UK Statutory Instrument SI 2019 United Kingdom

Nuclear Safeguards (EU Exit) Regulations 2019

Enforced by
ONR
Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Operator37

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Operator — also bound by 746 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

Part 1

Introduction

0 of 2 sections shown
2 other sections in this Part — procedural and definitional
s.001 Citation and commencement
s.002 Interpretation
Part 2

Accountancy and control, records and the provision of information by an operator

17 of 18 sections shown
s.003 Declaration of basic technical characteristics Regulated
  • Declare basic technical characteristics of nuclear facility to ONROperator
s.004 Programme of activities Regulated
  • Send annual programme of activities and physical inventory plans to ONROperator
s.005 Particular safeguard provisions Regulated
  • Comply with particular safeguard provisions imposed by ONROperator
s.006 Accountancy and control of qualifying nuclear material Regulated
  • Maintain a system of accountancy and control for qualifying nuclear materialOperator
s.007 Accountancy and control plan Regulated
  • Produce and send an accountancy and control plan for nuclear materialOperator
s.008 Replacement, amendment and revocation of accountancy and control plan Regulated
  • Amend your accountancy and control plan within 30 days of relevant technical changesOperator
s.009 Operation of an accountancy and control plan Regulated
  • Implement and follow your nuclear material safeguards planOperator
s.010 Operating records Regulated
  • Maintain detailed operating records for nuclear material in each areaOperator
s.011 Accounting records Regulated
  • Keep detailed accounting records for qualifying nuclear materialsOperator
s.012 Accounting reports Regulated
  • Submit accurate accounting reports to ONR and respond to information requestsOperator
s.013 Initial book inventory Regulated
  • Send initial nuclear material inventory to ONR within 15 daysOperator
s.014 Inventory change report Regulated
  • Submit monthly inventory change reports to ONROperator
s.015 Material balance report and physical inventory listing Regulated
  • Submit material balance reports and physical inventory listings to ONR within 15 daysOperator
s.016 Special report Regulated
  • Report unusual occurrences to ONR and provide further details on requestOperator
s.017 Unusual occurrences Regulated
  • Report unusual nuclear material occurrences to ONROperator
s.018 Reporting of nuclear transformations Regulated
  • Report nuclear transformation data for reactor facilitiesOperator
s.019 Additional reporting obligations arising from relevant international agreements and from obligations resulting from international trade Regulated
  • Identify and code qualifying nuclear material under international agreements and trade obligationsOperator
1 other section in this Part — procedural and definitional
s.020 Weight units and categories of qualifying nuclear materials
Part 3

Exports and imports

4 of 4 sections shown
s.021 Exports Regulated
  • Notify ONR before exporting qualifying nuclear materialOperator
s.022 Imports Regulated
  • Notify ONR before importing qualifying nuclear materialOperator
s.023 Loss or delay during transfer Regulated
  • Report lost or delayed qualifying nuclear material to ONR immediatelyOperator
s.024 Communication of change of date Regulated
  • Inform ONR of any change in dates for nuclear material movementsOperator
Part 4

Carriers and temporary storage agents

1 of 2 sections shown
s.025 Carriers and temporary storage agents Regulated
  • Handle nuclear material with signed receipts and keep records for 5 yearsOperator
1 other section in this Part — procedural and definitional
s.026 Intermediaries
Part 5

Ores

1 of 2 sections shown
s.028 Ore shipment and export reports Regulated
  • Report ore dispatches and exports to ONROperator
1 other section in this Part — procedural and definitional
s.027 Accounting records for ores
Part 6

Qualifying nuclear material in the form of conditioned and retained waste

2 of 2 sections shown
s.029 Stock list and accounting records for conditioned and retained waste Regulated
  • Keep accounting records and stock list for conditioned or retained wasteOperator
s.030 Transfers of conditioned waste Regulated
  • Report transfers of conditioned waste to ONR using prescribed formsOperator
Part 7

Qualifying nuclear facility with limited operation and exemption

1 of 2 sections shown
s.031 Declaration of basic technical characteristics, stock list and accounting records for qualifying nuclear facility with limited operation Regulated
  • Comply with the limited operation regime for your nuclear facilityOperator
1 other section in this Part — procedural and definitional
s.032 Exemption
Part 8

Civil activities

1 of 2 sections shown
s.033 Withdrawal from civil activities Regulated
  • Get ONR consent and give 14 days' notice before withdrawing nuclear material from civil activitiesOperator
1 other section in this Part — procedural and definitional
s.034 Qualifying nuclear facilities which are used partly for civil activities
Part 9

Communication

1 of 1 section shown
s.035 Communication with the ONR Regulated
  • Send required communications to ONR in writing and to correct addressesOperator
Part 10

Safeguards equipment

2 of 3 sections shown
s.036 Safeguards equipment Regulated
  • Install safeguards equipment when ONR requests it in writingOperator
s.037 Access to safeguards equipment Regulated
  • Allow ONR reasonable access to safeguards equipmentOperator
1 other section in this Part — procedural and definitional
s.038 Interference with safeguards equipment
Part 11

The ONR

0 of 4 sections shown
4 other sections in this Part — procedural and definitional
s.039 Inspections by the ONR
s.040 Publication of information by the ONR
s.041 ONR to provide an annual report to the Secretary of State
s.042 Provision of information to the Agency
Part 12

Offences

0 of 1 section shown
1 other section in this Part — procedural and definitional
s.043 Offences
Part 13

Notification to the Secretary of State

0 of 6 sections shown
6 other sections in this Part — procedural and definitional
s.044 The Secretary of State may issue written advice
s.045 Notification of receipt, production and transfer
s.046 Form of notification
s.047 Notification of change
s.048 Continued application
s.049 Interpretation
Part 14

General

0 of 5 sections shown
5 other sections in this Part — procedural and definitional
s.050 Extent
s.051 General consequential and supplementary amendments Part 1 of Schedule 3
s.052 General consequential amendments Part 2 of Schedule 3
s.053 Transitional provisions
s.054 Review
Schedules

Schedules

7 of 24 shown
s.sch002 The components of an accountancy and control system, referred to... Regulated
  • Implement a nuclear material accountancy and control system with all required componentsOperator
s.sch004 Inventory change report Regulated
  • Send two inventory change reports to ONR around commencement dayOperator
s.sch004 Material balance report Regulated
  • Carry out first physical inventory of nuclear material balance areasOperator
s.sch004 Advance notification or report Regulated
  • Treat pre-Brexit nuclear safeguard reports as sent to ONROperator
s.sch004 Advance notification on or after commencement day Regulated
  • Give ONR advance notice of nuclear activities and submit accountancy plansOperator
s.sch004 Accountancy and control of qualifying nuclear material Regulated
  • Retain nuclear material records for 5 years and make them available to ONROperator
s.sch004 Operator of qualifying nuclear facility with limited operation Regulated
  • Comply with adapted nuclear safeguards requirements during 12-month transitionOperator
17 other schedules
s.sch003 Nuclear Safeguards and Electricity (Finance) Act 1978
s.sch003 The Nuclear Safeguards (Notification) Regulations 2004
s.sch003 In regulation 2, omit the definition of “the commencement date”....
s.sch003 Omit regulation 3.
s.sch003 In the Schedule— (a) in the heading for Part I...
s.sch003 Revocation of retained EU law
s.sch003 In section 1— (a) in sub-section (1), for “made on...
s.sch003 In section 2(1)— (a) in paragraph (a) for “articles 71...
s.sch003 In section 2(2)— (a) in paragraph (a)—
s.sch003 In section 2(7) for “article 92(2)” substitute “ article 90...
s.sch003 In section 3(1)(b) for “article 76(d)” substitute “ article 74(d)...
s.sch003 Nuclear Safeguards Act 2000
s.sch003 In section 1(1)— (a) in the definition of “Additional Protocol”...
s.sch003 In section 1(3) for “22nd September 1998” substitute “ 7th...
s.sch004 Declaration of basic technical characteristics
s.sch004 Initial book inventory
s.sch004 Stock list for conditioned and retained waste held on commencement day
1 other provision
sch. 1 sch. 1

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.