UK Statutory Instrument SI 1996/2867 United Kingdom

The Bodmin and Wenford Light Railway Order 1996

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Operator2 Trader1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Operator — also bound by 746 other Acts
Trader — also bound by 825 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art006 Leasing of railway to Company Regulated
  • Comply with all statutory obligations of the Council for the railway during the leaseTrader
11 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Incorporation and modification of enactments
s.art004 Transfer of rights,
s.art005 Power to construct railway
s.art007 Sub-letting of railway to Bodmin Company
s.art008 Gauge of railway and motive power
s.art009 Level crossings
s.para.10 A portion (10,060 metres in length) of the former Bodmin...
s.para.104 Signs shall be provided on both sides of the railway...
s.para.11 commencing in the parish of Lanivet at Boscarne Junction on...
Schedules

Schedules

2 of 34 shown
s.sch003 Drivers shall bring their trains to a halt at the... Regulated
  • Drivers must stop at stop boards, wait for signals, and sound whistle before proceedingOperator
s.sch003 The operator shall give notice in writing to the Secretary... Regulated
  • Notify Secretary of State when crossing provisions are metOperator
32 other schedules
s.sch003 A. Particulars of the Barriers and other Protective Equipment
s.sch003 A traffic light signal of the size, colour and type...
s.sch003 An audible warning device shall be provided on or adjacent...
s.sch003 A reflectorised stop line of the size, colour and type...
s.sch003 Where the specified road passes over the crossing, reflectorised edge...
s.sch003 The centre line of the carriageway shall be marked on...
s.sch003 There shall be a control point on each railway approach...
s.sch003 Each control point shall have a keyswitch to energise the...
s.sch003 Lighting shall be provided as necessary so that during the...
s.sch003 A stop board of standard railway design displaying the words...
s.sch003 A lamp shall be provided on the western railway approach...
s.sch003 When lowered the barriers shall be as nearly horizontal as...
s.sch003 A stop board of standard railway design displaying the words...
s.sch003 A driver’s indicator shall be provided on each railway approach...
s.sch003 An advance warning board of standard railway design shall be...
s.sch003 Two independent power supplies shall be provided at the crossing,...
s.sch003 Cattle-cum-trespass guards of standard railway design shall be provided adjacent...
s.sch003 B. Conditions and Requirements to be observed by the Operator.
s.sch003 The lifting barriers shall be kept in the fully raised...
s.sch003 Visual indicators shall be provided at each control point. The...
s.sch003 When the keyswitch is operated to energise the control point...
s.sch003 When the ‘lower’ push-button of the control point is pressed...
s.sch003 When the barriers are fully lowered their uppermost surfaces shall...
s.sch003 The intermittent red lights shall continue to show until the...
s.sch003 Drivers shall bring their trains to a halt at the...
s.sch003 If any lifting barrier fails to rise from the lowered...
s.sch003 When in the fully raised position the barriers shall be...
s.sch003 The barriers shall be as light as possible but shall...
s.sch003 The barriers shall display on both front and rear faces...
s.sch003 Suitable screening shall be provided for each barrier machine to...
s.sch003 Two electric lamps, each of not less than 5 watts...
s.sch003 There shall be an additional swinging barrier on each side...

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.