UK Statutory Instrument SI 2013/1203 United Kingdom

The Galloper Wind Farm Order 2013

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker3 Licence Holder1 Any Person1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts
Licence Holder — also bound by 225 other Acts
Any Person — also bound by 2340 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art015 Authority to survey and investigate the land Regulated
  • Give 14 days' notice before surveying land and compensate for damageStatutory Undertaker
34 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Development consent
s.art004 Maintenance of authorised project
s.art005 Operation of an offshore electricity generating station and keeping of overhead lines
s.art006 Requirements, appeals, etc.
s.art007 Benefit of the Order
s.art008 Public rights of navigation
s.art009 Abatement of works abandoned or decayed
s.art010 Deemed licence under the Marine and Coastal Access Act 2009
s.art011 Saving for
s.art012 Crown rights
s.art013 Street works
s.art014 Agreements with street authorities
s.art016 Compulsory acquisition of land
s.art017 Time limit for exercise of authority to acquire land compulsorily
s.art018 Compulsory acquisition of rights
s.art019 Private rights
s.art020 Application of the Compulsory Purchase (Vesting Declarations) Act 1981
s.art021 Acquisition of subsoil only
s.art022 Rights under or over streets
s.art023 Temporary use of land for carrying out the authorised project
s.art024 Temporary use of land for maintaining authorised project
s.art025 For the protection of specified undertakers
s.art026 Statutory undertakers
s.art027 Recovery of costs of new connections
s.art028 Application of landlord and tenant law
s.art029 Operational land for purposes of the
s.art030 Certification of plans etc.
s.art031 Arbitration
Schedules

Schedules

4 of 57 shown
s.sch002 Reporting of engaged agents, contractors and vessels Regulated
  • Report agents, contractors, and vessels to the MMO before and during constructionStatutory Undertaker
s.sch002 Equipment and operation of vessels engaged in licensed activities Regulated
  • Equip and operate vessels properly for licensed wind farm activitiesLicence Holder
s.sch002 Notifications and inspections Regulated
  • Distribute licence, collect confirmations, and manage inspections and noticesStatutory Undertaker
s.sch002 Force majeure Regulated
  • Notify MMO in writing within 48 hours when depositing material outside Order limits due to stress of weatherAny Person
53 other schedules
s.sch001 Aids to navigation
s.sch001 The undertaker shall ensure that timely and efficient notices to...
s.sch001 The undertaker shall notify Trinity House, in writing, as soon...
s.sch001 The undertaker shall provide reports on the availability of aids...
s.sch001 The undertaker shall notify the UK Hydrographic Office, in writing,...
s.sch001 (1) The undertaker shall colour all structures yellow starting at...
s.sch001 (1) The undertaker shall exhibit such lights, with such shape,...
s.sch001 Provision against danger to navigation
s.sch001 Offshore decommissioning
s.sch001 Stages of authorised development onshore
s.sch001 Detailed design approval onshore
s.sch001 (1) The connection works and the transmission works shall be...
s.sch001 Provision of landscaping
s.sch001 Implementation and maintenance of landscaping
s.sch001 Fencing and other means of enclosure
s.sch001 Surface and foul water drainage
s.sch001 Archaeology
s.sch001 Ecological management plan
s.sch001 Construction code of practice
s.sch001 Construction hours
s.sch001 Control of noise during operational phase
s.sch001 Control of artificial light emissions
s.sch001 Detailed emergency response plan
s.sch001 European protected species
s.sch001 Restoration of land used temporarily for construction
s.sch001 Interference with telecommunications
s.sch001 Onshore decommissioning
s.sch001 Requirement for written approval
s.sch001 Amendments to approved details
s.sch001 Approval of detailed wind turbine design parameters by the Secretary of State
s.sch001 Further offshore design requirements
s.sch001 (1) The total number of offshore substation platforms, accommodation platforms...
s.sch001 (1) The number of cables forming part of the authorised...
s.sch001 (1) Each monopile foundation forming part of the authorised development...
s.sch001 Offshore safety management
s.sch002 Pre-construction plans and documentation
s.sch002 The undertaker shall ensure that a copy of any agreed...
s.sch002 (1) Except with the prior approval of the MMO, each...
s.sch002 Seasonal restrictions
s.sch002 Pre-construction monitoring
s.sch002 Construction monitoring
s.sch002 Post construction
s.sch002 Offshore decommissioning
s.sch002 Requirement for written approval
s.sch002 (1) The total number of offshore substation platforms, accommodation platforms...
s.sch002 (1) The number of cables forming part of the authorised...
s.sch002 (1) Each monopile foundation forming part of the authorised scheme...
s.sch002 Chemicals, drilling and debris
s.sch006 (1) If, in the exercise of the powers conferred by...
s.sch006 (1) Where, in accordance with the provisions of this Schedule,...
s.sch006 (1) Not less than 28 days before starting the execution...
s.sch006 (1) If in consequence of the exercise of the powers...
s.sch006 (1) Subject to sub-paragraphs (2) and (3), if by reason...

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.