- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Operator1
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Operator — also bound by 746 other Acts
Regulation (EU) No 965/2012 (Air Operations)
203 duties
Space Industry Regulations 2021
76 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
46 other provisions — procedural and definitional
s.art001
Citation and commencement
s.art002
Interpretation
s.art003
Incorporation of the Railway Clauses Acts
s.art004
Application of the 1991 Act
s.art005
Disapplication of legislative provisions
s.art006
Power to construct and maintain works
s.art007
Power to deviate
s.art008
Closure of road level crossings
s.art009
Replacement and closure of footpath level crossings
s.art010
Accommodation crossings
s.art011
Power to alter layout etc. of streets
s.art012
Power to execute street works
s.art013
Stopping up of streets
s.art014
Temporary stopping up of streets
s.art015
Construction and maintenance of new or altered highways
s.art016
Access to works
s.art017
Agreements with street authorities
s.art018
Construction of bridges
s.art019
Discharge of water
s.art020
Protective works to buildings
s.art021
Power to survey and investigate land
s.art022
Power to acquire land
s.art023
Application of Part 1 of the 1965 Act
s.art024
Application of the 1981 Act
s.art025
Power to acquire new rights
s.art026
Power to acquire subsoil or airspace only
s.art027
Rights under or over streets
s.art028
Temporary use of land for construction of works
s.art029
Temporary use of land for maintenance of works
s.art030
Temporary use of land for access
s.art031
Disregard of certain interests and improvements
s.art032
Extinction or suspension of private rights of way
s.art033
Time limit for exercise of powers of acquisition
s.art034
Power to transfer undertaking
s.art035
Defence to proceedings in respect of statutory nuisance
s.art036
Power to lop trees overhanging the authorised works
s.art037
Power to operate and use railway
s.art038
Planning Permission
s.art039
Obstruction of construction of authorised works
s.art040
Disclosure of confidential information
s.art041
Statutory undertakers etc.
s.art042
Certification of plans etc.
s.art043
Service of notices
s.art044
Protection of interests
s.art045
No double recovery
s.art046
Arbitration
Schedules
Schedules
1 of 33 shown
s.sch016
(1) Subject to sub-paragraphs (2) to (4), if as the...
Regulated
- Notify Network Rail of damage claims and do not settle without consentOperator
32 other schedules
s.sch013
The enactments for the time being in force with respect...
s.sch013
(1) Without limitation on the scope of paragraph 1, the...
s.sch013
(1) Without limitation on the scope of paragraph 1, the...
s.sch013
Part 1 (compulsory purchase under Acquisition of Land Act 1946)...
s.sch013
(1) The modifications referred to in paragraph 4(a) are as...
s.sch015
(1) Sections 271 to 274 (power to extinguish rights of...
s.sch015
(1) Where a street is stopped up under article 8...
s.sch016
Application
s.sch016
Damage to apparatus: costs, losses, etc.
s.sch016
Enactments and agreements
s.sch016
(1) For the protection of any operator, the following provisions...
s.sch016
This Part of this Schedule does not apply to—
s.sch016
Nothing in this Part of this Schedule affects the provisions...
s.sch016
(1) The following provisions of this Part of this Schedule...
s.sch016
(1) Before beginning to construct any specified work, Network Rail...
s.sch016
Without limitation on the scope of paragraph 17, the requirements...
s.sch016
(1) Subject to sub-paragraph (2), any specified work, and all...
s.sch016
The provisions of paragraph 1 of Schedule 15 (provisions relating...
s.sch016
(1) Subject to sub-paragraph (5) Network Rail must from the...
s.sch016
Subject to paragraph 23, if by reason of the construction...
s.sch016
(1) Network Rail must take all such measures as may...
s.sch016
Nothing in paragraphs 19(4), 20(3), 21, 22(3) and (4) authorises...
s.sch016
Network Rail must indemnify the drainage authority in respect of...
s.sch016
(1) Without affecting the other provisions of this Part of...
s.sch016
The fact that any work or thing has been executed...
s.sch016
This Part of this Schedule does not apply to apparatus...
s.sch016
Interpretation
s.sch016
Acquisition of apparatus
s.sch016
Alternative apparatus
s.sch016
(1) Where, in accordance with the provisions of this Part...
s.sch016
Existing apparatus: protection and access
s.sch016
Expenses
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.