UK Statutory Instrument SI 2023/815 United Kingdom

The Rother Valley Railway (Bodiam to Robertsbridge Junction) Order 2023

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Trader33

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Trader — also bound by 825 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art009 Power to alter layout etc. of streets Regulated
  • Obtain consent before altering street layouts and restore streets to satisfactionTrader
s.art012 Temporary stopping up of streets Regulated
  • Consult street authority before temporarily stopping up streetsTrader
s.art016 Discharge of water Regulated
  • Obtain consent before discharging water into watercourses, sewers or drainsTrader
s.art017 Power to survey and investigate land Regulated
  • The Company may survey and investigate land within Order limitsTrader
s.art022 Temporary use of land for construction of works Regulated
  • Notify landowners 28 days before entering land for worksTrader
s.art023 Temporary use of land for maintenance of works Regulated
  • Follow conditions when temporarily using land for railway maintenanceTrader
s.art036 Certification of plans etc. Regulated
  • Submit certified copies of plans and documents to the Secretary of StateTrader
35 other provisions — procedural and definitional
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Incorporation of Railway Clauses Acts
s.art004 Application of the 1991 Act
s.art005 Disapplication of legislative provisions
s.art006 Power to construct new railway
s.art007 Power to maintain existing railways
s.art008 Power to deviate
s.art010 Power to execute street works
s.art011 Stopping up of street
s.art013 Access to works
s.art014 Agreements with street authorities
s.art015 Level crossings
s.art018 Power to acquire land
s.art019 Application of Part 1 of the 1965 Act
s.art020 Application of the 1981 Act
s.art021 Power to acquire airspace only
s.art024 Disregard of certain interests and improvements
s.art025 Extinction or suspension of private rights of way
s.art026 Time limit for exercise of powers of acquisition
s.art027 Defence to proceedings in respect of statutory nuisance
s.art028 Power to lop trees overhanging the authorised works
s.art029 Power to operate and use railway
s.art030 Power to transfer undertaking
s.art031 Power to charge fares
s.art032 Application of landlord and tenant law
s.art033 Removal of obstructions
s.art034 Saving for highway authorities
s.art035 Statutory undertakers etc.
s.art037 Service of notices
s.art038 Protection of interests
s.art039 No double recovery
s.art040 Arbitration
s.art041 Agreement between BRB (Residuary) Limited and Rother Valley Railway Limited
s.art042 Crown rights
Schedules

Schedules

26 of 50 shown
s.sch006 (1) Where a street is stopped up under article 11... Regulated
  • Pay the cost of relocating utility apparatus when a street is stopped upTrader
s.sch008 Damage to apparatus: costs, losses, etc. Regulated
  • Pay costs and compensation for damage to utility apparatus caused by construction worksTrader
s.sch008 (1) Subject to sub-paragraphs (2) to (4), if as the... Regulated
  • Pay costs and compensation for damage to electronic communications apparatusTrader
s.sch008 (1) Before beginning to construct any specified work, the Company... Regulated
  • Submit plans to drainage authority and obtain approval before constructing specified workTrader
s.sch008 (1) Subject to sub-paragraph (2), any specified work, and all... Regulated
  • Construct specified works to drainage authority standards and give noticeTrader
s.sch008 (1) Subject to sub-paragraph (5) the Company must from the... Regulated
  • Maintain drainage works on your land in good conditionTrader
s.sch008 Subject to paragraph 23, if by reason of the construction... Regulated
  • Repair impaired or damaged flood defence drainage worksTrader
s.sch008 (1) The Company must take all such measures as may... Regulated
  • Protect fish passage and make good fishery damage during railway worksTrader
s.sch008 The Company must indemnify the drainage authority in respect of... Regulated
  • Indemnify drainage authority for plan checks and site inspectionsTrader
s.sch008 (1) Without affecting the other provisions of this Part of... Regulated
  • Indemnify the drainage authority for environmental damage from your worksTrader
s.sch008 (1) The NH works must not commence until— Regulated
  • Do not start NH works until all pre-conditions are metTrader
s.sch008 Construction of the NH works Regulated
  • Comply with National Highways requirements for NH works constructionTrader
s.sch008 Payments Regulated
  • Pay all costs of National Highways works on demandTrader
s.sch008 Completion Regulated
  • Complete NH works to National Highways' satisfaction and obtain provisional certificateTrader
s.sch008 Final condition survey Regulated
  • Re-survey highways structures and assets after provisional certificate applicationTrader
s.sch008 Opening Regulated
  • Notify National Highways of opening dates and keep level crossing closed until conditions metTrader
s.sch008 Final Certificate Regulated
  • Apply for final certificate and carry out required remedial worksTrader
s.sch008 Security Regulated
  • Secure NH works with bond and cash surety before commencementTrader
s.sch008 The Company must pay to National Highways the Commuted Sum... Regulated
  • Pay commuted sum to National Highways before provisional certificateTrader
s.sch008 Indemnity Regulated
  • Pay indemnity to National Highways within 14 days of notificationTrader
s.sch008 Maintenance of the NH works Regulated
  • Maintain NH works and comply with National Highways' requirementsTrader
s.sch008 Acquisition of apparatus Regulated
  • Company must not acquire apparatus without the owner's agreementTrader
s.sch008 Alternative apparatus Regulated
  • Do not remove existing utility apparatus until alternative is operational and provide necessary facilitiesTrader
s.sch008 (1) Where, in accordance with the provisions of this Part... Regulated
  • Grant alternative apparatus rights to undertakers on agreed or arbitrated termsTrader
s.sch008 Existing apparatus: protection and access Regulated
  • Submit plans to utility undertaker before starting works near their equipmentTrader
s.sch008 Expenses Regulated
  • Repay undertaker's reasonable expenses for apparatus work required by railway worksTrader
24 other schedules
s.sch006 (1) Sections 271 to 274 (power to extinguish rights of...
s.sch008 Application
s.sch008 Enactments and agreements
s.sch008 (1) For the protection of any operator, the following provisions...
s.sch008 This Part of this Schedule does not apply to—
s.sch008 Nothing in this Part of this Schedule affects the provisions...
s.sch008 (1) The following provisions of this Part of this Schedule...
s.sch008 Without limitation on the scope of paragraph 17, the requirements...
s.sch008 The provisions of paragraph 1 of Schedule 6 (provisions relating...
s.sch008 Nothing in paragraphs 19(4), 20(3), 21, 22(3) and (4) authorises...
s.sch008 The fact that any work or thing has been executed...
s.sch008 Any difference arising between the Company and the drainage authority...
s.sch008 Application
s.sch008 Interpretation
s.sch008 Interpretation
s.sch008 Prior Approvals and Security
s.sch008 Construction traffic and route surveys
s.sch008 This Part of this Schedule does not apply to apparatus...
s.sch008 Commuted sums
s.sch008 Insurance
s.sch008 Expert Determination
s.sch008 Bond Form
s.schedule/1/part/1/paragraph/1 In the county of East Sussex—
s.schedule/1/part/2/paragraph/1 In the county of East Sussex—

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.