Welsh Statutory Instrument SI 2024 Wales

The Building (Registered Building Control Approvers etc.) (Wales) Regulations 2024

Status
Amended (in force with amendments)
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Any Person4 Contractor3

Plus 9 duties on the regulator, Crown ministers and public bodies — folded into the section list below.

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Any Person — also bound by 2340 other Acts
Contractor — also bound by 173 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

Part 3

Notices and certificates etc.

0 of 1 section shown
1 other section in this Part — procedural and definitional
s.015 Cancellation of initial notice: forms etc.
Schedules

Schedules

1 of 68 shown
s.sch004 Independence Regulated
  • Include independence declaration on certificateContractor
67 other schedules
s.sch002 Form
s.sch002 Drain connection
s.sch002 Local enactments
s.sch002 Earlier notice
s.sch002 Wrong local authority
s.sch002 Capacity of approver
s.sch002 Additionally, in the case of an amendment notice, the person...
s.sch002 Breach of section 54B
s.sch002 Information about the proposed work
s.sch002 Fire and rescue authority
s.sch002 Sewerage undertaker
s.sch002 Independence
s.sch003 Form
s.sch003 Independence
s.sch003 Wrong local authority
s.sch003 Work
s.sch003 Plans
s.sch003 No initial notice
s.sch003 Capacity of approver
s.sch003 Breach of section 54B
s.sch003 Fire and rescue authority
s.sch003 Sewerage undertaker
s.sch004 Form
s.sch004 Wrong local authority
s.sch004 Work
s.sch004 No initial notice
s.sch004 Capacity of approver
s.sch004 Breach of section 54B
s.sch004 Lack of fire safety information confirmation
s.sch005 Required information
s.sch005 Failure to comply with prescribed timescales
s.sch005 Either the transfer certificate or transfer report do not include...
s.sch005 Wrong local authority
s.sch005 No initial notice
s.sch005 Capacity of approver
s.sch005 Breach of section 54B
s.sch005 Earlier notice
s.sch005 Local authority action
s.sch005 Failure to provide information requested
s.sch006 Form
s.sch006 Wrong local authority
s.sch006 Capacity of public body
s.sch006 Fire and rescue authority
s.sch006 Sewerage undertaker
s.sch006 Drain connection
s.sch006 Local enactments
s.sch007 Form
s.sch007 Work
s.sch007 Plans
s.sch007 No public body’s notice
s.sch007 Capacity of public body
s.sch007 Fire and rescue authority
s.sch007 Sewerage undertaker
s.sch008 Form
s.sch008 Work
s.sch008 Capacity of public body
s.sch008 No proper signature
s.sch008 Fire and rescue authority
s.sch008 Sewerage undertaker
s.003 Independence of approvers Regulated
  • Ensure independence from projects you superviseAny Person
s.006 Form, grounds and period for rejecting initial notice Regulated
Other duties (1) — Crown / regulator
  • Local authority must decide on building control notices within 5 working daysLocal authority
s.007 Form, grounds and period for rejecting amendment notice Regulated
Other duties (1) — Crown / regulator
  • Local authorities must reject invalid amendment notices within 5 working daysLocal authority
s.008 Consultation with the fire and rescue authority Regulated
  • Registered building control approvers must consult fire and rescue authority on fire safety building workAny Person
s.009 Consultation with the sewerage undertaker Regulated
  • Building approvers must consult sewerage undertakers on drainage workContractor
s.012 Form, grounds and period for rejecting final certificate Regulated
Other duties (1) — Crown / regulator
  • Local authority must process Building Control final certificates within 10 daysLocal authority
s.013 Form of notice under section 51C of the 1984 Act Regulated
  • Use Form 8(W) when changing the person carrying out building workAny Person
s.016 Cancellation of initial notice: notice of contravention of building regulations Regulated
  • Approvers must notify you of building regulation breaches before cancellationContractor
s.018 Periods within which information on work to which an initial notice relates must be provided Regulated
  • Registered Building Control Approvers must provide work information to authoritiesAny Person
s.025 Form, grounds and period for rejecting public body’s notice Regulated
Other duties (1) — Crown / regulator
  • Local authority must decide on public body notices within 10 working daysLocal authority
s.028 Form, grounds and period for rejecting public body’s plans certificate Regulated
Other duties (1) — Crown / regulator
  • Local authority must notify rejection of building plans within 10 working daysLocal authority
s.032 Register of notices and certificates Regulated
Other duties (1) — Crown / regulator
  • Local authorities must maintain a public register of building control noticesLocal authority
s.034 Contravention of professional conduct rules Regulated
Other duties (1) — Crown / regulator
  • Welsh Ministers must notify local authorities of disciplinary ordersCrown / Minister / Government department
s.035 Interim suspension for suspected serious contravention Regulated
Other duties (1) — Crown / regulator
  • Welsh Ministers must notify local authorities of interim suspensionsCrown / Minister / Government department
s.036 Appealing a decision made by the Welsh Ministers Regulated
Other duties (1) — Crown / regulator
  • Magistrates’ court must determine appeals against Welsh MinistersTribunal / Court
27 other provisions
s.001 Title, coming into force and application
s.002 Interpretation
s.004 Functions of approvers
s.005 Modification of the 2010 Regulations etc.
s.010 Form, grounds and period for rejecting plans certificate
s.011 Effect of plans certificate
s.014 Events causing initial notice to cease to be in force
s.017 Local authority powers in relation to partly completed work
s.019 Section 53(7): prescribed provision
s.020 Information to be included in transfer certificates
s.021 Period for consideration of transfer certificate and report by local authority
s.022 Grounds for rejection of a transfer certificate and transfer report
s.023 Cases where a further initial notice may be given after cancellation of an initial notice under section 53D
s.024 Approval of public bodies
s.026 Public body’s consultation with the fire and rescue authority
s.027 Public body’s consultation with the sewerage undertaker
s.029 Effect of public body’s plans certificate
s.030 Form, grounds and period for rejecting public body’s final certificate
s.031 Events causing public body’s notice to cease to be in force
s.033 Registration periods
s.037 Contravention of certain regulations not to be an offence
s.038 Consequential amendment to the Regulatory Reform (Fire Safety) Order 2005
s.039 Consequential amendments to the Building (Local Authority Charges) Regulations 2010
s.040 Consequential amendment to the 2010 Regulations
s.041 Consequential amendments to the Building (Restricted Activities and Functions) (Wales) Regulations 2024
s.042 Revocations, transitional and savings provisions

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.