothing in this Order, or in any enactment incorporated with...
The undertakers must give written notice to Network Rail where...
The undertakers must no later than 28 days from the...
Force majeure
Pre-construction plans and documentation
(1) Any archaeological reports produced in accordance with condition 11(h)(iii)...
(1) Each programme, statement, plan, protocol or scheme required to...
Foundation restrictions
Reporting of engaged agents, contractors and vessels
Equipment and operation of vessels engaged in licensed activities
Pre-construction monitoring and surveys
Construction monitoring
Post construction
Offshore safety management
Aids to navigation
Chemicals, drilling and debris
Pre-construction plans and documentation
(1) Any archaeological reports produced in accordance with condition 11(h)(iii)...
(1) Each programme, statement, plan, protocol or scheme required to...
Foundation restrictions
Reporting of engaged agents, contractors and vessels
Equipment and operation of vessels engaged in licensed activities
Pre-construction monitoring and surveys
Construction monitoring
Post construction
Aids to navigation
Chemicals, drilling and debris
Force majeure
sch. 9 para. 3
- Pay costs, compensate and indemnify for damage to electronic communications apparatus Statutory Undertaker
Browse 53 other sections — procedural / definitional / commencement
A nationally significant infrastructure project as defined in sections 14...
The grid coordinates for that part of the authorised project...
The grid coordinates for that part of the authorised project...
Regardless of any provision in this Order or anything shown...
(1) If, in the exercise of the powers conferred by...
(1) Where, in accordance with the provisions of this part...
(1) Not less than 28 days before starting the execution...
(1) Subject to the following provisions of this paragraph, the...
(1) Subject to sub-paragraphs (2) and (3), if by reason...
Nothing in this part of this Schedule shall affect the...
(1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...
If at any time after the completion of a specified...
The undertakers must not provide any illumination or illuminated sign...
Any additional expenses which Network Rail may reasonably incur in...
(1) The undertakers must pay to Network Rail all reasonable...
Citation and commencement
Interpretation
Development consent
Power to construct and maintain authorised project
Benefit of the Order
Application and modification of legislative provisions
Defence to proceedings in respect of statutory nuisance
Street works
Temporary stopping up of public rights of way
Temporary stopping up of streets
Access to works
Agreements with street authorities
Discharge of water
Authority to survey and investigate the land
Compulsory acquisition of land
Time limit for exercise of authority to acquire land compulsorily
Compulsory acquisition of rights
Private rights
Application of the Compulsory Purchase (Vesting Declarations) Act 1981
Acquisition of subsoil only
Acquisition of part of certain properties
Rights under or over streets
Temporary use of land for carrying out the authorised project
Temporary use of land for maintaining authorised project
Protective provisions for specified
Statutory undertakers
Recovery of costs of new connections
Operation of generating station
Deemed marine licences under the Marine and Coastal Access Act 2009
Application of landlord and tenant law
Operational land for purposes of the
Felling or lopping of trees and removal of hedgerows
Certification of plans etc.
Arbitration
Requirements, appeals, etc.
Abatement of works abandoned or decayed
Saving provisions for
Crown rights
Explore more
Browse legislation
Find other UK business legislation with related guidance.