UK Statutory Instrument SI 2012/1914 United Kingdom

The Hinkley Point Harbour Empowerment Order 2012

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Trader4 Any Person1

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Trader — also bound by 825 other Acts
Any Person — also bound by 2340 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

s.art001 Citation, commencement and duration Regulated
  • Publish notice of termination date in newspapersTrader
s.art022 Byelaws Regulated
  • Obtain Secretary of State approval before making vessel byelawsTrader
s.art023 Confirmation of byelaws Regulated
  • Publish and consult on new harbour byelaws before confirming themTrader
s.art039 Closure of the jetty and reinstatement Regulated
  • Cease harbour operations, dismantle jetty and reinstate landTrader
39 other provisions — procedural and definitional
s.art002 Interpretation
s.art003 Incorporation of the Harbours, Docks and Piers Clauses Act 1847
s.art004 Power to construct works
s.art005 Power to deviate
s.art006 Further powers as to works and extinguishment of rights
s.art007 Subsidiary works
s.art008 Power to dredge
s.art009 Obstruction of work
s.art010 Survey of tidal works
s.art011 Provision against danger to navigation
s.art012 Abatement of works abandoned or decayed
s.art013 Lights on tidal works during construction
s.art014 Permanent lights on tidal works
s.art015 Period for completion of works and termination of works powers
s.art016 Operational land for purposes of the Town and Country Planning Act 1990
s.art017 Application and termination of permitted development rights
s.art018 Planning and works conditions
s.art019 Stopping up
s.art020 Permanent stopping up of footpath and extinguishment of rights
s.art021 Harbour limits
s.art024 General directions to vessels
s.art025 Publication of general directions
s.art026 Special directions to vessels
s.art027 Master’s responsibility to be unaffected
s.art028 Failure to comply with directions
s.art029 Enforcement of special directions
s.art030 Charges
s.art031 Power to lease etc.
s.art032 Restriction on use of the works
s.art033 Defence of due diligence
s.art034 Saving for
s.art035 Saving for other consents etc.
s.art036 Disapplication of regulation 75 of the Conservation of Habitats and Species Regulations 2017
s.art037 Crown rights
s.art038 For the protection of the Environment Agency
s.art040 Saving for termination of this Order
Schedules

Schedules

1 of 49 shown
s.sch001 Height and details of the sand shed and silos Regulated
  • Submit sand shed and silo designs to planning authority for approvalAny Person
48 other schedules
s.sch001 Use noise limit
s.sch001 Noise and vibration: control of noise during construction, maintenance and use
s.sch001 Infill material
s.sch001 Landscape and visual: lighting
s.sch001 Construction programme for silos and sand shed
s.sch001 Alignment of the silos
s.sch001 Height of subsidiary works
s.sch001 Storage of oils, fuels, concrete and chemicals
s.sch001 Restriction of aggregate washing
s.sch001 Ecological mitigation and monitoring plan
s.sch001 Habitat management plan
s.sch001 Ecological method statement
s.sch001 Ecology: tree and hedgerow protection
s.sch001 Historic environment: recording of important hedgerows
s.sch001 Historic environment: monitoring of palaeontological remains
s.sch001 Historic: scheduled monument management plan
s.sch001 Drainage: surface water and foul drainage works
s.sch001 Drainage: oil interceptor
s.sch001 Air quality
s.sch001 Residential amenity: information dissemination and complaints handling
s.sch001 Drainage: water & sediment management plan
s.sch001 Engineering details of foreshore access road
s.sch001 Access to foreshore
s.sch001 Flooding: foreshore access
s.sch001 Geology & contaminated land: radiological monitoring
s.sch001 Geology & land: previous contamination unidentified
s.sch001 Groundwater: monitoring
s.sch001 Construction method statement
s.sch001 Construction and environmental management plan
s.sch001 On-site vehicular movements and maintenance - permitted hours
s.sch001 Vegetation clearance
s.sch001 Materials management plan
s.sch001 Site waste management plan
s.sch001 Soil management plan
s.sch001 Limit of closure of coast footpath
s.sch001 Traffic obligations
s.sch001 Bund planting
s.sch001 Maintenance of planting
s.sch001 Coastal hydrology: cliff management plan
s.sch001 Noise and vibration: control of noise during reinstatement
s.sch001 Landscape and visual: external storage of contractors’ materials
s.sch001 Working hours during reinstatement
s.sch001 On-site vehicular movements and maintenance - permitted hours during reinstatement
s.sch001 Noise and vibration during reinstatement: no amplified sound
s.sch001 Landscape and visual and air quality: no burning of materials
s.sch001 Noise and vibration: no amplified sound
s.sch001 Directional foghorn
s.sch001 Noise and vibration: noise level