- Status
- In Force
- Penalty ceiling
- Regulated
Does it bind you?
Business-side roles with duties under this instrument.
Operator1
Other Acts binding the same actors
If a role above is yours, these are the other instruments that most often bind it.
Operator — also bound by 746 other Acts
Regulation (EU) No 965/2012 (Air Operations)
203 duties
Space Industry Regulations 2021
76 duties
What it requires
Regulations creating concrete business duties or carrying penalties, grouped as the instrument is structured. Titles link to the source text — blue means you’re leaving for legislation.gov.uk.
12 other provisions — procedural and definitional
s.art001
Citation and commencement
s.art002
Interpretation
s.art003
Incorporation of Railways Clauses Consolidation Act
s.art004
Permanent stopping up of streets
s.art005
Agreement with the street authority
s.art006
Power to operate, use and maintain the new railway
s.art007
Maintenance of approved works
s.art008
Service of notices
s.art009
No double recovery
s.art010
Arbitration
s.art011
Provision of level crossings over new highway
s.art012
Provision for abandonment of redundant railway
Schedules
Schedules
1 of 14 shown
s.sch002
When one or other of the key switches mentioned in...
Regulated
- Follow safe crossing procedures: stop at stop boards, sound whistle, and do not proceed without white light or shunter directionOperator
13 other schedules
s.sch002
In this Schedule: (a) All references to a regulation are...
s.sch002
An advance warning board of standard railway design shall be...
s.sch002
In this Part— “class I retroreflecting material” is material which...
s.sch002
Visual indicators shall be provided in each primary control point....
s.sch002
The undertaker shall give notice in writing to the Secretary...
s.sch002
There shall be a road traffic light controller to provide...
s.sch002
A lamp which when illuminated shows a light signal of...
s.sch002
The road traffic light signal controller mentioned in paragraph 2...
s.sch002
The special phase mentioned in paragraph 4 above shall be...
s.sch002
There shall be a primary control point on each rail...
s.sch002
There shall be a secondary control point on each rail...
s.sch002
A driver’s indicator shall be provided on each railway approach...
s.sch002
A stop board of standard railway design displaying the words...
Duty extraction and severity labels are Guvnor’s analysis of the instrument, not the instrument itself. Always verify against the linked source text.