What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

sch. 2 para. 2 sch. 2 para. 2 Regulated
  • Build turbines to the approved make, model and dimensionsStatutory Undertaker
18 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent
s.art004 Limits of deviation
s.art005 Maintenance of authorised project
s.art006 Operation of electricity generating station
s.art007 Consent to transfer benefit of Order
s.art008 Requirements, appeals
s.art009 Public rights of navigation
s.art010 Abatement of works abandoned or decayed
s.art011 Survey of works
s.art012 Deemed licence under the Marine and Coastal Access Act 2009
s.art013 Saving for
s.art014 Crown rights
s.art015 Certification of plans etc
s.art016 Arbitration
Schedules

Schedules

0 of 29 shown
29 other schedules
s.sch001 Aviation safety
s.sch001 Provision against danger to navigation
s.sch001 Archaeology above mean low water level
s.sch001 Ecological management plan above mean low water level
s.sch001 Code of construction practice
s.sch001 Construction hours
s.sch001 Decommissioning
s.sch001 Requirement for written approval
s.sch001 Amendments to approved details
s.sch001 Detailed design approval
s.sch001 Detailed design parameters
s.sch001 Except with the prior written approval of the Secretary of...
s.sch001 (1) The total length of the cables comprising Work No....
s.sch001 Each monopile foundation forming part of the authorised development shall...
s.sch001 Safety management
s.sch001 Lighting
s.sch002 Reporting of engaged agents, contractors and vessels
s.sch002 Equipment and operation of vessels engaged in licensed activities
s.sch002 Pre-construction baseline
s.sch002 Construction monitoring
s.sch002 Post construction
s.sch002 Amendments to approved details
s.sch002 (1) The total length of the cables comprising Work No....
s.sch002 Notifications and inspections
s.sch002 Chemicals, drilling and debris
s.sch002 Force majeure
s.sch002 Seasonal restrictions
s.sch002 In the event that cable installation works take place between...
s.sch002 Pre-construction plans and documentation