UK Statutory Instrument 2010 United Kingdom

SSAFO Regulations 2010

What this means for your business

5 obligations
5 penalties
2 guides
Applies to
United Kingdom
On this page
5 compliance obligations, 2 practical guides
Read full text on legislation.gov.uk

What you must do

5 compliance obligations under this legislation.

Management duties 2

Design, build and maintain silage silos to meet SSAFO standards

Unlimited fine

If your business stores silage in a silo you must design, construct and keep it so that the base extends beyond the walls, captures all effluent, drains it to an appropriately sized tank and is impermeable and resistant to silage liquid. The silo and its drainage must be at least 10 m from any inland or coastal water and built to last at least 20 years. Failure to meet these technical specs can lead to unlimited fines and imprisonment.

Trader/Business Schedule 1 Environment Agency when you have or construct a silage silo

Store fuel oil on farm in approved tanks or drums

Unlimited fine

If you keep fuel oil on your farm, you must store it in a dedicated tank or drum area that meets the standards set out in Schedule 3, or in an approved underground tank. The rule does not apply if you only store up to 1,500 litres or if the oil is in a tanker just being moved around the farm.

Any Person s.5 Environment Agency Storing more than 1,500 litres of fuel oil on the farm (excluding …

Notifications 1

Notify Environment Agency before building new or expanded storage

Unlimited fine

If you plan to build, substantially enlarge, or rebuild a silo, slurry tank or fuel‑oil store after 15 June 2013, you must inform the Environment Agency of the type and location of the store. The notice has to be sent at least 14 days before any construction work starts. Failing to do so can lead to unlimited fines and prosecution.

Any Person s.9 Environment Agency Planning to construct, significantly enlarge, or reconstruct a new or improved silage, …

Other requirements 1

Comply with any SSAFO regulation 7 notice

Unlimited fine

If the Environment Agency serves you with a regulation 7 notice because you store or control silage, slurry or fuel oil, you must carry out the works, precautions or steps set out in that notice. The work must be completed within the period stated (normally 28 days, or a longer reasonable period). Failure to do so can lead to prosecution and an unlimited fine.

Any Person s.7 Environment Agency When a regulation 7 notice is served on you by the Environment …

Offences and prohibitions 1

Breach SSAFO regulations 3, 4, 5 or 7

Unlimited fine

If your business fails to follow the requirements set out in SSAFO Regulations 3(1) or (4), 4(1), 5(1) or 7(4A), you commit a criminal offence. On conviction in a magistrates’ court you could be fined up to the statutory maximum (currently £5,000); if the case goes to Crown Court the fine is unlimited.

Any Person s.10 Environment Agency

Penalties for non-compliance

5 penalties under this legislation. 5 carry an unlimited fine.

Unlimited fine

Design, build and maintain silage silos to meet SSAFO standards

Unlimited fine

Either way Schedule 1 Penalises: Design, build and maintain silage silos to meet …
Unlimited fine

Store fuel oil on farm in approved tanks or drums

Unlimited fine

Either way s.5 Penalises: Store fuel oil on farm in approved tanks …
Unlimited fine

Notify Environment Agency before building new or expanded storage

Unlimited fine

Summary only s.9 Penalises: Notify Environment Agency before building new or expanded …
Unlimited fine

Comply with any SSAFO regulation 7 notice

Unlimited fine

Either way s.7 Penalises: Comply with any SSAFO regulation 7 notice
Unlimited fine

Breach SSAFO regulations 3, 4, 5 or 7

Unlimited fine

Either way s.10 Penalises: Breach SSAFO regulations 3, 4, 5 or 7

Practical guidance

Our guides explain how to comply with the requirements above.

Sections and provisions

11 classified provisions from this legislation.

Duties 4

  • Schedule 1 REQUIREMENTS FOR SILOS
  • s.5 Storage of fuel oil on farms
  • s.7 Notice requiring works etc. such requirement is
  • s.9 Notice of construction etc

Offences and penalties 1

  • s.10 Offences and penalties

Powers 1

  • s.8 Appeals against regulation 7 notices

Exemptions 4

  • Schedule 2 REQUIREMENTS FOR SLURRY STORAGE SYSTEMS
  • s.3 Making or storage of silage
  • s.4 Storage of slurry
  • s.6 Exemptions