- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Any Person4
Operator2
Contractor1
Plus 1 duty on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Any Person — also bound by 2340 other Acts
Human Medicines Regulations 2012
184 duties
Merchant Shipping Act 1995
144 duties
Insolvency (England and Wales) Rules 2016
104 duties
Communications Act 2003
92 duties
Road Traffic Act 1988
92 duties
Operator — also bound by 746 other Acts
Regulation (EU) No 965/2012 (Air Operations)
203 duties
Space Industry Regulations 2021
76 duties
Contractor — also bound by 173 other Acts
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
s.005
Conditions (opens in a new tab)
Regulated
- Comply with planning conditions before starting Border Control Post operationsContractor
s.006
Relevant approval (opens in a new tab)
Regulated
Other duties (1) — Crown / regulator
- Local planning authority must process 'relevant approval' requestsLocal authority
s.007
Building height and hard surfacing (opens in a new tab)
Regulated
- Ensure building heights do not exceed the specified limits in each zoneAny Person
s.010
Lighting (opens in a new tab)
Regulated
- Meet lighting standards for the North Wales Border Control PostAny Person
s.013
Travel plan coordinator (opens in a new tab)
Regulated
- Appoint a travel plan coordinator and notify the local planning authorityOperator
s.029
s.29 (opens in a new tab)
Regulated
- Keep noise at residential receptors within specified limitsAny Person
s.030
s.30 (opens in a new tab)
Regulated
- Don't leave vehicle engine idling for more than 5 minutesAny Person
31 other provisions — procedural and definitional
s.art001
Title, coming into force and application
s.art002
Interpretation
s.art003
Grant of planning permission
s.art004
Limitation
s.art005
Conditions
s.art006
Relevant approval
Schedules
Schedules
1 of 1 shown
s.schedule
Conditions
Regulated
- Comply with construction and design standards for North Wales Border Control PostOperator
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.