Business-side roles with duties under this instrument.
Statutory Undertaker1
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Statutory Undertaker — also bound by 179 other Acts
The Cory Decarbonisation Project Order 2025
120 duties
Water Industry Act 1991
53 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
sch. 2 para. 2
sch. 2 para. 2
Regulated
- Build turbines to the approved make, model and dimensionsStatutory Undertaker
18 other provisions — procedural and definitional
s.art001
Citation and commencement
s.art002
Interpretation
s.art003
Development consent
s.art004
Limits of deviation
s.art005
Maintenance of authorised project
s.art006
Operation of electricity generating station
s.art007
Consent to transfer benefit of Order
s.art008
Requirements, appeals
s.art009
Public rights of navigation
s.art010
Abatement of works abandoned or decayed
s.art011
Survey of works
s.art012
Deemed licence under the Marine and Coastal Access Act 2009
s.art013
Saving for
s.art014
Crown rights
s.art015
Certification of plans etc
s.art016
Arbitration
Schedules
Schedules
0 of 29 shown29 other schedules
s.sch001
Aviation safety
s.sch001
Provision against danger to navigation
s.sch001
Archaeology above mean low water level
s.sch001
Ecological management plan above mean low water level
s.sch001
Code of construction practice
s.sch001
Construction hours
s.sch001
Decommissioning
s.sch001
Requirement for written approval
s.sch001
Amendments to approved details
s.sch001
Detailed design approval
s.sch001
Detailed design parameters
s.sch001
Except with the prior written approval of the Secretary of...
s.sch001
(1) The total length of the cables comprising Work No....
s.sch001
Each monopile foundation forming part of the authorised development shall...
s.sch001
Safety management
s.sch001
Lighting
s.sch002
Reporting of engaged agents, contractors and vessels
s.sch002
Equipment and operation of vessels engaged in licensed activities
s.sch002
Pre-construction baseline
s.sch002
Construction monitoring
s.sch002
Post construction
s.sch002
Amendments to approved details
s.sch002
(1) The total length of the cables comprising Work No....
s.sch002
Notifications and inspections
s.sch002
Chemicals, drilling and debris
s.sch002
Force majeure
s.sch002
Seasonal restrictions
s.sch002
In the event that cable installation works take place between...
s.sch002
Pre-construction plans and documentation