Give a landlord's certificate for building safety costs in England

As a landlord in a relevant building in England, you must give a leaseholder a landlord's certificate when you demand a remediation service charge and in other cases. Without a compliant certificate, the developer test is treated as met and relevant measures cannot be charged. Some barred costs are recoverable from other landlords.

Construction & Property England

Know the terms the duties use

A relevant building is a self-contained building, or a self-contained part of a building, in England that contains at least two dwellings and either is at least 11 metres high or has at least 5 storeys. It is not a relevant building if tenants have exercised the right of first refusal under Part 1 or the right of compulsory acquisition under Part 3 of the Landlord and Tenant Act 1987 in relation to it, if the right to collective enfranchisement has been exercised, if its freehold is leaseholder owned, meaning solely owned by tenants in the building through a corporate structure or otherwise (and none of the other exclusions applies), or if it is on commonhold land. A relevant defect is a defect in the building that arises from anything done or not done, or used or not used, in connection with relevant works, and that causes a building safety risk. Relevant works are construction or conversion of the building, or works undertaken or commissioned by or on behalf of a landlord under a lease of the building or any part of it, or of a person party to such a lease otherwise than as landlord or tenant, completed in the relevant period, which is the 30 years ending with 28 June 2022, and later works to remedy a relevant defect. A building safety risk is a risk to the safety of people in or about the building from the spread of fire or the collapse of the building or any part of it. A relevant measure is a measure taken to remedy the defect, or a relevant step taken in relation to it, meaning a step whose purpose is to prevent or reduce the likelihood of a fire or collapse resulting from the defect, to reduce the severity of such an incident, or to prevent or reduce harm to people in or about the building.

A qualifying lease is a long lease of a single dwelling in a relevant building, granted before 14 February 2022, under which the tenant is liable to pay a service charge. A long lease is granted for a term of years certain exceeding 21 years, whether or not it can end earlier by notice, re-entry, forfeiture or otherwise. The lease qualifies only if, at the start of 14 February 2022, which is the qualifying time, at least one of these was true: the dwelling was a relevant tenant's only or principal home, a relevant tenant owned no other dwelling in the United Kingdom, or a relevant tenant owned no more than two dwellings in the United Kingdom apart from their interest under the lease. A person owns a dwelling in England, Wales or Northern Ireland if they hold the freehold or are a tenant under a long lease of it. A relevant tenant is a tenant, or any of the tenants, under the lease at the qualifying time. Where a dwelling was let at the qualifying time under two or more long leases, each with a service charge payable by the tenant, a lease superior to any of the others is not a qualifying lease. A connected replacement lease, as section 119A of the Building Safety Act 2022 defines it, is a qualifying lease.

Schedule 8 to the Building Safety Act 2022 also has rules on lease value, caps, cladding remediation, legal costs and shifting costs between tenants. A relevant reserve fund is a trust fund under section 42 of the Landlord and Tenant Act 1987, an express trust of the kind that section describes, or any other fund of payments by the tenant and others held to meet costs of the building or part of it. A resident management company is a body corporate party to a lease of the building that is limited by guarantee with leaseholders as members, or has a majority of its shares held by leaseholders.

Developer test

Under a lease of any premises in a relevant building, no service charge is payable for a relevant measure relating to a relevant defect if a relevant landlord is responsible for the relevant defect or is associated with a person responsible for it. A relevant landlord here is the landlord under the lease at the qualifying time or any superior landlord at that time.

A person is responsible for the defect in these cases:

  • for an initial defect, which is a relevant defect arising from construction or conversion works completed in the relevant period, if the person was the developer, was in a joint venture with the developer, or undertook or commissioned works relating to the defect
  • for any other defect, if the person undertook or commissioned works relating to the defect

The developer is the person who undertook or commissioned the construction or conversion of the building, or part of it, with a view to granting or disposing of interests in it. A joint venture includes a partnership.

A partnership or body corporate is associated with another person in these cases:

  • a partnership is associated with a person who was a partner in it, other than a limited partner, at any time in the 5 years ending at the qualifying time
  • a body corporate is associated with a person who was a director of it at any time in that period
  • a body corporate is associated with another body corporate if a person was a director of both at any time in that period, or if at the qualifying time one controlled the other or a third body corporate controlled both
  • where a person's interest in the building was held on trust at the qualifying time, a partnership or body corporate that was a beneficiary of the trust then is associated with that person

Control has the meaning given in section 121 of the Building Safety Act 2022.

Contribution condition

Under a qualifying lease, no service charge is payable for a relevant measure relating to any relevant defect if the landlord under the lease at the qualifying time met the contribution condition. The condition is met if the landlord group's net worth at the qualifying time was more than N x £2,000,000. N is the number of relevant buildings in which a member of the landlord group was, at that time, a landlord under a lease of the building or any part of it.

The landlord group is that landlord and anyone associated with it. For this test only, a person is not in the group if the only link is that a person was a director of the landlord, or that the landlord and another body corporate had a common director. The test does not apply if the landlord at the qualifying time was a private registered provider of social housing, a local authority, a government department or other arm's length body, the Crown, or an NHS foundation trust.

Regulation 5 of the Building Safety (Leaseholder Protections) (England) Regulations 2022 sets the net worth rules. Where the relevant landlord is a private or public limited company, it is total assets less total liabilities and intangible assets, taken from the group's most recent accounts audited or filed after 14 February 2017 and before 14 February 2022. Where the relevant landlord is an individual, it is assets less liabilities, and both the assets and the liabilities include those of the landlord's spouse or civil partner at the qualifying time. Accounts in another currency are converted into sterling at the Bank of England daily spot rate on 14 February 2022. Where the relevant landlord is more than one person, those persons are jointly the relevant landlord. Its net worth is the sum of the net worth of each person and their associates, and its relevant buildings are all those that each person or their associates own, leasehold or freehold.

Landlord's certificate

If you are a current landlord, meaning a landlord under a lease of premises in a relevant building, you must give a leaseholder a landlord's certificate in each of these circumstances. A leaseholder is a tenant under a lease of a dwelling in a building.

  • when you demand payment of a remediation service charge, which is a service charge that includes a charge for a relevant measure relating to a relevant defect
  • within four weeks of the leaseholder notifying you that the leasehold interest is to be sold
  • within four weeks of becoming aware, either yourself or by notification from another person, of a relevant defect not covered by an earlier landlord's certificate
  • within four weeks of the leaseholder asking for one
  • within four weeks of becoming aware of a new leaseholder deed of certificate for a dwelling in a building where you are the landlord, if it contains information not in an earlier landlord's certificate

The certificate must be in the form in Schedule 1 to the Building Safety (Leaseholder Protections) (England) Regulations 2022 and be signed by the person who is the current landlord on the date it is completed. It must confirm whether the landlord at the qualifying time met the contribution condition, and whether a relevant landlord, meaning that landlord or a superior landlord then, was responsible for the defect or associated with a person responsible for it.

It must also give the following information:

  • the share of the building's storeys each relevant landlord held at the qualifying time
  • where a relevant landlord was part of a landlord group at the qualifying time, the group's corporate structure, including the companies, their beneficial owners (and, where a beneficial owner is or includes a trust, foundation or similar arrangement, details of the trust and the trustees), their directors and the directors of each corporate trustee (including nominee and shadow directors), and anyone else with significant control or influence over the group
  • where a relevant landlord was part of a landlord group at the qualifying time and a trust is involved, the trust's type, governing law and tax residence and, for a trust with an interest in shares of a company in the group, its economic settlor, named beneficiaries or class, protector and anyone else with significant influence or control over it

The certificate must be accompanied by this evidence:

  • the company accounts for the relevant landlord and, where it is part of a landlord group, each company in the group
  • a statement from a chartered accountant or finance director of the landlord company setting out the net worth of the relevant landlord and of each company in the group and confirming that it is calculated under regulation 5 and paragraph 3 of Schedule 8 and is accurate
  • documents or receipts showing that the building was constructed or converted before the relevant period, and details of any relevant works carried out in the relevant period
  • where applicable, evidence that the person who undertook or commissioned the works was not the relevant landlord or associated with it, with that person's identity and, for a joint venture, proof that the relevant landlord was not a party and details of the parties
  • details of any relevant defects, and of any relevant measures taken in relation to them, since 28 June 2017
  • details of costs paid or due since 28 June 2017 for relevant measures, including the total, the number of flats between which they should be divided and the leaseholder's maximum remaining liability, meaning the capped amount payable less payments since 28 June 2017

None of that information or evidence is required where the certificate confirms that the contribution condition was met or that the lease is not a qualifying lease, and confirms either that a relevant landlord was responsible for the defect or associated with a person responsible for it, or that the relevant landlord did not believe, when the certificate was completed, that a relevant defect existed. Other combinations reduce what must be supplied, and the Regulations set out each.

If you cannot provide any of the information or evidence, you must ask the other relevant landlords for it. A relevant landlord must give you the share of storeys it held and, where it was part of a landlord group at the qualifying time, the group's corporate structure details, within 3 weeks of your request.

Within one week of giving a certificate to a leaseholder, you must give a copy to any other landlord of premises in the building and to the resident management company, right to manage company or named manager. A named manager is a person named in a lease as the party with managing and repairing obligations who is a separate legal person from the freeholder and any landlord of the building or part of it. If you do not give the copy, the costs of relevant measures relating to relevant defects in that building are not relevant costs for service charge purposes and must not be met from a relevant reserve fund.

If you do not provide a leaseholder with a certificate that complies with those Regulations, the condition in the developer test is treated as met for that lease, in accordance with paragraph 14(2) of Schedule 8, and no service charge is payable for the relevant measure under that test. The landlord at the qualifying time under a qualifying lease is treated, for the purposes of Schedule 8, as having met the contribution condition unless the landlord under the lease gives the tenant a certificate, complying with any prescribed requirements, that it did not.

Leaseholder deed of certificate

If you are a landlord under a long lease of a single dwelling in a relevant building with a service charge, granted before 14 February 2022, you must give the leaseholder a written notice asking for a leaseholder deed of certificate, as the Building Safety (Leaseholder Protections) (Information etc.) (England) Regulations 2022 (the Information Regulations) require. You must give it before the notification date, which is 5 days after you become aware that the leaseholder's interest is to be sold or that there is a relevant defect in the building. You need not give it if you received a deed for that lease before the notification date.

The notice must state that it is for the purposes of paragraphs 13 and 15 of Schedule 8, include the form of the deed, and give a reply date at least 8 weeks after the leaseholder receives it, with the address for the reply. It must also state that failure to provide a completed deed and the required evidence will result in the lease being treated, for the purposes of sections 116 to 122 of the Building Safety Act 2022, as if it were not a qualifying lease, may result in an assumed 100% share where the lease is a shared ownership lease, and may result in a higher value being used for the lease.

You must leave the notice at the leaseholder's address or send it there by prepaid first class post, and email it if the leaseholder has given you an email address. You may not charge the leaseholder for sending any notice. If you have had no reply by 14 days before the reply date, you must send a further notice no later than 7 days before the reply date, and telephone the leaseholder, if you have a number, to draw it to their attention. The further notice must state that no reply has been received, set out the reply date and say that the leaseholder may ask for an extra four weeks. Like the first notice, it must state its purpose, include the form of the deed, carry the consequences statement and be delivered in the same way. If the leaseholder asks before the reply date, you must allow an extra four weeks from the reply date. Within one week of receiving a deed, you must give a copy to any resident management company, right to manage company or named manager. If you do not, the costs of relevant measures relating to relevant defects in that building are not relevant costs for service charge purposes and must not be met from a relevant reserve fund.

If you are the leaseholder, you must by the reply date, or by the end of the extra four weeks if you asked for them before the reply date, either give the landlord a deed of certificate, executed as a deed in the form in the Schedule to the Information Regulations, with the required evidence, or reply in writing that you will not provide one. Where the dwelling was disposed of on the open market before 14 February 2022, the evidence is proof of the most recent sale before that date, including an official copy of the register of title showing the date of sale and proof of the price paid at completion. For a dwelling held on a shared ownership lease at the start of 14 February 2022, it also includes a copy of the lease and proof of the percentage share held then.

A long lease of a single dwelling in a relevant building, with a service charge, granted before 14 February 2022, is treated, for the purposes of Schedule 8, as a qualifying lease unless the landlord under the lease has taken all reasonable steps, and any prescribed steps, to obtain a qualifying lease certificate from a tenant under it and none has been provided to the landlord. A qualifying lease certificate is a certificate, complying with any prescribed requirements, that at the qualifying time the dwelling was a relevant tenant's only or principal home, or that a relevant tenant owned no other dwelling in the United Kingdom, or no more than two apart from their interest under the lease.

Recover a barred cost from other landlords

If you are a landlord, resident management company, right to manage company or named manager that has paid, or is liable to pay, the cost of a relevant measure that paragraph 2, 3, 4 to 9 or 11 of Schedule 8 stops you charging to a tenant, regulations let you recover it from other landlords.

  • Where the developer test bars the charge, the responsible landlord is liable to pay you. That is the person who, at the start of 14 February 2022, was the tenant's landlord or a superior landlord and was responsible for the defect or associated with a person responsible for it, or who later became owner of that interest. Where two or more persons are responsible landlords in relation to a particular relevant defect, each is jointly and severally liable. You must give a notice to at least one of them and, where two or more landlords are liable, at least one notice must go to a landlord that meets the responsible for criteria in paragraph 2(3) of Schedule 8, not only to one that is associated with a person responsible. Only a responsible landlord who has been given a notice can be required to pay.
  • Where the contribution condition bars the charge on a qualifying lease, the contributing landlord is liable to pay you. That is the landlord under the qualifying lease that met the contribution condition on 14 February 2022, or whoever later became owner of that interest. You must give it a notice.
  • Where the low-value, cap, cladding or legal costs rule, or the rule against shifting costs between tenants, bars the charge, each landlord under any lease in the building is liable to pay you a share. A type 1 owner, with the freehold or a long lease of 90% or more of the storeys, bears three shares, a type 2 owner, with a long lease of more than 40% but less than 90%, bears two, and a type 3 owner, with a long lease of 40% or less, bears one. A landlord's share of the amount you paid or are liable to pay is its shares divided by the total of three times the number of type 1 owners, twice the number of type 2 owners and the number of type 3 owners. A part-storey interest counts as the whole storey, and ownership is measured at the date of the notice. You must give each landlord a notice that also states the amount it must pay and how it was calculated.

Each notice must state the amount you have paid or expect to pay, the time limit for appealing to the First-tier Tribunal and for applying to extend it, and the possible grounds of appeal. The amount you claim under one route cannot include an amount you are entitled to recover under another, though you can seek to recover under another route. An amount payable to you is recoverable as a civil debt.

A person notified of a requirement to pay can appeal to the First-tier Tribunal within 30 days of the notification, specifying the grounds, and can apply within the same 30 days for an extension, which the Tribunal may grant by no more than 30 days. The grounds are that the amount is not the cost of the relevant measure, and that the person is not the responsible landlord or the contributing landlord, as the case requires, or, in the shares case, a landlord under a lease of the building or a superior landlord. In the shares case, a third ground is that the share is incorrect.