UK Statutory Instrument SI 2010/2020 United Kingdom

The Port of Bristol (Deep Sea Container Terminal) Harbour Revision Order 2010

Status
In Force
Penalty ceiling
Regulated

Does it bind you?

Business-side roles with duties under this instrument.

Trader12

Other Acts binding the same actors

If a role above is yours, these are the other instruments that most often bind it.

Trader — also bound by 825 other Acts

What it requires

Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.

sch. 6 para. 2 sch. 6 para. 2 Regulated
  • Submit plans to the Agency for approval before starting non-excluded workTrader
sch. 6 para. 4 sch. 6 para. 4 Regulated
  • Construct harbour works per Agency approval, conditions and timelinesTrader
sch. 6 para. 5 sch. 6 para. 5 Regulated
  • Maintain drainage works affected by constructionTrader
sch. 6 para. 6 sch. 6 para. 6 Regulated
  • Remedy flood defence damage caused by port constructionTrader
sch. 6 para. 7 sch. 6 para. 7 Regulated
  • Repair damage to flood defence drainage caused by your worksTrader
sch. 6 para. 8 sch. 6 para. 8 Regulated
  • Prevent interruption of fish passage during constructionTrader
sch. 6 para. 9 sch. 6 para. 9 Regulated
  • Indemnify the Agency for costs of plan approval, inspection, and claims from specified damagesTrader
sch. 7 para. 2 sch. 7 para. 2 Regulated
  • Appoint a Retained Archaeologist and complete pre-construction archaeological work before buildingTrader
sch. 8 para. 3 sch. 8 para. 3 Regulated
  • Obtain and implement approved travel plan for port operationsTrader
sch. 8 para. 4 sch. 8 para. 4 Regulated
  • Implement Port Management Plan measures and comply with agreed requirementsTrader
s.art011 Provision against danger to navigation Regulated
  • Notify Trinity House and follow directions to prevent navigation dangerTrader
s.art015 Lights on tidal works during construction, etc. Regulated
  • Exhibit navigation lights on tidal works during construction when directedTrader
31 other provisions — procedural and definitional
sch. 6 para. 3 sch. 6 para. 3
sch. 7 para. 1 sch. 7 para. 1
sch. 7 para. 3 sch. 7 para. 3
sch. 7 para. 4 sch. 7 para. 4
sch. 8 para. 2 sch. 8 para. 2
s.art001 Citation and commencement
s.art002 Interpretation
s.art003 Power to construct,
s.art004 Subsidiary works
s.art005 Power to dredge the Severn Estuary
s.art006 Power to deviate
s.art007 Period for completion of works
s.art008 Works to be within the district of The City of Bristol
s.art009 Obstruction of works
s.art010 Tidal works not to be executed without approval of Secretary of State
s.art012 Abatement of works abandoned or decayed
s.art013 Survey of tidal works
s.art014 Permanent lights on tidal works
s.art016 Application of permitted development rights
s.art017 Extension of limits of jurisdiction for the purposes of pilotage
s.art018 Crown rights
s.art019 Saving for Trinity House
s.art020 For the protection of the Environment Agency
s.art021 For the protection of the Historic Environment
s.art022 For the protection of the Highways Agency
s.art023 Works to form part of the undertaking
s.art024 Application of byelaws
s.art025 Power to appropriate
s.art026 Defence to proceedings in respect of statutory nuisance
s.art027 Defence of due diligence
s.art028 Certification of plans

Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.