UK Statutory Instrument SI 2022/1406 United Kingdom

The Network Rail (Cambridge South Infrastructure Enhancements) Order 2022

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Contractor1 Operator1 Any Person1

Plus 1 duty on the regulator, Crown ministers and public bodies — folded into the section list below.

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Contractor — also bound by 173 other Acts
Operator — also bound by 746 other Acts
Any Person — also bound by 2340 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

44 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Incorporation of the Railway Clauses Act
s.art004 Application of the 1991 Act
s.art005 Disapplication of legislative provisions
s.art006 Power to construct and maintain works
s.art007 Power to deviate
s.art008 Level crossings to be stopped up
s.art009 Power to alter layout etc., of streets
s.art010 Power to execute street works
s.art011 Temporary stopping up of streets
s.art012 Construction and maintenance of new or altered highways
s.art013 Access to works
s.art014 Use of private roads for construction and operation
s.art015 Agreements with street authorities
s.art016 Discharge of water
s.art017 Protective works to buildings
s.art018 Power to survey and investigate land
s.art019 Power to acquire land
s.art020 Application of Part 1 of the 1965 Act
s.art021 Application of the 1981 Act
s.art022 Power to acquire new rights
s.art023 Power to acquire subsoil or airspace only
s.art024 Rights under or over streets
s.art025 Temporary use of land for construction of works
s.art026 Temporary use of land for maintenance works
s.art027 Temporary use of land for access
s.art028 Disregard of certain interest and improvements
s.art029 Extinction or suspension of private rights of way
s.art030 Time limit for exercise of powers of acquisition
s.art031 Powers to transfer undertaking
s.art032 Defence to proceedings in respect of statutory nuisance
s.art033 Power to lop trees overhanging the authorised works
s.art034 Power to operate and use railway
s.art035 Planning permission and supplementary powers
s.art036 Public open space
s.art037 Obstruction of construction of authorised works
s.art038 Disclosure of confidential information
s.art039 Statutory undertakers etc.
s.art040 Certification of plans etc.
s.art041 Service of notices
s.art042 Protection of interests
s.art043 No double recovery
s.art044 Arbitration
Schedules

Schedules

4 of 91 shown
s.sch012 (1) Network Rail must not exercise the powers conferred by... Regulated
Other duties (1) — Crown / regulator
  • Network Rail must get your consent before using your busway propertyStatutory regulator
s.sch012 (1) Not less than 28 days before commencing the specified... Regulated
  • Submit works plans for engineer approval before starting constructionContractor
s.sch012 The operator must on being given reasonable notice (save in... Regulated
  • Allow Network Rail access to works and provide information on requestOperator
s.sch012 Damage to guided busway property: costs, losses etc. Regulated
  • Network Rail must pay for damage to guided busway property and indemnify against claimsAny Person
87 other schedules
s.sch010 The enactments for the time being in force with respect...
s.sch010 (1) Without limitation on the scope of paragraph (1), the...
s.sch010 (1) Without limitation on the scope of paragraph 1, the...
s.sch010 Part 1 (compulsory purchase under Acquisition of Land Act 1946)...
s.sch010 (1) The modifications referred to in paragraph 4(a) are as...
s.sch011 (1) Sections 271 to 274 (power to extinguish rights of...
s.sch012 Application
s.sch012 Damage to apparatus: costs, losses, etc.
s.sch012 Enactments and agreements
s.sch012 (1) For the protection of any operator, the following provisions...
s.sch012 (1) Subject to sub-paragraphs (2) to (4), if as the...
s.sch012 This Part of this Schedule does not apply to—
s.sch012 Nothing in this Part of this Schedule affects the provisions...
s.sch012 (1) The following provisions of this Part of this Schedule...
s.sch012 (1) Before beginning to construct any specified work, Network Rail...
s.sch012 Without limitation on the scope of paragraph 17, the requirements...
s.sch012 (1) Subject to sub-paragraph (2), any specified work, and all...
s.sch012 The provisions of paragraph 1 of Schedule 11 (provisions relating...
s.sch012 (1) Subject to sub-paragraph (5) Network Rail must from the...
s.sch012 Subject to paragraph 23, if by reason of the construction...
s.sch012 (1) Network Rail must take all such measures as may...
s.sch012 Nothing in paragraphs 19(4), 20(3), 21, 22(3) and (4) authorises...
s.sch012 Network Rail must indemnify the drainage authority in respect of...
s.sch012 (1) Without affecting the other provisions of this Part of...
s.sch012 The fact that any work or thing has been executed...
s.sch012 Application
s.sch012 Interpretation
s.sch012 Exercise of Powers
s.sch012 This Part of this Schedule does not apply to apparatus...
s.sch012 Network Rail must not use any land or property of...
s.sch012 Survey of watercourse
s.sch012 Notification, approval, protective works
s.sch012 Network Rail must give to the engineer 14 days’ notice...
s.sch012 Carrying out specified works and protective works
s.sch012 Network Rail must not in the course of constructing a...
s.sch012 Network Rail must provide and maintain at its own expense...
s.sch012 Access
s.sch012 Maintenance of the specified works and protective works
s.sch012 Expenses
s.sch012 Interpretation
s.sch012 Detriment to the watercourse
s.sch012 Disputes
s.sch012 Application
s.sch012 Interpretation
s.sch012 (1) This Part of this Schedule does not apply to...
s.sch012 Notwithstanding the temporary stopping up or diversion of any highway...
s.sch012 Network Rail must exercise the powers conferred by article 17...
s.sch012 (1) Regardless of any provision in this Order or anything...
s.sch012 (1) If, in the exercise of the powers conferred by...
s.sch012 (1) Where, in accordance with the provisions of this Part...
s.sch012 Acquisition of apparatus
s.sch012 (1) Not less than 56 days before the commencement of...
s.sch012 (1) Subject to the following provisions of this paragraph, Network...
s.sch012 (1) Subject to sub-paragraphs (2) and (3), if by reason...
s.sch012 Except where this Part of this Schedule provides otherwise, nothing...
s.sch012 (1) Where in consequence of the proposed construction of any...
s.sch012 If in consequence of any agreement reached in accordance with...
s.sch012 Save for differences or disputes arising under sub-paragraphs 48(2), 48(4),...
s.sch012 Notwithstanding article 41 (Service of Notices) any plans submitted to...
s.sch012 Application
s.sch012 This Part of this Schedule does not apply to apparatus...
s.sch012 Alternative apparatus
s.sch012 Interpretation
s.sch012 Guided busway property: notification, protective works
s.sch012 Carrying out protective works and specified works
s.sch012 Access
s.sch012 Expenses
s.sch012 Maintenance of the specified works
s.sch012 (1) Where, in accordance with the provisions of this Part...
s.sch012 Assessment of sums payable
s.sch012 Agreements
s.sch012 Transfer of undertaking
s.sch012 Certified documents
s.sch012 Disputes
s.sch012 Application
s.sch012 The provisions of paragraph 1 of Schedule 11 (provisions relating...
s.sch012 This Part of this Schedule does not apply to apparatus...
s.sch012 Interpretation
s.sch012 Acquisition of apparatus
s.sch012 Existing apparatus: protection and access
s.sch012 Alternative apparatus
s.sch012 (1) Where, in accordance with the provisions of this Part...
s.sch012 Existing apparatus: protection and access
s.sch012 Expenses
s.sch012 Damage to apparatus: costs, losses, etc.
s.sch012 Enactments and agreements
s.sch012 Expenses