UK Statutory Instrument SI 1998/1566 United Kingdom

The Meters (Certification) Regulations 1998

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Any Person1 Employer1

Plus 1 duty on the regulator, Crown ministers and public bodies — folded into the section list below.

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Any Person — also bound by 2340 other Acts
Employer — also bound by 682 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.005 Authorised examiner Regulated
  • Follow strict rules when certifying meters as an authorised examinerEmployer
s.008 Equivalent European provisions Regulated
Other duties (1) — Crown / regulator
  • Examiners must consider EEA test results from accredited bodiesLocal authority
12 other provisions — procedural and definitional
s.001 Citation and commencement
s.002 Interpretation
s.003 Authorised manufacturer
s.004 Authorised repairer
s.006 Application for certification
s.007 Procedure for certification
s.009 Batch certification
s.009 Certification by type
s.010 Duration of certification
s.010 Extensions to the duration of certification
s.011 Fees
s.012 Revocation
Schedules

Schedules

1 of 42 shown
s.sch001 Test loads Regulated
  • Test repaired and new meters at specified loadsAny Person
41 other schedules
s.sch001 Pre-heating
s.sch001 Insulation property test
s.sch001 Non-registration test
s.sch001 Accuracy tests
s.sch001 Methods of accuracy test
s.sch001 Reference conditions for all testing
s.sch001 Multi-register meters
s.sch001 Polyphase meters
s.sch001 Margins of error
s.sch002 In respect of each meter to which the report refers,...
s.sch002 In respect of each meter to which the report refers,...
s.sch002 A report may include the errors obtained at each test...
s.sch002 In the case of a meter intended for use with...
s.sch002 Where a transformer intended for use with a meter has...
s.sch002 In a report for a transformer, the following information—
s.sch002 The meter or transformer errors obtained at each test load...
s.sch002 Before a meter is submitted for certification, the report on...
s.sch003 Pre-heating
s.sch003 Voltage and current supplies for polyphase meters
s.sch003 External magnetic induction
s.sch003 Dial tests
s.sch003 Duration of test
s.sch003 Conditions for mixing methods of test
s.sch003 Multi-register meters
s.sch003 Static meters
s.sch003 Non-registration test
s.sch003 Static meters
s.sch003 Method 2
s.sch003 Method A test
s.sch003 Method B test
s.sch003 Method C test
s.sch003 Ambient temperature
s.sch003 Meter position
s.sch003 Induction meters
s.sch003 Accuracy tests
s.sch003 Methods of accuracy test
s.sch003 Reference conditions for all testing
s.sch003 Test loads
s.sch003 Induction meters
s.sch003 Polyphase meters
s.sch003 Margins of error

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.