UK Statutory Instrument SI 2013/1873 United Kingdom

The North Blyth Biomass Power Station Order 2013

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art012 Authority to survey and investigate the land Regulated
  • Give 14 days' notice and obtain consents before surveying land, and compensate for damageStatutory Undertaker
33 other provisions — procedural and definitional
sch. 4 para. 1 sch. 4 para. 1
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent
s.art004 Procedure in relation to approvals etc under the Requirements
s.art005 Maintenance of authorised development
s.art006 Operation of generating station
s.art007 Benefit of Order
s.art008 Defence to proceedings in respect of statutory nuisance
s.art009 Street works
s.art010 Agreements with street authorities
s.art011 Discharge of water
s.art013 Compulsory acquisition of land
s.art014 Compulsory acquisition of land – incorporation of the minerals code
s.art015 Time limit for exercise of authority to acquire land compulsorily
s.art016 Compulsory acquisition of rights
s.art017 Private rights of way
s.art018 Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art019 Acquisition of subsoil only
s.art020 Acquisition of part of certain properties
s.art021 Rights under or over streets
s.art022 Statutory undertakers
s.art023 Recovery of costs of new connections
s.art024 Railway and navigation undertakings
s.art025 Application of landlord and tenant law
s.art026 Operational land for purposes of the
s.art027 Deemed licence for purposes of the
s.art028 Certification of plans etc
s.art029 Arbitration
s.art030 Crown rights
s.art031 Protective provisions
Schedules

Schedules

0 of 67 shown
67 other schedules
s.sch001 In Northumberland the construction use and maintenance of a nationally...
s.sch001 Associated development within the meaning of section 115(2) of the...
s.sch002 Interpretation
s.sch002 Earthworks and remediation
s.sch002 Ecological management
s.sch002 Code of construction practice and
s.sch002 Suppression of dust and dirt during construction
s.sch002 Construction traffic routing and management plan
s.sch002 Control of noise during construction and commissioning
s.sch002 External lighting during construction
s.sch002 Unexploded ordnance (
s.sch002 Travel plan – construction
s.sch002 Flooding – mitigation
s.sch002 Time limits
s.sch002 Flooding – warning and evacuation plan
s.sch002 Fire prevention
s.sch002 Otter mitigation strategy
s.sch002 Asbestos
s.sch002 Storage of liquids on site
s.sch002 Database of tall structures
s.sch002 Aviation safety
s.sch002 European protected species
s.sch002 Construction hours
s.sch002 Piling and vibration
s.sch002 Detailed design
s.sch002 Control of artificial light emissions
s.sch002 Control of dust emissions
s.sch002 Waste management on site
s.sch002 Travel plan and traffic management plan – operational period
s.sch002 Combined heat and power
s.sch002 Site safety and signage
s.sch002 Control of noise during operational phase
s.sch002 External storage
s.sch002 Deliveries of fuel stock by road
s.sch002 Biomass fuel sustainability
s.sch002 Highway accesses
s.sch002 Decommissioning
s.sch002 Workforce development strategy
s.sch002 Requirement for written approval
s.sch002 Amendments to approved details
s.sch002 Fencing and other means of enclosure
s.sch002 Surface and foul water drainage
s.sch002 Surface water drainage – contamination
s.sch002 Contaminated land and groundwater
s.sch002 Disposal of contaminated materials
s.sch004 Activity specific conditions
s.sch005 For the protection of Network Rail
s.sch005 The undertaker shall repay to Network Rail all reasonable fees,...
s.sch005 (1) In this paragraph— “EMI” means, subject to sub-paragraph (2),...
s.sch005 If at any time after the completion of a specified...
s.sch005 The undertaker shall not provide any illumination or illuminated sign...
s.sch005 Any additional expenses which Network Rail may reasonably incur in...
s.sch005 (1) The undertaker shall pay to Network Rail all reasonable...
s.sch005 Network Rail shall, on receipt of a request from the...
s.sch005 In the assessment of any sums payable to Network Rail...
s.sch005 The undertaker and Network Rail may, subject in the case...
s.sch005 Nothing in this Order, or in any enactment incorporated with...
s.sch005 In this Schedule— “construction” includes execution, placing, alteration and reconstruction...
s.sch005 The undertaker shall give written notice to Network Rail if...
s.sch005 The undertaker shall no later than 28 days from the...
s.sch005 (1) Where, under this Schedule, Network Rail is required to...
s.sch005 (1) The undertaker shall not exercise the powers conferred by...
s.sch005 (1) The undertaker shall before commencing construction of any specified...
s.sch005 (1) Any specified work and any protective works to be...
s.sch005 The undertaker shall— (a) at all times afford reasonable facilities...
s.sch005 Network Rail shall at all times afford reasonable facilities to...
s.sch005 (1) If any permanent or temporary alterations or additions to...

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.