UK Statutory Instrument SI 1999/2981 United Kingdom

The River Thames (Hungerford Footbridges) Order 1999

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Statutory Undertaker1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Statutory Undertaker — also bound by 179 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art014 Power to survey and investigate land Regulated
  • Give at least 7 days' notice before entering land to survey or investigateStatutory Undertaker
36 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Power to construct works
s.art004 Power to deviate
s.art005 Power to execute street works
s.art006 Stopping up of streets and extinguishment of rights
s.art007 Temporary stopping up of streets
s.art008 Access to works
s.art009 Construction and maintenance of new or altered streets
s.art010 Dedication and maintenance of highways
s.art011 Agreements with street authorities
s.art012 Discharge of Water
s.art013 Safeguarding works to buildings
s.art015 Power to acquire land
s.art016 Application of Part I of Compulsory Purchase Act 1965
s.art017 Power to acquire new rights
s.art018 Power to acquire subsoil only
s.art019 Vesting declarations
s.art020 Temporary use of land for construction of works
s.art021 Temporary use of land for maintenance of works
s.art022 Disregard of certain interests and improvements
s.art023 Acquisition of part of certain properties
s.art024 Extinguishment and suspension of private rights of way
s.art025 Use of subsoil
s.art026 Time limit for exercise of powers of acquisition
s.art027 Saving for
s.art028 Protection of certain persons
s.art029 Statutory undertakers,
s.art030 Regulation of footways
s.art031 Application, modification and exclusion of miscellaneous enactments
s.art032 Repeal of enactments
s.art033 Certification of plans, etc.
s.art034 Service of notices
s.art035 No double recovery
s.art036 Arbitration
s.art037 Byelaws
Schedules

Schedules

0 of 91 shown
91 other schedules
s.sch001 In the City of Westminster and the London Borough of Lambeth
s.sch007 The enactments for the time being in force with respect...
s.sch007 (1) Without prejudice to the generality of paragraph 1 above,...
s.sch007 In section 44 (compensation for injurious affection), as it applies...
s.sch007 (1) The 1965 Act shall have effect with the modifications...
s.sch007 For section 7 of the 1965 Act (measure of compensation)...
s.sch007 For section 8 of the 1965 Act (provision as to...
s.sch007 The following provisions of the 1965 Act (which state the...
s.sch007 Section 11 of the 1965 Act (powers of entry) shall...
s.sch007 Section 20 of the 1965 Act (protection for interests of...
s.sch007 Section 22 of the 1965 Act (protection of acquiring authority’s...
s.sch009 For the protection of the Environment Agency (in this Schedule...
s.sch009 The undertaker shall indemnify the Agency in respect of all...
s.sch009 (1) Without prejudice to the other provisions of this Schedule,...
s.sch009 The fact that any work or thing has been executed...
s.sch009 (1) Unless the parties agree to arbitration under article 36...
s.sch009 In this Schedule— “construction” shall include execution, placing, altering, replacing,...
s.sch009 (1) Before beginning to construct the specified works and again...
s.sch009 (1) Before beginning to construct any specified work, the undertaker...
s.sch009 Without prejudice to the generality of paragraph 4 above, the...
s.sch009 (1) Any specified work, and all protective works required by...
s.sch009 (1) Subject to the provisions of this Schedule and except...
s.sch009 If by reason of the construction of any specified work...
s.sch009 (1) Without prejudice to the other provisions of this Schedule,...
s.sch010 (1) The following provisions of this Part of this Schedule...
s.sch010 All temporary works and equipment erected or placed by the...
s.sch010 The undertaker shall not provide any illumination or illuminated sign...
s.sch010 (1) The undertaker shall pay to Railtrack PLC a sum...
s.sch010 The undertaker and Railtrack PLC may enter into, and carry...
s.sch010 Any provision of an agreement entered into under paragraph 13...
s.sch010 Any difference arising between the undertaker and Railtrack PLC under...
s.sch010 The provisions of this Part of this Schedule shall, unless...
s.sch010 (1) In this Part of this Schedule— “construction” shall include...
s.sch010 (1) The undertaker shall not commence tidal works until it...
s.sch010 (1) The undertaker shall mark and light the tidal works...
s.sch010 (1) The undertaker shall not under the powers conferred by...
s.sch010 (1) Before the construction of the tidal works is commenced...
s.sch010 (1) Save to the extent permitted by any approval of...
s.sch010 (1) The undertaker shall be responsible for and make good...
s.sch010 Any difference arising between the undertaker and the Port Authority...
s.sch010 (1) The provisions of this Part of this Schedule shall,...
s.sch010 The temporary stopping up or diversion of any street under...
s.sch010 If BT suffers damage in consequence of the construction, use...
s.sch010 Nothing in this Order shall affect any right of a...
s.sch010 The provisions of this Part of this Schedule shall have...
s.sch010 In this Part of this Schedule— “approval” in relation to...
s.sch010 (1) The undertaker shall before commencing construction of any authorised...
s.sch010 (1) The undertaker shall not under the powers conferred by...
s.sch010 (1) The undertaker shall, before commencing the specified works, furnish...
s.sch010 (1) The undertaker shall give to the engineer not less...
s.sch010 Without prejudice to the generality of paragraphs 31 and 32...
s.sch010 The undertaker shall at all times afford reasonable facilities to...
s.sch010 During the construction of any part of the specified works...
s.sch010 (1) If any alterations or additions either permanent or temporary,...
s.sch010 The undertaker shall repay to any protected person all costs,...
s.sch010 (1) The undertaker shall be responsible for and make good...
s.sch010 Any difference arising between the undertaker and a protected person...
s.sch010 Specified works (and any protective works specified by the engineer...
s.sch010 The provisions of this Part of this Schedule shall take...
s.sch010 In this Part of this Schedule— “construction” shall include reconstruction,...
s.sch010 (1) The undertaker shall not under the powers conferred by...
s.sch010 (1) The undertaker shall, before commencing the specified works, furnish...
s.sch010 (1) The undertaker shall give to the engineer not less...
s.sch010 Without prejudice to the generality of paragraphs 43 and 44...
s.sch010 The undertaker shall at all times afford reasonable facilities to...
s.sch010 During the construction of any part of the specified works...
s.sch010 (1) If any alterations or additions either permanent or temporary,...
s.sch010 The undertaker shall repay to LRT all costs, charges and...
s.sch010 The undertaker shall— (a) at all times afford reasonable facilities...
s.sch010 (1) The undertaker shall be responsible for, and make good...
s.sch010 Any difference between the undertaker and LRT under this Part...
s.sch010 (1) If any alterations or additions, either permanent or temporary,...
s.sch010 The undertaker shall repay to Railtrack PLC all reasonable fees,...
s.sch010 (1) If at any time after the completion of the...
s.sch010 Where so required by the engineer, the undertaker shall, to...
s.sch011 (1) Sections 271 to 274 of the 1990 Act (power...
s.sch011 (1) Where a street is stopped up under article 6...
s.sch011 (1) Subject to the following provisions of this paragraph, the...
s.sch012 This Schedule has effect for the regulation of such part...
s.sch012 In this Schedule— “footway” means such part of the authorised...
s.sch012 The undertaker may make arrangements for— (a) the maintenance, cleansing...
s.sch012 Except in the case of an emergency, not less than...
s.sch012 Where it is necessary for the undertaker to make any...
s.sch012 A notice displayed pursuant to paragraph 4(a) above shall specify—...
s.sch012 The period specified in a notice under paragraph 6(b) above...
s.sch012 The undertaker shall use its best endeavours to ensure that...
s.sch012 Where any representations are made to the undertaker in relation...
s.sch013 Section 27(2) of the Thames Embankment (North and South) Act...
s.sch013 The following provisions of the Port of London Act 1968,...
s.sch014 For any period during which the undertaker is, pursuant to...
s.sch014 On the dedication as a highway of either Work No....

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.