Quick checklist for SME developers submitting minor residential applications (1-9 dwellings). Skip the explanation - get straight to what you need to do.

Construction & Property Starting Updated 3 November 2026

Small site planning checklist

This is a fast-track checklist for experienced developers. If you need detailed explanations, see the full guides linked throughout.

Before application

Permitted development check

  • ☐ Checked if proposal qualifies as permitted development (prior approval)
  • ☐ Checked for Article 4 directions removing PD rights
  • ☐ If PD applies, submit prior approval application (not full planning)

Site constraints

  • ☐ Checked local plan designations (such as housing, green belt)
  • ☐ Checked conservation area / listed building status
  • ☐ Checked Tree Preservation Orders
  • ☐ Checked flood zone (use EA flood map)
  • ☐ Checked nutrient neutrality catchment (27 catchments)

Show your development is nutrient neutral

If your development adds homes or other overnight accommodation in one of 27 nutrient-affected catchments in England, the council can grant permission only once it is satisfied the scheme adds no nutrient pollution.

Application documents

Always required

  • ☐ Completed application form (online via Planning Portal)
  • ☐ Location plan (1:1250/1:2500) - red line site, blue line other ownership
  • ☐ Site plan (1:200/1:500)
  • ☐ Floor plans and elevations
  • ☐ Ownership certificate (A, B, C or D)
  • ☐ Agricultural holdings certificate
  • ☐ Correct fee paid

Often required (check local validation list)

  • ☐ Planning statement
  • ☐ Design and Access Statement (if in conservation area)
  • ☐ Biodiversity Gain Plan and metric
  • ☐ Tree survey (if trees on/adjacent to site)
  • ☐ Flood Risk Assessment (if in flood zone or >1ha)
  • ☐ Nutrient Neutrality Statement (if in affected catchment)

Biodiversity net gain

Exemption check

  • ☐ Self-build or custom build (up to 9 dwellings, site no larger than 0.5ha) with the application made before 6 August 2026 → exempt
  • ☐ Householder application → exempt
  • ☐ Impact under 25sqm habitat AND under 5m linear habitat AND no priority habitat affected → exempt (de minimis)
  • ☐ Site of 0.2ha or under, application made on or after 6 August 2026, no onsite priority habitat affected → exempt
  • ☐ Temporary development (permission for 5 years or less), application made on or after 6 August 2026, no onsite priority habitat affected → exempt

If BNG applies

  • ☐ Baseline survey completed (within 2 years)
  • ☐ Small Sites Metric completed
  • ☐ Post-development biodiversity value calculated
  • ☐ 10% net gain achieved (on-site preferred)
  • ☐ Biodiversity Gain Plan prepared

BNG for small sites

Simplified BNG compliance for minor development

Key timescales

Minor application determination8 weeks
Condition discharge8 weeks
Appeal deadline (householder)12 weeks
Appeal deadline (other minor)6 months
Permission validity3 years (unless stated)

Before starting work

  • ☐ All pre-commencement conditions discharged IN WRITING
  • ☐ CIL Assumption of Liability submitted
  • ☐ CIL exemptions claimed (if applicable)
  • ☐ Commencement Notice submitted (CIL)
  • ☐ Party wall notices served (if applicable)
  • ☐ Building control application/notice submitted

Discharge planning conditions

Step-by-step condition discharge guide

Full guides

For detailed guidance on any of these topics:

Planning for small sites

Complete guide for minor development

Apply for planning permission

Step-by-step application guide