Your site is in a nutrient-affected catchment and you cannot get planning permission. This guide explains your options for achieving neutrality and moving your project forward.
Stuck on nutrient neutrality?
If your site is in one of the 27 nutrient-affected catchments, you cannot get planning permission without demonstrating neutrality. There is no exemption for small sites.
This guide helps you understand your options and find a way forward.
-
Confirm you're affected
First, verify that nutrient neutrality really is your blocker:
- ☐ Site is within affected catchment boundary (not just near it)
- ☐ Development involves overnight accommodation (residential, hotel, care home)
- ☐ LPA has confirmed nutrient neutrality requirement applies
Check if nutrient neutrality affects you
How to confirm your site is affected
-
Understand your options
Option 1: Buy mitigation credits
Natural England Nutrient Mitigation Scheme
- Available in some catchments (Tees, Poole Harbour, others being developed)
- Cost: about £2,700-3,250 per kg of nitrogen (Tees and Poole Harbour catchments; prices are set per catchment and application round and change over time - check the current figures on the relevant gov.uk catchment page before budgeting)
- Simple and certain - once bought, you have proof of mitigation
- Limitation: Not available in all catchments, may have limited supply
Option 2: Private mitigation schemes
- Some private providers offer nutrient credits
- May be available where NE scheme is not
- Due diligence required - ensure scheme is LPA-accepted
- Costs vary - shop around
Option 3: On-site mitigation
- Enhanced wastewater treatment (package treatment plants)
- Constructed wetlands for polishing
- SuDS with nutrient capture
- Requires technical design and ongoing maintenance
Option 4: Land use change
- Convert agricultural land to low-nutrient use (woodland, permanent grassland)
- Must be within same catchment
- Requires long-term management commitment
- May require separate land holding
Option 5: Wait for wastewater upgrades
- Water companies must upgrade treatment works by April 2030
- Once upgraded, developments connecting to that works may not need separate mitigation
- Risk: 4+ years wait, no guarantee it solves your specific catchment
Option 6: The Nature Restoration Fund (coming, not yet live)
- The Planning and Infrastructure Act 2025 (Royal Assent 18 December 2025) creates a Nature Restoration Fund and Environmental Delivery Plans (EDPs)
- In time, you may be able to pay into a strategic fund instead of demonstrating site-by-site neutrality
- Enacted but not yet operational: as of mid-2026 no EDP is in force, so per-site neutrality still applies
- Natural England has notified an intention to prepare nutrient-pollution EDPs, expected to be consulted on during 2026 - check the current position with your LPA
-
Calculate your costs
Typical nutrient load for residential development:
- Single dwelling: about 0.8-1.2 kg nitrogen/year
- 10-unit scheme: about 8-12 kg nitrogen/year
At around £3,000 per kg (current Natural England credit pricing), a 10-unit scheme might cost £24,000-36,000 for nutrient mitigation.
-
Take action
- Contact your LPA: Understand their specific requirements and any local schemes
- Calculate your budget: Use Natural England's calculator for your catchment
- Explore mitigation options: Get quotes from NE, private providers, and technical consultants
- Secure mitigation before application: You need committed mitigation, not just plans
- Prepare your statement: Document everything in your Nutrient Neutrality Statement
Nutrient neutrality compliance
Complete guide to achieving and demonstrating neutrality