What this covers (1 activity descriptions)
  • Installation of sun filter mounting on buildings

What you must comply with

Applies to all other specialised construction activities

inspection

Health and Safety at Work etc. Act 1974

HSE
Ongoing

General duties to employees and others. HSENI enforces in Northern Ireland.

notification

CDM Regulations 2015

HSE
Per_Project

Notification required for projects lasting >30 working days with >20 workers, or >500 person-days.

reporting

CITB Levy

Annual

Exempt if total wage bill <£120,000. Micro employers mostly exempt.

certification

CSCS Card (Construction Skills Certification Scheme)

Periodic

Industry standard, not a legal requirement, but most major sites require it.

insurance

Employers' Liability Insurance

HSE
Annual

Required for all employers. Sole traders with no employees exempt.

Guidance for this activity

Aggregate Levy for construction businesses

Current Aggregate Levy rate, registration requirements, exemptions for recycled and secondary aggregates, returns and payment deadlines, and the interaction between Aggregate Levy and Construction Industry Scheme (CIS) deductions.

Sector-Specific
Read guide

Building Safety Levy for developers

How the Building Safety Levy affects residential developers in England. Covers exemptions for small sites, rates, timing, and planning for levy costs. Essential reading for SME housebuilders and developers of new residential buildings.

Sector-Specific
Read guide

Adopt new sewers under Section 104

How to get new sewers adopted by the water and sewerage company under Section 104 of the Water Industry Act 1991. Covers the adoption agreement process, Design and Construction Guidance standards, bond requirements, the inspection regime, vesting of assets, and the separate Section 106 right to connect.

Sector-Specific
Read guide

Structural works compliance checklist

Pre-start checklist for structural works covering demolition notices, asbestos surveys, temporary works design, excavation permits, LOLER examinations, and CPCS competency cards. Use this before beginning any structural, demolition, or deep excavation work on a construction project.

Sector-Specific
Read guide

Adopt new roads and streets for developers

How to get new roads adopted as publicly maintained highways through Section 38 agreements under the Highways Act 1980. Covers the adoption process, bond requirements, construction to adoptable standard using DMRB or local design guides, inspection fees, maintenance periods, final adoption, Section 219 advance payments for private streets, and the Section 228 adoption process for existing private streets.

Sector-Specific
Read guide

Construction drainage design and compliance

How to design and install foul and surface water drainage that meets Approved Document H requirements. Covers pipe sizing, gradients, access points, testing, connection to public sewers under Section 106, and build-over agreements.

Sector-Specific
Read guide

Building safety duties for designers

Your legal duties as a designer under the Building Safety Act 2022 when working on higher-risk buildings. Covers the Principal Designer role, competence requirements, golden thread responsibilities, gateway submissions, and personal liability for architects, structural engineers, and other designers in England.

Sector-Specific
Read guide

Timber sourcing compliance for construction

How to comply with the UK Timber Regulation (UKTR) when sourcing timber for construction projects. Covers due diligence obligations for operators, the three-step due diligence system, chain of custody requirements, FLEGT licensing, CITES permits for protected species, construction-specific timber products in scope, and enforcement by the Office for Product Safety and Standards (OPSS).

Sector-Specific
Read guide

Construction product marking - CE and UKCA compliance

How the Construction Products (Amendment) Regulations 2025 affect CE and UKCA marking for construction products placed on the Great Britain market. CE marking is accepted indefinitely from 8 January 2026. UKCA marking remains voluntary. Covers Declarations of Performance, harmonised standards, and OPSS enforcement.

Sector-Specific
Read guide

Excavation and foundation safety

HSE requirements for safe excavation and foundation work on construction sites. Covers trench support systems, edge protection, safe access, cable and pipe avoidance, inspection duties, and emergency procedures for collapse. Trench collapse is a leading cause of construction fatalities in the UK.

Sector-Specific
Read guide

CDM 2015: your duties as a construction client

Your legal duties when commissioning construction work under the Construction (Design and Management) Regulations 2015. Covers appointing Principal Designer and Principal Contractor, providing pre-construction information, notification requirements, and the difference between commercial and domestic clients.

Sector-Specific
Read guide

Manage hazardous construction materials

How to comply with COSHH 2002 when working with cement, silica dust, solvents, lead paint, and wood dust on construction sites. Covers COSHH assessments, workplace exposure limits, health surveillance, RPE selection, and dust suppression controls.

Sector-Specific
Read guide

Reinstatement standards for highway works

Reinstatement categories, guarantee periods, materials specifications, inspection regime, and defect correction requirements under the Specification for the Reinstatement of Openings in Highways (SROH). Covers road categories, compaction standards, coring powers, and penalties for non-compliance.

Sector-Specific
Read guide

Build and manage higher-risk buildings safely

How construction businesses must comply with the Building Safety Act 2022 when developing higher-risk buildings (18m+ or 7+ storeys). Covers the gateway approval process, golden thread record-keeping, and accountable person responsibilities. England only.

Sector-Specific
Read guide

Work safely in confined spaces on drainage projects

How to comply with the Confined Spaces Regulations 1997 when working in manholes, sewers, chambers, and service ducts on drainage projects. Covers risk assessment, safe systems of work, atmospheric monitoring, emergency rescue arrangements, and permits to enter.

Sector-Specific
Read guide

Crane and lifting operations for structural work

LOLER 1998 requirements for crane and lifting operations on construction sites. Covers appointed persons, lift planning, thorough examination intervals, and competency requirements for crane operators, slinger/signallers, and piling rig operators.

Sector-Specific
Read guide

Demolition safety and compliance

How to comply with demolition safety requirements in England and Wales. Covers Section 80/81 demolition notices, asbestos refurbishment and demolition surveys, CDM 2015 Schedule 3 particular risks, BS 6187 code of practice, structural stability assessments, method statements, and competent person requirements.

Sector-Specific
Read guide

Carry out works affecting the strategic road network

How to obtain National Highways approval before carrying out works on or adjacent to motorways and trunk roads in England. Covers DMRB design standards, the design review process, road space booking, technical approval for structures, traffic management requirements, and penalties for unauthorised works.

Sector-Specific
Read guide

Related activities