Small site planning checklist
This is a fast-track checklist for experienced developers. If you need detailed explanations, see the full guides linked throughout.
Before application
Permitted development check
- ☐ Checked if proposal qualifies as permitted development (prior approval)
- ☐ Checked for Article 4 directions removing PD rights
- ☐ If PD applies, submit prior approval application (not full planning)
Site constraints
- ☐ Checked local plan designations (such as housing, green belt)
- ☐ Checked conservation area / listed building status
- ☐ Checked Tree Preservation Orders
- ☐ Checked flood zone (use EA flood map)
- ☐ Checked nutrient neutrality catchment (27 catchments)
Check if nutrient neutrality affects you
List of affected catchments
Application documents
Always required
- ☐ Completed application form (online via Planning Portal)
- ☐ Location plan (1:1250/1:2500) - red line site, blue line other ownership
- ☐ Site plan (1:200/1:500)
- ☐ Floor plans and elevations
- ☐ Ownership certificate (A, B, C or D)
- ☐ Agricultural holdings certificate
- ☐ Correct fee paid
Often required (check local validation list)
- ☐ Planning statement
- ☐ Design and Access Statement (if in conservation area)
- ☐ Biodiversity Gain Plan and metric
- ☐ Tree survey (if trees on/adjacent to site)
- ☐ Flood Risk Assessment (if in flood zone or >1ha)
- ☐ Nutrient Neutrality Statement (if in affected catchment)
Biodiversity net gain
Exemption check
- ☐ Self-build for own occupation → exempt
- ☐ Householder application → exempt
- ☐ Impact under 25sqm habitat AND under 5m linear habitat AND no priority habitat affected → exempt (de minimis)
- ☐ Site of 0.2ha or under → exemption confirmed 15 April 2026 but NOT yet in force (expected ~end July 2026, with a priority-habitat carve-out) - until then BNG still applies
If BNG applies
- ☐ Baseline survey completed (within 2 years)
- ☐ Small Sites Metric completed
- ☐ Post-development biodiversity value calculated
- ☐ 10% net gain achieved (on-site preferred)
- ☐ Biodiversity Gain Plan prepared
BNG for small sites
Simplified BNG compliance for minor development
Key timescales
| Minor application determination | 8 weeks |
| Condition discharge | 8 weeks |
| Appeal deadline (householder) | 12 weeks |
| Appeal deadline (other minor) | 6 months |
| Permission validity | 3 years (unless stated) |
Before starting work
- ☐ All pre-commencement conditions discharged IN WRITING
- ☐ CIL Assumption of Liability submitted
- ☐ CIL exemptions claimed (if applicable)
- ☐ Commencement Notice submitted (CIL)
- ☐ Party wall notices served (if applicable)
- ☐ Building control application/notice submitted
Discharge planning conditions
Step-by-step condition discharge guide
Full guides
For detailed guidance on any of these topics:
Planning for small sites
Complete guide for minor development
Apply for planning permission
Step-by-step application guide