What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
sch. 9 para. 3
sch. 9 para. 3
Regulated
- Pay costs, compensate and indemnify for damage to electronic communications apparatusStatutory Undertaker
53 other provisions — procedural and definitional
s.001
A nationally significant infrastructure project as defined in sections 14... (opens in a new tab)
s.art001
Citation and commencement
s.art002
Interpretation
s.art003
Development consent
s.art004
Power to construct and maintain authorised project
s.art005
Benefit of the Order
s.art006
Application and modification of legislative provisions
s.art007
Defence to proceedings in respect of statutory nuisance
s.art008
Street works
s.art009
Temporary stopping up of public rights of way
s.art010
Temporary stopping up of streets
s.art011
Access to works
s.art012
Agreements with street authorities
s.art013
Discharge of water
s.art014
Authority to survey and investigate the land
s.art015
Compulsory acquisition of land
s.art016
Time limit for exercise of authority to acquire land compulsorily
s.art017
Compulsory acquisition of rights
s.art018
Private rights
s.art019
Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art020
Acquisition of subsoil only
s.art021
Acquisition of part of certain properties
s.art022
Rights under or over streets
s.art023
Temporary use of land for carrying out the authorised project
s.art024
Temporary use of land for maintaining authorised project
s.art025
Protective provisions for specified
s.art026
Statutory undertakers
s.art027
Recovery of costs of new connections
s.art028
Operation of generating station
s.art029
Deemed marine licences under the Marine and Coastal Access Act 2009
s.art030
Application of landlord and tenant law
s.art031
Operational land for purposes of the
s.art032
Felling or lopping of trees and removal of hedgerows
s.art033
Certification of plans etc.
s.art034
Arbitration
s.art035
Requirements, appeals, etc.
s.art036
Abatement of works abandoned or decayed
s.art037
Saving provisions for
s.art038
Crown rights
Schedules
Schedules
0 of 74 shown74 other schedules
s.sch001
Detailed design approval onshore
s.sch001
Landfall method statement
s.sch001
Provision of landscaping
s.sch001
Implementation and maintenance of landscaping
s.sch001
Highway accesses and improvements
s.sch001
Fencing and other means of enclosure
s.sch001
Surface and foul water drainage
s.sch001
Contaminated land and ground water
s.sch001
Archaeology
s.sch001
Ecological management plan
s.sch001
Code of construction practice
s.sch001
External lighting and control of artificial light emissions
s.sch001
Control of noise during construction
s.sch001
Construction hours
s.sch001
Control of noise during operational phase
s.sch001
Traffic
s.sch001
Port travel plan
s.sch001
European protected species
s.sch001
Restoration of land used temporarily for construction
s.sch001
Installation of cable ducts
s.sch001
Skills strategy
s.sch001
Onshore decommissioning
s.sch001
Decommissioning of Work No. 3B and Work No. 4
s.sch001
Requirement for written approval
s.sch001
Amendments to approved details
s.sch001
Transmission system
s.sch001
Marine mammal mitigation protocol
s.sch001
No meteorological mast, wind turbine generator or offshore substation forming...
s.sch001
(1) The total number of offshore substations forming part of...
s.sch001
(1) The total length of the cables comprising Work No....
s.sch001
(1) In relation to a WTG, each gravity base foundation...
s.sch001
As built offshore parameters
s.sch001
Aviation safety
s.sch001
Offshore decommissioning
s.sch007
Compensation enactments
s.sch007
(1) Without prejudice to the generality of paragraph 1, the...
s.sch007
Application of the 1965 Act
s.sch007
For section 7 of the 1965 Act (measure of compensation)...
s.sch007
For section 8 of the 1965 Act (provisions as to...
s.sch007
The following provisions of the 1965 Act (which state the...
s.sch007
Section 11 of the 1965 Act (powers of entry) shall...
s.sch007
Section 20 of the 1965 Act (protection for interests of...
s.sch007
Section 22 of the 1965 Act (protection of acquiring authority’s...
s.sch009
Network Rail must, on receipt of a request from the...
s.sch009
In the assessment of any sums payable to Network Rail...
s.sch009
The undertakers and Network Rail may, subject in the case...
s.sch009
Nothing in this Order, or in any enactment incorporated with...
s.sch009
The undertakers must give written notice to Network Rail where...
s.sch009
The undertakers must no later than 28 days from the...
s.sch010
Force majeure
s.sch010
Pre-construction plans and documentation
s.sch010
(1) Any archaeological reports produced in accordance with condition 11(h)(iii)...
s.sch010
(1) Each programme, statement, plan, protocol or scheme required to...
s.sch010
Foundation restrictions
s.sch010
Reporting of engaged agents, contractors and vessels
s.sch010
Equipment and operation of vessels engaged in licensed activities
s.sch010
Pre-construction monitoring and surveys
s.sch010
Construction monitoring
s.sch010
Post construction
s.sch010
Offshore safety management
s.sch010
Aids to navigation
s.sch010
Chemicals, drilling and debris
s.sch011
Pre-construction plans and documentation
s.sch011
(1) Any archaeological reports produced in accordance with condition 11(h)(iii)...
s.sch011
(1) Each programme, statement, plan, protocol or scheme required to...
s.sch011
Foundation restrictions
s.sch011
Reporting of engaged agents, contractors and vessels
s.sch011
Equipment and operation of vessels engaged in licensed activities
s.sch011
Pre-construction monitoring and surveys
s.sch011
Construction monitoring
s.sch011
Post construction
s.sch011
Aids to navigation
s.sch011
Chemicals, drilling and debris
s.sch011
Force majeure