- Enforced by
- MMO
- Status
- Amended (in force with amendments)
- Penalty ceiling
- Prosecution 1 of 40 obligations carry a criminal penalty. 1 carries different penalties and 38 have no criminal penalty — flagged in the list below.
Does it bind you?
Business-side roles with duties under this instrument.
Applicant6
Director or Officer1
Any Person1
Plus 32 duties on the regulator, Crown ministers and public bodies — folded into the section list below.
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Applicant — also bound by 325 other Acts
Human Medicines Regulations 2012
42 duties
The Land Registration Rules 2003
25 duties
Regulation (EU) No 1178/2011 (Aircrew)
20 duties
Value Added Tax Regulations 1995
18 duties
Director or Officer — also bound by 482 other Acts
Insolvency (England and Wales) Rules 2016
162 duties
Companies Act 2006
126 duties
Insolvency Act 1986
77 duties
Building Societies Act 1986
32 duties
Any Person — also bound by 2684 other Acts
Human Medicines Regulations 2012
184 duties
Merchant Shipping Act 1995
144 duties
Insolvency (England and Wales) Rules 2016
104 duties
Communications Act 2003
92 duties
Road Traffic Act 1988
92 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
Part 1
INTRODUCTION
0 of 5 sections shown5 other sections in this Part — procedural and definitional
s.001
Title and commencement
s.001
Extent
s.002
Interpretation
s.002
Proposed activity which would otherwise be a regulated activity
s.003
Fees
Part 2
REGULATED ACTIVITY IN RELATION TO WHICH AN ENVIRONMENTAL IMPACT ASSESSMENT IS (OR MAY BE) REQUIRED
4 of 10 sections shown
s.004
Environmental impact assessment
Regulated
- Do not start marine works until EIA consent is grantedApplicant
s.007
Determination: Schedule A1 projects
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must require EIA for Schedule A1 marine projectsCrown / Minister / Government department
s.008
Determination: Schedule A2 projects
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must decide if Schedule A2 projects need EIAStatutory regulator
s.011
Screening opinions
Regulated
Other duties (1) — Crown / regulator
- Regulator must not process marine licence applications until EIA screening opinion issuedStatutory regulator
6 other sections in this Part — procedural and definitional
s.005
Requirement of assessment by agreement
s.006
Requirement of assessment by determination
s.009
Projects serving national defence purposes
s.009
Projects in response to a civil emergency
s.010
Exceptions
s.010
Further provisions in relation to Article 2(4) of the EIA Directive
Part 3
ENVIRONMENTAL IMPACT ASSESSMENTS
16 of 18 sections shown
s.012
Application for a regulatory approval in relation to a regulated activity
Regulated
- Submit environmental statement and supporting documents for marine works approvalApplicant
s.013
Scoping opinions
Regulated
Other duties (1) — Crown / regulator
- Regulator and appropriate authority must wait for full environmental statementStatutory regulator
s.014
Provision of further information
Regulated
Other duties (1) — Crown / regulator
- MMO must request further information in writing for environmental assessmentsStatutory regulator
s.015
Availability of information held by regulator
Regulated
Other duties (1) — Crown / regulator
- Regulator must share relevant environmental information with applicant on requestStatutory regulator
s.015
Co-ordination
Regulated
Other duties (1) — Crown / regulator
- Authority must coordinate EIA and Habitats/Wild Birds assessmentsStatutory regulator
s.016
Publicity
Regulated
- Marine works applicants must comply with publicity directions and provide inspection copiesApplicant
s.017
Consultation on proposed regulated activity
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must circulate consultation material or direct applicant to do soStatutory regulator
s.018
Provision of information to affected EEA States
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must send EIA details to affected EEA StatesCrown / Minister / Government department
s.020
Consultation of EEA States
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must consult affected EEA states on marine worksCrown / Minister / Government department
s.020
Projects in an EEA State likely to have significant transboundary effects
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must consult on transboundary EIA projectsStatutory regulator
s.021
Consideration of representations from the public
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must apply Schedule 5 to each public representationStatutory regulator
s.021
Conclusion about environmental impact
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must conclude on environmental effects before EIA consentStatutory regulator
s.022
The EIA consent decision
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must consider environmental impacts before issuing EIA consentStatutory regulator
s.023
Notification and publication of EIA consent decisions
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must notify and publish EIA consent decisionsStatutory regulator
s.024
Effect of EIA consent decision on application and regulatory decision
Regulated
Other duties (1) — Crown / regulator
- Regulator must decide marine works application in line with EIA consent and give reasonsStatutory regulator
s.024
Notification and publication of regulatory decisions
Regulated
Other duties (1) — Crown / regulator
- Regulator must send marine works EIA decisions to interested parties and publish themStatutory regulator
2 other sections in this Part — procedural and definitional
s.019
Provision of information to other EEA States
s.024
Fees in relation to the assessment etc. of the results of monitoring measures
Part 4
OFFENCES
2 of 3 sections shown
s.025
Provision of false etc information
Prosecution
- Provide false information to obtain marine EIA consentAny Person
Unlimited fine
s.026
Offences committed by bodies corporate
Regulated
- Officer liable for company's false information offenceDirector or Officer
1 other section in this Part — procedural and definitional
s.027
Offences committed by Scottish partnerships
Part 5
MISCELLANEOUS
1 of 4 sections shown
s.031
Review
Regulated
Other duties (1) — Crown / regulator
- Secretary of State must review Marine Works EIA Regulations and publish reportsCrown / Minister / Government department
3 other sections in this Part — procedural and definitional
s.028
Access to review procedure before a court
s.029
Revocation
s.030
Transitional and saving provisions
Schedules
Schedules
17 of 158 shown
s.sch002
Procedure for reaching a screening opinion
Regulated
- Provide further information when asked for a marine works screening opinionApplicant
s.sch002
Consultation
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must consult before issuing screening opinionStatutory regulator
s.sch002
Giving a screening opinion
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must give reasoned screening opinionStatutory regulator
s.sch002
Notification of a screening opinion
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must provide screening opinion within 90 daysCrown / Minister / Government department
s.sch002
Availability of screening opinions for inspection
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must publicise screening opinions and add to registerStatutory regulator
s.sch004
Information required where another application has been made
Regulated
- Notify authorities of other applications and provide environmental statements if requestedApplicant
s.sch004
Procedure for reaching a scoping opinion
Regulated
- Supply further information and copies requested for a scoping opinionApplicant
s.sch004
Matters to be considered in reaching a scoping opinion
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must consider listed factors when scoping marine worksStatutory regulator
s.sch004
Consultation
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must consult bodies before issuing scoping opinionStatutory regulator
s.sch004
Notification of a scoping opinion
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must send scoping opinion and reasons to applicant and consulteesStatutory regulator
s.sch004
Availability of scoping opinions for inspection
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must publicise scoping opinions on the public registerStatutory regulator
s.sch005
(1) In relation to each representation made pursuant to the...
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must consider whether EIA representations are admissibleStatutory regulator
s.sch005
(1) If the appropriate authority concludes in accordance with paragraph...
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must consider EIA representations and forward relevant concernsStatutory regulator
s.sch005
(1) If the appropriate authority concludes in accordance with paragraph...
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must consider arrangements to resolve representationsStatutory regulator
s.sch005
(1) If either— (a) the appropriate authority concludes in accordance...
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must take unresolved EIA representations into accountStatutory regulator
s.sch005
(1) If the appropriate authority instigates a local inquiry in...
Regulated
Other duties (1) — Crown / regulator
- MMO must run a fair local inquiry before deciding marine EIA consentStatutory regulator
s.sch005
(1) If the appropriate authority appoints a person to report...
Regulated
Other duties (1) — Crown / regulator
- Appropriate authority must notify parties and consider report before EIA consentCrown / Minister / Government department
141 other schedules
s.sch001
Characteristics of the project
s.sch001
Location of the project
s.sch001
Types and characteristics of the potential impact
s.sch002
Request for a screening opinion
s.sch002
Payment of a fee for a screening opinion
s.sch003
A description of the project and of the regulated activity,...
s.sch003
A non-technical summary of the information provided under paragraphs 1...
s.sch003
A reference list detailing the sources used for the descriptions...
s.sch003
A description of the reasonable alternatives (for example in terms...
s.sch003
A description of the relevant aspects of the current state...
s.sch003
A description of the factors specified in regulation 21A(2)(a) to...
s.sch003
A description of the likely significant effects of the project...
s.sch003
The description of the likely significant effects on the factors...
s.sch003
A description of the forecasting methods or evidence used to...
s.sch003
A description of the measures envisaged to avoid, prevent, reduce...
s.sch003
A description of the expected significant adverse effects of the...
s.sch004
Request for a scoping opinion
s.sch004
Payment of a fee for a scoping opinion
s.sch005
(1) Subsections (2) to (5) of section 250 (power to...
s.schedule a1 para.1
Crude‑oil refineries (excluding undertakings manufacturing only lubricants from crude‑oil) and...
s.schedule a1 para.10
Construction of lines for long‑distance railway traffic and of airports...
s.schedule a1 para.11
Construction of motorways and express roads.
s.schedule a1 para.12
Construction of a new road of four or more lanes,...
s.schedule a1 para.13
Inland waterways and ports for inland‑waterway traffic which permit the...
s.schedule a1 para.14
Trading ports, piers for loading and unloading connected to land...
s.schedule a1 para.15
Waste disposal installations for the incineration, chemical treatment (as defined...
s.schedule a1 para.16
Waste disposal installations for the incineration or chemical treatment (as...
s.schedule a1 para.17
Groundwater abstraction or artificial groundwater recharge schemes where the annual...
s.schedule a1 para.18
Works for the transfer of water resources, other than piped...
s.schedule a1 para.19
In all other cases, works for the transfer of water...
s.schedule a1 para.2
Thermal power stations and other combustion installations with a heat...
s.schedule a1 para.20
Waste water treatment plants with a capacity exceeding 150,000 population...
s.schedule a1 para.21
Extraction of petroleum and natural gas for commercial purposes where...
s.schedule a1 para.22
Dams and other installations designed for the holding back or...
s.schedule a1 para.23
Pipelines with a diameter of more than 800 millimetres and...
s.schedule a1 para.24
Installations for the intensive rearing of poultry or pigs with...
s.schedule a1 para.25
Industrial plants for— (a) the production of pulp from timber...
s.schedule a1 para.26
Quarries and open‑cast mining where the surface of the site...
s.schedule a1 para.27
Construction of overhead electrical power lines with a voltage of...
s.schedule a1 para.28
Installations for storage of petroleum, petrochemical or chemical products with...
s.schedule a1 para.29
Storage sites pursuant to Chapter 3 of Part 1 of...
s.schedule a1 para.3
Nuclear power stations and other nuclear reactors including the dismantling...
s.schedule a1 para.30
Installations for the capture of carbon dioxide streams for the...
s.schedule a1 para.31
Any change to or extension of project specified in this...
s.schedule a1 para.32
In this Schedule— “airport” means an airport which complies with...
s.schedule a1 para.4
Installations for the reprocessing of irradiated nuclear fuel.
s.schedule a1 para.5
Installations designed— (a) for the production or enrichment of nuclear...
s.schedule a1 para.6
Integrated works for the initial smelting of cast‑iron and steel....
s.schedule a1 para.7
Installations for the production of non‑ferrous crude metals from ore,...
s.schedule a1 para.8
Installations for the extraction of asbestos and for the processing...
s.schedule a1 para.9
Integrated chemical installations, that is to say, installations for the...
s.schedule a2 para.1
Agriculture, silviculture and aquaculture
s.schedule a2 para.10
Extraction of minerals by fluvial or marine dredging;
s.schedule a2 para.11
Deep drillings, in particular— (a) geothermal drilling;
s.schedule a2 para.12
Surface industrial installations for the extraction of coal, petroleum, natural...
s.schedule a2 para.13
Energy
s.schedule a2 para.14
Industrial installations for carrying gas, steam and hot water and...
s.schedule a2 para.15
Surface storage of natural gas.
s.schedule a2 para.16
Underground storage of combustible gases.
s.schedule a2 para.17
Surface storage of fossil fuels.
s.schedule a2 para.18
Industrial briquetting of coal and lignite.
s.schedule a2 para.19
Installations for the processing and storage of radioactive waste (unless...
s.schedule a2 para.2
Projects for the use of uncultivated land or semi-natural areas...
s.schedule a2 para.20
Installations for hydroelectric energy production.
s.schedule a2 para.21
Installations for the harnessing of wind power for energy production...
s.schedule a2 para.22
Installations for the capture of carbon dioxide streams for the...
s.schedule a2 para.23
Production and processing of metals
s.schedule a2 para.24
Installations for the processing of ferrous metals—
s.schedule a2 para.25
Ferrous metal foundries.
s.schedule a2 para.26
Installations for the smelting, including the alloyage, of non-ferrous metals,...
s.schedule a2 para.27
Installations for surface treatment of metals and plastic materials using...
s.schedule a2 para.28
Manufacture and assembly of motor vehicles and manufacture of motor...
s.schedule a2 para.29
Shipyards.
s.schedule a2 para.3
Water management projects for agriculture, including irrigation and land drainage...
s.schedule a2 para.30
Installations for the construction and repair of aircraft.
s.schedule a2 para.31
Manufacture of railway equipment.
s.schedule a2 para.32
Swaging by explosives.
s.schedule a2 para.33
Installations for the roasting and sintering of metallic ores.
s.schedule a2 para.34
Mineral industry
s.schedule a2 para.35
Installations for the manufacture of cement.
s.schedule a2 para.36
Installations for the production of asbestos and the manufacture of...
s.schedule a2 para.37
Installations for the manufacture of glass including glass fibre.
s.schedule a2 para.38
Installations for smelting mineral substances including the production of mineral...
s.schedule a2 para.39
Manufacture of ceramic products by burning, in particular roofing tiles,...
s.schedule a2 para.4
Initial afforestation and deforestation for the purposes of conversion to...
s.schedule a2 para.40
Chemical industry (unless included in Schedule A1)
s.schedule a2 para.41
Production of pesticides and pharmaceutical products, paint and varnishes, elastomers...
s.schedule a2 para.42
Storage facilities for petroleum, petrochemical and chemical products.
s.schedule a2 para.43
Food industry
s.schedule a2 para.44
Packing and canning of animal vegetable products.
s.schedule a2 para.45
Manufacture of dairy products.
s.schedule a2 para.46
Brewing and malting.
s.schedule a2 para.47
Confectionery and syrup manufacture.
s.schedule a2 para.48
Installations for the slaughter of animals.
s.schedule a2 para.49
Industrial starch manufacturing installations.
s.schedule a2 para.5
Intensive livestock installations (unless included in Schedule A1).
s.schedule a2 para.50
Fish-meal and fish-oil factories.
s.schedule a2 para.51
Sugar factories.
s.schedule a2 para.52
Textile, leather, wood and paper industries
s.schedule a2 para.53
Plants for the pre-treatment (operations such as washing, bleaching, mercerisation)...
s.schedule a2 para.54
Plants for the tanning of hides and skins.
s.schedule a2 para.55
Cellulose-processing and production installations.
s.schedule a2 para.56
Rubber industry
s.schedule a2 para.57
Infrastructure projects
s.schedule a2 para.58
Urban development projects, including the construction of shopping centres and...
s.schedule a2 para.59
Construction of intermodal transhipment facilities and of intermodal terminals (unless...
s.schedule a2 para.6
Intensive fish farming.
s.schedule a2 para.60
Construction of railways (unless included in Schedule A1).
s.schedule a2 para.61
Construction of airfields (unless included in Schedule A1).
s.schedule a2 para.62
Construction of roads (unless included in Schedule A1).
s.schedule a2 para.63
Construction of harbours and port installations including fishing harbours (unless...
s.schedule a2 para.64
Inland-waterway construction not included in Schedule A1, canalisation and flood-relief...
s.schedule a2 para.65
Dams and other installations designed to hold water or store...
s.schedule a2 para.66
Tramways, elevated and underground railways, suspended lines or similar lines...
s.schedule a2 para.67
Oil and gas pipeline installations and pipelines for the transport...
s.schedule a2 para.68
Installations of long-distance aqueducts.
s.schedule a2 para.69
Coastal work to combat erosion and maritime works capable of...
s.schedule a2 para.7
Reclamation of land from the sea.
s.schedule a2 para.70
Groundwater abstraction and artificial groundwater recharge schemes not included in...
s.schedule a2 para.71
Works for the transfer of water resources between river basins...
s.schedule a2 para.72
Motorway service areas.
s.schedule a2 para.73
Other projects
s.schedule a2 para.74
Installations for the disposal of waste (unless included in Schedule...
s.schedule a2 para.75
Waste-water treatment plants (unless included in Schedule A1).
s.schedule a2 para.76
Sludge-deposition sites.
s.schedule a2 para.77
Storage of scrap iron, including scrap vehicles.
s.schedule a2 para.78
Test benches for engines, turbines or reactors.
s.schedule a2 para.79
Installations for the manufacture of artificial mineral fibres.
s.schedule a2 para.8
Extractive industry
s.schedule a2 para.80
Installations for the recovery or destruction of explosive substances.
s.schedule a2 para.81
Knackers’ yards.
s.schedule a2 para.82
Tourism and leisure
s.schedule a2 para.83
Marinas.
s.schedule a2 para.84
Holiday villages and hotel complexes outside urban areas and associated...
s.schedule a2 para.85
Theme parks.
s.schedule a2 para.86
Permanent camp sites and caravan sites.
s.schedule a2 para.87
Golf courses and associated developments.
s.schedule a2 para.88
Changes and extensions
s.schedule a2 para.89
Any change to or extension of development of a description...
s.schedule a2 para.9
Underground mining.
s.schedule a2 para.90
Development of a description mentioned in Schedule A1 undertaken exclusively...
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.